Search NASA⌕ Search

SEARCH · Search NASA

Results for “IDAHO NATIONAL LABORATORY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

International Governmental Collaboration on Best Practice in Aging Infrastructure Management - 18027

Legacy nuclear sites in the US, UK and Canada are all facing a similar challenge of completing their operational and cleanup missions in parallel in a safe, efficient and cost-effective manner. Compounding the challenge is the fact that many important facilities are old with a significant level of deferred maintenance/capital needs, resulting in the need for a strategic approach to infrastructure management to ensure that maintenance and capital funding is directed at the highest priority items and that neither operations nor ongoing Decontamination and Decommissioning (D and D) activities are compromised. To help address this challenge, a Technical Information Exchange meeting was held in Ottawa, Canada in early June 2017 which brought together responsible parties from; - Government agencies including the UK Nuclear Decommissioning Authority (NDA), US Department of Energy Environmental Management (DOE EM), US National Nuclear Security Administration (NNSA), Atomic Energy of Canada Ltd (AECL) and Canadian Department of Defense - Implementers and other Government entities including Savannah River National Laboratory, Idaho National Laboratory and Canadian Nuclear Laboratories (CNL) - Associations including representation on behalf of the Institute of Asset Management and; - Contractors including Mission Support Alliance, Mott McDonald, and Longenecker and Associates The objective of this meeting was to share information about respective 'best practices' and to begin to develop common approaches to the prioritization and management of aging infrastructure investment across the organizations. The exchange focused on identifying common critical issues which were discussed through a series of presentations and small group discussions. The outcome from the meeting was an improved understanding by all participants of the latest approaches being applied to Infrastructure Asset Management and the formation of four International Working Groups which now meet on a regular (4-6 week) basis to share lessons learned and to develop international best practice in their area of interest. This paper details; - the issues and challenges that were identified during the meeting - how these were assimilated and distilled into discrete areas to enable formation of specific Working Groups - progress made by the Working Groups to date. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Testing and certification of the SAVY 4000 nuclear material container for DOT Type A liquid transport - 15636

Los Alamos National Laboratory has contracted with Nuclear Filter Technology, Inc. to perform testing and certification of the SAVY 4000 container for DOT Type A liquid transport. The container was originally designed to meet DOE M441.1-1 requirements for safe storage of nuclear material, and it is currently being used for storage at Los Alamos National Laboratory, Livermore National Laboratory, Idaho National Laboratory and Nevada National Security Site. The SAVY 4000 container is manufactured from 316L stainless steel in a range of sizes from 1 quart to 10 gallon capacity, it can be opened and closed easily by hand, it is sealed with a Viton{sup R} O-Ring, and the filter retains particulates and resists liquid water entry while allowing hydrogen gas to escape. Finite element analysis has been used to guide the development of a testing regime that includes a 30 foot drop, bar penetration, vibration, water spray and stacking for the 5 quart capacity container. The results of the tests will be compared with the finite element analysis to validate the model. The validated model is being used to extend the Type A certification to the other container sizes. This poster will describe the results of the Type A liquid testing, the finite element analysis, and the benefits of broadening the use and versatility of the container. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2016 Idaho National Laboratory Water Use Report and Comprehensive Well Inventory (Revision 25)

This 2016 Idaho National Laboratory Water Use Report and Comprehensive Well Inventory (Revision 25) provides water use information for production and potable water wells at the Idaho National Laboratory Site for Calendar Year 2016. It also provides detailed information for new, modified, and decommissioned wells. Four new wells were drilled and completed in Calendar Year 2016. Five storm water injection wells were decommissioned in Calendar Year 2016. Detailed construction and decommissioning information and location maps for the wells are provided. This report is being submitted in accordance with the Water Rights Agreement between the State of Idaho and the United States, for the United States Department of Energy (dated 1990), the subsequent Partial Decree for Water Right 34-10901 issued June 20, 2003, and the Final Unified Decree issued August 26, 2014.

2016 Water Use Report and Comprehensive Well Inven↗

2020 Idaho National Laboratory Water Use Report and Comprehensive Well Inventory (Rev. 29)

This 2020 Idaho National Laboratory Water Use Report and Comprehensive Well Inventory (Revision 29) provides water use information for production and potable water wells at the Idaho National Laboratory (INL) Site for calendar year 2020. It also provides detailed information for new, modified, and decommissioned wells Two new wells (TRA-2317 and USGS-150) were drilled in 2019 and are included in this report. One well (USGS-147) was modified in 2020. The location maps and detailed construction diagrams are provided.in the appendix. Fifty-six monitoring wells and boreholes were abandoned (decommissioned) in calendar year 2020. The location maps and construction diagrams, if available, for the decommissioned monitoring wells and boreholes are provided in the appendix. This report is being submitted in accordance with the Water Rights Agreement between the State of Idaho and the United States, for the United States Department of Energy (dated 1990), the subsequent Partial Decree for Water Right 34-10901 issued June 20, 2003, and the Final Unified Decree issued August 26, 2014.

99 GENERAL AND MISCELLANEOUS↗

SPC-71260 Rev 0 MARVEL Heat Extraction Subsystem Secondary Coolant Equipment (SCE) Design/Build

A. The Microreactor Applications Research Validation and Evaluation (MARVEL) reactor will offer experimental capabilities that are not currently available at DOE’s national laboratories. Idaho National Laboratory (INL), operated for the U.S. Department of Energy (DOE) by Battelle Energy Alliance, LLC (BEA) (Contractor hereafter) is procuring services for the design, analysis, fabrication, testing and delivery of a Secondary Coolant Equipment system (SCE). This specification contains the requirements for design, analysis, fabrication, testing and delivery of the SCE as described herein. The MARVEL reactor is a microreactor which uses eutectic sodium-potassium alloy (NaK) as a primary coolant. The primary coolant is circulated through four primary loops by natural convection of the coolant. In each loop is a closed well which will accommodate an intermediate heat exchanger (IHX) for extracting heat from the loop. These wells will be referred to in this specification as the “IHX wells.” It is intended for the IHX containment to also be filled with NaK. The MARVEL design team has determined that a Heat Extraction System (HES) using pumped NaK will be used to extract heat from the IHXs and deliver it to a downstream system for power generation or alternate process heat users. This Heat Extraction System will enable MARVEL operations including the ability to test, demonstrate, and address issues related to installation, startup, and operations. In addition, it will allow down-stream utilization of process heat for various uses. The objective of this specification is to develop the final design for the HES Secondary Coolant Equipment system (SCE) that will be used as the core of the HES. This system provides control of the NaK circulation between the MARVEL reactor and the subsequent process heat utilization systems. It does not include design of the Intermediate Heat Exchangers and piping inside the T-REXc pit in which the reactor is located. B. The MARVEL microreactor will be installed in the Transient Reactor Test Facility (TREAT) building in the Transient Reactor Test (TREAT) Micro-Reactor Experiment Cell (T-REXc) C. An INL Subcontractor has developed a conceptual design for this system per SPC-71145, referred to in that specification as the Process Heat Extraction System. SPC-71260 is based on the pumped NaK loop concept developed under SPC-71145. D. The SCE system design and (as option scope) fabrication shall be provided by the awardee of the subcontract (Subcontractor hereafter) pertaining to this Specification. Prior to shipment, the SCE will be fabricated, assembled, and tested at the Subcontractor’s facility. After successful completion of acceptance testing, the SCE and associated equipment will be shipped to the Materials and Fuels Complex (MFC) at the INL (Contractor’s Facility hereafter) to be installed by others in TREAT/T-REXc.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Safety Analysis Challenges With Restart of the Idaho National Laboratory (INL) Transient Reactor Test (TREAT) Facility

Safety Analysis Challenges With Restart of the Idaho National Laboratory Transient Reactor Test (TREAT) Facility Dr. James Parry David Broussard Anthony LaPorta Douglas Gerstner Battelle Energy Alliance Idaho National Laboratory P.O. Box 1625/MS6194 Idaho Falls, ID 83415 The Transient Reactor Test Facility, commonly referred to as TREAT, is an air-cooled, thermal spectrum test reactor facility designed to: • Induce intense fission heating in the nuclear fuel being tested. • Test nuclear reactor fuels under severe reactor-accident conditions. • Study fuel meltdowns, metal-water reactions, interactions between overheated fuel and coolant, and the transient behavior of fuels for high-temperature systems. • Provide nondestructive test data through neutron radiography of fuel samples. • Allow for the detailed monitoring of the experiments during the test. TREAT was specifically designed to test prototypic-sized reactor fuel pins and bundles under transient power conditions. During its 35 year operating history, it conducted thousands of transient experiments. Today, these capabilities are required for predicting safety margins for next generation fuels and advanced reactor design safety. Even though TREAT has not operated since 1994, return to operable conditions and resumption of testing will occur in FY 2018. This paper discusses the unique challenges with performing and documenting the safety analyses that demonstrate that the TREAT restart may be performed safely. This includes a discussion of 1) the TREAT capability, design, and operations, 2) identification of the format and content of the required safety basis document changes, and 3) demonstration that the consequences of potential accidents during TREAT operations meet the consequence guidelines.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

2010 Idaho National Laboratory Water Use Report and Comprehensive Well Inventory (Revision 19)

This 2010 Idaho National Laboratory Water Use Report and Comprehensive Well Inventory (Revision 19) provides water use information (monthly annual average and total annual volume) for production and potable water wells at the Idaho National Laboratory for Calendar Year 2010. It also provides detailed information for new, modified, and abandoned (decommissioned) wells and holes. Five new wells were drilled and completed in the latter part of Calendar Years 2009 and 2010. Two wells were modified in Calendar Year 2010 and 66 wells and boreholes reported as abandoned (decommissioned). Detailed construction information for the new and modified wells, along with abandonment information for older wells, is provided. Location maps are provided if survey information was available. This report is being submitted in accordance with the Water Rights Agreement between the State of Idaho and the United States, for the United States Department of Energy (dated 1990) and the subsequent Partial Decree for Water Right 34-10901 issued June 20, 2003.

99 GENERAL AND MISCELLANEOUS↗

2012 Idaho National Laboratory Water Use Report and Comprehensive Well Inventory (Revision 21)

This 2012 Idaho National Laboratory Water Use Report and Comprehensive Well Inventory (Revision 21) provides water use information (monthly annual average and total annual volume) for production and potable water wells at the Idaho National Laboratory for Calendar Year 2012. It also provides detailed information for new, modified, and abandoned (decommissioned) wells and holes. Three new wells were drilled and completed in Calendar Year 2012. Two wells, RWMC-GAS-V-078 and USGS-092 were modified. No wells or holes were decommissioned. Detailed construction information for the new and modified wells is provided. Location maps are included, provided survey information was available.

99 GENERAL AND MISCELLANEOUS↗

Evaluation of Sedimentary Structure Near the Advanced Test Reactor Complex at the Idaho National Laboratory

An analysis of relevant sediment stratigraphy near Idaho National Laboratory’s Advanced Test Reactor Complex in support of the proposed remote-handled low-level waste disposal facility is presented. The scope of analysis includes a geostatistical evaluation of sedimentary interbed top elevations and thicknesses compiled for wells near the Advanced Test Reactor Complex from land surface to the elevation of the water table. It also includes an evaluation of expected sediment texture and composition based on information contained in existing reports. Finally, based on this analysis, recommendations for characterization well spacing and appropriate transport model dimensionality are made.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

OVERVIEW OF RECENT PU-238 PRODUCTION ACTIVITIES AT IDAHO NATIONAL LABORATORY

The Plutonium Fuel Services (PFS) program at Idaho National Laboratory (INL) is active in the qualification of irradiation targets containing Np-237 for irradiation in the Advanced Test Reactor (ATR) to produce Pu-238 for future NASA missions. INL qualified and loaded 7 targets in ATR’s South Flux Trap (SFT) for cycle 169A, which occurred in Spring 2021. This program was reinitiated after two baseline production targets in three positions validated significant production of Pu-238 [ref.1]. The validation model was followed by the PFS-1 experimental test in the ATRC (Critical) facility [ref.2]. This paper outlines the progress and status of the PFS program. The qualification effort, safety analysis, hardware status, and future activities for qualification of an updated target design for use in the ATR will be discussed.

36 MATERIALS SCIENCE↗

Idaho National Laboratory CY 2024 National Emission Standards for Hazardous Air Pollutants Analysis, Methodology, and Results for Radionuclides

This report documents the methodology and results for calculating the effective dose equivalent (EDE) to the maximally exposed individual (MEI) from atmospheric radionuclide emissions from Idaho National Laboratory (INL) sources in Calendar Year (CY) 2024. The calculations were performed in accordance with requirements in Code of Federal Regulations (CFR), Title 40, “Protection of the Environment,” Part 61, “National Emission Standards for Hazardous Air Pollutants (NESHAPs),” Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” (40 CFR 61, Subpart H). UDFs were calculated using the computer model CAP88-PC for unit (1 Ci/yr) emission rates at INL Site facilities and INL in-town (Idaho Falls) facilities and stored in Microsoft Access databases. The UDFs—in this case, mrem/Ci—were then combined with radionuclide-specific release (emission) rates for each facility-specific source to compute doses at predetermined public receptor locations, including the MEI locations. This report contains the dose results and a description of the methodology and tools used to compute the doses.

07 - ISOTOPES AND RADIATION SOURCES↗

Idaho National Laboratory’s Mobile Hot Cell Transportation: Engineering Solutions for Global Disused Sealed Radioactive Sources.

Title: Idaho National Laboratory’s Mobile Hot Cell Transportation: Engineering Solutions for Global Disused Sealed Radioactive Sources. Abstract: The Mobile Hot Cell (MHC), currently under development by Idaho National Laboratory (INL) for the Off-Site Source Recovery Project (OSRP), is designed to help international partners meet the unique challenges of end-of-life radioactive material management. The MHC will provide a critical resource for countries that require assistance securing and disposing of Disused Sealed Radioactive Sources (DSRS) and orphaned sources in challenging environments, allowing these sources to be secured against misuse and nefarious activities. The MHC is a rapidly deployable system for conditioning and preparing end-of-life radioactive sources for transportation or storage. It is designed to handle sources of up to 1,000 Ci Co-60 equivalent while maintaining full radiological and biological containment. It will be deployable within 48 hours of an alert, making it ideal for emergency situations. The MHC features an operational suite for control, support racks for electronics, pneumatics, and welding systems, and a modular robust steel structure providing radiological shielding and internal robotic support. This design allows configurations for multiple device types to be conditioned and the ability to safely manage routine issues such as leaking or damaged sources. The MHC has been designed with the transportation challenges of rapid deployment to difficult environments in mind. The system weighs approximately 150,000 pounds, with individual systems breaking down into pieces not exceeding 20,000 pounds. Components are to be transportable on standard 20ft ISO containers, with shielding shells on 20ft flat racks. It is estimated that a total of eight containers and flat racks will be required. The use of 20ft containers, as opposed to 40ft containers, minimizes the impact on less developed road infrastructures, enabling the MHC to be positioned in constrained environments such as hospital parking lots. The system’s modularity also allows for deployment using smaller equipment, such as a 10-ton boom truck or forklift, which is crucial given the potential logistical challenges in different countries. This transportation strategy, evaluated in collaboration with Utah State University, ensures the MHC can be deployed via ground, rail, sea, or air, addressing the primary concern of international transport logistics.

99 - GENERAL AND MISCELLANEOUS↗

Idaho National Laboratory Cultural Resource Management Office FY 2010 Activity Report

The Idaho National Laboratory (INL) Site is home to vast numbers and a wide variety of important cultural resources representing at least a 13,500 year span of human land use in the region. As a federal agency, the Department of Energy, Idaho Operations Office (DOE-ID) has legal responsibility for the management and protection of the resources and has contracted these responsibilities to Battelle Energy Alliance (BEA). The BEA professional staff is committed to maintaining a cultural resource management program that accepts the challenge of preserving INL cultural resources in a manner reflecting their importance in local, regional, and national history. This report summarizes activities performed by the INL Cultural Resource Management Office (CRMO) staff during fiscal year 2010. This work is diverse, far-reaching and though generally confined to INL cultural resource compliance, also includes a myriad of professional and voluntary community activities. This document is intended to be informative to both internal and external stakeholders and to serve as a planning tool for future INL cultural resource management work.

54 ENVIRONMENTAL SCIENCES↗

Idaho National Laboratory Cultural Resource Management Annual Report FY 2007

The Idaho National Laboratory (INL) Site is home to vast numbers and a wide variety of important cultural resources representing at least a 13,500-year span of human land use in the region. As a federal agency, the Department of Energy Idaho Operations Office has legal responsibility for the management and protection of those resources and has delegated these responsibilities to its primary contractor, Battelle Energy Alliance (BEA). The BEA professional staff is committed to maintaining a cultural resource management program that accepts these challenges in a manner reflecting the resources’ importance in local, regional, and national history. This annual report summarizes activities performed by the INL Cultural Resource Management Office (CRMO) staff during fiscal year 2007. This work is diverse, far-reaching and though generally confined to INL cultural resource compliance, also includes a myriad of professional and voluntary community activities. This document is intended to be both informative to internal and external stakeholders, and to serve as a planning tool for future cultural resource management work to be conducted on the INL.

54 ENVIRONMENTAL SCIENCES↗

Idaho National Laboratory Integrated Safety Management System 2011 Effectiveness Review and Declaration Report

Idaho National Laboratory (INL) performed an annual Integrated Safety Management System (ISMS) effectiveness review per 48 Code of Federal Regulations (CFR) 970.5223-1, 'Integration of Environment, Safety and Health into Work Planning and Execution.' The annual review assessed Integrated Safety Management (ISM) effectiveness, provided feedback to maintain system integrity, and helped identify target areas for focused improvements and assessments for fiscal year (FY) 2012. The information presented in this review of FY 2011 shows that the INL has performed many corrective actions and improvement activities, which are starting to show some of the desired results. These corrective actions and improvement activities will continue to help change culture that will lead to better implementation of defined programs, resulting in moving the Laboratory's performance from the categorization of 'Needs Improvement' to the desired results of 'Effective Performance.'

99 GENERAL AND MISCELLANEOUS↗

Generalized Test Plan for the Vitrification of Simulated High-Level-Waste Calcine in the Idaho National Laboratory‘s Bench-Scale Cold Crucible Induction Melter

This Preliminary Idaho National Laboratory (INL) Test Plan outlines the chronological steps required to initially evaluate the validity of vitrifying INL surrogate (cold) High-Level-Waste (HLW) solid particulate calcine in INL's Cold Crucible Induction Melter (CCIM). Its documentation and publication satisfies interim milestone WP-413-INL-01 of the DOE-EM (via the Office of River Protection) sponsored work package, WP 4.1.3, entitled 'Improved Vitrification' The primary goal of the proposed CCIM testing is to initiate efforts to identify an efficient and effective back-up and risk adverse technology for treating the actual HLW calcine stored at the INL. The calcine's treatment must be completed by 2035 as dictated by a State of Idaho Consent Order. A final report on this surrogate/calcine test in the CCIM will be issued in May 2012-pending next fiscal year funding In particular the plan provides; (1) distinct test objectives, (2) a description of the purpose and scope of planned university contracted pre-screening tests required to optimize the CCIM glass/surrogate calcine formulation, (3) a listing of necessary CCIM equipment modifications and corresponding work control document changes necessary to feed a solid particulate to the CCIM, (4) a description of the class of calcine that will be represented by the surrogate, and (5) a tentative tabulation of the anticipated CCIM testing conditions, testing parameters, sampling requirements and analytical tests. Key FY -11 milestones associated with this CCIM testing effort are also provided. The CCIM test run is scheduled to be conducted in February of 2012 and will involve testing with a surrogate HLW calcine representative of only 13% of the 4,000 m3 of 'hot' calcine residing in 6 INL Bin Sets. The remaining classes of calcine will have to be eventually tested in the CCIM if an operational scale CCIM is to be a feasible option for the actual INL HLW calcine. This remaining calcine's make-up is HLW containing relatively high concentrations of zirconium and aluminum, representative of the cladding material of the reprocessed fuel that generated the calcine. A separate study to define the CCIM testing needs of these other calcine classifications in currently being prepared under a separate work package (WP-0) and will be provided as a milestone report at the end of this fiscal year.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Recent 238 Pu Production Activities at Idaho National Laboratory

The Plutonium-238 ( 238 Pu) Production program at Idaho National Laboratory (INL) is actively qualifying irradiation targets containing 237 Np for the Advanced Test Reactor (ATR) to produce 238 Pu for future National Aeronautics and Space Administration missions. INL qualified and loaded seven targets in the ATR’s south flux trap for cycle 169A, which occurred in Spring 2021. The irradiation qualification program has expanded to additional ATR irradiation positions after two baseline production targets in three positions validated significant production of 238 Pu. The validation model was followed by the PFS-1 experimental test in the ATR Critical Facility that verified 238 Pu production cross sections. This paper outlines the progress and status of the 238 Pu production program at INL. The qualification effort, safety analysis, hardware status, and future activities for qualification of an updated target design for use in the ATR are discussed.

07 ISOTOPE AND RADIATION SOURCES↗

Idaho National Laboratory 2013-2022 Ten-Year Site Plan

The Idaho National Laboratory (INL) Ten-Year Site Plan (TYSP) describes the strategy for accomplishing the long-term objective of transforming the laboratory to meet Department of Energy (DOE) national nuclear research and development (R&D) goals, as outlined in DOE strategic plans. The plan links R&D mission goals and INL core capabilities with infrastructure requirements (single- and multi-program), establishs the 10-year end-state vision for INL complexes, and identifies and prioritizes infrastructure needs and capability gaps. The TYSP serves as the basis for documenting and justifying infrastructure investments proposed as part of the FY 2013 budget formulation process.

99 GENERAL AND MISCELLANEOUS↗