Search NASA⌕ Search

SEARCH · Search NASA

Results for “Launch operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Orbital transfer vehicle launch operations study: Automated technology knowledge base, volume 4

A simplified retrieval strategy for compiling automation-related bibliographies from NASA/RECON is presented. Two subsets of NASA Thesaurus subject terms were extracted: a primary list, which is used to obtain an initial set of citations; and a secondary list, which is used to limit or further specify a large initial set of citations. These subject term lists are presented in Appendix A as the Automated Technology Knowledge Base (ATKB) Thesaurus.

Source record↗

EXODUS: Integrating intelligent systems for launch operations support

Kennedy Space Center (KSC) is developing knowledge-based systems to automate critical operations functions for the space shuttle fleet. Intelligent systems will monitor vehicle and ground support subsystems for anomalies, assist in isolating and managing faults, and plan and schedule shuttle operations activities. These applications are being developed independently of one another, using different representation schemes, reasoning and control models, and hardware platforms. KSC has recently initiated the EXODUS project to integrate these stand alone applications into a unified, coordinated intelligent operations support system. EXODUS will be constructed using SOCIAL, a tool for developing distributed intelligent systems. EXODUS, SOCIAL, and initial prototyping efforts using SOCIAL to integrate and coordinate selected EXODUS applications are described.

Adler, Richard M.↗

Launch site integration for mixed fleet operations

Launch site impacts and integration planning issues are presented to support launch operations for a mixed vehicle fleet (manned and cargo). Proposed ground systems and launch site configurations are described. Prelaunch processing scenarios and schedules are developed for candidate launch vehicles. Earth-to-orbit (ETO) vehicle architectures are presented to meet future launch requirements, including the Space Exploration Initiative (SEI). Flight vehicle design recommendations to enhance launch processing are discussed. The significance of operational designs for future launch vehicles is shown to be a critical factor in planning for mixed fleet launch site operations.

Scott, L. P.↗

Nuclear safety

Topics dealing with nuclear safety are addressed which include the following: general safety requirements; safety design requirements; terrestrial safety; SP-100 Flight System key safety requirements; potential mission accidents and hazards; key safety features; ground operations; launch operations; flight operations; disposal; safety concerns; licensing; the nuclear engine for rocket vehicle application (NERVA) design philosophy; the NERVA flight safety program; and the NERVA safety plan.

Buden, D.↗

Development and Qualification of Alternate Blowing Agents for Space Shuttle External Tank Thermal Protection System

The Aerospace industry has a long history of using low density polyurethane and polyurethane-modified isocyanurate foam systems as lightweight, low cost, easily processed cryogenic Thermal Protection Systems (TPS) for ascent vehicles. The Thermal Protection System of the Space Shuttle External Tank (ET) is required so that quality liquid cryogenic propellant can be supplied to the Orbiter main engines and to protect the metal structure of the tanks from becoming too hot from aerodynamic heating, hence preventing premature break-up of the tank. These foams are all blown with CFC-1 I blowing agent which has been identified by the Environmental Protection Agency (EPA) as an ozone depleting substance. CFCs will not be manufactured after 1995, Consequently, alternate blowing agent substances must be identified and implemented to assure continued ET manufacture and delivery. This paper describes the various testing performed to select and qualify HCFC-1 41 b as a near term drop-in replacement for CFC-11. Although originally intended to be a one for one substitution in the formulation, several technical issues were identified regarding material performance and processability which required both formulation changes and special processing considerations to overcome. In order to evaluate these material changes, each material was subjected to various tests to qualify them to meet the various loads imposed on them during long term storage, pre-launch operations, launch, separation and re-entry. Each material was tested for structural, thermal, aeroshear, and stress/strain loads for the various flight environments each encounters. Details of the development and qualification program and the resolution of specific problems are discussed in this paper.

Williams, Charles W.↗

STS-114: Discovery Shuttle Processing Overview Briefing

This video of a briefing to representatives from the national media took the form of a slide show presentation by Jon Cowart, Manager of the Resident Office at Johnson Space Center. The presentation was an overview of ground maintainance facilities and procedures at Kennedy Space Center used to support Space Shuttle operations. The photographs in the slide show: Shuttle ground transport, maintenance, computers, and payloads, the Vehicle Assembly Building, ground operations, launch operations, crew boarding, liftoff, Pad A and Pad B, Solid Rocket Motor retrieval, crew procedures on-orbit, and landing. After the presentation is a brief question and answer session, in which reporters ask Cowart about Shuttle readiness, changes in Shuttle operations made for the Return to Flight, and how weather affects Shuttle operations.

Source record↗

NASA Lessons Learned on Reusable and Expendable Launch Vehicle Operations and Their Application Towards DARPA's Experimental Spaceplane (XS-1) Program

Outline: Selected Historic Shuttle Operations Data; Shuttle Lessons Learned Recommendations for Lower Cost, Operationally Efficient Launch Vehicle Systems; Selected Expendable launch vehicle experiences; Past NASA Launch Vehicle Development Programs, Studies (1985 to present); Discussion: Suggested applications of NASA Lessons Learned to already-baselined contractor XS-1 Phase I concepts.

Reusable launch vehicle↗

Spitzer Pre Launch Mission Operations System - The Road to Launch

Spitzer Space Telescope was launched on 25 August 2003 into an Earth-trailing solar orbit to acquire infrared observations from space. Development of the Mission Operations System (MOS) portion prior to launch was very different from planetary missions from the stand point that the MOS teams and Ground Data System had to be ready to support all aspects of the mission at launch (i.e., no cruise period for finalizing the implementation). For Spitzer, all mission-critical events post launch happen in hours or days rather than months or years, as is traditional with deep space missions. At the end of 2000 the Project was dealt a major blow when the Mission Operations System (MOS) had an unsuccessful Critical Design Review (CDR). The project made major changes at the beginning of 2001 in an effort to get the MOS (and Project) back on track. The result for the Spitzer Space Telescope was a successful launch of the observatory followed by an extremely successful In Orbit Checkout (IOC) and operations phase. This paper describes how the project was able to recover the MOS to a successful Delta (CDR) by mid 2001, and what changes in philosophies, experiences, and lessons learned followed. It describes how projects must invest early or else invest heavily later in the development phase to achieve a successful operations phase.

observatory↗

Statistical Analysis of Model Data for Operational Space Launch Weather Support at Kennedy Space Center and Cape Canaveral Air Force Station

The 12-km resolution North American Mesoscale (NAM) model (MesoNAM) is used by the 45th Weather Squadron (45 WS) Launch Weather Officers at Kennedy Space Center (KSC) and Cape Canaveral Air Force Station (CCAFS) to support space launch weather operations. The 45 WS tasked the Applied Meteorology Unit to conduct an objective statistics-based analysis of MesoNAM output compared to wind tower mesonet observations and then develop a an operational tool to display the results. The National Centers for Environmental Prediction began running the current version of the MesoNAM in mid-August 2006. The period of record for the dataset was 1 September 2006 - 31 January 2010. The AMU evaluated MesoNAM hourly forecasts from 0 to 84 hours based on model initialization times of 00, 06, 12 and 18 UTC. The MesoNAM forecast winds, temperature and dew point were compared to the observed values of these parameters from the sensors in the KSC/CCAFS wind tower network. The data sets were stratified by model initialization time, month and onshore/offshore flow for each wind tower. Statistics computed included bias (mean difference), standard deviation of the bias, root mean square error (RMSE) and a hypothesis test for bias = O. Twelve wind towers located in close proximity to key launch complexes were used for the statistical analysis with the sensors on the towers positioned at varying heights to include 6 ft, 30 ft, 54 ft, 60 ft, 90 ft, 162 ft, 204 ft and 230 ft depending on the launch vehicle and associated weather launch commit criteria being evaluated. These twelve wind towers support activities for the Space Shuttle (launch and landing), Delta IV, Atlas V and Falcon 9 launch vehicles. For all twelve towers, the results indicate a diurnal signal in the bias of temperature (T) and weaker but discernable diurnal signal in the bias of dewpoint temperature (T(sub d)) in the MesoNAM forecasts. Also, the standard deviation of the bias and RMSE of T, T(sub d), wind speed and wind direction indicated the model error increased with the forecast period all four parameters. The hypothesis testing uses statistics to determine the probability that a given hypothesis is true. The goal of using the hypothesis test was to determine if the model bias of any of the parameters assessed throughout the model forecast period was statistically zero. For th is dataset, if this test produced a value >= -1 .96 or <= 1.96 for a data point, then the bias at that point was effectively zero and the model forecast for that point was considered to have no error. A graphical user interface (GUI) was developed so the 45 WS would have an operational tool at their disposal that would be easy to navigate among the multiple stratifications of information to include tower locations, month, model initialization times, sensor heights and onshore/offshore flow. The AMU developed the GUI using HyperText Markup Language (HTML) so the tool could be used in most popular web browsers with computers running different operating systems such as Microsoft Windows and Linux.

Bauman, William H., III↗

Launch Vehicle Operations Simulator

The Saturn Launch Vehicle Operations Simulator (LVOS) was developed for NASA at Kennedy Space Center. LVOS simulates the Saturn launch vehicle and its ground support equipment. The simulator was intended primarily to be used as a launch crew trainer but it is also being used for test procedure and software validation. A NASA/contractor team of engineers and programmers implemented the simulator after the Apollo XI lunar landing during the low activity periods between launches.

Blackledge, J. W.↗

Modified Universal Design Survey: Enhancing Operability of Launch Vehicle Ground Crew Worksites

Operability is a driving requirement for next generation space launch vehicles. Launch site ground operations include numerous operator tasks to prepare the vehicle for launch or to perform preflight maintenance. Ensuring that components requiring operator interaction at the launch site are designed for optimal human use is a high priority for operability. To promote operability, a Design Quality Evaluation Survey based on Universal Design framework was developed to support Human Factors Engineering (HFE) evaluation for NASA s launch vehicles. Universal Design per se is not a priority for launch vehicle processing however; applying principles of Universal Design will increase the probability of an error free and efficient design which promotes operability. The Design Quality Evaluation Survey incorporates and tailors the seven Universal Design Principles and adds new measures for Safety and Efficiency. Adapting an approach proven to measure Universal Design Performance in Product, each principle is associated with multiple performance measures which are rated with the degree to which the statement is true. The Design Quality Evaluation Survey was employed for several launch vehicle ground processing worksite analyses. The tool was found to be most useful for comparative judgments as opposed to an assessment of a single design option. It provided a useful piece of additional data when assessing possible operator interfaces or worksites for operability.

Blume, Jennifer L.↗