Search NASA⌕ Search

SEARCH · Search NASA

Results for “Human-Rating”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

NASA Ares I Crew Launch Vehicle Upper Stage Overview

By incorporating rigorous engineering practices, innovative manufacturing processes and test techniques, a unique multi-center government/contractor partnership, and a clean-sheet design developed around the primary requirements for the International Space Station (ISS) and Lunar missions, the Upper Stage Element of NASA's Crew Launch Vehicle (CLV), the "Ares I," is a vital part of the Constellation Program's transportation system. Constellation's exploration missions will include Ares I and Ares V launch vehicles required to place crew and cargo in low-Earth orbit (LEO), crew and cargo transportation systems required for human space travel, and transportation systems and scientific equipment required for human exploration of the Moon and Mars. Early Ares I configurations will support ISS re-supply missions. A self-supporting cylindrical structure, the Ares I Upper Stage will be approximately 84' long and 18' in diameter. The Upper Stage Element is being designed for increased supportability and increased reliability to meet human-rating requirements imposed by NASA standards. The design also incorporates state-of-the-art materials, hardware, design, and integrated logistics planning, thus facilitating a supportable, reliable, and operable system. With NASA retiring the Space Shuttle fleet in 2010, the success of the Ares I Project is essential to America's continued leadership in space. The first Ares I test flight, called Ares 1-X, is scheduled for 2009. Subsequent test flights will continue thereafter, with the first crewed flight of the Crew Exploration Vehicle (CEV), "Orion," planned for no later than 2015. Crew transportation to the ISS will follow within the same decade, and the first Lunar excursion is scheduled for the 2020 timeframe.

Davis, Daniel J.↗

Ares I First Stage: Powering Exploration

he mission of the National Aeronautics and Space Administration (NASA) is not simply to maintain its current position with the International Space Station and other space exploration endeavors, but to build a permanent outpost on the Moon and then travel on to explore ever more distant terrains. The Constellation Program will oversee the development of the crew capsule, launch vehicles, and other systems needed to achieve this mission. From this initiative will come two new launch vehicles: the Ares I and Ares V. The Ares I will be a human-rated vehicle, which will be used for crew transport; the Ares V, a cargo transport vehicle, will be the largest launch vehicle ever built. The Ares Projects team at Marshall Space Flight Center (MSFC) in Huntsville, Alabama is assigned with developing these two new vehicles. The Ares I vehicle will have an in-line, two-stage rocket configuration. The first stage will provide the thrust or propulsion component for the Ares rocket systems through the first two minutes of the mission. The First Stage Team is tasked with developing the propulsion system necessary to liftoff from the Earth and loft the entire Ares vehicle stack toward low-Earth orbit. Building on the legacy of the Space Shuttle and other NASA space exploration initiatives, the propulsion for the Ares I First Stage will be a Shuttle-derived reusable solid rocket motor. Progress to date by the First Stage Team has been robust and on schedule. This presentation provides an overview and update on the design and development of the Ares I First Stage Propulsion system.

Tiller, Bruce K.↗

The Ares I Crew Launch Vehicle: Human Space Access for the Moon and Beyond

The National Aeronautics and Space Administration (NASA)'s Constellation Program is depending on the Ares Projects to deliver the crew launch capabilities needed to send human explorers to the Moon and beyond. The Ares Projects continue to make progress toward design, component testing, and early flight testing of the Ares I crew launch vehicle (Figure 1), the United States first new human-rated launch vehicle in over 25 years. Ares I will provide the core space launch capabilities the United States needs to continue providing crew and cargo access to the International Space Station (ISS), maintaining the U.S. pioneering tradition as a spacefaring nation, and enabling cooperative international ventures to the Moon and beyond. This paper will discuss programmatic, design, fabrication, and testing progress toward building this new launch vehicle.

Cook, Stephen A.↗

Development and Testing of the Orion CEV Parachute Assembly System (CPAS)

The Crew Exploration Vehicle (CEV) is an element of the Constellation Program that includes launch vehicles, spacecraft, and ground systems needed to embark on a robust space exploration program. As an anchoring capability of the Constellation Program, the CEV shall be human-rated and will carry human crews and cargo from Earth into space and back again. Coupled with transfer stages, landing vehicles, and surface exploration systems, the CEV will serve as an essential component of the architecture that supports human voyages to the Moon and beyond. In addition, the CEV will be modified, as required, to support International Space Station (ISS) mission requirements for crewed and pressurized cargo configurations. Headed by Johnson Space Center (JSC), NASA selected Jacobs Engineering as the support contractor to manage the overall CEV Parachute Assembly System (CPAS) program development. Airborne Systems was chosen to develop the parachute system components. General Dynamics Ordnance and Tactical Systems (GD-OTS) was subcontracted to Airborne Systems to provide the mortar systems. Thus the CPAS development team of JSC, Jacobs, Airborne Systems and GD-OTS was formed. The CPAS team has completed the first phase, or Generation I, of the design, fabrication, and test plan. This paper presents an overview of the CPAS program including system requirements and the development of the second phase, known as the Engineering Development Unit (EDU) architecture. We also present top level results of the tests completed to date. A significant number of ground and flight tests have been completed since the last CPAS presentation at the 2007 AIAA ADS Conference.

Lichodziejewski, David↗

A Review of State-of-the-Art Separator Materials for Advanced Lithium-Based Batteries for Future Aerospace Missions

As NASA embarks on a renewed human presence in space, safe, human-rated, electrical energy storage and power generation technologies, which will be capable of demonstrating reliable performance in a variety of unique mission environments, will be required. To address the future performance and safety requirements for the energy storage technologies that will enhance and enable future NASA Constellation Program elements and other future aerospace missions, advanced rechargeable, lithium-ion battery technology development is being pursued with an emphasis on addressing performance technology gaps between state-of-the-art capabilities and critical future mission requirements. The material attributes and related performance of a lithium-ion cell's internal separator component are critical for achieving overall optimal performance, safety and reliability. This review provides an overview of the general types, material properties and the performance and safety characteristics of current separator materials employed in lithium-ion batteries, such as those materials that are being assessed and developed for future aerospace missions.

Bladwin, Richard S.↗

Ares I-X Flight Test--The Future Begins Here

In less than one year, the National Aeronautics and Space Administration (NASA) will launch the Ares I-X mission. This will be the first flight of the Ares I crew launch vehicle, which, together with the Ares V cargo launch vehicle, will send humans to the Moon and beyond. Personnel from the Ares I-X Mission Management Office (MMO) are finalizing designs and fabricating vehicle hardware for a 2009 launch. Ares I-X will be a suborbital development flight test that will gather critical data about the flight dynamics of the integrated launch vehicle stack; understand how to control its roll during flight; better characterize the severe stage separation environments that the upper stage engine will experience during future flights; and demonstrate the first stage recovery system. NASA also will modify the launch infrastructure and ground and mission operations. The Ares I-X Flight Test Vehicle (FTV) will incorporate flight and mockup hardware similar in mass and weight to the operational vehicle. It will be powered by a four-segment Solid Rocket Booster (SRB), which is currently in Shuttle inventory, and will include a fifth spacer segment and new forward structures to make the booster approximately the same size and weight as the five-segment SRB. The Ares I-X flight profile will closely approximate the flight conditions that the Ares I will experience through Mach 4.5, up to approximately 130,000 feet (39,600 meters (m)) and through maximum dynamic pressure ('Max Q') of approximately 800 pounds per square foot (38.3 kilopascals (kPa)). Data from the Ares I-X flight will support the Ares I Critical Design Review (CDR), scheduled for 2010. Work continues on Ares I-X design and hardware fabrication. All of the individual elements are undergoing CDRs, followed by a two-part integrated vehicle CDR in March and July 2008. The various hardware elements are on schedule to begin deliveries to Kennedy Space Center (KSC) in early September 2008. Ares I-X is the first step in the long journey to the Moon and farther destinations. This suborbital test will be NASA's first flight of a new human-rated launch vehicle in more than a generation. This promises to be an exciting time for NASA and the nation, as we reach for new goals in space exploration. A visual presentation is included.

Davis, Stephan R.↗

Ensuring Safe Exploration: Ares Launch Vehicle Integrated Vehicle Ground Vibration Testing

Ground vibration testing has been an integral tool for developing new launch vehicles throughout the space age. Several launch vehicles have been lost due to problems that would have been detected by early vibration testing, including Ariane 5, Delta III, and Falcon 1. NASA will leverage experience and testing hardware developed during the Saturn and Shuttle programs to perform ground vibration testing (GVT) on the Ares I crew launch vehicle and Ares V cargo launch vehicle stacks. NASA performed dynamic vehicle testing (DVT) for Saturn and mated vehicle ground vibration testing (MVGVT) for Shuttle at the Dynamic Test Stand (Test Stand 4550) at Marshall Space Flight Center (MSFC) in Huntsville, Alabama, and is now modifying that facility to support Ares I integrated vehicle ground vibration testing (IVGVT) beginning in 2012. The Ares IVGVT schedule shows most of its work being completed between 2010 and 2014. Integrated 2nd Stage Ares IVGVT will begin in 2012 and IVGVT of the entire Ares launch stack will begin in 2013. The IVGVT data is needed for the human-rated Orion launch vehicle's Design Certification Review (DCR) in early 2015. During the Apollo program, GVT detected several serious design concerns, which NASA was able to address before Saturn V flew, eliminating costly failures and potential losses of mission or crew. During the late 1970s, Test Stand 4550 was modified to support the four-body structure of the Space Shuttle. Vibration testing confirmed that the vehicle's mode shapes and frequencies were better than analytical models suggested, however, the testing also identified challenges with the rate gyro assemblies, which could have created flight instability and possibly resulted in loss of the vehicle. Today, NASA has begun modifying Test Stand 4550 to accommodate Ares I, including removing platforms needed for Shuttle testing and upgrading the dynamic test facilities to characterize the mode shapes and resonant frequencies of the vehicle. The IVGVT team expects to collect important information about the new launch vehicles, greatly increasing astronaut safety as NASA prepares to explore the Moon and beyond.

Tuma, M. L.↗

Testing Lunar Return Thermal Protection Systems using Sub-Scale Flight Test Vehicles

A key objective of NASA's Vision for Space Exploration is to revisit the lunar surface. Such an ambitious goal requires the development of a new human-rated spacecraft, the Orion Crew Exploration Vehicle (CEV), to ferry crews to low earth orbit and to the moon. The successful conclusion of both types of missions will require a thermal protection system (TPS) capable of protecting the vehicle and crew from the extreme heat of atmospheric reentry. As a part of the TPS development, various materials are being tested in arcjet tunnels; however, the combined lunar return aerothermal environment of high heat flux, shear stress, and surface pressure cannot be duplicated using only existing ground test facilities. To ensure full TPS qualification, a flight test program using sub-scale Orion capsules has been proposed to test TPS materials and heat shield construction techniques under the most stressing combination of lunar return aerothermal environments. Originally called Testing Of Reentry Capsule Heat Shield, or TORCH, but later renamed LEX, for Lunar Reentry Experiment, the proposed flight test program is presented along with the driving requirements and descriptions of the vehicle and the TPS instrumentation suite slated to conduct in-flight measurements.

heatshield↗

The Art and Science of Systems Engineering

The National Aeronautics and Space Administration (NASA) was established in 1958, and its Marshall Space Flight Center was founded in 1960, as space-related work was transferred from the Army Ballistic Missile Agency at Redstone Arsenal, where Marshall is located. With this heritage, Marshall contributes almost 50 years of systems engineering experience with human-rated launch vehicles and scientific spacecraft to fulfill NASA's mission exploration and discovery. These complex, highly specialized systems have provided vital platforms for expanding the knowledge base about Earth, the solar system, and cosmos; developing new technologies that also benefit life on Earth; and opening new frontiers for America's strategic space goals. From Mercury and Gemini, to Apollo and the Space Shuttle, Marshall's systems engineering expertise is an unsurpassed foundational competency for NASA and the nation. Current assignments comprise managing Space Shuttle Propulsion systems; developing environmental control and life support systems and coordinating science operations on the International Space Station; and a number of exploration-related responsibilities. These include managing and performing science missions, such as the Lunar Crater Observation and Sensing Satellite and the Lunar Reconnaissance Orbiter slated to launch for the Moon in April 2009, to developing the Ares I crew launch vehicle upper stage and integrating the vehicle stack in house, as well as designing the Ares V cargo launch vehicle and contributing to the development of the Altair Lunar Lander and an International Lunar Network with communications nodes and other infrastructure.

Singer, Christopher E.↗

Ares I Avionics Introduction

The Ares I is the next generation human-rated launcher for the United States Constellation program. This system is required to provide single fault tolerance within defined crew safety and mission reliability limits. As part of the effort to achieve those safety goals, Ares I includes an avionics subsystem built as a multistring, voting architecture. The avionics design draws upon experience gained from building fly-by-wire systems for Shuttle, X- 38, and Seawolf. Architectural drivers for the avionics design include using proven technologies with existing suppliers of space rated parts for critical functions (to reduce overall development risk), easing the software development effort by using an off-theshelf, DO-178B certifiable, ARINC-653 operating system in the main flight computers, minimizing mutual data and power connections that might lead to a common-mode hardware failure of the redundant avionics strings, and centralizing overall Ares I command & control within the Upper Stage.

Marchant, Christopher C.↗

Historic and Current Launcher Success Rates

This presentation reviews historic and current space launcher success rates from all nations with a mature launcher industry. Data from the 1950's through present day is reviewed for possible trends such as when in the launch timeline a failure occurred, which stages had the highest failure rate, overall launcher reliability, a decade by decade look at launcher reliability, when in a launchers history did failures occur, and the reliability of United States human-rated launchers. This information is useful in determining where launcher reliability can be improved and where additional measures for crew survival (i.e., Crew Escape systems) will have the greatest emphasis

Rust, Randy↗

Analysis and Test of a Proton Exchange Membrane Fuel Cell Power System for Space Power Applications

An effort is underway to develop a prototype Proton Exchange Membrane (PEM) Fuel Cell breadboard system for fuhlre space applications. This prototype will be used to develop a comprehensive design basis for a space-rated PEM fuel cell powerplant. The prototype system includes reactant pressure regulators, ejector-based reactant pumps, a 4-kW fuel cell stack and cooling system, and a passive, membranebased oxygen / water separator. A computer model is being developed concurrently to analytically predict fluid flow in the oxidant reactant system. Fuel cells have historically played an important role in human-rated spacecraft. The Gemini and Apollo spacecraft used fuel cells for vehicle electrical power. The Space Shuttle currently uses three Alkaline Fuel Cell Powerplants (AFCP) to generate all of the vehicle's 15-20kW electrical power. Engineers at the Johnson Space Center have leveraged off the development effort ongoing in the commercial arena to develop PEM fuel cel ls for terrestrial uses. The prototype design originated from efforts to develop a PEM fuel cell replacement for the current Space Shuttle AFCP' s. In order to improve on the life and an already excellent hi storical record of reliability and safety, three subsystems were focused on. These were the fuel cell stack itself, the reactant circulation devices, and reactant / product water separator. PEM fuel cell stack performance is already demonstrating the potential for greater than four times the useful life of the current Shuttle's AFCP. Reactant pumping for product water removal has historically been accomplished with mechanical pumps. Ejectors offer an effective means of reactant pumping as well as the potential for weight reduction, control simplification, and long life. Centrifugal water separation is used on the current AFCP. A passive, membrane-based water separator offers compatibility with the micro-gravity environment of space, and the potential for control simplification, elimination of moving parts in an oxygen environment, and long life. The prototype system has been assembled from components that have previously been tested and evaluated at the component level. Preliminary data obtained from tests performed with the prototype system, as well as other published data, has been used to validate the analytical component models. These components have been incorporated into an integrated oxidant fluid system model. Results obtained from both the performance tests and the analytical model are presented.

Vasquez, Arturo↗

Designing the Ares I Crew Launch Vehicle Upper Stage Element and Integrating the Stack at NASA's Marshall Space Flight Center

Fielding an integrated launch vehicle system entails many challenges, not the least of which is the fact that it has been over 30 years since the United States has developed a human-rated vehicle - the venerable Space Shuttle. Over time, whole generations of rocket scientists have passed through the aerospace community without the opportunity to perform such exacting, demanding, and rewarding work. However, with almost 50 years of experience leading the design, development, and end-to-end systems engineering and integration of complex launch vehicles, the National Aeronautics and Space Administration's (NASA's) Marshall Space Flight Center offers the in-house talent - both junior- and senior-level personnel - to shape a new national asset to meet the requirements for safe, reliable, and affordable space exploration solutions. The technical personnel are housed primarily in Marshall's Engineering Directorate and are matrixed into the programs and projects that reside at the rocket center. Fortunately, many Apollo-era and Shuttle engineers, as well as those who gained valuable hands-on experience in the 1990s by conducting technology demonstrator projects such as the Delta-Clipper Experimental Advanced, X-33, X-34, and X-37, as well as the short-lived Orbital Space Plane, work closely with industry partners to advance the nation's strategic capability for human access to space. The Ares Projects Office, resident at Marshall, is managing the design and development of America's new space fleet, including the Ares I, which will loft the Orion crew capsule for its first test flight in the 2013 timeframe, as well as the heavy-lift Ares V, which will round out the capability to leave low-Earth orbit once again, when it delivers the Altair lunar lander to orbit late next decade. This paper provides information about the approach to integrating the Ares I stack and designing the upper stage in house, using unique facilities and an expert workforce to revitalize the nation's space exploration resources.

Otte, Neil E.↗

Progress on Ares First Stage Propulsion

The mission of the National Aeronautics and Space Administration (NASA) is not simply to maintain its current position with the International Space Station and other space exploration endeavors, but to build a permanent outpost on the Moon and then travel on to explore ever more distant terrains. The Constellation Program will oversee the development of the crew capsule, launch vehicles, and other systems needed to achieve this mission. From this initiative will come two new launch vehicles: the Ares I and Ares V. The Ares I will be a human-rated vehicle, which will be used for crew transport; the Ares V, a cargo transport vehicle, will be the largest launch vehicle ever built. The Ares Projects team at Marshall Space Flight Center (MSFC) in Huntsville, Alabama is assigned with developing these two new vehicles. The Ares I vehicle will have an in-line, two-stage rocket configuration. The first stage will provide the thrust or propulsion component for the Ares rocket systems through the first two minutes of the mission. The First Stage Team is tasked with developing the propulsion system necessary to liftoff from the Earth and loft the entire Ares vehicle stack toward low-Earth orbit. Building on the legacy of the Space Shuttle and other NASA space exploration initiatives, the propulsion for the Ares I First Stage will be a Shuttle-derived reusable solid rocket motor. Progress to date by the First Stage Team has been robust and on schedule. This paper provides an update on the design and development of the Ares First Stage Propulsion system.

Priskos, Alex S.↗

Progress on Ares First Stage Propulsion

The mission of the National Aeronautics and Space Administration (NASA) is not simply to maintain its current position with the International Space Station and other space exploration endeavors, but to build a permanent outpost on the Moon and then travel on to explore ever more distant terrains. The Constellation Program will oversee the development of the crew capsule, launch vehicles, and other systems needed to achieve this mission. From this initiative will come two new launch vehicles: the Ares I and Ares V. The Ares I will be a human-rated vehicle, which will be used for crew transport; the Ares V, a cargo transport vehicle, will be the largest launch vehicle ever built. The Ares Projects team at Marshall Space Flight Center (MSFC) in Huntsville, Alabama is assigned with developing these two new vehicles. The Ares I vehicle will have an inline, two-stage rocket configuration. The first stage will provide the thrust or propulsion component for the Ares rocket systems through the first two minutes of the mission. The First Stage Team is tasked with developing the propulsion system necessary to liftoff from the Earth and loft the entire Ares vehicle stack toward low-Earth orbit. Building on the legacy of the Space Shuttle and other NASA space exploration initiatives, the propulsion for the Ares I First Stage will be a Shuttle-derived reusable solid rocket motor. Progress to date by the First Stage Team has been robust and on schedule. This paper provides an update on the design and development of the Ares First Stage Propulsion system. The presentation provides an overview of the information presented in the paper.

Priskos, Alex S.↗

Enabling Reliable, Fault-Tolerant Autonomous Lunar Habitats with High-Performance Spaceflight Computing

The lunar surface presents unfavorable constraints and harsh living conditions. To address these challenges, autonomous habitats will require complex integrated systems that combine advanced software, high-performance hardware, and cutting-edge sensors to ensure sustainability, safety, and operational efficiency. Consequently, maintaining a sustainable presence on the Moon requires reliable infrastructure and efficient development, precise monitoring, and utilization of resources within a lunar installation. These elements are essential not only to ensure that lunar settlement can be long-term, self-sustaining, and resource-efficient, but also to serve as a foundation for future missions and eventual human habitation on Mars. Humans are not native to the Moon; therefore, our survival and ability to thrive will depend on autonomous systems that can foster safety and resilience through high-availability architectures, graceful degradation, and highly fault-tolerant spaceflight hardware capable of continuing operation during failures. This requires advanced human-rated distributed systems architectures with specialized electronics, scalable capabilities, and an integrated design approach. Unlike current practices focused on short-term missions and regularly maintained components, permanent lunar compute systems must be designed for extended operations beyond mission durations. This paper explores the necessity of transitioning toward fault- tolerant, highly autonomous hardware systems designed for multi-year missions. It also identifies critical subsystems that require high levels of autonomy, supported by radiation-hardened processors and extreme thermal loads, which are essential to mitigate long-term degradation and ensure sustainable lunar habitation. Finally, the paper aligns with NASA’s identified Civil Space Shortfalls, particularly in high-performance onboard computing, advanced data acquisition, extreme-environment avionics, radiation monitoring and countermeasures, and autonomous health management. It proposes NASA’s new High-Performance Spaceflight Computing (HPSC) processor as a turnkey solution, delivering 100 times the performance-per-watt of legacy rad-hard CPUs and enabling onboard AI, edge computing, and fault-tolerant features essential for sustained lunar autonomy and beyond.

Sarkis S Mikaelian↗

Revisiting the Soyuz-1 Parachute Failure in the Context of Safety in the Modern Era

The Soyuz‑1 accident remains one of the most consequential parachute related failures in human spaceflight history and provides enduring lessons for modern Entry, Descent, and Landing (EDL) system design. Occurring during the height of the Cold War and the Space Race, the mission unfolded under extraordinary political and schedule pressure as the Soviet Union sought to maintain its early leadership in space achievements following the death of chief designer Sergei Korolev. Despite unresolved propulsion, electrical, and parachute system deficiencies, Soyuz‑1 proceeded to launch and immediately encountered critical inflight anomalies, including a failed solar panel deployment, attitude control issues, and communication dropouts. Upon reentry, a malfunction in the parachute system, driven by a primary main canopy that failed to deploy, and subsequent entanglement of the reserve main canopy with the primary drogue parachute, resulted in insufficient deceleration and the fatal crash of cosmonaut Vladimir Komarov. Subsequent investigations revealed deep rooted cultural and organizational issues within the Soviet space program, including inadequate testing, suppression of dissent, undocumented last minute design changes, and the absence of integrated parachute system verification. More than 200 design flaws were identified after the accident, and firsthand accounts, including those from Yuri Gagarin, highlighted widespread concern prior to launch. Over time, the Soviet program implemented substantial reforms: systematic design corrections, rigorous process documentation, and an extensive series of drop tests that ultimately transformed the Soyuz system into one of the world’s most reliable human-rated return vehicles. This paper examines the technical architecture of the Soyuz‑1 parachute system, reconstructs the likely deployment sequence and failure mechanism, and analyzes the cultural contributors that shaped the accident. The study draws parallels to modern spacecraft parachute development, emphasizing the critical importance of integrated system testing, transparent engineering culture, and continuous hardware surveillance. These lessons remain directly relevant to today’s NASA and Commercial Crew Programs (CCP), where the Government continues to refine its understanding of aggregate risk and strengthen overall astronaut safety in the face of increasingly complex parachute systems.

Aaron L Morris↗

Overview of Past and Future EVA Suit Testing and Training in Chamber B at NASA JSC

The Crew and Thermal System Division’s Chamber B has received an increase in demand for next generation suit testing. Chamber B is the National Aeronautics and Space Administration (NASA) Johnson Space Center’s only human-rated thermal vacuum (TVAC) chamber. Historically it was used in Gemini, Apollo, Skylab, Shuttle, and the International Space Station (ISS) suit tests. Recently, the chamber has been returned to service with new capabilities for suit testing. In 2023, The Exploration Extravehicular Mobility Unit (xEMU) underwent a 5-day, extensive thermal vacuum test that included both a full-bodied Exploration Pressure Garment Suit (xPGS) as well as a high fidelity Short xEMU. SpaceX has also used the chamber for human-in-the-loop (HITL) qualification and acceptance testing on their flight Polaris Dawn suits for the first-ever commercial extravehicular activity (EVA). Current chamber Manlock B2 upgrades include the support of two test subjects at the same time with updated chamber interface and support systems for the next generation of suits. This paper will discuss the history of spacesuit testing in the chamber, the recent testing for commercial and NASA suits, and upgrades to accommodate new test requirements.

Polaris Dawn↗