Search NASA⌕ Search

SEARCH · Search NASA

Results for “James Webb Telescope”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Commissioning the James Webb Space Telescope Optical Telescope Element

The James Webb Space Telescope (JWST) launched on December 25th, 2021. The observatory was deployed and commissioned during its first six months. The Optical Telescope Element includes both large deployments of the Deployable Tower Assembly, Secondary Mirror Support Structure and the Primary Mirror Wings and it includes the deployment and alignment of the 18 primary mirror segments and the secondary mirror. The initial phase included cooldown and ice mitigation efforts followed by telescope deployments, mirror deployment and wavefront sensing and control. This paper will discuss the entire OTE commissioning from deployment through alignment including a discussion of results and lessons learned.

Lee D Feinberg↗

James Webb Space Telescope Primary Mirror Integration: Testing the Multiwavelength Interferometer on the Test Bed Telescope

The James Webb Space Telescope (JWST) integration includes a center of curvature test on its 18 primary mirror segment assemblies (PMSAs). This important test is the only ground test that will demonstrate the ability to align all 18 PMSAs. Using a multi-wavelength interferometer (MWIF) integrated to the test bed telescope (TBT), a one-sixth scale model of the JWST, we verify our ability to align and phase the 18 PMSAs. In this paper we will discuss data analysis and test results when using the MWIF to align the segments of the TBT in preparation for alignment of the JWST.

Olczak, Gene↗

Overview of Contamination Control for the James Webb Space Telescope Launch Campaign

The James Webb Space Telescope (JWST) is a large, infrared space telescope operating at Lagrange point 2. JWST is a joint effort between NASA, ESA, and CSA and was launched from the Centre Spatial Guyanais (CSG) on an Ariane 5 rocket in December 2021. The three-month launch campaign utilized enhanced contamination controls to meet JWST’s strict cleanliness requirements. Prior to launch, JWST was permitted to only be exposed to ISO Class 7 cleanrooms, whereas the processing facilities at CSG are ISO Class 8. NASA, ESA, Arianespace, and CNES implemented temporary upgrades to the nominal contamination control operations for the launch campaign unique to JWST, including the use of vetted, portable High Efficiency Particulate Air (HEPA) filter walls, pre-entrance cleanliness acceptance surveys of each facility and the intra-plant transporter, tightened cleanroom protocols, upgraded garmenting and laundering techniques, cleaning of Self-Contained Atmospheric Protection Ensemble (SCAPE) suits, increased maintenance, staffed pre-cleaning stations, adaptation of the house purge network, and a contamination control enclosure atop the Ariane 5 launcher prior to fairing encapsulation. The Ariane 5 fairing interior and Vehicle Equipment Bay membrane also received multiple cleanings, detailed inspections, and verification sampling to achieve necessary cleanliness levels. The fairing itself was specially sealed to protect the inner environment with just a small, doored porthole accessible via diving board for final closeout of the purge interface. All these enhancements together allowed JWST to meet its contamination requirements for launch, ensuring successful post-separation deployments and mission science.

James Webb Space Telescope, launch, contamination,↗

Overview of Contamination Control for the James Webb Space Telescope Launch Campaign

The James Webb Space Telescope (JWST) is a large, infrared space telescope operating at Lagrange point 2. JWST is a joint effort between NASA, ESA, and CSA and was launched from the Centre Spatial Guyanais (CSG) on an Ariane 5 rocket in December 2021. The three-month launch campaign utilized enhanced contamination controls to meet JWST’s strict cleanliness requirements. Prior to launch, JWST was permitted to only be exposed to ISO Class 7 cleanrooms, whereas the processing facilities at CSG are ISO Class 8. NASA, ESA, Arianespace, and CNES implemented temporary upgrades to the nominal contamination control operations for the launch campaign unique to JWST, including the use of vetted, portable High Efficiency Particulate Air (HEPA) filter walls, pre-entrance cleanliness acceptance surveys of each facility and the intra-plant transporter, tightened cleanroom protocols, upgraded garmenting and laundering techniques, cleaning of Self-Contained Atmospheric Protection Ensemble (SCAPE) suits, increased maintenance, staffed pre-cleaning stations, adaptation of the house purge network, and a contamination control enclosure atop the Ariane 5 launcher prior to fairing encapsulation. The Ariane 5 fairing interior and Vehicle Equipment Bay membrane also received multiple cleanings, detailed inspections, and verification sampling to achieve necessary cleanliness levels. The fairing itself was specially sealed to protect the inner environment with just a small, doored porthole accessible via diving board for final closeout of the purge interface. All these enhancements together allowed JWST to meet its contamination requirements for launch, ensuring successful post-separation deployments and mission science.

James Webb Space Telescope↗

An Overview of Contamination Control for the James Webb Space Telescope Launch Campaign

The James Webb Space Telescope (JWST) is a large, infrared space telescope operating at Lagrange point 2. JWST is a joint effort between NASA, ESA, and CSA and was launched from the Centre Spatial Guyanais (CSG) on an Ariane 5 rocket in December 2021. The three-month launch campaign utilized enhanced contamination controls to meet JWST’s strict cleanliness requirements. Prior to launch, JWST was permitted to only be exposed to ISO Class 7 cleanrooms, whereas the processing facilities at CSG are ISO Class 8. NASA, ESA, Arianespace, and CNES implemented temporary upgrades to the nominal contamination control operations for the launch campaign unique to JWST, including the use of vetted, portable High Efficiency Particulate Air (HEPA) filter walls, pre-entrance cleanliness acceptance surveys of each facility and the intra-plant transporter, tightened cleanroom protocols, upgraded garmenting and laundering techniques, cleaning of Self-Contained Atmospheric Protection Ensemble (SCAPE) suits, increased maintenance, staffed pre-cleaning stations, adaptation of the house purge network, and a contamination control enclosure atop the Ariane 5 launcher prior to fairing encapsulation. The Ariane 5 fairing interior and Vehicle Equipment Bay membrane also received multiple cleanings, detailed inspections, and verification sampling to achieve necessary cleanliness levels. The fairing itself was specially sealed to protect the inner environment with just a small, door porthole accessible via diving board for final closeout of the purge interface. All of these enhancements together allowed JWST to meet its contamination requirements for launch, ensuring successful post-separation deployments and mission science.

Contamination Control↗

The Development of Microshutters for the Near Infrared Spectrograph on the James Webb Space Telescope

One of the James Webb Space Telescope's (JWST) primary science goals is to characterize the epoch of galaxy formation in the universe and observe the first galaxies and clusters of galaxies. This goal requires multi-band imaging and spectroscopic data in the near infrared portion of the spectrum for large numbers of very faint galaxies. Because such objects are sparse on the sky at the JWST resolution, a multi-object spectrograph is necessary to efficiently carry out the required observations. We have developed a fully programmable microshutter array that will be used as the field selector for the Near Infrared Spectrograph (NIRSpec) on JWST. This device allows slits to be opened at the locations of selected galaxies in the field of view while blocking other unwanted light from the sky background and bright sources. In practice, greater than 100 objects within the field of view will be observed simultaneously. In this paper, we describe the microshutter arrays, their development, fabrication, testing, and progress toward delivery of flight qualified devices to the NIRSpec instrument team in 2008.

Silverberg, Robert F.↗

The James Webb Space Telescope Mission Status

The James Webb Space Telescope (Webb) is a large, infrared space telescope that recently completed its on-orbit commissioning activities and will now embark on the first year of approved science. Its architecture includes many first-of-its-kind innovations for space, including a segmented primary mirror that is 6.6 m in diameter and a 5-layer sunshield used to passively cool the telescope and its four science instruments. Although Webb had an extensive test program, the system-level performance often relied on predictions based on integrated modeling, using conservative factors for the model uncertainties and primarily focusing on evaluating the performance requirements at end of life. A set of commissioning activities were designed for a system-level characterization of the performance. This proceeding will provide the status of the mission, including a discussion of the major events, on-orbit system performance, and early science highlights.

Michael McElwain↗

Evaluating the performance of portable air filter walls for the James Webb Space Telescope launch campaign

The James Webb Space Telescope (JWST) launched from the Centre Spatial Guyanais (CSG) in December 2021. JWST’s requirements permitted processing in International Organization for Standardization (ISO) Class 7 or better facilities, but CSG was only equipped with ISO Class 8 facilities. To temporarily upgrade the air cleanliness in the Payload Processing Facility, Fueling Hall, and Final Assembly Building Encapsulation Hall, NASA provided two portable High Efficiency Particulate Air (HEPA) and carbon filter walls that were used in each location. The walls were comprised of stacks of two modules high and arranged in push-push configurations as shown to be most effective via Computational Fluid Dynamics simulations of expected floor layouts in each facility. After delivery to NASA’s Goddard Space Flight Center in 2020, the walls underwent initial verification measurements inside a cleanroom and validation testing in an uncontrolled area to quantify their improvement of air cleanliness and particle and molecular fallout. Validation testing showed improvements of 83-99% for airborne particle counts, 79-91% for particle fallout, and 50-90% for molecular fallout. The particle improvements were applied to the contamination budget analysis that tracked current and predicted future cleanliness against End-of-Life requirements for JWST’s critical surfaces. At CSG, the walls successfully maintained an ISO Class 7 environment or better within their envelope in each location, despite their presence in ISO Class 8 facilities with dense integration operations.

HEPA, Contamination Control, Filtration↗

Evaluating the Performance of Portable Air Filter Walls for the James Webb Space Telescope Launch Campaign

The James Webb Space Telescope (JWST) launched from the Centre Spatial Guyanais (CSG) in December 2021. JWST’s requirements permitted processing in International Organization for Standardization (ISO) Class 7 or better facilities, but CSG was only equipped with ISO Class 8 facilities. To temporarily upgrade the air cleanliness in the Payload Processing Facility, Fueling Hall, and Final Assembly Building Encapsulation Hall, NASA provided two portable High Efficiency Particulate Air (HEPA) and carbon filter walls that were used in each location. The walls were comprised of stacks of two modules high and arranged in push-push configurations as shown to be most effective via Computational Fluid Dynamics simulations of expected floor layouts in each facility. After delivery to NASA’s Goddard Space Flight Center in 2020, the walls underwent initial verification measurements inside a cleanroom and validation testing in an uncontrolled area to quantify their improvement of air cleanliness and particle and molecular fallout. Validation testing showed improvements of 83-99% for airborne particle counts, 79-91% for particle fallout, and 50-90% for molecular fallout. The particle improvements were applied to the contamination budget analysis that tracked current and predicted future cleanliness against End-of-Life requirements for JWST’s critical surfaces. At CSG, the walls successfully maintained an ISO Class 7 environment or better within their envelope in each location, despite their presence in ISO Class 8 facilities with dense integration operations.

HEPA, Contamination Control, Filtration↗

James Webb Space Telescope Optical Telescope Element Mirror Coatings

James Webb Space Telescope (JWST) Optical Telescope Element (OTE) mirror coating program has been completed. The science goals of the JWST mission require a uniform, low stress, durable optical coating with high reflectivity over the JWST spectral region. The coating has to be environmentally stable, radiation resistant and compatible with the cryogenic operating environment. The large size, 1.52 m point to point, light weight, beryllium primary mirror (PM) segments and flawless coating process during the flight mirror coating program that consisted coating of 21 flight mirrors were among many technical challenges. This paper provides an overview of the JWST telescope mirror coating program. The paper summarizes the coating development program and performance of the flight mirrors.

Keski-Kuha, Ritva A.↗

James Webb Space Telescope: Mission Overview and Status

Often described as the successor to the Hubble Space Telescope, the James Webb Space Telescope (JWST) is a general astrophysics mission that will be used by the international astronomy community in a manner similar to other major space observatories: HST, Chandra, and Spitzer. The JWST is being developed by NASA in partnership with the European and Canadian Space Agencies for launch during 2013. This talk will review the science goals, overall mission architecture, and development status of the JWST.

Greenhouse, Matthew↗

Phasing the Webb Telescope

The James Webb Space Telescope (JWST) is a segmented deployable telescope, currently operating at L2. The telescope utilizes 6 degrees of freedom for adjustment of the Secondary Mirror (SM) and 7 degrees of freedom for adjustment of each of its 18 segments in the Primary Mirror (PM). After deployment, the PM segments and the SM arrived in their correct optical positions to within a ~1 mm, with accordingly large wavefront errors. A Wavefront Sensing and Controls (WFSC) process was executed to adjust each of these optical elements in order to correct the deployment errors and produce diffraction-limited images across the entire science field. This paper summarizes the application of the WFSC process.

JWST↗

James Webb Space Telescope Orbit Determination Analysis

The James Webb Space Telescope (JWST) is designed to study and answer fundamental astrophysical questions from an orbit about the Sun-EarthMoon L2 libration point, 1.5 million km away from Earth. Three mid-course correction (MCC) maneuvers during launch and early orbit phase and transfer orbit phase are required for the spacecraft to reach L2. These three MCC maneuvers are MCC-1a at Launch+12 hours, MCC-1b at L+2.5 days and MCC-2 at L+30 days. Accurate orbit determination (OD) solutions are needed to support MCC maneuver planning. A preliminary analysis shows that OD performance with the given assumptions is adequate to support MCC maneuver planning. During the nominal science operations phase, the mission requires better than 2 cmsec velocity estimation performance to support stationkeeping maneuver planning. The major challenge to accurate JWST OD during the nominal science phase results from the unusually large solar radiation pressure force acting on the huge sunshield. Other challenges are stationkeeping maneuvers at 21-day intervals to keep JWST in orbit around L2, frequent attitude reorientations to align the JWST telescope with its targets and frequent maneuvers to unload momentum accumulated in the reaction wheels. Monte Carlo analysis shows that the proposed OD approach can produce solutions that meet the mission requirements.

James Webb Space Telescope↗

James Webb Space Telescope Orbit Determination Analysis

The James Webb Space Telescope (JWST) is designed to study and answer fundamental astrophysical questions from an orbit about the Sun-Earth/Moon L2 libration point, 1.5 million km away from Earth. This paper describes the results of an orbit determination (OD) analysis of the JWST mission emphasizing the challenges specific to this mission in various mission phases. Three mid-course correction (MCC) maneuvers during launch and early orbit phase and transfer orbit phase are required for the spacecraft to reach L2. These three MCC maneuvers are MCC-1a at Launch+12 hours, MCC-1b at L+2.5 days and MCC-2 at L+30 days. Accurate OD solutions are needed to support MCC maneuver planning. A preliminary analysis shows that OD performance with the given assumptions is adequate to support MCC maneuver planning. During the nominal science operations phase, the mission requires better than 2 cm/sec velocity estimation performance to support stationkeeping maneuver planning. The major challenge to accurate JWST OD during the nominal science phase results from the unusually large solar radiation pressure force acting on the huge sunshield. Other challenges are stationkeeping maneuvers at 21-day intervals to keep JWST in orbit around L2, frequent attitude reorientations to align the JWST telescope with its targets and frequent maneuvers to unload momentum accumulated in the reaction wheels. Monte Carlo analysis shows that the proposed OD approach can produce solutions that meet the mission requirements.

Libration Point Orbit↗

James Webb Space Telescope: Large Deployable Cryogenic Telescope in Space

The James Webb Space Telescope (JWST) is an infrared space telescope designed to explore four major science themes: first light and reionization, the assembly of galaxies, the birth of stars and protoplanetary systems, and planetary systems and origins of life. JWST is a segmented architecture telescope with an aperture of 6.6 m. It will operate at cryogenic temperature (40 K), achieved via passive cooling, in an orbit about the Earth-Sun second Lagrange point (L2). Passive cooling is facilitated by means of a large sunshield that provides thermal isolation and protection from direct illumination from the Sun. The large size of the telescope and spacecraft systems require that they are stowed for launch in a configuration that fits the Ariane 5 fairing, and then deployed after launch. Routine wavefront sensing and control measurements are used to achieve phasing of the segmented primary mirror and initial alignment of the telescope. A suite of instruments will provide the capability to observe over a spectral range from 0.6- to 27-micron wavelengths with imaging and spectroscopic configurations. An overview is presented of the architecture and selected optical design features of JWST are described

Lightsey, Paul A.↗

Performance of the Center-Of-Curvature Optical Assembly During Cryogenic Testing of the James Webb Space Telescope

Cryogenic testing of the James Webb Space Telescope (JWST) included center-of-curvature metrology of the 18-segment primary mirror (PM). The Center-of-Curvature Optical Assembly (COCOA) consisted of a multiple-wavelength interferometer, a reflective null, coarse and fine alignment systems, and two displacement measuring interferometer systems. The COCOA enabled alignment and phasing of the segments from millimeter-level errors down to the nanometer level. This paper describes the COCOA, the test setup, the testing performed, and the performance of the COCOA in aligning the PM segments and measuring the final PM wavefront error.

Hadaway, James↗

James Webb Space Telescope Navigation Optimization Challenges

The James Webb Space Telescope (JWST) is a NASA flagship mission launched on December 25, 2021. The early orbit phase was highlighted by three midcourse correction burns that were performed to maneuver the vehicle into a libration orbit at the second Sun-Earth-Moon (SEM) libration point (L2). During the coast to L2, the vehicle’s primary observatory and sunshield were deployed. Once the tennis-court-sized sunshield was unfurled and tensioned into place, the large area exposed to solar radiation pressure (SRP) dictated that the SRP force model would need to account for the vehicle’s geometry, reflective properties, and orientation relative to the Sun. Following the insertion of JWST into its L2 libration orbit on January 24, 2022, the commissioning phase for the vehicle’s observatory commenced along with the first cycle of routine station-keeping maneuvers. The NASA Goddard Space Flight Center’s Flight Dynamics Facility (FDF) provides navigation services for the JWST mission. The FDF serves as the prime or backup navigation operations center for more than 30 active missions spanning a wide array of flight regimes performing orbit determination, maneuver planning, trajectory optimization, and tracking data evaluation. Definitive orbit determination for JWST is performed by the FDF using an Extended Kalman Filter (EKF) to estimate the vehicle’s trajectory and reflective properties using Deep Space Network (DSN) TRK-2-34 tracking data and spacecraft attitude telemetry. For the purposes of orbit prediction and station-keeping maneuver targeting, the sensitivity of the SRP force to the vehicle’s orientation requires that predictive attitude information must be incorporated to generate accurate orbit predictions and maneuver plans. Predictive attitude plans are provided to the FDF by the JWST Spacecraft Operations Center (SOC). Short-term (28 day) orbit predictions are propagated using a Short Range Attitude Plan (SRAP) to model the vehicle’s future attitude states for up to a week. SRAP attitude data is highly reliable, as it reflects finalized planned attitude states that the vehicle will be commanded to attain during the ensuing week. A Long Range Attitude Plan (LRAP) can be implemented to model predicted attitude states beyond one week, but these predictions are tentative and subject to revision due to changes in science operations plans. Instead, a conservative approach of applying a Sun-Pointing Neutral (SPN) attitude configuration is utilized for long-term (2 year) orbit predictions where reliable planned attitude data is not available. SPN attitude mode aligns the net SRP force along the JWST-to-Sun vector where it becomes independent of the vehicle’s angle of rotation about this vector, defined as the Sun yaw. Given the dynamic instability of the libration orbit, station-keeping thrust must be applied in either the sunward or anti-sunward direction to balance the resulting orbit. The attitude constraints of the vehicle also impose limits on the available pointing directions for station-keeping thrusters. The thrusters cannot be aligned with the optimal pointing direction for sunward maneuvers, rendering sunward maneuvers to be significantly less fuel efficient than anti-sunward maneuvers. Consequently, station-keeping maneuvers must be targeted to balance the orbit while ensuring that the next maneuver will also be performed in the anti-sunward direction to optimize propellant usage. When targeting a station-keeping maneuver, the attitude and SRP modeling configuration which is applied to the predicted post-maneuver trajectory will dictate the direction of the subsequent station-keeping maneuver, assuming nominal propulsion system performance. If the predicted post-maneuver attitude states result in an SRP model which under-predicts the cumulative SRP impact on the post-maneuver orbit, a targeted anti-sunward maneuver will be larger than necessary and the next maneuver will need to be executed sunward in order to compensate. In contrast, an anti-sunward maneuver which is targeted using an SRP model which over-predicts the cumulative SRP impact will achieve station-keeping while ensuring that the next maneuver will likewise be performed anti-sunward. For this reason, station-keeping maneuvers are targeted while applying the SPN attitude mode, as this mode entails the largest possible SRP area cross-section and therefore a larger modeled cumulative SRP impact. This paper documents the NASA Goddard Space Flight Center’s FDF support for JWST on-orbit operations and the analysis projects undertaken utilizing the experiences and data accumulated throughout the first full year of routine science operations. The results of these analysis efforts have been used to implement improvements to orbit prediction accuracy and maneuver efficiency which have the potential to prolong the lifespan of JWST to continue to conduct ground-breaking infrared astronomy for decades to come.

Flight Dynamics↗