Lunar Communication and Navigation Architecture: NASA Viewpoint
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Onboard lunar orbital navigation system simulation, using minimum variance estimation
Both navigation and surface science can benefit from the ability to generate high resolution and accurate maps of the surface of the Moon and other solar system bodies. The primary way these maps are generated is through the use of orbital imagery and ranging data. Traditionally, the process of using orbital imagery and ranging data is tedious and labor-intensive. Additionally, once maps have been built, there has generally been limited effort in developing standards by which to verify the accuracy and quality of the generated maps. The Lunar Navigation Maps (LuNaMaps) project is a NASA Game Changing Development (GCD) project which over the last 4 years has aimed to address these issues both for the Moon and for other rocky solar system bodies. This has been accomplished through development of new and existing capabilities including: a suite of methods and tools to combine all sources of orbital imagery; a benchmark data set as well as basic requirements for high-fidelity simulations of precision landing functions; tools to synthetically enhance map products with lander-scale features for use in the development and testing of hazard detection systems; methods and tools to evaluate the accuracy of developed digital elevation maps (DEMs) and their quality for use in terrain relative navigation scenarios; and tools to realistically render image and lidar data. In this work, we provide an overview of the capabilities developed through LuNaMaps, demonstrating its use for processing existing lunar data, and describing how it can be applied to other use cases. We additionally provide preliminary results showing the application of the developed tools and processes to the generation of elevation maps of the Lunar Surface Proving Grounds (LSPG) lunar analog at Astrobotic’s Mojave testing facility using “orbital imagery” captured by a drone. In this terrestrial demonstration, we have the benefit of being able to compare the results to a ground truth model of the LSPG. We finally describe plans to use the newly created maps in a terrestrial terrain relative navigation demonstration over the LSPG in early 2025.
NASA Goddard Space Flight Center is developing Autonomous Navigation Guidance and Control (autoNGC) as a flight software system for future onboard use for missions in a variety of orbital regimes, including cislunar space and beyond. This paper describes processor-in-the-loop (PIL) testing using a lunar landing scenario with terrain relative navigation (TRN) and weak-signal GPS. We give an overview of the autoNGC project and describe preliminary navigation simulation results. We also describe the TRN PIL tests on a flight-like development board, using simulated images rendered from Lunar Reconnaissance Orbit high-resolution digital terrain models. The navigation simulations show that weak-signal GPS combined with TRN during a descent from a low lunar parking orbit results in sufficiently low navigation uncertainties to support such a mission profile independent of ground-based navigation. The PIL tests show that onboard image processing and landmark correlation is achievable at a sufficiently high measurement rate.
Celestial and satellite position fix schemes for navigating lunar roving vehicles
Topics include: Computational Ghost Imaging for Remote Sensing; Digital Architecture for a Trace Gas Sensor Platform; Dispersed Fringe Sensing Analysis - DFSA; Indium Tin Oxide Resistor-Based Nitric Oxide Microsensors; Gas Composition Sensing Using Carbon Nanotube Arrays; Sensor for Boundary Shear Stress in Fluid Flow; Model-Based Method for Sensor Validation; Qualification of Engineering Camera for Long-Duration Deep Space Missions; Remotely Powered Reconfigurable Receiver for Extreme Environment Sensing Platforms; Bump Bonding Using Metal-Coated Carbon Nanotubes; In Situ Mosaic Brightness Correction; Simplex GPS and InSAR Inversion Software; Virtual Machine Language 2.1; Multi-Scale Three-Dimensional Variational Data Assimilation System for Coastal Ocean Prediction; Pandora Operation and Analysis Software; Fabrication of a Cryogenic Bias Filter for Ultrasensitive Focal Plane; Processing of Nanosensors Using a Sacrificial Template Approach; High-Temperature Shape Memory Polymers; Modular Flooring System; Non-Toxic, Low-Freezing, Drop-In Replacement Heat Transfer Fluids; Materials That Enhance Efficiency and Radiation Resistance of Solar Cells; Low-Cost, Rugged High-Vacuum System; Static Gas-Charging Plug; Floating Oil-Spill Containment Device; Stemless Ball Valve; Improving Balance Function Using Low Levels of Electrical Stimulation of the Balance Organs; Oxygen-Methane Thruster; Lunar Navigation Determination System - LaNDS; Launch Method for Kites in Low-Wind or No-Wind Conditions; Supercritical CO2 Cleaning System for Planetary Protection and Contamination Control Applications; Design and Performance of a Wideband Radio Telescope; Finite Element Models for Electron Beam Freeform Fabrication Process Autonomous Information Unit for Fine-Grain Data Access Control and Information Protection in a Net-Centric System; Vehicle Detection for RCTA/ANS (Autonomous Navigation System); Image Mapping and Visual Attention on the Sensory Ego-Sphere; HyDE Framework for Stochastic and Hybrid Model-Based Diagnosis; and IMAGESEER - IMAGEs for Education and Research.
Explore the source record for details and available documents.
Many of the highest priority destinations at the Moon lack a continuous view of Earth, such as the lunar poles or lunar far side. Exploration of these sites will require spacecraft in cislunar space to relay communications and provide position, navigation, and timing (PNT) services. Accurate knowledge of relay position, velocity, and time is essential to these services. This paper describes a concept for a PNT Instrument being developed for the Lunar Communications Relay and Navigation Systems (LCRNS) Project. The instrument is intended as a payload that would enable autonomous, on-board, real-time navigation and timing using Global Navigation Satellite System (GNSS), optical navigation, and one-way measurements from Earth-based ground stations. Hardware-in-the-loop simulations using flight software are used to realistically characterize performance on hardware platforms with a path to flight. These results provide preliminary validation of the proposed PNT Instrument, demonstrate the benefits of augmenting GNSS with other measurements, and serve as an insightful reference for the design of future lunar missions, including those that will operate within the LunaNet framework of standards. This instrument concept relies on several technologies developed at NASA Goddard Space Flight Center (GSFC). For GNSS observables, the instrument relies on the high-altitude NavCube 3 mini (NC3m) GNSS receiver specifically designed for cislunar applications. The autoNGC system, which consists of flight software and a hardware platform, is responsible for fusing the observables using its extended Kalman filter, the Goddard Enhanced Onboard Navigation System (GEONS). Optical navigation observables are processed within autoNGC (“autonomous Navigation, Guidance, and Control”) using the Goddard Image Analysis & Navigation Tool (GIANT) which is also responsible for simulating high-fidelity images for test and analysis. In addition to describing the PNT Instrument and its components, the paper will present predicted performance based on simulation results. As a baseline, it will present GNSS-only hardware-in-the loop results using a NC3m test unit to process Spirent-simulated GPS signals in a potential lunar relay trajectory: a 12-hour elliptical frozen lunar orbit (ELFO). GEONS then processes the GPS pseudorange and time differenced carrier phase measurements to estimate and propagate the relay state (position, velocity, and time). These results extend previously published work that showed preliminary ELFO performance. Previous work has shown the importance of other measurement types, so additional simulations are performed which augment GNSS with ground station observables and several methods of optical navigation, including celestial navigation, limb-finding (e.g., observations of the lunar horizon), and terrain relative navigation (TRN). TRN involves correlating simulated predicted images of the lunar surface with actual imagery; misalignments of landmarks identified in each image are translated into relay state updates. TRN is valuable as a measurement of the relay’s state relative to the Moon, especially during GNSS outages or after maneuvers. One-way Pseudorange and Doppler measurements from Earth-based ground stations are also simulated. The full set of observables is processed using autoNGC. These simulations make use of autoNGC and NC3m test units, a lab atomic clock, and a pulse-per-second (PPS) generation and distribution system. This combination of subsystems, and the hardware platforms used in this analysis, represents a PNT Instrument that could be flown on a lunar relay. Results from the hardware-in-the-loop simulations presented in this paper provide a preliminary assessment of the achievable navigation performance of this instrument concept. PNT Instrument performance is compared to the GPS-only performance, and a discussion is provided on the apparent merits and challenges of each measurement type.
Explore the source record for details and available documents.
NASA’s Space Communications and Navigation (SCaN) program is developing a support structure of networks, partners, and technologies to provide communication, position, navigation, and timing services at the Moon. In this paper, we describe the progress and status of these diverse efforts and the ways in which they will be used during NASA’s crewed lunar exploration program, Artemis. We provide an update on developments at NASA which are targeted to cislunar space, including the Orion Artemis II Optical Communications System (O2O) demonstration mission, planned Lunar Exploration Ground Sites (LEGS) that will offer a dedicated Direct to Earth (DTE) capability servicing the cislunar region, and a recently released RFP for commercial Lunar Communications Relay and Navigation Services as well as Direct to Earth communications capabilities. We also describe the current status and key role of the LunaNet Interoperability Specification (LNIS), a collaborative standards framework developed by NASA, international partner agencies, and commercial stakeholders. A common thread, weaving these efforts together, is the support of commercial enterprises that can meet the Artemis challenge. Together, these projects and activities will enable safe, robust, and reliable communications and position, navigation, and timing (PNT) services for both crewed and uncrewed missions across cislunar space. SCaN and NASA, with our partners, are helping to build the foundation for a long term, sustainable human presence at the Moon –one that will set the stage for similar efforts at Mars.
Apollo 12 navigation for pinpoint lunar landing, correcting errors in downtrack position in guidance computer near powered descent initiation time
Capability for precise lunar landing is the goal for future NASA missions. A LIDAR-based terrain relative navigation (TRN) approach lets us achieve this goal and also land under any illumination conditions. Results from field test data showed that the LIDAR TRN algorithm obtained position estimates with mean error of about 20 meters and standard deviations of about 10 meters. Moreover, the algorithm was capable of providing 99 percent correct estimates by assessing the local terrain relief in the data. Also, the algorithm was able to handle initial position uncertainty of up to 1.6 kilometers without performance degradation.
The new generation of Navigation Doppler Lidar has been designed, developed, and tested for lunar missions. Comprehensive environmental testing is performed to assess the performance of the instrument for upcoming lunar missions and future missions to the Moon and other planetary bodies.
The new generation of Navigation Doppler Lidar has been designed, developed, and tested for lunar missions. Comprehensive environmental testing is performed to assess the performance of the instrument for upcoming lunar missions and future missions to the Moon and other planetary bodies.
To increase safety and land near pre-deployed resources, future NASA missions to the moon will require precision landing. A LIDAR-based terrain relative navigation (TRN) approach can achieve precision landing under any lighting conditions. This paper presents results from processing flash lidar and laser altimeter field test data that show LIDAR TRN can obtain position estimates less than 90m while automatically detecting and eliminating incorrect measurements using internal metrics on terrain relief and data correlation. Sensitivity studies show that the algorithm has no degradation in matching performance with initial position uncertainties up to 1.6 km
Manual navigation method for evaluating transfer orbits for lunar landings
Observations from Lunar Prospector, LCROSS, Lunar Reconnaissance Orbiter (LRO), and other missions have contributed evidence that water and other volatiles exist at the lunar poles in permanently shadowed regions. Combining a surface rover and a volatile prospecting and analysis payload would enable the detection and characterization of volatiles in terms of nature, abundance, and distribution. This knowledge could have impact on planetary science, in-situ resource utilization, and human exploration of space. While Lunar equatorial regions of the Moon have been explored by manned (Apollo) and robotic missions (Lunokhod, Cheng'e), no surface mission has reached the lunar poles.