Search NASA⌕ Search

SEARCH · Search NASA

Results for “Installation Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Development of Gas Bearings for Supercritical CO 2 Recompression Brayton Cycle (Final Technical Report)

During the period of performance from March 1 st , 2022 through December 31st, 2023 the University of Nevada, Las Vegas (UNLV) worked with New Way Air Bearings (NWAB) to design, fabricate, install, and test a set of non-contact Externally Pressurized Porous (EPP) gas bearings for a solar driven supercritical CO 2 Brayton system. This report summarizes the work performed for the entire project.

14 SOLAR ENERGY↗

Triton Initiative: FY 2024 Communications, Outreach, and Engagement End-of-Year Report

The Department of Energy (DOE) Water Power Technologies Office (WPTO) Triton Initiative works to reduce barriers to permitting of marine energy testing and installation through environmental monitoring research that can help inform decision-makers on potential environmental effects associated with these systems. Communications, outreach, and engagement efforts are critical to Triton's success, which involves facilitating the effective communication and dissemination of environmental monitoring research information and results to end-users and fostering collaborations between researchers and industry partners to address the most pressing needs of this emerging industry. The Triton Initiative's communications, outreach, and engagement (TCOE) foundational goals are to educate and raise awareness of ME and the role of Triton's environmental monitoring research in supporting the industry, build trust with audiences through transparent communications and outreach, and evaluate and refine TCOE tactics based on feedback and metrics. The TCOE FY 2024-specific objectives were to (1) refine and grow Triton's audience network by reaching new individuals and communities within Triton's target audience base, and (2) improve the strategy and evaluation of TCOE efforts to demonstrate the value of communications and outreach for the ME community. This report presents the results and analysis of communications activities from September 1, 2023 through August 31, 2024. We assess the TCOE target audiences, highlight notable successes and lessons learned from FY2024, and identify the most effective channels and activities used to connect with those audiences to achieve the TCOE goals.

16 TIDAL AND WAVE POWER↗

MCNP® Code Version 6.3.1: Build Guide (Rev. 1)

This is a build guide for the MCNP® code, version 6.3.1, that expands upon the README.md included with the source code. It covers compilers, dependencies, building, testing, and installing the code in one of its supported configurations.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Leveling-Up for Big-Format Modules

Like Mario grabbing a super mushroom, PV modules just keep getting bigger! As they grow, so do the challenges of handling, installing, and testing them in the field. At NREL, we've embarked on our own New Hope - adapting to this size revolution across our tools, transportation, ergonomics, and field compatibility. Join us as we navigate this galactic expansion and keep PV testing at the cutting edge.

14 SOLAR ENERGY↗

Gear Test Assembly - Experimental Testing and Analysis of Gears and Bearings - FY2026

The Gear Test Assembly (GTA) is an experimental test apparatus built and installed in the Mechanisms and Engineering Test Loop (METL) at Argonne National Laboratory (ANL). While designed to accommodate a variety of components intended for use in advanced compact in-vessel transfer machine, the focus of GTA been the testing of large radial spur gears. The performance of the components used in GTA motivates the choices made in the design, components, and material choices for the forthcoming METL test articles; the Gripper Test Assembly (GrTA), and the Bearing Test Assembly (BTA). To date, GTA has completed nine experimental testing campaigns and achieved over 21 million revolutions under prototypic sodium fast reactor loads and operating conditions. This report provides an overview and results for the two most recent experiments Campaign #8 and Campaign #9. `Campaign #8 was the first campaign to make use of a set of nickel alloy radial spur gears, made from Hastelloy C-22HS, and combined with heat-treated tapered roller bearings. The bearings and torque profile used allowed Campaign #8 to be directly compared with Campaign #1 where Inconel 718 gears were used instead. Campaign #8 attained 1,058,880 shaft revolutions within 23% of the 1,314,855 revolutions achieved in Campaign #1. These results demonstrate that the heat-treated tapered roller bearings show consistent increased lifetimes, approximately three times longer than for non heat-treated taper rollers, and that the particular material of the gear does not play a substantial role in performance. Similar to Campaign #7 where bearing failure resulted in fragmentation and transport of bearing material into the gear teeth led to tooth damage in the Inconel gears, a similar process led to the damage of the Hastelloy gears. Subsequent NDE analysis showed that the damage was only limited to the tooth surface and does not extend into the gear interiors. Based on the NDE reports, the Hastelloy gears can be reconditioned and put back into service for future campaigns as was done for the Inconel gears. Reconditioned Inconel 718 gears damaged in Campaign #7 were returned to service in Campaign #9 and paired with non heat-treated tapered roller bearings. In Campaign #9 a novel set of operating conditions were implemented whereby the gears and bearings were cycled between hot, submerged refueling conditions where fuel handling operations occurred and cold, dry, and inert conditions where the sodium was drained and the vessel was allowed to cool simulating long, ex-vessel storage of the fuel handling machine. A total of eight of these operating cycles were achieved before a bearing failure occurred after the accumulation of 475,692 shaft revolutions were achieved. During Campaign #9, one of the drive motors was damaged and over the course of a 240 day standby period, the entire GTA drive system was upgraded from a 480VAC system to a 240VAC system that provided the opportunity to consolidate wall-space in the METL facility and provide more space for additional test articles being installed in the coming year. The over 475,000 shaft revolutions achieved in Campaign #9 eclipses the previous record for lifetime of non heat-treated tapered roller bearings held by Campaign #3 of 392,000 shaft revolutions. Further analysis and future campaigns hope to shed light on the cause of this approximately 17% increase in lifetime.

42 ENGINEERING↗

A New Era for Bubble Chamber Technology

Neutrino experiments like DUNE are limited by how well we understand the way neutrinos actually interact with atoms. The best way to fix that is to measure interactions on hydrogen, since a hydrogen nucleus is just a single free proton with largely none of the nuclear effects that heavier targets like argon have. The catch is that no one has built a hydrogen bubble chamber for a neutrino beam since the 1980s, mostly because the old chambers had too low of an active time. MAMBA is a project focused on bringing that technology back but built to cycle continuously at 1 Hz. I spent my summer internship on two of the subsystems that make that kind of speed possible. First, I helped install and test a new solid copper thermal link that replaced the old flexible braided cooling path, and it brought the coldhead down to 21.3 K, right at the target temperature. Second, I built and tested a Raspberry Pi based PLC control system, and across 20,000 trials it answered in a median of 0.64 ms, with only 0.66\% of trials running past 1 ms. Both results point the same direction: that inexpensive, off the shelf hardware can perform fast and reliable enough to eventually run a bubble chamber the way MAMBA needs it to run.

Williams, Nicholas [DuPage Coll.]↗

Influence of Time and Frequency Domain Wave Forcing on the Power Estimation of a Wave Energy Converter Array

Industry-specific tools for analyzing and optimizing the design of wave energy converters (WECs) and associated power systems are essential to advancing marine renewable energy. This study aims to quantify the influence of phase information on the device power output of a virtual WEC array. We run the phase-resolving wave model FUNWAVE-TVD (Total Variation Diminishing) to generate directional waves at the PacWave South site offshore from Newport, Oregon, where future WECs are expected to be installed for testing. The two broad cases presented correspond to mean wave climates during warm months (March–August) and cold months (September–February). FUNWAVE-TVD time series of sea-surface elevation are then used in WEC-Sim, a time domain numerical model, to simulate the hydrodynamic response of each device in the array and estimate their power output. For comparison, WEC-Sim is also run with wave energy spectra calculated from the FUNWAVE-TVD simulations, which do not retain phase information, and with wave spectra computed using the phase-averaged model Simulating WAves Nearshore (SWAN). The use of spectral data in WEC-Sim requires a conversion from frequency to time domain by means of random superposition of wave components, which are not necessarily consistent because of the linear assumption implicit in this method. Thus, power response is characterized by multiple realizations of the wave climates.

13 HYDRO ENERGY↗

Advanced Materials Program Summary

Materials solutions - enabling design, construction, and operation of licensable Advanced Nuclear Material, design, fabrication, installation, examination, testing, overpressure protection, inspection, stamping, and certification

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

ASME Section III

This presentation is for ASME Section III at University of Tennessee Student Event on October 18, 2023. Includes ASME Section III - Rules for construction of nuclear facility components, including an all-inclusive term that includes material, design, fabrication, installation, examination, testing, overpressure protection, inspection, stamping, and certification, and discusses Division 1-5.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

NRAP-Open-IAM: NRAP Open Source Integrated Assessment Model

Note: This is the last version (a2.6.1) of NRAP-Open-IAM released during NRAP Phase II in 2022. The latest version of NRAP-Open-IAM is available here: https://edx.netl.doe.gov/dataset/phase-iii-nrap-open-iam NRAP-Open-IAM is an open-source software product that enables quantification of containment effectiveness and leakage risk at storage sites in the context of system uncertainties and variability. NRAP-Open-IAM represents the next-generation in a line of systems-based computational models developed for quantitative geological carbon storage (GCS) risk assessment. The model comprises a set of reduced-order and analytical models of various components of the GCS system, potential leakage pathways, receptors of concern including impact to groundwater resources and the atmosphere, a framework to support stochastic simulation, time stepping, uncertainty quantification, other analytical functionality for scenario and risk-performance evaluation, and a basic graphical user interface to support scenario development, data input simulation definition, and basic post-processing and results display. As the NRAP Open-IAM functionality continues to evolve, we continue to add to its capability to develop quantitative, probabilistic, and time-dependent profiles of the evolution of risk at a GCS site and evaluate the influence of uncertain parameters on uncertainty in predicted risk. It can be used to quantify the dynamics of reservoir saturation plume and pressure-affected area, for evaluation of the area of potential groundwater impact (i.e., Area of Review) and monitoring requirements to support cost and regulatory analysis, and for consideration of different post-injection site care and closure scenarios. This submission contains the current version of NRAP-Open-IAM available for evaluation and testing. To use the NRAP-Open-IAM, download the source code (https://edx.netl.doe.gov/dataset/08f396c8-bc5f-44ad-a028-6e98a6ea6d70/resource/4c24a3da-3b40-4ffe-9892-c807ae9f8760) then open the NRAP-Open-IAM user's guide (https://edx.netl.doe.gov/dataset/08f396c8-bc5f-44ad-a028-6e98a6ea6d70/resource/8b27335a-343c-4836-b8a3-3ad0bdc9e669) to read more about the tool. Installation instructions for Windows, Mac, and Linux can be found in the "installers" folder of the extracted NRAP-Open-IAM folder and describe setup of environment (e.g., Python libraries) needed for proper work of the tool. Test of installation can be done by running "python openiam_setup_tests.py" in the "setup" folder. The installation test also runs a test suite to see if the NRAP-Open-IAM has been installed correctly. To run the test suite separately, run "python iam_test.py" in the "test" folder. User's guide: https://edx.netl.doe.gov/dataset/08f396c8-bc5f-44ad-a028-6e98a6ea6d70/resource/8b27335a-343c-4836-b8a3-3ad0bdc9e669 Developer's guide: https://edx.netl.doe.gov/dataset/08f396c8-bc5f-44ad-a028-6e98a6ea6d70/resource/3bc6ee7d-609d-4eb6-80ba-fa6130ee0313 Reservoir simulation data used in some examples distributed with NRAP-Open-IAM: - Kimberlina: https://edx.netl.doe.gov/dataset/08f396c8-bc5f-44ad-a028-6e98a6ea6d70/resource/eb62cece-61b2-4037-9b6d-32407dde2ab8 - Kimberlina (compartmentalized): https://edx.netl.doe.gov/dataset/08f396c8-bc5f-44ad-a028-6e98a6ea6d70/resource/366f9530-3b32-4b84-affe-ab2df1d9a8b5 - FutureGen 2.0: https://edx.netl.doe.gov/dataset/futuregen-2-0-1008-simulation-reservoir-lookup-table NRAP-Open-IAM GitLab repository: https://gitlab.com/NRAP/OpenIAM Related publications: - Bacon, D., Yonkofski, C., Brown, C., Demirkanli, D. and Whiting, J., 2019. Risk-based post injection site care and monitoring for commercial-scale carbon storage: Reevaluation of the FutureGen 2.0 site using NRAP-Open-IAM and DREAM. International Journal of Greenhouse Gas Control 90: 102784. - Bacon, D. Demirkanli, D., and White, S., 2020. Probabilistic risk-based Area of Review (AoR) determination for a deep-saline carbon storage site. International Journal of Greenhouse Gas Control 102: 103153. - Harp, D., Oldenburg, C., and Pawar, R., 2019. A metric for evaluating conformance robustness during geologic CO2 sequestration operations. International Journal of Greenhouse Gas Control 85: 100-108. - Lackey, G., Vasylkivska, V., Huerta, N., King, S., and Dilmore, R., 2019. Managing well leakage risks at a geologic carbon storage site with many wells, International Journal of Greenhouse Gas Control, 88 :182-194. - Vasylkivska, V., Dilmore, R., Lackey, G., Zhang, Y., King, S., Bacon, D., Chen, B., Mansoor, K., and Harp, D., 2021. NRAP-Open-IAM: A flexible open-source integrated assessment model for geologic carbon storage risk assessment and management, Environmental Modelling & Software, 143: 105114. Presentations: - Chen, B., Harp, D., and Pawar, R., A data assimilation approach (ES-MDA) coupling with NRAP-Open-IAM for quantifying uncertainty reduction in geological CO2 sequestration. AGUFM 2019: T44A-02. - Chen, B., and Harp, D., Improving risk analysis precision for geologic CO2 sequestration by quantifying the uncertainty reduction before and after acquiring monitoring data. 14th Greenhouse Gas Control Technologies Conference, Melbourne, Australia, 2018, pp. 21-26. - Harp, D., National Risk Assessment Partnership Task 2: Containment Assurance. No. LA-UR-19-28654, Los Alamos National Laboratory (LANL), Los Alamos, NM (United States), 2019. - Vasylkivska, V., King, S., Bacon, D., Harp, D., Chen, B., Mansoor, K., Onishi, T., Yang, Y., Zhang, Y., and Keating, E., NRAP-Open-IAM: An open-source integrated assessment model, poster, Mastering the Subsurface Through Technology Innovation, Partnerships and Collaboration: Carbon Storage and Oil and Natural Gas Technologies Review Meeting, Pittsburgh, PA, August 13-16, 2018. - Vasylkivska, V., Lackey, G., King, S., Wentworth, A., Huerta, N., Creason, C., DiGiulio, J., Yang, Y., and Dilmore, R., Long-term risk analysis of a geologic CO2 storage project during the post-injection period, SIAM Conference on Computational Science and Engineering, Spokane, WA, February 25-March 1, 2019. - Vasylkivska, V., Overview of the NRAP-Open-IAM tool for carbon storage (beta release), 2019 Annual NRAP Tool Users Meeting, Pittsburgh, PA, August 27, 2019. - Vasylkivska, V., Bacon, D., Chen, B., Dilmore, R., Harp, D., King, S., Lackey, G., Lindner, E., Liu, G., Mansoor, K. and Zhang, Y., NRAP-Open-IAM: A new, open-source code for integrated assessment of geologic carbon storage containment effectiveness and leakage risk, poster, American Geophysical Union Fall Meeting 2020 (virtual meeting), December 2020. - Vasylkivska, V., NRAP open-source integrated assessment model and relevant application, oral presentation, NRAP workshop "NRAP Tools for Geologic Carbon Storage Risk-Based Decision Making" held in conjunction with Groundwater Protection Council (GWPC) 2021 Annual Forum (virtual meeting), Salt Lake City, UT, September 2021. - Vasylkivska, V., NRAP-Open-IAM: open-source integrated assessment model, digital poster/demonstration, software demonstration session, 2022 Carbon Management Project Review Meeting, August 16, 2022

AoR↗

Gear Test Assembly - Experimental Testing and Analysis of Gears and Bearings - FY2023

The Gear Test Assembly (GTA) is an experimental test apparatus built and installed in the Mechanisms Engineering Test Loop (METL) at Argonne National Laboratory (ANL). The focus of GTA has been to test larger radial spur gears sets machined from Inconel 718 along with a variety of bearing components that are to be used in the fuel handling machines built for use in pool-type sodium fast reactors. The testing in GTA also informs the design and material choices for the full-scale Gripper Test Assembly (GrTA) being developed by Argonne. To date, the Inconel 718 gears used in all six GTA experimental campaigns have completed over 23.2 million revolutions under various loads equivalent to approximately 37,156 simulated fuel assembly maneuvers (removal from and reinsertion to core) using a conventional height of a core assembly. While the heat treated and untreated tapered roller bearings and cylindrical pin thrust bearings used in the first five experimental campaigns have experienced mechanical or material failure after completing a range of fuel assembly maneuvers ranging from as early as 575 operations in Campaign #5 to 9800 operations in Campaign #1, Campaign #6 was the most successful campaign, achieving 22,563 maneuvers and was concluded before any catastrophic failure occurred. In this report we will present the results from the most recent campaigns, #5 and #6. The longevity of Campaign #6 was likely aided by a variety of adjustments made to the materials and components used and to the experimental testing procedures employed. In terms of materials and components, new gearboxes were fabricated, as opposed to using the old gear boxes which had been impacted by the previous bearing failures, and ball bearings were replaced with tapered roller bearings. The adjustments to the experimental procedure focused on a lowering of the maximum torque applied to the gears and bearings and the increase of the duration of each simulated fuel assembly maneuver conducted. This report will present and discuss the changes made to the materials, components, and procedures and the subsequent results for Campaign #5 and Campaign #6.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Gear Test Assembly – Experimental Testing and Analysis of Gears and Bearings – FY2024

The Gear Test Assembly (GTA) is an experimental test apparatus built and installed in the Mechanisms Engineering Test Loop (METL) at Argonne National Laboratory (ANL). The focus of GTA has been to test larger radial spur gear sets machined from Inconel 718 along with a variety of bearing components that are to be used in the fuel handling machines built for use in pool-type sodium fast reactors. The testing in GTA also informs the design and material choices for the full-scale Gripper Test Assembly (GrTA) being developed by Argonne.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Installation and Demonstration of CNC Machining for Mechanical Test Specimens in the IFEL Hot Cell

This report documents the installation and demonstration of computer numerical control (CNC) machining capabilities in the Irradiated Fuels Examination Laboratory hot cell facility at Oak Ridge National Laboratory (ORNL). A modified Tormach PCNC 440 mill was integrated into the hot cell with custom fixturing, fines management, and manipulator-compatible interfaces to enable the fabrication of axial tension test (ATT) and ring tension test (RTT) specimens from irradiated cladding. The first irradiated specimens machined included ATT and RTT geometries harvested from the high-burnup 6XV fuel rod. Dimensional inspections confirmed that machined specimens met the ±0.025 mm tolerance envelope established in prior development; deviations were consistent with expected measurement scatter and inherent specimen variability, such as wall thickness gradients and eccentricity. Comparisons with out-of-cell metrology confirmed that in-cell machining performance aligns with baseline scatter observed under ideal conditions. This work establishes reproducible, end-to-end specimen preparation at ORNL, directly supporting the US Department of Energy’s Accident-Tolerant Fuel program by enabling reliable, traceable mechanical testing of irradiated cladding.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Results of an In-Field Validation Exercise in Support of Wide-Area Environmental Sampling

The National Nuclear Security Administration’s (NNSA) Office of Nonproliferation and Arms Control (NA-24) is evaluating Wide-Area Environmental Sampling (WAES) as an additional safeguards verification tool for the International Atomic Energy Agency to detect undeclared nuclear activities. The NNSA is evaluating strategies for conducting a generic WAES campaign, the cost of a WAES campaign, and the effect of technological advancements that have occurred since the last major WAES review in 1999. Until now, the NNSA effort has focused on tabletop exercises (TTXs) in which high-performance computing allows for advanced modeling and simulation efforts to be applied to the WAES question. Although the modeling and simulations used in the TTXs are extremely valuable, field campaigns are still needed to validate the assumptions that underpin the models and the modeling process itself. During a 7 week period beginning in May 2023 and ending in June 2023, which included 4 weeks of active field collections, a multilaboratory team conducted its first in-field validation exercise. Prior to the in-field exercise, abbreviated TTXs were conducted to estimate the performance of all collection systems to be used during the field test. These TTXs guided the selection of materials to be released and the placement of the collection system. Based on these determinations, materials were procured to use in the field test, and an injection/release system was designed, built, and installed at the test facility. Background samples were collected during weeks one and four, and environmental collections against active releases were conducted during weeks two and three. The goals of this validation exercise included a demonstration of (1) the ability to provide controlled releases of particulates of surrogate materials, (2) the fielding and operation of collection systems (including deposition and active air collectors), and (3) the flexibility to revise equipment and campaign plans in the field. This paper presents the results and preliminary conclusions for this initial validation test. Based on these results, subsequent field campaigns are anticipated and will include the addition of other released materials.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

In-Sodium Testing of a Prototype Thermoacoustic Power Sensor for Sodium-Cooled Fast Reactors

The ultimate goal of this project is to develop and demonstrate a thermoacoustic power sensor (TAPS) for Sodium-Cooled Fast Reactors (SFRs), with potential application also envisioned to other nuclear technologies such as Lead-Cooled Fast Reactors (LFRs), Molten Salt Reactors (MSRs), in addition to Light Water Reactors (LWRs). The project was led by Westinghouse Electric Company, LLC (Westinghouse) and carried out in collaboration with Argonne National Laboratory (ANL) and the University of Pittsburgh. A TAPS is a passive (self-powered), non-invasive (wireless) sensor envisioned for measuring key parameters, such as local temperature and neutron flux, in a nuclear reactor core. The sensor generates pressure waves (i.e., sound waves) with a frequency and amplitude dependent upon nuclear operating conditions (coolant temperature or power changes). The acoustic waves are able to travel through the core and associated structures, and reach to the sensor network placed outside and/or inside of the reactor vessel. These sensors require a very small amount of power which, during loss of power events, can be provided, for example, by harvesting gamma radiation energy, thus resulting in a monitoring system that can function both during normal operation and during loss of power events. Westinghouse and the University of Pittsburgh designed and fabricated TAPS prototypes for Argonne National Laboratory (ANL) to carry out in-sodium testing to evaluate the effects of sodium on the TAPS and the performance of the TAPS technique in sodium. Argonne received a TAPS prototype from Westinghouse, and the prototype was modified such that it can be installed into a test vessel and function in sodium at elevated temperature without potentially leaking. A water mockup test apparatus was constructed to validate proper working of the prototype. An instrumentation and control (I&C) system, running on the National Instruments (NI) LabView platform, was developed to: 1) operate both the water mockup test and the in-sodium test facility; and 2) process and analyze the received acoustic signals from an array of accelerometers and the Argonne sodium-submersible high-temperature acoustic sensor. The prototype was successfully tested in a water bath at different temperatures. Water mockup tests demonstrated that the TAPS prototype is working properly and its resonance frequency changes linearly with the coolant (water) temperature. A TAPS test apparatus was constructed and integrated with the upgraded Under-Sodium Viewing (USV) sodium test facility. The integrated USV-TAPS sodium test facility has been operational. The TAPS prototype and a high-temperature sodium-submersible acoustic sensor (SSAS) developed by Argonne were both installed inside the TAPS test vessel. Being operated within argon cover gas under ambient conditions, the TAPS prototype demonstrated that it was functioning properly with a resonance frequency at 1407.2 Hz, which was successfully detected by the accelerometers mounted on the external wall of the vessel and the high-temperature SSAS installed inside the vessel. After successfully transferring sodium into the vessel, in-sodium tests of the prototype were conducted. Tests of the TAPS prototype demonstrated that the resonance frequency of the TAPS changes linearly with respect to the temperature difference between the interior of the TAPS and bulk sodium. The early tests showed that the TAPS prototype could not establish a continuous and consistent resonance in sodium. The resonance diminished before the prototype reached its operating temperature. A signal postprocessor was added to the DAQ module latterly to isolate interferences, enhance signal conditioning, improve peak detection, and generate resonance frequency versus temperature plots. After testing in molten sodium and immersion at higher temperature for several weeks, the TAPS prototype was able to establish a continuous resonance. Performance evaluation of the TAPS prototype was then conducted in sodium. The tests included the investigation of 1) the effects of the temperature difference between the TAPS and bulk sodium, 2) the effects of sodium flowrate; and 3) the performance of the different sensor-receiver systems positioned inside or outside the vessel. Results of a test demonstrated that, with limited sodium circulation, a continuous and consistent resonance of the TAPS prototype was established occasionally. The tests also demonstrated that, because of the nature of detection principles and mounting methods, the high temperature SSAS is more affected by acoustic noise, while accelerometers are more affected by vibrations, in the test environment. It is unknown why the TAPS prototype only occasionally established a continuous and consistent resonance when the TAPS temperature reached its operating temperature in molten sodium, and why it ultimately failed to resonate at all. A failure modes assessment was conducted and a few potential causes of failure were identified. Different post in-sodium tests were conducted to obtain additional information potentially relevant to the cause of the failure. Nondestructive evaluation techniques are suggested to examine the internal integrity as well as the gas mixture of the prototype. If they prove inconclusive, the prototype should be cut open to conduct a thorough inspection of its internal integrity and determine the state of the gas mixture.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

UKy-CAER Heat Integrated Transformative CO 2 Capture Process in Pulverized Coal Power Plants

The goal of this Phase II Topical Report is to summarize the work for public domain conducted on project DE-FE0031583. Building upon the Design Basis completed during Phase I and in accordance with the Statement of Project Objectives (SOPO), the University of Kentucky (UK) Center for Applied Energy Research (CAER) (Recipient) along with team members has completed the Front End Engineering Design (FEED) for its advanced, versatile post-combustion CO 2 capture system (CCS) at the 10 MWe large pilot scale to be installed at the Wyoming (WY) Integrated Test Center (ITC), using a heat integrated process with split-rich fed, two-stage stripping and any advanced solvent to enhance the CO 2 absorber performance and lower the cost of CO 2 capture. The proposed project (Phases I-III) involves the design, fabrication, installation, testing and evaluation of a large pilot scale facility that will demonstrate the UK CAER transformative CCS integrated with an operating power plant. The work performed in Phase I, detailed in the Phase I Topical Report that was submitted in March 2019, included formation of a project team, securing the host site, and completing pre-FEED design basis, a cost estimation, a preliminary techno-economic analysis (TEA) and an environmental information volume (EIV). The work performed in Phase II, detailed in this Phase II Topical Report, includes completion of FEEDs, completion of a process risk analysis (PRA), obtaining necessary permits, updating the EIV and TEA, updating the cost and schedule estimate for the Phase III scope of work (SOW) and securing the necessary cost share. Updated information is provided on the current status of the UK CAER CCS technology and the project is ready to begin immediately detailed design, construction and operation of the proposed pilot.

20 FOSSIL-FUELED POWER PLANTS↗

Description of the Gas Sampling and Circulation System for the LYNM PE1-A Experiment

A series of multiphysics experiments, referred to as Physics Experiment 1 (PE1) is underway at the U.S. Nevada National Security Site. The PE1 series includes detonations of three underground chemical explosions. As the name implies, there are a number of experiments investigating the signals generated by the explosion. The experiment series objectives are outlined in a report from Lawrence Livermore National Laboratory.1 One of the experiments is a gas migration experiment. Gas tracers were imbedded in the explosives and gas sampling boreholes were installed in the formation in the test bed. Connected to the monitoring points is a circulation system that moves gas to a central measurement location. This report does not describe the gas analysis or collection systems, but rather the circulation system that provides the gas for measurement. Here, we have combined four project documents into a single report that describes the design, build, installation, testing, and operation of the gas sampling network.

42 ENGINEERING↗

Field-Scale Testing of a High-Efficiency Membrane Reactor (MR)—Adsorptive Reactor (AR) Process for H2 Generation and Pre-Combustion CO2 Capture

The study objective was to field-validate the technical feasibility of a membrane- and adsorption-enhanced water gas shift reaction process employing a carbon molecular sieve membrane (CMSM)-based membrane reactor (MR) followed by an adsorptive reactor (AR) for pre-combustion CO2 capture. The project was carried out in two different phases. In Phase I, the field-scale experimental MR-AR system was designed and constructed, the membranes, and adsorbents were prepared, and the unit was tested with simulated syngas to validate functionality. In Phase II, the unit was installed at the test site, field-tested using real syngas, and a technoeconomic analysis (TEA) of the technology was completed. All project milestones were met. Specifically, (i) high-performance CMSMs were prepared meeting the target H2 permeance (>1 m3/(m2.hbar) and H2/CO selectivity of >80 at temperatures of up to 300 °C and pressures of up to 25 bar with a <10% performance decline over the testing period; (ii) pelletized adsorbents were prepared for use in relevant conditions (250 °C < T < 450 °C, pressures up to 25 bar) with a working capacity of >2.5 wt.% and an attrition rate of <0.2; (iii) TEA showed that the MR-AR technology met the CO2 capture goals of 95% CO2 purity at a cost of electricity (COE) 30% less than baseline approaches.

42 ENGINEERING↗