Search NASA⌕ Search

SEARCH · Search NASA

Results for “Landing Pad”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Development of Space Shuttle Rescue and Recovery Operations

As the first Space Shuttle launch was still in our future, many from NASA, the Department of Defense (DoD) and NASA contractors were busy planning for not only a nominal launch and return, but contingency operations at the launch pad and landing sites. Prior to the first launch, detailed coordination, planning and simulations were conducted at all three locations and internal rescue procedures were taught at Kennedy Space Center (KSC). Later in the Program, the Transoceanic Abort Landing (TAL) sites were added in Europe and Africa. For the 51L mission a new TAL site was brought on line in Morocco. However, upon launch, the Shuttle Program experienced it's first lost. During the following months a complete review of all contingency operations (launch and landing) was completed. Many enhancements were made based on the reviews following. A Mode VIII water rescue was developed for NASA by the DoD before the STS-26 launch. Different concepts were explored and being debated by NASA. Training of the contingency forces was required before final decisions were made forcing the teaching of two different sets of procedures. To assist with training, a video was developed for the fire/crash/rescue personnel. This accompanied the detailed extraction procedures that were developed by a combination of KSC and DoD firemen. Training for the fire/crash/rescue personnel at Vandenberg AFB was also being planned before the accident happen. The fire/crash/rescue mockup that was being built at Chanute AFB was diverted to Edwards AFB. Educational Objectives: With the emphasis on Commercial Crew Programs for Space flight it is important that all involved understand what is required to prepare for contingencies. Cost effective means of being prepared for contingencies are needed. Questions: 1. When should planning for nominal and contingency operations begin? 2. What type of training aids are needed for contingency operations? 3. Who were the major contributors to Shuttle contingency operations?

Chandler, Michael↗

Surface Construction

Explore the source record for details and available documents.

Surface Construction↗

Large Vehicle Lunar Landing Surface Interaction and In-Situ Resource Based Risk Mitigation

A key capability required for the exploration of planetary bodies is the ability to land on the surface. Previous work performed by NASA and other institutions has primarily focused on landing small spacecraft on planetary surfaces and the associated small-to-medium thrusters required for the soft landing. In the case of human exploration—particularly the establishment of long duration exploration and habitation outposts—the ability to land large landers, such as the SpaceX Starship, is necessary. These larger landing systems require the use of more powerful engines, with higher temperature engine exhaust and higher landing loads. Understanding the excavation of material by the engines, as well as the potential for the landing legs to sink into the subsurface, is key in ensuring reliable and safe landings. A further improvement in landing reliability can be achieved by constructing landing/launchpads, especially with in-situ resources.

Landing Pad↗

Atmospheric study relating to pad lift-off and entry landing

A relationship between the atmospheric general circulation and geophysical hydrodynamic experiments was sought by attempting to find a relationship between wave number and temperature gradient at mid-latitudes at 500 mb. To this end data were gathered from four winter seasons and analyzed. The statistical analysis failed to provide convincing support for the hypothesis of a direct relationship between wave number and temperature gradient, although an indication that the transient waves may be so related was noted.

King, R. L.↗

Launch-pad abort capabilities of the HL-20 lifting body

The capability of the HL-20 lifting body to perform an abort maneuver from the launch pad to a horizontal landing was studied. The study involved both piloted and batch simulation models of the vehicle. A point-mass model of the vehicle was used for trajectory optimization studies. The piloted simulation was performed in the Langley Visual/Motion Simulator in the fixed-base mode. A candidate maneuver was developed and refined for the worst-case launch-pad-to-landing-site geometry with an iterative procedure of off-line maneuver analysis followed by piloted evaluations and heuristic improvements to the candidate maneuver. The resulting maneuver demonstrates the launch-site abort capability of the HL-20 and dictates requirements for nominal abort-motor performance. The sensitivity of the maneuver to variations in several design parameters was documented.

Jackson, E. Bruce↗

Investigation of the launch pad abort capabilities of the HL-20 lifting body

The capability of the HL-20 lifting body spacecraft to perform an abort maneuver from the launch pad to a horizontal landing was studied at NASA Langley Research Center. This study involved both piloted and batch simulation models of the vehicle. A point-mass model of the vehicle was used for trajectory optimization studies. The piloted simulation was performed in the Visual Motion Simulator in fixed-base mode. A candidate maneuver was developed and refined for the worst-case launch-pad-to-landing-site geometry using an iterative procedure of off-line maneuver analysis followed by piloted evaluations and heuristic improvements to the candidate maneuver. The resulting maneuver demonstrates the launch site abort capability of the HL-20 and dictates requirements for nominal abort motor performance. The sensitivity of the maneuver to variations in several design parameters was documented.

Jackson, E. B.↗

Automatic helical rotorcraft descent and landing using a Microwave Landing System

A helical-approach concept is presented for Instrument Flight Rules (IFR) operation of rotorcraft into congested terminal areas where separation from high-speed jet traffic is highly desirable and the airport-precision-approach aid is a Microwave Landing System (MLS). The concept takes advantage of the fact that rotorcraft need not land on the main runway but can operate from a pad that lies on an MLS radial offset from the centerline. The results of 48 flights using a UH-1H helicopter and a research avionics system are presented. Three levels of navigation sophistication were also investigated. It is shown that an approach helix can be contained in a relatively small volume and that being within the Instrument Landing System (ILS) Category II window at a 30-m (100-ft) altitude is not a requirement for a successful hover over a landing pad. Only two of the three navigation systems provided estimates that allowed all flights to descend from hover to touchdown.

Mcgee, L. A.↗

In-Situ Surface Construction of Infrastructure

In situ resources offer an opportunity to reduce the amount of items brought from Earth when exploring moons and planets. Utilizing those resources requires energy that comes with a cost. In the case of human missions to Mars, trading surface power for launch mass is beneficial for propellant and consumables required to sustain human pioneering and settlement on the planet’s surface. However, In Situ Resource Utilization (ISRU) can mean far more than propellant production and consumables replacement for missions beyond Low Earth Orbit. NASA’s Systems Capability Leader-ship Team (SCLT) for ISRU created a work break-down structure based on functions identified in roadmaps pertaining to human exploration. That WBS includes Prospecting, Extraction, Processing, Construction, Manufacturing, and Energy. Over the years, NASA has developed some capabilities and technologies for prospecting, extraction, and processing carbon dioxide and water on Mars into propellants and life support consumables. However, that is a small subset of the ISRU needs that are coming to light with NASA’s push to return to the Moon for extended periods of time. For instance, astronauts require shielding from Ga-lactic Cosmic Rays and nuclear radiation and protection from the low temperatures and pressures in Space. Surface assets including crew, landers, and ascent modules can be damaged by surface ejecta during landing and launch operations on the Moon and Mars. Creating shielding, berms, and pads requires movement of large volumes and stabilization of regolith in the context of a civil engineering construction project. Because of the multi-disciplinary nature of the aerospace systems needed for human exploration, SCLT on ISRU created an ISRU Construction Integrated Steering Group that combines expertise among several NASA Principal Technologists and Capabilities Leaders for exploring options, assessing opportunities, and developing requirements for construction and manufacturing on the Moon and Mars NASA’s new program to develop Lunar landers for small, mid, and large payload deliveries to the Lunar surface leading to human missions by 2025 spawned an investigation into plume surface interactions caused by the lander during descent and ascent. The trade space to resolve this issue includes regolith stabilization via landing pad construction techniques and lander nozzles characteristics due to vehicle systems design. Some data exists from the Apollo missions but more is required for the missions ahead. The purpose of this paper [1] is to outline an approach for developing requirements that can guide systems designs while taking advantage of flight opportunities in NASA’s plans to return to the Moon.

In-Situ↗

Analysis of navigation and guidance requirements for commercial VTOL operations

The paper presents some results of a program undertaken to define navigation and guidance requirements for commercial VTOL operations in the takeoff, cruise, terminal and landing phases of flight in weather conditions up to and including Category III. Quantitative navigation requirements are given for the parameters range, coverage, operation near obstacles, horizontal accuracy, multiple landing aircraft, multiple pad requirements, inertial/radio-inertial requirements, reliability/redundancy, update rate, and data link requirements in all flight phases. A multi-configuration straw-man navigation and guidance system for commercial VTOL operations is presented. Operation of the system is keyed to a fully automatic approach for navigation, guidance and control, with pilot as monitor-manager. The system is a hybrid navigator using a relatively low-cost inertial sensor with DME updates and MLS in the approach/departure phases.

Hoffman, W. C.↗

Lunar Mega Project: Processes, Work Flow and Terminology of the Terrestrial Construction Industry versus the Space Industry

Recent developments around the world show an increased interest and international activity toward developing a lunar surface human and robotic presence with a long term, sustainable vision. In Europe, the construction of a "Moon Village" has been proposed, and China has stated its intention to build a research station with a crew at the lunar South Pole. Russia stated it will land cosmonauts on the Moon in the 2030's. India has sent an orbiter, a robotic lander, and rover to the Moon. The USA intends to land the first woman and a man on the Moon by 2024 to initiate a sustained human lunar presence.A lunar research station with associated commercial activities will require infrastructure to become a permanent capability. Landing and launch pads, propellant storage and distribution farms, spacecraft access and handling structures, cranes, blast protection berms or walls, roads, graded areas, dust stabilized areas, foundations, parking lots, radiation shelters, micro-meteorite protection hangars, habitats and other human shelters, greenhouse farms, utility trenches, power plants, industrial water and oxygen extraction plants, communications antenna towers, thermal protection, mining zones, crater access and sub-surface access will be required to create a safe and sustainable lunar operations capability. This infrastructure will require significant construction activities in an extreme environment, with risky and expensive operations. On Earth, there are similar large and expensive projects (>$1 Billion) in difficult locations that attract a lot of public attention. These are known as "Mega Projects" and examples include bridges, tunnels, highways, railways, airports, seaports, power plants, dams, wastewater projects, Special Economic Zones (SEZ), oil and natural gas extraction projects, public buildings, information technology systems, aerospace projects, and weapons systems. Large consortiums consisting of public and private entities typically implement these infrastructure Mega-Projects.This paper will compare the typical design process, project management process, and work flow in the terrestrial construction industry to the space industry in order to create a better understanding between the terrestrial construction industry and the space industry, to further enable collaboration on a lunar Mega Project to build infrastructure on the Moon. In addition, a glossary of respective industry terminology with annotated linkages and definitions has been compiled. This information will enable contracts and business practices to be formulated for generating requests for proposals (RFP) by governments to consortiums consisting of construction and space industry companies that will bid on Lunar Infrastructure Projects that could lead to contracts to build the permanent capabilities.

Robert P Mueller↗

The Use of Solar Heating and Heat Cured Polymers for Lunar Surface Stabilization

Dust ejecta can affect visibility during a lunar landing, erode nearby coated surfaces and get into mechanical assemblies of in-place infrastructure. Regolith erosion was observed at many of the Apollo landing sites. This problem needs to be addressed at the beginning of the lunar base missions, as the amount of infrastructure susceptible to problems will increase with each landing. Protecting infrastructure from dust and debris is a crucial step in its long term functionality. A proposed way to mitigate these hazards is to build a lunar launch pad. Other areas of a lunar habitat will also need surface stabilization methods to help mitigate dust hazards. Roads would prevent dust from being lifted during movement and dust free zones might be required for certain areas critical to crew safety or to critical science missions. Work at NASA Kennedy Space Center (KSC) is investigating methods of stabilizing the lunar regolith including: sintering the regolith into a solid and using heat or UV cured polymers to stabilize the surface. Sintering, a method in which powders are heated until fusing into solids, has been proposed as one way of building a Lunar launch/landing pad. A solar concentrator has been built and used in the field to sinter JSC-1 Lunar stimulant. Polymer palliatives are used by the military to build helicopter landing pads and roads in dusty and sandy areas. Those polymers are dispersed in a solvent (water), making them unsuitable for lunar use. Commercially available, solvent free, polymer powders are being investigated to determine their viability to work in the same way as the solvent borne terrestrial analog. This presentation will describe the ongoing work at KSC in this field. Results from field testing will be presented. Physical testing results, including compression and abrasion, of field and laboratory prepared samples will be presented.

Hintze, Paul↗

Day of Launch Profile Selection for Pad Abort Guidance

A day of launch selection approach that involves choosing from an array of pitch profiles of varying loft was analyzed with the purpose of reducing the risk of a land landing failure during a pad abort. It was determined that selecting from three pitch profiles can reduce the number of waterline abort performance requirement failures approximately in half without compromising other performance metrics.

Whitley, Ryan J.↗

Model Investigation of Technique for Full Scale Landing Impact Tests at Simulated Lunar Gravity

An investigation of a 1/6-scale dynamic model has been made to develop and evaluate a technique for conducting full-scale landing-impact tests at simulated lunar gravity. Landings were made at touchdown pitch attitudes of -15 degrees, 0 degrees, and 15 degrees. All landings were made with two gear pads forward and at a roll attitude of 0 degrees. Both roll and yaw attitudes were constrained. Vertical landing speed was varied from 5 to 15 feet per second (1.5 to 4.6 m/s) and horizontal speed was varied from 0 to 10 feet per second (0 to 3.0 m/s). Most of the landings were made at a vertical and horizontal speed of 10 feet per second or 3.0 m/s (45 degree flight-path angle) while pitch attitude and surface characteristics, friction and topography, were varied. These parameters were investigated with the free-body earth-gravity and the simulated lunar-gravity test techniques. The landings were made at a model mass corresponding to a full-scale lunar weight (force due to gravity) of 1,440 pounds (6.41 kN) or an earth weight of 8,640 pounds (38.4 kN).

TESTS↗

Effluent sampling of Titan 3 C vehicle exhaust

Downwind in situ ground-level measurements of the exhaust from a Titan 3 C launch vehicle were made during a normal launch. The measurement activity was conducted as part of an overall program to obtain field data for comparison with the multilayer dispersion model currently being used to predict the behavior of rocket vehicle exhaust clouds. All measurements were confined to land, ranging from the launch pad to approximately 2 kilometers downwind from the pad. Measurement systems included detectors for hydrogen chloride (HCl), carbon dioxide (CO2), and particulates (Al2O3). Airborne and ground-based optical systems were employed to monitor exhaust cloud rise, growth, and movement. These measurement systems, located along the ground track (45 deg azimuth from the launch pad) of the exhaust cloud, showed no effluents attributable to the launch. Some hydrogen chloride and aluminum oxide were detected in the surface wind direction (15 deg azimuth) from the pad. Comparisons with the model were made in three areas: (1) assumption of cloud geometry at stabilization; (2) prediction of cloud stabilization altitude; and (3) prediction of the path of cloud travel. In addition, the importance of elemental analyses of the particulate samples is illustrated.

Gregory, G. L.↗

The INCO Expert System Project: CLIPS in Shuttle mission control

The INCO (Integrated Communications Officer) Expert System Project (IESP) was undertaken in 1987 by the Mission Operations Directorate (MOD) at NASA's Johnson Space Center (JSC) to explore the use of advanced automation in the mission operations arena. One of MOD's primary responsibilities in the space shuttle program is the manning of the flight control positions in the Mission Control Center (MCC) at JSC. The MCC is the central hub for all ground support activities in support of Space Shuttle missions. Its responsibility extends from the moment of lift-off from the launch pad though the completion of landing. The flight controllers in the MCC are tasked with monitoring the health and status of all on-board systems and payloads, detecting and remedying errors and failures, and modifying flight activity plans accordingly.

Rasmussen, Arthur N.↗