An Update On Waste Control Specialists' 2004 License Application For Safe Disposal Of Class A, B, and C Low-Level Radioactive Waste In Texas

On December 10, 2007, Waste Control Specialists LLC (WCS) received notification that the Executive Director of the Texas Commission on Environmental Quality (TCEQ) had prepared an interim draft license and made a preliminary decision that it met all statutory and regulatory requirements for safe disposal of low-level radioactive waste (LLW) at the WCS' site in Texas. Pursuant to this interim draft license, WCS will be authorized to dispose Class A, B, and C LLW in two enhanced near-surface landfills at WCS' 5.4-square-kilometer (1,338-acre) treatment, storage, and disposal (TSD) site in Andrews County, Texas (Fig. 1). One landfill will be dedicated to LLW generated within the member/party states of the Texas Compact (Texas and Vermont), while the other will be dedicated to LLW generated by the federal government. The calculated annual peak dose to the maximally exposed member of the general public, i.e., an adjacent resident, from any of the proposed LLW-disposal landfills occurs approximately 36,400 years after closure and is 0.034 milli-sievert (mSv) (3.4 milli-rem (mrem)), which is less than 14 percent of the applicable regulatory limit of 25 mSv (25 mrem). The draft license will be published in February 2008, which will be followed by 12 months of public hearings, and three months for preparation of the final license. Based on this schedule, the final license is due in May 2009. When opened, the WCS site will achieve a national milestone; it will be the first new Compact LLW-disposal site in the USA to open under the Low-Level Radioactive Waste Policy Act of 1980, as amended in 1985. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Strategic Benefit of Self Shielded Boxes for Storage and Disposal of Metallic Uranic Material-18141

Sellafield Ltd, on behalf of the Nuclear Decommissioning Authority (NDA), is responsible for the management of a number of facilities whose inventories include a range of metallic uranic material. Additional fuel and fuel bearing materials exist in the NDA estate, some of which are similar to the Sellafield-managed inventory and others present different management challenges. Whilst UK Government policy directs that some of these materials are assets and are therefore managed with eventual future use in mind, there remains a large quantity of material, principally either out-of-scope for reprocessing or which derives from legacy facilities, which is likely to be disposed of to a future Geological Disposal Facility (GDF). The majority of this material is stored under wet conditions to facilitate dose shielding and heat dissipation and will therefore require removal from wet storage, consolidation and conditioning, prior to transfer to GDF. In order to accelerate high hazard and risk reduction by sooner retrieval of legacy material from wetted storage, one of the legacy storage facilities has led technical work to develop the design of Self Shielded Boxes (SSBs) and to substantiate their use for interim storage of the materials in question. Use of the SSBs would represent a change of strategy on the Sellafield Site: historically, timescales for retrieval of material have been reliant upon a waste treatment and storage/disposal route being available. SSBs provide the opportunity to retrieve uranic materials from aging legacy storage facilities for immediate buffer storage, by decoupling the timing of retrieval from the availability of an onward route. An understanding was required of the scope for defining optimal routes for each metallic uranic fuel and fuel bearing material group for safe transport and storage commensurate with current final disposal assumptions and risks, taking into account international best practice. A study is underway to understand options for transfer of material into SSBs, buffer/interim storage locations, treatment/conditioning processes and transport to the GDF. This work forms the basis of a prioritised road-map for the development of routes for study material groups aligned with ongoing and existing planned technical work, which is a pre-requisite to strategy development. The ultimate output of the study will be identification of full life cycle management strategies for metallic uranic material from an enterprise perspective. The combination of this strategic work and ongoing technical work will underpin a series of decisions to divert sub-groups of uranic material away from currently assumed baseline routes in support of earliest practicable hazard and risk reduction. Hence, each decision will reduce the scope of a placeholder future uranic fuel treatment capability, which will diminish the associated British Pound 1 bn capital cost. To date, a technical case for interim storage of uranic material in SSBs has been substantiated for around two thirds of the study materials. The requirement for a new strategy at Sellafield was driven by technical development of SSBs in response to the needs of one programme, but this prompted the study into the potential utilisation of SSBs in order to derive benefit for the wider enterprise and across the NDA estate. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CENTRAL STORAGE FACILITY PROJECT IN COLOMBIA TO PROVIDE THE SAFE STORAGE AND PROTECTION OF HIGH-ACTIVITY RADIOACTIVE SOURCES

The Global Threat Reduction Initiative (GTRI) reduces and protects vulnerable nuclear and radiological material located at civilian sites worldwide. Internationally, over 40 countries are cooperating with GTRI to enhance the security of these materials. The GTRI program has worked successfully with foreign countries to remove and protect nuclear and radioactive materials, including orphaned and disused high-activity sources. GTRI began cooperation with the Republic of Colombia in April 2004. This cooperation has been a resounding success by securing forty high-risk sites, consolidating disused/orphan sources at an interim secure national storage facility, and developing a comprehensive approach to security, training, and sustainability. In 2005 the Colombian Ministry of Mines and Energy requested the Department of Energy’s support in the construction of a new Central Storage Facility (CSF). In December 2005, the Ministry selected to construct this facility at the Institute of Geology and Mining (Ingeominas) site in Bogota. This site already served as Colombia’s national repository, where disused sources were housed in various buildings around the complex. The CSF project was placed under contract in May 2006, but environmental issues and public protests, which led to a class action lawsuit against the Colombian Government, forced the Ministry to quickly suspend activities, thereby placing the project in jeopardy. Despite these challenges, however, the Ministry of Mines and Energy worked closely with public and environmental authorities to resolve these issues, and continued to be a strong advocate of the GTRI program. In June 2008, the Ministry of Mines and Energy was granted the construction and environmental licenses. As a result, construction immediately resumed and the CSF was completed by December 2008. A commissioning ceremony was held for the new facility in January 2009, which was attended by representatives from the Department of Energy, U.S. Embassy, and the Ministry of Mines and Energy, including the Minister and Vice Minister.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Long-length Scintillating Fibers for Nuclear Geological Repositories

This research focuses on the usage of plastic scintillating fibers as ruggedized detectors in long-length sections coupled to long-length standard optical fiber segments for the purpose of radiation detection and monitoring. This technology addresses a need for monitoring radiation in difficult-to-access or inaccessible areas, such as monitoring: radioactive waste within geological repositories, nuclear material storage facilities, spent fuel dry storage areas, inaccessible areas within nuclear facilities including reactors and reprocessing facilities, decommissioning of nuclear facilities, and other similar areas. The fiber can be placed along the tunnels of a geological repository to monitor the radiation field along its length. This can detect an increase of radiation due to movement, leakage, or unexpected opening of the containers, as well as decrease in the radiation due to removal of material. These capabilities have been demonstrated at INL’s Radioactive Scrap Waste Facility by successfully detecting the removal of an interim storage containers from the storage area. The poster focuses on explaining the technology and its capability in monitoring deep geological repositories (DGRs), especially in the domain of safety and international safeguards. As more countries consider the development of DGRs, technologies such as the one being presented can help establish continuity of knowledge of the material, maintain public confidence, and ensure safe operation of the facility. Furthermore, the poster looks at the future steps of the technology and its potential role in the international safeguards regime.

98 - NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL↗

Public Views on Nuclear Facility Siting and Radioactive Waste Management in the United States: Methodology and Response Reference Report for the 2017 Energy and Environment Survey

This report presents the questions and responses to a nationwide survey of U.S. residents taken May 2017. The focus of the 2017 survey is public perceptions on (1) nuclear energy and new nuclear technology, such as small modular reactors; (2) the risks and benefits of nuclear energy; (3) different options for managing spent nuclear fuel (SNF); and (4) the role of individuals, organizations and elected officials in locating SNF facilities. Highlights of survey results related to nuclear energy found the U.S. public (1) wants nuclear energy to continue to contribute 20% of total electrical power produced for the next 20 years; (2) is more supportive of adding new reactors at existing sites than at new sites; and (3) is more supportive of small modular reactors than traditional reactors. Highlights related to risks and benefits of nuclear energy include (1) the public believes that terrorist attacks are the greatest threat and that energy independence is the greatest benefit; (2) 56% of the public believes that nuclear power has both high benefit and high risk; (3) the 2011 accident at the Fukushima nuclear facility continues to negatively influence the perceived benefits and risks of nuclear energy except for those who perceive nuclear power as low risk and high benefit; (4) building new reactors is supported by those who perceive nuclear power as low risk and high benefit, and opposed by those who perceive it as high risk and low benefit. Highlights related to SNF management options include (1) support remains higher for permanent disposal than either consolidated interim storage or continued on-site storage; (2) support for private initiatives for interim storage in New Mexico and Texas are higher than generic storage and disposal options; (3) the general public is more likely to increase support if a majority of the local and state residents support an SNF facility. Highlights related to the role of individuals, organizations, and elected officials include (1) 54% of the public agrees that if an SNF facility is deemed safe by regulators, political considerations should not derail the location; (2) 47% of the US public agrees that non-governmental organizations should be able to provide input to locating an SNF facility; (3) 36% of the public believes that the federal government should lead siting of an SNF facility while 25% believes private companies should lead; (4) 81% of the public believes local residents and farmers/ranchers should have a say in the final decision on locating a SNF facility and 56% believe that they should have veto power; and (5) only 27% of the public believes the state governor should have a say and veto power.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Regulation of the Shutdown Defueling and Decommissioning Reactors in the United Kingdom - 16576

Nuclear policy, including for decommissioning, in the United Kingdom is set by the UK Government. The Nuclear Decommissioning Authority, NDA, is responsible for managing the clean-up of the UK's nuclear legacy which includes the first generation of Magnox power stations. Magnox Ltd (MXL), owned by Cavendish Fluor Partnership, is the licensee and the management and operations contractor responsible for ten Magnox reactor sites and two restoration sites in the UK, working for the sites' owner, NDA. The work of the company is diverse covering electricity generation at Wylfa (until December 2015), defueling, and preparation for an interim end state, known as Care and Maintenance (C and M) which will precede the final site clearance. The C and M phase is expected to last over 75 years during which the sites are maintained in a passively safe and secure state while radiation levels are left to decay naturally. Preparations for this phase include removing fuel from the reactors and storage ponds; retrieving intermediate level waste from current stores and treating it or converting it to forms suitable for long-term storage or disposal and making sure of the integrity of critical safety systems of the de-fuelled reactors. The Decommissioning, Fuel and Waste programme within the Office for Nuclear Regulation, ONR, regulates nuclear safety in the 12 Magnox nuclear licensed sites. ONR works with the environmental regulators who are responsible for environmental protection on nuclear sites. The focus of this paper is the regulation of nuclear safety by ONR across the Magnox sites and the interactions with nuclear security and the environmental aspects required to achieve effective, proportionate and efficient regulation of these sites in the UK. ONR's strategy for regulating the Magnox defueling and decommissioning sites is focused on enabling the licensee to complete the initial stages of decommissioning and reduce the nuclear and radioactive hazards on its sites. To this effect, ONR's revised inspection guidance is centred on inspecting the (remaining) important systems for safety identified in the safety cases. Other interventions focus on engaging with the licensee on safety significant decommissioning projects to gain evidence of the licensee's readiness prior to and during these activities rather than formal assessment of the associated safety cases. In light of reduced hazards and risks across the de-fueled and decommissioning Magnox reactors, ONR's revised regulatory expectation regarding evolution of emergency arrangements during decommissioning is based on key transition points that follow electricity generation. Implementation of these revised strategies as well as organisational restructuring within the team responsible for regulation of the Magnox fleet has resulted in improved efficiency and consistency in regulatory approach whilst securing the required safety standards in managing decommissioning activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Belgian Research and Development Feasibility Programme for the Geological Disposal of High-Level and Long-Lived Radioactive Waste - 12338

ONDRAF/NIRAS, the Belgian Agency for Radioactive Waste and Enriched Fissile Materials, considers geological disposal in the poorly indurated Boom Clay as the reference solution for the long-term management of high-level and/or long-lived radioactive waste. To develop a safety concept and design for geological disposal, ONDRAF/NIRAS follows an iterative process demonstrating that the repository will be both safe and feasible to implement. This process is called the safety strategy. A part of the safety strategy is the feasibility programme which aims at demonstrating, at a conceptual level, that the proposed geological disposal system can be constructed, operated and progressively closed. The followed methodology is based on the substantiation of a hierarchy of feasibility statements. These statements cover all activities from the removal of primary waste packages from interim storage buildings to the closure of the disposal site and a period of institutional control. They focus on engineering practicability, health and safety and environmental considerations, costs and quality assurance issues. A 4 year research project to support the R and D feasibility programme was launched in 2009 with several international partners coordinated by ONDRAF/NIRAS. It aims at confirming that there are no fundamental flaws or show-stoppers in the feasibility of building and operating the facilities for geological disposal in the Boom Clay. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RIVER PROTECTION PROJECT SYSTEM PLAN

The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and disposal at the Waste Isolation Pilot Plant (WIPP) in New Mexico. (6) Deploying interim storage capacity for the immobilized high-level waste (IHLW) pending determination of the final disposal pathway. (7) Closing the SST and DST tank farms, ancillary facilities, and all associated waste management and treatment facilities. (8) Optimizing the overall mission by resolution of technical and programmatic uncertainties, configuring the tank farms to provide a steady, well-balanced feed to the WTP, and performing trade-offs of the required amount and type of supplemental treatment and of the amount of HLW glass versus LAW glass. ORP has made and continues to make modifications to the WTP contract as needed to improve projected plant performance and address known or emerging risks. Key elements needed to implement the strategy described above are included within the scope of the Tank Operations Contract (TOC). Interim stabilization of the SSTs was completed in March 2004. As of April 2009, retrieval of seven SSTs has been completed and retrieval of four additional SSTs has been completed to the limits of technology. Demonstration of supplemental LAW treatment technologies has stopped temporarily pending revision of mission need requirements. Award of a new contract for tank operations (TOC), the ongoing tank waste retrieval experience, HLW disposal issues, and uncertainties in waste feed delivery and waste treatment led to the revision of the Performance Measurement Baseline (PM B), which is currently under review prior to approval. 6 This System Plan is aligned with the current WTP schedule, with hot commissioning beginning in 2018, and full operations beginning in late 2019. Major decisions regarding the use of supplemental treatment and the associated technology, the ultimate needed capacity, and its relationship to the WTP have not yet been finalized. This System Plan assumes that the outcome of these decisions will be to provide a second LAW vitrification facility. No final implementation decisions regarding supplemental technology can be made until the Tank Closure and Waste Management Environmental Impact Statement is completed and a Record of Decision is issued by DOE. Technical solutions are being developed to mitigate the impact from substantially increased estimates of sodium to be added during pretreatment of the tank waste solids. This may involve one or more of the following options: (1) refining or modifying the flowsheet to reduce the required amount of additional sodium, (2) increasing the overall LAW vitrification capacity, (3) increasing the incorporation of sodium into the LAW glass, (4) increasing the incorporation of aluminum in the HLW glass to reduce caustic leaching requirements, or (5) implementing other technical solutions. For planning purposes, the PMB assumes that option (5) above, in the form of an ARF, will be successful in reducing the sodium required to be added during pretreatment of the tank waste.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The EU Approach for Responsible and Safe Management of Spent Fuel and Radioactive Waste - 12118

In July 2011 legislation on responsible and safe management of spent fuel and radioactive waste was adopted in the European Union (EU). It aims at ensuring a high level of safety, avoiding undue burdens on future generations and enhancing transparency. EU Member States are responsible for the management of their spent fuel and/or radioactive waste. Each Member State remains free to define its fuel cycle policy. The spent fuel can be regarded either as a valuable resource that may be reprocessed or as radioactive waste that is destined for direct disposal. Whatever option is chosen, the disposal of high level waste, separated at reprocessing, or of spent fuel regarded as waste should be considered. The storage of radioactive waste, including long-term storage, is an interim solution, but not an alternative to disposal. To this end, each Member State has to establish, maintain and implement national policy, framework and programme for management of spent fuel and/or radioactive waste in the long term. Member States will invite international peer reviews to ensure that high safety standards are achieved. The EU approach is anchored in internationally endorsed principles and requirements of the IAEA safety standards and the Joint Convention and in this context makes them legally binding and enforceable in the EU. The EU approach of regulating the management of spent fuel and radioactive waste is anchored in the competence of the national regulatory authorities and in the internationally endorsed principles and requirements of the IAEA Safety Standards and the Joint Convention. Member States have to report to the Commission on the implementation of Directive 2011/70/Euratom for the first time by 23 August 2015, and every 3 years thereafter, taking advantage of the review and reporting under the Joint Convention. On the basis of the Member States' reports, the Commission will submit to the European Parliament and the Council a report on progress made and an inventory of radioactive waste and spent fuel present in the EU territory and the future prospects. Directive 2011/70/Euratom is a logical next step after the Council Directive 2009/71/Euratom on the nuclear safety of nuclear installations. The EU is the first major regional actor providing a binding legal framework on nuclear safety and on responsible and safe management of spent fuel and radioactive waste, and thus is a real model to progress spent fuel and waste management in a safe and responsible manner. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SLIGHTLY IRRADIATED FUEL (SIF) INTERIM DISPOSITION PROJECT

CH2M HILL Plateau Remediation Company (CH2M HILL PRC) is proud to submit the Slightly Irradiated Fuel (SIF) Interim Disposition Project for consideration by the Project Management Institute as Project of the Year for 2010. The SIF Project was a set of six interrelated sub-projects that delivered unique stand-alone outcomes, which, when integrated, provided a comprehensive and compliant system for storing high risk special nuclear materials. The scope of the six sub-projects included the design, construction, testing, and turnover of the facilities and equipment, which would provide safe, secure, and compliant Special Nuclear Material (SNM) storage capabilities for the SIF material. The project encompassed a broad range of activities, including the following: Five buildings/structures removed, relocated, or built; Two buildings renovated; Structural barriers, fencing, and heavy gates installed; New roadways and parking lots built; Multiple detection and assessment systems installed; New and expanded communication systems developed; Multimedia recording devices added; and A new control room to monitor all materials and systems built. Project challenges were numerous and included the following: An aggressive 17-month schedule to support the high-profile Plutonium Finishing Plant (PFP) decommissioning; Company/contractor changeovers that affected each and every project team member; Project requirements that continually evolved during design and construction due to the performance- and outcome-based nature ofthe security objectives; and Restrictions imposed on all communications due to the sensitive nature of the projects In spite of the significant challenges, the project was delivered on schedule and $2 million under budget, which became a special source of pride that bonded the team. For years, the SIF had been stored at the central Hanford PFP. Because of the weapons-grade piutonium produced and stored there, the PFP had some of the tightest security on the Hanford nuclear reservation. Workers had to pass through metal detectors when they arrived at the plant and materials leaving the plant had to be scanned for security reasons. Whereas other high-security nuclear materials were shipped from the PFP to Savannah River, S.C. as part ofa Department of Energy (DOE) program to consolidate weapons-grade plutonium, it was determined that the SIF should remain onsite pending disposition to a national repository. Nevertheless, the SIF still requires a high level of security that the PFP complex has always provided. With the 60-year PFP mission of producing and storing plutonium concluded, the environmental cleanup plans for Hanford call for the demolition of the 63-building PFP complex. Consequently, if the SIF remained at PFP it not only would have interfered with the environmental cleanup plans, but would have required $100 million in facility upgrades to meet increased national security requirements imposed after the 9/11 terrorist attacks. A new smaller and more cost-effective area was needed to store this material, which led to the SIF Project. Once the SIF project was successfully completed and the SIF was safely removed from PFP, the existing Protected Area at PFP could be removed, and demolition could proceed more quickly without being encumbered by restrictive security requirements that an active Protected Area requires. The lightened PFP security level brought by safely removing and storing the SIF would also yield lowered costs for deactivation and demolition, as well as reduce overall life-cycle costs.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Nondestructive Evaluation in Steel Structures Using Ultrasonic Guided Waves

Material degradation and damage during extended service is an important concern for long-term nuclear power plant operation. Interim storage of spent nuclear fuel in dry storage systems (DSS) has gained additional importance and urgency for resolving waste-management-related technical issues. DOE has established research and development objectives to create technologies and solutions that can improve the reliability, sustain the safety while extending the life of nuclear facilities. To achieve this objective, nondestructive evaluation and monitoring of structural material conditions is highly desired to be integrated into the fuel cycle to quantify the 'state of health' and more importantly, to guarantee the safe operation of existing facilities during their predicted life span. Ultrasonics based NDE approach relies on elastic waves to achieve broad coverage across a range of material types and failure modes. Within the ultrasonic waves family, the guided ultrasonic waves (GUW) that propagate through the solid waveguides while interacting with the waveguide surface(s) are widely used due to their sensitivity to degradation through the thickness as well as their capability to provide area-wise inspection compared to the traditional point-wise inspection by pressure waves. To address the need for NDE of the steel canisters inside the DSS, an acoustic-ultrasonics (AU) NDE methodology has been under development utilizing the guided ultrasonic waves. Fundamental methods of using GUW in various modes to sensing and detection with various sensor technologies are present in this paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Collaboration for the Management of the Bruce Power Major Component Replacement (MCR) Nuclear Waste - 19630

Bruce Power's Major Component Replacement (MCR) Program will generate large volume waste via steam generators (SGs) and intermediate-level nuclear waste, which will require specialized packaging and handling to safely receive and store it at Ontario Power Generation's (OPG) Western Waste Management Facility (WWMF). The refurbishment of a Candu reactor involves, in part, the removal and replacement of all of a reactor core's fuel channel assemblies. Bruce Power and OPG collaborated to develop nuclear waste management solutions to optimize the use of OPG's existing Steam Generator Storage Building (SGSB) and Retube Component Storage Building (RCSB). By designing specialized Retube Waste Containers (RWCs) and optimizing configurations for the waste to be stored in the buildings, we will reduce the interim nuclear waste storage needs at the OPG WWMF, while improving Bruce Power MCR process efficiencies and reducing the overall costs of the MCR Program (Units 3 through 8). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Structural Health Monitoring of Nuclear Spent Fuel Storage Facilities

Interim storage of spent nuclear fuel from reactor sites has gained additional importance and urgency for resolving waste-management-related technical issues. To ensure that nuclear power remains clean energy, monitoring has been identified by DOE as a high priority cross-cutting need, necessary to determine and predict the degradation state of the systems, structures, and components (SSCs) important to safety (ITS). Therefore, nondestructive structural condition monitoring becomes a need to be installed on existing or to be integrated into future storage system to quantify the state of health or to guarantee the safe operation of nuclear power plants (NPPs) during their extended life span. In this project, the lead university and the collaborating national laboratory teamed to develop a nuclear structural health monitoring (n-SHM) system based on in-situ piezoelectric sensing technologies that can monitor structural degradation and aging for nuclear spent fuel DCSS and similar structures. We also aimed to identify and quantify possible influences of nuclear spent fuel environment (temperature and radiation) to the piezoelectric sensor system and come up with adequate solutions and guidelines therefore. We have therefore developed analytical model for piezoelectric based n-SHM methods, with considerations of temperature and irradiation influence on the model of sensing and algorithms in acoustic emission (AE), guided ultrasonic waves (GUW), and electromechanical impedance spectroscopy (EMIS). On the other side, experimentally the temperature and irradiation influence on the piezoelectric sensors and sensing capabilities were investigated. Both short-term and long-term irradiation investigation with our collaborating national laboratory were performed. Moreover, we developed multi-modal sensing, validated in laboratory setup, and conducted the testing on the We performed multi-modal sensing development, verification and validation tests on very complex structures including a medium-scale vacuum drying chamber and a small-scale mockup canister available for the desired testing. Our work developed the potential candidate for long term structural health monitoring of spent fuel canister through piezoelectric wafer sensors and provided the sensing methodologies based on AE and GUW methodologies. It overall provides an innovative system and methodology for enhancing the safe operation of nuclear power plant. All major accomplishments planned in the original proposal were successfully achieved.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

WRPS MEETING THE CHALLENGE OF TANK WASTE

Washington River Protection Solutions (WRPS) is the Hanford tank operations contractor, charged with managing one of the most challenging environmental cleanup projects in the nation. The U.S. Department of Energy hired WRPS to manage 56 million gallons of high-level radioactive waste stored in 177 underground tanks. The waste is the legacy of 45 years of plutonium production for the U. S. nuclear arsenal. WRPS mission is three-fold: safely manage the waste until it can be processed and immobilized; develop the tools and techniques to retrieve the waste from the tanks, and build the infrastructure needed to deliver the waste to the Waste Treatment Plant (WTP) when it begins operating. WTP will 'vitrify' the waste by mixing it with silica and other materials and heating it in an electric melter. Vitrification turns the waste into a sturdy glass that will isolate the radioactivity from the environment. It will take more than 20 years to process all the tank waste. The tank waste is a complex highly radioactive mixture of liquid, sludge and solids. The radioactivity, chemical composition of the waste and the limited access to the underground storage tanks makes retrieval a challenge. Waste is being retrieved from aging single-shell tanks and transferred to newer, safer double-shell tanks. WRPS is using a new technology known as enhanced-reach sluicing to remove waste. A high-pressure stream of liquid is sprayed at 100 gallons per minute through a telescoping arm onto a hard waste layer several inches thick covering the waste. The waste is broken up, moved to a central pump suction and removed from the tank. The innovative Mobile Arm Retrieval System (MARS) is also being used to retrieve waste. MARS is a remotely operated, telescoping arm installed on a mast in the center of the tank. It uses multiple technologies to scrape, scour and rake the waste toward a pump for removal. The American Reinvestment and Recovery Act (ARRA) provided nearly $326 million over two-and-a-half years to modernize the infrastructure in Hanford's tank farms. WRPS issued 850 subcontracts totaling more than $152 million with nearly 76 percent of that total awarded to small businesses. WRPS used the funding to upgrade tank farm infrastructure, develop technologies to retrieve and consolidate tank waste and extend the life of two critical operating facilities needed to feed waste to the WTP. The 222-S Laboratory analyzes waste to support waste retrievals and transfers. The laboratory was upgraded to support future WTP operations with a new computer system, new analytical equipment, a new office building and a new climate-controlled warehouse. The 242-A Evaporator was upgraded with a control-room simulator for operator training and several upgrades to aging equipment. The facility is used to remove liquid from the tank waste, creating additional storage space, necessary for continued waste retrievals and WTP operation. The One System Integrated Project Team is ajoint effort ofWRPS and Bechtel National to identify and resolve common issues associated with commissioning, feeding and operating the Waste Treatment Plant. Two new facilities are being designed to support WTP hot commlsslomng. The Interim Hanford Storage project is planned to store canisters of immobilized high-level radioactive waste glass produced by the vitrification plant. The facility will use open racks to store the 15-foot long, two-foot diameter canisters of waste, which require remote handling. The Secondary Liquid Waste Treatment Project is a major upgrade to the existing Effluent Treatment Facility at Hanford so it can treat about 10 million gallons of liquid radioactive and hazardous effluent a year from the vitrification plant. The One System approach brings the staff of both companies together to identify and resolve WTP safety issues. A questioning attitude is encouraged and an open forum is maintained for employees to raise issues. WRPS is completing its mission safely with record-setting safety performance. Since WRPS took over the Hanford Tank Operations Contract in October 2008, the recordable injury rate has decreased 43 percent, while the lost work-days rate decreased by 30 percent. The company recently surpassed three million hours worked without a lost workday accident.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The TRANSCEND University Consortium: Theme 4: Nuclear Materials - 20431

The safe and secure management of Pu is a matter of international concern, with ∼250 t of separated Pu currently stockpiled worldwide. The UK's civil inventory of nuclear materials contains significant stocks of separated Pu from the reprocessing of Magnox and AGR spent fuels. The preferred option for the 138.5 tonnes of Pu is re-use as mixed oxide (MOx) fuel, although 5% is not suitable for re-use and is recommended for direct disposal. However, it will take more than 15 years to implement re-use, requiring that the Pu be kept in interim storage in its current state for that period, i.e. as PuO{sub 2} powder within inert steel storage cans at Sellafield. The focus of the work presented here is thus plutonium storage and the direct disposal of plutonium. The Research and Development needs of both are now pressing: in the case of storage due to it being the current default; in the case of immobilization and disposal because of a comparative lack of Research and Development on Pu conditioning and packaging due to policy uncertainty as to whether it would be disposed of in a Geologic Disposal Facility (GDF). Addressing these needs is complicated by Pu's high radioactivity, decay heat and radiotoxicity, criticality, nuclear safeguard requirements and, for some UK Pu contaminated materials targeted for disposal, poor inventory. Thus, there is also a critical requirement for underpinning research on Pu bearing materials in these two contexts. In response to these needs, the TRANSCEND Consortium (Transformative Science and Engineering for Nuclear Decommissioning, a multi-disciplinary collaboration of 11 universities and 8 key industry partners from across the UK's civil nuclear sector) is seeking to provide technical underpinning to ongoing option development for the UK's civil Pu stockpile. Whilst understanding the behaviour of plutonium during its re-use as MOx is beyond the scope of the TRANSCEND Consortium work plan, the main objectives of the work are: (1) For interim storage: to understand how the surface structure and properties of pristine and radiation damaged PuO{sub 2} change with time in the absence and presence of water; and (2) For immobilization and disposal: to understand the mechanisms of incorporation of Pu into ceramic and glass-ceramic waste-forms, as well as the effect on these of self-induced radiation damage. Each objective is being addressed through separate work packages, the details of which are discussed in this paper. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Treatment of Uranium Slugs at the CEA Marcoule site - 12026

The decladding units on the Marcoule nuclear site in southeast France were commissioned in the early 1960's to receive spent fuel cartridge for interim storage in pools and to prepare them for dissolution. After decladding, the uranium slugs were sent to the reprocessing plant for dissolution. The units were shut down in 1997. All the operational and process equipment was dismantled and transferred to the ANDRA waste repository between 1998 and 2001. During cleanup of the G2-G3 interim storage pool all the internal components (baskets and machinery) mounted on the civil engineering structures were cut up. In November 2007, a UNGG fuel slug in its aluminum cartridge was found at the bottom of the pool. Similarly, while iron slugs (used to control plutonium-producing reactors) were being sorted, five de-cladded uranium slugs were found between 2006 and 2008. As the processing facilities had already been dismantled, it was decided to send these fuel cartridges to a laboratory for dissolution. The project was to recover and condition the cartridge and slugs and transport them safely to the laboratory. This required the design of dedicated equipment due in particular to the high dose rate and pyro-phoricity hazard. The procedure also required safety clearance by the regulatory authorities for the operations within the facility and for the transport of radioactive materials. The cartridge was dissolved in May 2009, 18 months after it was discovered. Based on the experience acquired, the retrieval of the uranium slugs was completed in March 2011 after a year of preparation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Used fuel transportation considerations to support centralized interim storage

The deployment of a used fuel centralized interim storage facility (CISF) can offer a renewed opportunity for the U.S. to make real progress towards integrating of the back end of the fuel cycle. One of the key elements of success, and perhaps as important as the CISF project itself, is transportation-program readiness for large-scale rail shipments of spent fuel to a centralized storage facility. This paper offers an overview of the status of spent fuel transportation readiness in the U.S. The authors identify a number of technical and institutional challenges to be resolved before rail shipments of used fuel to a centralized storage facility can begin. Furthermore, 'NAC International', a transportation company, recommends a key action to ensure a safe, secure and efficient transportation system that meets stakeholder expectations is ready to meet milestone dates. NAC will address the challenges of deploying such a system, focused on leveraging existing U.S. transportation experience, capabilities and infrastructure. This paper concludes with the assertion, that spent fuel transportation to a CISF by 2021 is possible if we seriously commit resources now to address the critical institutional, operational, and system requirements implicit in a consent based transportation and storage program.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Does the Perfect Waste Package Exist? Development of a Decisional Tool Addressing this Challenge - 17053

The definition of a safe, technically, economically and societally acceptable waste management strategy is highly dependent on the Waste Acceptance Criteria in each country and on the already available disposal routes. It is the reason why there is not a single solution but a combination of optimized solutions depending on the type of waste and on each country's considerations. In fact, when operating a nuclear plant or performing its decommissioning or legacy waste management, one has to consider a large waste diversity in term of natures, types, volumes and radioactivity spectra. All nuclear operators have to take-up the challenge of implementing solutions for conditioning its waste in packages suitable for transport short to long term interim storage and final disposal of it (or prepare for final disposal if the repository is not yet available). Operators have then to answer the following dilemma: either define a complete strategy packaging the waste for final disposal, or 'containerising' it temporarily, pending final disposal. The strategy is highly country dependent; in the first case, one has to take into account the available information and future orientations relative to acceptability of the packages in order to define a robust solution. The approach implemented in France requires a close dialogue between the Operators, the Safety Authority, the Administration and the stakeholders. Moreover it pushes forward whenever possible standardization, contributing to cost minimization. If the second approach has the advantage of leaving the options open, and reducing the initial investments, it inevitably requires future retrieval and re-packaging with potential evolutions/degradation of the initial waste form. It also induces the potential risk to produce additional secondary waste. As an additional drawback, it introduces uncertainties and unknowns related to the future waste management criteria and to the costs. The general idea is that, depending on context, a given route (i.e., treatment, conditioning, and transport), could be considered as efficient or not. Assessing a waste package is certainly highly context dependent. However it should be possible to recognize and to lead an evaluation based on a number of fixed criteria, whatever the context, to be addressed when assessing the development of a final waste package in connection to the overall management route. A waste package is always a combination of a waste container and a waste form and will have to be transported one day from the production site to the final repository or to off-site interim storage facilities. AREVA's approach consists in defining an evaluation grid based on a set of criteria which aim (i) to evaluate whether the different waste treatments, conditionings, transport and packages deserve to be considered within different national contexts, and (ii) to evaluate R and D actions to be performed for improving existing solutions or developing new ones. One of the key lessons to be drawn from AREVA's experience in developing waste packages is that the perfect waste doesn't exist even though the vitrified canister is probably the most efficient one. The performance of a package resulting from a compromise depends on context and is a strength combination between the waste container and the waste form. The approach is to evaluate a waste package development against different set of criteria and to draw optimization diagrams. In such diagram, a given waste package is assessed with respect to selected criteria such as waste form and waste container, stability, level of waste incorporation, integrity lifetime, secondary waste generation, transport, long term behavior, and economical effectiveness, etc. Addressing a waste form is a very key point. This evaluation grid and comparative approach will be presented through examples and comparison providing from AREVA feedback on waste package development related to complex waste management such as problematic waste or legacy waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗