Demonstration of a Continuous Motion Direct Air Capture System
Global Thermostat (GT) has developed a process that addresses the primary technical challenges associated with direct air capture (DAC): the ability to process enormous volumetric flowrates of air and provide the energy for regeneration at acceptable cost. However, at current, there is opportunity for improvement in overall capture costs and especially in capital costs. While GT has advanced its base technology to TRL levels supporting commercial deployments, its research strategy includes alternative technology embodiments that enable substantial reductions in the cost per tonne of CO 2 removed. The objective of this project is to advance the most promising of these embodiments, where a DAC plant is operated in a continuous fashion rather than a discrete stepwise fashion (GT’s commercial scale technology approach). The Continuous Motion Direct Air Capture (cDAC) System’s advantages over the GT baseline stepwise DAC platform have been proposed primarily as a reduction in the complexity required for starting and stopping a movement system, relaxing requirements for other components designed for a rapid switching application, and a flattening of the sharp instantaneous fluid flowrates into steady-state mass & energy flows to enable smoother operation and easier heat integration. These advantages can lead to shorter cycle times, greater plant reliability, and lower capital expense. The primary objective of this project is the design, construction, commissioning, and operation of a field-test unit (FTU) at a scale in the range of ~200 tons CO 2 per year. Data generated from the operation campaign would then be used in a prescreening techno-economic analysis (TEA) and life cycle analysis (LCA), allowing this process to be compared to other carbon capture technologies.