Acrylic Adhesive Contamination Testing and Mitigations for James Webb Space Telescope (JWST) and Roman Space Telescope (RST)
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
The James Webb Space Telescope (JWST) is a segmented deployable telescope, currently operating at L2. The telescope utilizes 6 degrees of freedom for adjustment of the Secondary Mirror (SM) and 7 degrees of freedom for adjustment of each of its 18 segments in the Primary Mirror (PM). After deployment, the PM segments and the SM arrived in their correct optical positions to within a ~1 mm, with accordingly large wavefront errors. A Wavefront Sensing and Controls (WFSC) process was executed to adjust each of these optical elements in order to correct the deployment errors and produce diffraction-limited images across the entire science field. This paper summarizes the application of the WFSC process.
The James Webb Space Telescope (JWST) is a large aperture (6.5 meter), cryogenic space telescope with a suite of near and mid-infrared instruments. JWST's primary science goal is to detect and characterize the first galaxies. It will also study the assembly of galaxies, star formation, protoplanetary systems, and the formation of evolution of planetary systems. We will review the motivations for JWST's science goals in the context of recent Hubble Space Telescope, and Spitzer Space Telescope observations and review the status of the JWST Observatory.
The James Webb Space Telescope (JWST) will carry four scientific instruments, one of which is the Tunable Filter Imager (TFI), which is an instrument within the Fine Guidance Sensor. The Dual Wheel (DW) mechanism is being designed, built and tested by COM DEV Ltd. under contract from the Canadian Space Agency. The DW mechanism includes a pupil wheel (PW) holding seven coronagraphic masks and two calibration elements and a filter wheel (FW) holding nine blocking filters. The DW mechanism must operate at both room temperature and at 35K. Successful operation at 35K comprises positioning each optical element with the required repeatability, for several thousand occasions over the five year mission. The paper discusses the results of testing geared motors and bearings at the cryogenic temperature. In particular bearing retainer design and PGM-HT material, the effects of temperature gradients across bearings and the problems associated with cooling mechanisms down to cryogenic temperatures. The results of additional bearing tests are described that were employed to investigate an abnormally high initial torque experienced at cryogenic temperatures. The findings of these tests, was that the bearing retainer and the ball/race system could be adversely affected by the large temperature change from room temperature to cryogenic temperature and also the temperature gradient across the bearing. The DW mechanism is now performing successfully at both room temperature and at cryogenic temperature. The life testing of the mechanism is expected to be completed in the first quarter of 2010.
The James Webb Space Telescope (JWST) will be a nearly ideal machine for acquiring the transmission and emission spectra of transiting exoplanets over its large wavelength range 0.7 - 28 microns. The NIRSpec, NIRCam, nTFI, and MIRI instruments will have spectroscopic capabilities that span spectral resolutions from 20 - 3000 and can cover up to 2 - 3 octaves in wavelength simultaneously. This will allow observing multiple molecular features at once, facilitating the separation of atmospheric temperature and abundance effects on spectra. Many transiting planets will also be able to be observed with both transmission and eclipse spectroscopy, providing further insights and constraints on planetary thermal structures and energy transport. Simulated JWST spectra of planets ranging from mini-Neptunes to gas giants will be presented. These simulations include planets ranging from mini-Neptunes to gas giants will be presented. These simulations include current best estimates of actual instrument throughput, resolution, spectral range, systematic noise, and random noise terms. They show that JWST will be able to determine the atmospheric parameters of a wide variety of planets, often when observing only one or a few transit or eclipse event sequences. The thermal emissions of rocky super-Earths will also be quickly detectable via mid-IR eclipse observations if such planets are found around nearby M star hosts beforehand.
The James Webb Space Telescope (JWST) is a large aperture (6.5 meter), cryogenic space telescope with a suite of near and mid-infrared instruments covering the wavelength range of 0.6 micrometers - 28 micrometers. JWST's primary science goal is to detect and characterize the first galaxies. It will also study the assembly of galaxies, star formation, and the formation of evolution of planetary systems. JWST is a segmented mirror telescope operating at (is) approximately 40K, a temperature achieved by passive cooling of the observatory, via a large, 5-layer membrane-based sunshield. We present an overview of the observatory systems design, the science instruments and the mission science objectives. With the completion of the Spacecraft Critical Design Review, the spacecraft has also fully transitioned to fabrication. We will discuss recent highlights associated with the Observatory, including completion and delivery of the primary mirror segments, delivery of the primary mirror backplane and its wings, and the delivery of five template membrane layers. We will also summarize the current predicted performance of the telescope, including stray light, pointing and image quality following the completion of the final design review. Finally, the current schedule through to launch will be presented with a summary of integration and test activities planned when the science payload is delivered to Northrop Grumman following cryo-optical testing at the Johns Space Flight Center.
The James Webb Space Telescope (JWST) is a large aperture (6.5 meter), cryogenic space telescope with a suite of near and mid-infrared instruments covering the wavelength range of 0.6 micron to 28 micron. JWST's primary science goal is to detect and characterize the first galaxies. It will also study the assembly of galaxies, star formation, and the formation of evolution of planetary systems. We will review the expected scientific performance of the observatory, and recent technical progress with the observatory and its complement of instruments.
The James Webb Space Telescope (JWST) was launched from Kourou Spaceport on December 25, 2021, at 12:20 UTC on an Ariane 5 launch vehicle. The launch vehicle inserted JWST into a 30-day transfer trajectory to the Sun-Earth-Moon (SEM) Lagrange point L2 region. JWST executed three mid-course correction maneuvers (MCCs) to insert the spacecraft into a quasi-halo orbit about SEM L2; JWST will maintain its trajectory about L2 for at least 5.5 years, with a goal of at least 10.5 years. This paper summarizes the flight dynamics support for JWST, including the prelaunch nominal trajectory design, the launch window analysis, contingency planning for trajectory-related anomalies, mission operations support for the first 6 months, and a comparison of the planned and achieved actual JWST trajectory results. The orbit determination strategy, both planned and executed, will be summarized, and the method of addressing the anomalies as they occurred will be included.
The James Webb Space Telescope (JWST) was launched from Kourou Spaceport on December 25, 2021, at 12:20 UTC on an Ariane 5 launch vehicle. The launch vehicle inserted JWST into a 30-day transfer trajectory to the Sun-Earth-Moon (SEM) Lagrange point L2 region. JWST executed three mid-course correction maneuvers (MCCs) to insert the spacecraft into a quasi-halo orbit about SEM L2; JWST will maintain its trajectory about L2 for at least 5.5 years, with a goal of at least 10.5 years. This paper summarizes the flight dynamics support for JWST, including the prelaunch nominal trajectory design, the launch window analysis, contingency planning for trajectory-related anomalies, mission operations support for the first 6 months, and a comparison of the planned and achieved actual JWST trajectory results. The orbit determination strategy, both planned and executed, will be summarized, and the method of addressing the anomalies as they occurred will be included.
The James Webb Space Telescope (JWST) primary mirror (PM) is 6.6 m in diameter and consists of 18 hexagonal segments, each 1.5 m point-to-point. Each segment has a six degree-of-freedom hexapod actuation system and a radius-of-curvature (RoC) actuation system. The full telescope will be tested at its cryogenic operating temperature at Johnson Space Center. This testing will include center-of-curvature measurements of the PM, using the Center-of-Curvature Optical Assembly (COCOA) and the Absolute Distance Meter Assembly (ADMA). The COCOA includes an interferometer, a reflective null, an interferometer-null calibration system, coarse & fine alignment systems, and two displacement measuring interferometer systems. A multiple-wavelength interferometer (MWIF) is used for alignment & phasing of the PM segments. The ADMA is used to measure, and set, the spacing between the PM and the focus of the COCOA null (i.e. the PM center-of-curvature) for determination of the ROC. The performance of these metrology systems was assessed during two cryogenic tests at JSC. This testing was performed using the JWST Pathfinder telescope, consisting mostly of engineering development & spare hardware. The Pathfinder PM consists of two spare segments. These tests provided the opportunity to assess how well the center-of-curvature optical metrology hardware, along with the software & procedures, performed using real JWST telescope hardware. This paper will describe the test setup, the testing performed, and the resulting metrology system performance. The knowledge gained and the lessons learned during this testing will be of great benefit to the accurate & efficient cryogenic testing of the JWST flight telescope.
Explore the source record for details and available documents.
The James Webb Space Telescope (JWST) is a large, infrared space telescope operating at Lagrange point 2. JWST is a joint effort between NASA, ESA, and CSA and was launched from the Centre Spatial Guyanais (CSG) on an Ariane 5 rocket in December 2021. The Ariane 5 payload faring (PLF), as shown in Figure 1, interior and Vehicle Equipment Bay membranes received multiple cleanings, detailed inspections, and verification sampling to achieve necessary cleanliness levels. Investigation of PLF cleanliness began early in the JWST program to test the Fairing Acoustic Protection (FAP) panels. Initial PLF cleaning was performed at RUAG in Switzerland prior to shipment to the launch site in collaboration with NASA and ESA. The cleaning procedure used at RUAG premises was based on heritage of the PLF cleaning procedure for ESA/Herschel-Planck and NASA/Mars2020 missions on an Atlas V launcher. The Ariane 5 fairing was packaged in a clean manner and inspected and cleaned upon arrival to CSG. Silicon wafers and particle fall out (PFO) plates were used to monitor the internal fairing cleanliness prior to encapsulation. Just after encapsulation, PFO plates and calcium fluoride (CaF2) crystals were placed inside the fairing on a specific tool door for monitoring the cleanliness inside the fairing during the ventilation phase. The fairing itself was specially sealed to protect the inner environment with just a small, doored porthole accessible via diving board for final closeout of the purge interface. Fairing cleanliness was achieved and mitigated contamination distribution upon launch.
The James Webb Space Telescope (JWST) Science Working Group has published the key scientific study areas for the mission: the end of the dark ages, the assembly of galaxies, the birth of stars and protoplanetary systems, and planetary systems and the origins of life. With these objectives establishing the major scientific capabilities of the observatory, the JWST Project has successfully completed major reviews of the telescope architecture and budget plan and has reached agreement on the contributions for all three international partners (NASA, ESA, and the Canadian Space Agency). Northrop Grumman Space Technologies (NGST) is the prime contractor responsible for the spacecraft, telescope, and integration. GSFC/NASA oversees the development and integration of the science instruments. The Space Telescope Science Institute is developing the JWST Science & Operations Center. The JWST will be launched to L2 2011 using an Ariane V. At this town hall, the mission's Project Scientists will present the technical and scientific status of the mission, concentrating on those areas that have changed over the last year. This will be an excellent opportunity to learn about JWST and catch up on the most recent developments. Questions from the audience will be welcomed. The town hall speakers will be John Mather, Peter Jakobsen, John Hutchings, and Peter Stockman.
The James Webb Space Telescope (JWST) is a large, infrared-optimized space telescope consisting of the following elements: (1) Optical telescope element (OTE) (2) Integrated science instrument module (ISIM) (3) Spacecraft (4) Sunshield The Integrated Science Instrument Module (ISIM) consists of the JWST science instruments (NIRCam, MIRI, NIRSpec), a fine guidance sensor (FGS), the ISIM Structure, and thermal and electrical subsystems. JWST's instruments are designed to work primarily in the infrared range of the electromagnetic spectrum, and the instruments and telescope operate at cryogenic temperatures (approximately 35 K for the instruments). The development and validation of a thermal distortion modeling and analysis capability for the JWST ISIM Structure was successfully completed. The modeling and analysis approach was grounded in initial constituent materials testing and benchmarked to test results at the composite bonded joint, subassembly, and fullscale flight hardware levels. Comparison of analysis predictions and test results from this series of incremental cryogenic thermal distortion tests demonstrates that the model validation goals are achieved.
The James Webb Space Telescope (JWST) Integrated Science Instrument Module (ISIM) Structure is a precision optical metering structure for the JWST science instruments. Optomechanical performance requirements place stringent limits on the allowable thermal distortion of the metering structure between ambient and cryogenic operating temperature (~35 K). This paper focuses on thermal distortion testing and successful verification of performance requirements for the flight ISIM Structure. The ISIM Structure Cryoset Test was completed in Spring 2010 at NASA Goddard Space Flight Center in the Space Environment Simulator Chamber. During the test, the ISIM Structure was thermal cycled twice between ambient and cryogenic (~35 K) temperatures. Photogrammetry was used to measure the Structure in the ambient and cryogenic states for each cycle to assess both cooldown thermal distortion and repeatability. This paper will provide details on the post-processing of the metrology datasets completed to compare measurements with performance requirements.
The James Webb Space Telescope (JWST) Integrated Science Instrument Module (ISIM) Structure is a precision optical metering structure for the JWST science instruments. Optomechanical performance requirements place stringent limits on the allowable thermal distortion of the metering structure. A significant effort was completed to develop capabilities to predict and metrologize cryogenic thermal distortion of the ISIM Structure. This paper focuses on thermal distortion finite element modeling, analysis, and model validation. Extensive thermal distortion analysis was completed during the design phase for the ISIM Structure to demonstrate that thermal distortion requirements were achieved. Comparison of measurements from recently completed cryogenic testing and model predictions demonstrate the adequacy of thermal distortion modeling uncertainty factors adopted during the design phase, and provide bounds on the accuracy of the model predictions. This paper will provide an overview of the test configurations, describe the thermal distortion models of the tests, and provide a comparison of test results and analytical predictions from the models.
The James Webb Space Telescope (JWST) is a large, infrared-optimized space telescope consisting of an Optical telescope element (OTE), Integrated science instrument module (ISIM), a Spacecraft, and a Sunshield. The Integrated Science Instrument Module (ISIM) consists of the JWST science instruments (NIRCam, MIRI, NIRSpec), a fine guidance sensor (FGS), the ISIM Structure, and thermal and electrical subsystems. JWST's instruments are designed to work primarily in the infrared range of the electromagnetic spectrum, and the instruments and telescope operate at cryogenic temperatures (approximately 35 K for the instruments).
James Webb Space Telescope (JWST) transmission and emission spectra will provide invaluable glimpses of transiting exoplanet atmospheres, including possible biosignatures. This promising science from JWST, however, will require exquisite precision and understanding of systematic errors that can impact the time series of planets crossing in front of and behind their host stars. Here, we provide estimates of the random noise sources affecting JWST Near-Infrared Camera (NIRCam) time-series data on the integration-to-integration level. We find that 1/ f noise can limit the precision of grism time series for two groups (230–1000 ppm depending on the extraction method and extraction parameters) but will average down like the square root of N frames/reads. The current NIRCam grism time-series mode is especially affected by 1/ f noise because its GRISMR dispersion direction is parallel to the detector fast-read direction, but could be alleviated in the GRISMC direction. Care should be taken to include as many frames as possible per visit to reduce this 1/ f noise source: thus, we recommend the smallest detector subarray sizes one can tolerate, four output channels, and readout modes that minimize the number of skipped frames (RAPID or BRIGHT2). We also describe a covariance-weighting scheme that can significantly lower the contributions from 1/ f noise as compared to sum extraction. We evaluate the noise introduced by preamplifier offsets, random telegraph noise, and high dark current resistor capacitor (RC) pixels and find that these are correctable below 10 ppm once background subtraction and pixel masking are performed. We explore systematic error sources in a companion paper.