Search NASA⌕ Search

SEARCH · Search NASA

Results for “MANAGEMENT PLANNING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Supplemental Information Regarding the Application for Remediation of the Flanged Tritium Waste Containers at Los Alamos National Laboratory

This letter is in response to the October 18, 2021 letter from David Gray, Acting Regional Administrator, to Mr. Theodore Wyka, Manager of the National Nuclear Security Administration’s Los Alamos Field Office (NA-LA). That letter requested additional information regarding the Application for remediation of the Flanged Tritium Waste Containers (FTWCs) at Los Alamos National Laboratory (LANL) Technical Area 54, Area G. The Emissions Management Plan for the FTWC Venting Project is attached.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A template of information needs for decision-making about delaying remediation on contaminated lands to protect human health

The contamination legacy of industrialization, militarization, and nuclear arms race poses current or future risks to populations and the environment. Responsible parties and regulators make decisions regarding which sites to clean up, how, how much, and when. This study aimed to provide an information needs template to evaluate and reduce risks to human health when considering whether to initiate or delay remediation. This investigation focused on four aspects of timing and prioritization: 1) management, planning and implementation, 2) source terms, pathways, and exposures, 3) risks and receptors, and 4) external drivers. Within each type, issues were identified and described. Management class included personnel, health and safety data, funding, equipment, and structural integrity. Source term included contaminant sources, pathways, initiating events, and barriers to exposure. Risk included types and exposures to workers and general public. External drivers included regulatory framework, stakeholders, Congressional mandates, and economic and social contexts. Risk may increase over time as contamination spreads, enters aquifers, and reaches receptors, and may decline as radionuclides decay, and plumes dissipate. The overall objective was to provide a template of information that is useful to managers and regulators, and might be used by the public to understand the risks and benefits of re-prioritization cleanup.

Environmental Sciences & Ecology↗

Building 151 NNMA Clean Laboratory Project Soil Sampling and Analysis Plan

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Function Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Building 151 NNMA Clean Laboratory Project (project) located immediately south of Building 154. The purpose of the SAP was to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction in accordance with Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL, 2022), which is consistent with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA, 2006). The SAP was developed in accordance with the SSMP and based on preliminary design information provided to EFA by PMO. In addition to environmental samples, geotechnical samples will be collected by Consolidated Engineering Laboratories (CEL) on behalf of PMO. Geotechnical samples will be collected from a dedicated geotechnical boring location or co-located with environmental samples. Collection of geotechnical samples is determined by CEL and is therefore not discussed in this SAP.

54 ENVIRONMENTAL SCIENCES↗

Lawrence Livermore National Laboratory Experimental Test Site 300 (Site 300): Site 300 Roadway Improvements - Chem Mag Loop Soil Sampling and Analysis Plan (May 2023)

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Function Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Roadway Improvements Project at the Chem Mag Loop (project). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on preliminary design information provided to EFA by PMO.

54 ENVIRONMENTAL SCIENCES↗

Lawrence Livermore National Laboratory Experimental Test Site 300 (Site 300): Site 300 Roadway Improvements - 836 Complex Soil Sampling and Analysis Plan (May 2023)

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Functional Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Roadway Improvements Project at the 836 Complex (project). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on preliminary design information provided by PMO.

54 ENVIRONMENTAL SCIENCES↗

Lawrence Livermore National Laboratory Livermore Site: 4200 Block Development Project Soil Sampling and Analysis Plan (June 2023)

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Function Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Maintenance Shop Facility in the 4200 Block (project). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on design information provided by PMO.

54 ENVIRONMENTAL SCIENCES↗

Site 300 Roadway Improvements - 834 Complex Soil Sampling and Analysis Plan

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Functional Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Roadway Improvements Project at the 834 Complex (project) (Figure 1). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on preliminary design information provided by PMO.

54 ENVIRONMENTAL SCIENCES↗

Building 871 and 874 Retaining Wall Project Soil Sampling and Analysis Plan

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Functional Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed retaining wall near Buildings 871 and 874 (project) (Figure 1). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on preliminary design information provided by PMO.

54 ENVIRONMENTAL SCIENCES↗

CalWave - Reports and Plans for xWave Device Demonstration at PacWave South Site

CalWave has developed a submerged pressure differential type Wave Energy Converter (WEC) architecture called xWave. The single body device oscillates submerged, is positively buoyant, and taut moored to the sea floor and integrates novel features such as absorber submergence depth control. Since participation in the US Wave Energy Prize, CalWave has evolved the design and successfully concluded a scaled 10-month open ocean pilot. CalWave recently concluded the final design phase of a scaled up WEC version for PacWave and started component order/build of the WEC towards the grid-connected demonstration at PacWave. Documentation and data here includes: a system certification plan, a risk registry in the form of an FMECA (Failure Mode, Effects, and Criticality Analysis) table, an updated LCOE content model, a report on performance metrics, and a risk management plan.

16 TIDAL AND WAVE POWER↗

Improving sustainable tropical forest management with voluntary carbon markets

Due to a rapidly changing climate, voluntary carbon markets are gaining momentum and should be leveraged to improve and expand tropical sustainable forest management plans, limiting carbon emissions and enhancing critical carbon sinks. By sequestering more carbon than any other terrestrial ecosystem — ~1 Pg C yr –1 — tropical forests provide crucial natural climate solutions and opportunities in the evolving voluntary carbon market. Here, we argue that some issues with the current sustainable management of tropical forests can be addressed using carbon-focused sustainable forest management (SFM + C) to leverage financial resources for tropical forest carbon storage and sequestration. We suggest an extended harvest cycle in SFM + C and calculate an associated potential increase in aboveground carbon stocks of commercial timber of 1.26 Mg C ha –1 after each cycle in the Brazilian Amazon. The additional carbon storage due to a longer harvest cycle can generate carbon credits worth 152.6 (SD 9.2) US dollars per hectare in 40 years. Considering an average cost of 180 BRL per m3 of commercial timber delivered to the sawmill, an SFM + C plan with a 40-year cycle could generate 28.7% (SD 2.5) more profit than 35-year cycles by combining timber and carbon revenues. A robust carbon price could incentivize the further extension of harvest cycles, providing a monetary return that offsets the opportunity cost intrinsic to harvesting under longer cycles. Lastly, we highlight research needs to support tropical SFM + C, which can be part of a global collective effort to limit global warming to below 2 °C above pre-industrial levels.

54 ENVIRONMENTAL SCIENCES↗

Radiological Recovery Logistics Tool - 20161

Argonne is building and testing a tool, the Radiological Recovery Logistics Tool (RRLT), that can be used during the response and recovery from a radiological or nuclear incident to effectively allocate appropriate commercial and public works equipment to mitigate, remove, and contain radiological contamination. The requirements for this tool - as well as development of the resulting software - is overseen by a steering committee of stakeholders from DHS's National Urban Security Technology Laboratory (NUSTL), the Federal Emergency Management Agency (FEMA), and the Environmental Protection Agency (EPA). One essential requirement is for RRLT to support the efficient and appropriate allocation of resources for a radiological response. Subsequent discussions between ANL and stakeholders have solidified the nature of this support to include identification of the types of resources to be allocated. The study reported in this paper has both factored fundamental concepts and connections out of this identification process and created a Knowledge Base detailing support goals, response scenarios, and efficacy information on dozens of equipment types. In short, RRLT will dynamically apply these findings to situational conditions surrounding contamination incidents. RRLT's Domain, the model of elements, ideas and relationships with which the tool will work, draws concepts from technical reports and stakeholder vocabularies to connect response goals and scenarios to types of equipment that offer utility towards those goals in those scenarios. RRLT's Knowledge Base will contain details on dozens of equipment types and facilitate the operator's discovery and consumption of these details most pertinent to a dynamically selected subset of goals. The core of its Domain Model is based on a report authored by this team. This report [1] contains a comprehensive list of proposed equipment to accomplish various missions or scenarios that might arise after a large-scale radiological contamination incident in an urban environment or critical infrastructure. The report divides potential response and recovery efforts into five support goals: Survey and monitoring of the contaminated area; Mitigation of received dose to first responders: Decontamination (gross and final) of buildings, vehicles, roadways, parks, and other surfaces: Waste management of solid waste generated during recovery operations: and Containment of wastewater and other waste generated during the response and recovery phases. RRLT's development is driven by use cases. A use case is an intention with which a user approaches the software. Use cases are grouped into delivery increments to schedule development, testing, and presentation to stakeholders. This model partitions the system into seven increments: User Arrival and Authentication, Search and Navigation, Equipment Recommendation, Plan Management, Content Management, and Expanded Access. Once a user 15 authenticated, RRLT will present the user with a dashboard that allows them to explore or search RRLT's content. The dashboard will also include a 'Plan' panel for collecting decisions and relevant observations about an incident at hand to facilitate development of an equipment list. RRLT will offer three general modes of access to items in the knowledge base: - Keyword search for direct discovery of items, - Navigation along predetermined paths from recovery goal towards equipment types, and - Interactive guidance towards equipment types by an autonomous software agent: the Equipment Recommendation Wizard. This presentation will detail progress in the development of the RRLT and also discuss opportunities for those interested in providing feedback on its content and functionality. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Designing Iowa Agricultural Landscapes to Improve Environmental Co-Benefits of Bioenergy Production

Cellulosic bioenergy feedstocks are needed to improve carbon (C) management while provisioning biomass for bioproducts and biofuel. The transition to increased cellulosic biomass production can be guided by land management plans designed to improve economic, environmental, and ecological performance. We constructed a sustainability model to compare landscape designs for biofuel production from corn (Zea mays L.) stover and switchgrass (Panicum virgatum L.) in central Iowa, USA. We used the model to compare environmental and socioeconomic outcomes associated with four landscape management strategies, with and without cellulosic biomass markets. We evaluated (1) a fuelshed area containing over 1.2 million ha (3 million acres) of corn and soybean (Glycine max (L.) Merr.) within 80 km (50 miles) of a commercial-scale cellulosic biorefinery in Nevada, Iowa, and (2) the South Fork watershed containing over 72,000 ha (178,000 acres) of these row crops within eight north central Iowa HUC-12 (hydrologic unit code) watersheds. At both landscape scales, we found that it is possible to achieve multiple environmental and socioeconomic benefits concomitantly with cellulosic biomass production by strategically collecting corn stover and converting the 10% of the lowest-profitability row crop land to perennial switchgrass. Potential benefits from landscape design include increased biodiversity, soil and water quality improvements, increased soil carbon sequestration for climate change mitigation, and reduced fertilizer use and cost. Our model results showed that increasing benefits can accrue when complementary conservation practices (e.g., reduced tillage, use of a rye cover crop) are combined and integrated throughout a fuelshed or watershed area. We conclude that ecologically based landscape designs offer valuable insights about costs and benefits of land management alternatives, with relevance for achieving stakeholder goals.

54 ENVIRONMENTAL SCIENCES↗

Impact of U-10Mo HALEU Fuel Element Tolerances on the Massachusetts Institute of Technology Reactor safety and operational performance – Neutronics

The U.S. is coordinating efforts for the conversion of six U.S. high performance research reactors (USHPRR), including one critical assembly from highly enriched uranium (HEU) to low-enriched uranium (LEU). In order to continue the mission of these reactors, including the Massachusetts Institute of Technology Reactor (MITR), and achieve similar performance, high assay low-enriched uranium (HALEU) with a high-density metallic alloy of uranium with 10 wt% molybdenum (U-10Mo) is being considered. Following the preliminary design of the proposed MITR LEU fuel elements using the U-10Mo monolithic alloy, the impact of the fabrication specification was assessed. This work focuses on the analysis of select neutronics characteristics of the MITR LEU core as a function of the variation of the relevant fuel specification parameters (e.g., U-10Mo composition, fuel plate thickness, etc.). A separate article submitted to this journal addresses the impact on the thermal hydraulic performance. The analyses in these works are performed based on an all-LEU conversion management plan identified in previous work, in which only the proposed elements are utilized for achieving the conversion of MITR. The variations of two main neutronics characteristics are assessed as a function of the variability of the specification parameters resulting from the fabrication process: the MITR LEU core reactivity and the fuel cycle length. The main findings of this work show that the MITR core can meet the operational requirements during the LEU transition plan under the limiting fabrication parameter combinations considered. In addition, the analyses show that the dependency of the core neutronics characteristics on the specification parameters is highly linear within the specification tolerances. The rates of variation are reported in detail for each parameter and can serve as a powerful tool for future MITR fuel management in cases such as when HALEU supply is established that may allow additional cycle length or other operational benefits.

Conversion↗

Reviewing clinical considerations and guideline recommendations of C1 inhibitor prophylaxis for hereditary angioedema

Abstract Background Hereditary angioedema (HAE), a rare disease that is characterized by painful and recurring non‐allergic swelling episodes, is caused by the deficiency or dysfunction of C1 inhibitor (C1INH) protein. A comprehensive HAE management plan may require long‐term prophylaxis (LTP) in addition to on‐demand treatment to help “normalize” patients' lives so that they may fully engage in work, school, family, and leisure activities. Aim The main objective of this narrative review is to provide an overview of updated guideline recommendations specific to LTP of HAE and discuss clinical considerations and pharmacologic management options, with a focus on C1INH. Materials and Methods The authors reviewed relevant HAE literature for current recommendations regarding LTP and the role of C1NH. Results Acute HAE attacks are treated with on‐demand medication; however, there is a consensus that LTP should routinely be considered for risk reduction and prevention of future episodes. The 2017 World Allergy Organization/European Academy of Allergy and Clinical Immunology guidelines recommend that all patients with HAE be evaluated for LTP routinely and the 2020 HAE Association (HAEA) guidelines emphasize that the decision to use LTP should not be based on rigid criteria, but rather should be based on individual patient needs. Both guidelines recommend C1INH as first‐line/preferred therapy for LTP in a range of patient types including adults, children/adolescents, and pregnant/lactating patients. The HAEA also recommends the kallikrein inhibitor, lanadelumab, as a first‐line option for LTP. HAE pathway‐specific agents for LTP have not been associated with notable safety concerns. Discussion Plasma‐derived C1INH has been available for 40+ years in Europe and impacts multiple targets within the HAE pathway. C1INH has been used for on‐demand treatment and LTP. A subcutaneous formulation of plasma‐derived C1INH is approved for LTP and produces functional C1INH activity levels consistently above the threshold needed for protection from HAE attacks. Other pathway‐specific options for LTP include the plasma kallikrein inhibitors, lanadelumab‐flyo and berotralstat, approved for adults and pediatric patients aged ≥12 years. C1INH is approved for adults and pediatric patients aged ≥6 years. Conclusion Assessing the need for LTP is vital in the ongoing dialogue between clinicians and patients, as both disease‐related factors and patient preferences may change over time. Among available options for LTP, plasma‐derived C1INH is the broadly recommended first‐line option for LTP in patients with HAE, including pregnant/lactating women and pediatric patients (≥6 years).

Anderson, John↗

Hazardous Chemical Inventory Guidelines, Purpose, and Process

The Environment, Safety, and Health Planning department at Sandia National Laboratories is interested in the purchase and storage of chemicals and their potential impact following an uncontrolled release. The large number of projects conducted at SNL make tracking every chemical purchase impractical; therefore, attention is focused on hazardous substances purchased in large quantities. Chemicals and quantities of concern are determined through regulatory guidelines; e.g., the OSHA Process Safety Management list, the EPA Risk Management Plan list, and the Department of Energy Subcommittee on Consequence Assessment and Protective Actions Emergency Response Planning Guidelines. Based on these regulations, a list of chemicals with quantities of concern was created using the Aerial Locations of Hazardous Atmospheres (ALOHA) and SCREEN View chemical dispersion modelling software. The nature of this report does not draw conclusions, rather it documents the logic for a chemicals of concern list to ensure compliance with various regulations and form the basis for monitoring chemicals that may affect hazard classification. Hazardous Chemical Inventory Guidelines, Purpose, and Process 4 This page left blank.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Waste Compliance and Tracking System (WCATS) Version 3 Requirements Document

This document describes the end-user requirements for the Waste Compliance and Tracking System (WCATS) project in accordance with the WCATS Software Quality Management Plan, EPC-WMP-WCATSPLAN-001. The WCATS application shall support the generation, characterization, processing, and shipment of LANL radioactive, hazardous, and industrial waste. Regulatory drivers include RCRA hazardous waste, DOT shipping, NNSA nuclear material control and accountability, DOE nuclear safety, TSDF permit, and transuranic waste certification requirements. The system will utilize a task-based architecture that supports the spectrum of treatment, storage, disposal, administrative, and characterization based unit operations necessary to manage waste from cradle to grave. The application design shall readily accommodate new facilities, processes, workflow, signature requirements, and so forth, via end-user established metadata. WCATS will provide support for representing waste storage and disposal facilities, buildings, rooms, and grid layouts (x, y, z) to support waste and radioactive material inventory management. Nuclear material at risk (MAR), DOE hazard rating (e.g., Category II facility) compliance per DOE-STD-1027, and permit inventory requirements will be configurable for any storage or disposal facility, or waste operation, and the system will automatically evaluate and enforce those requirements. In addition, the application will support the characterization and management of the entire range of hazardous and radioactive wastes (TRU, MTRU, LLW, MLLW, hazardous waste, etc.) that might be colocated or processed at a permitted facility. Some capabilities not found in traditional systems include user-defined tank systems for liquid waste, user-defined work paths (i.e., sequence of operations), and an equipment subsystem for tracking the calibration, maintenance, and inspection of tools used to process waste, such as torque wrenches, scales, pH probes, etc. The application incorporates a desktop and mobile user interface as shown in Figure 1. The mobile interface supports field operations, such as waste item characterization, intra-facility transfers, internal and external audits, and shipment preparation and receipt.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lawrence Livermore National Laboratory Experimental Test Site 300 (S300): S300 Roadway Improvements - 817 Complex Soil Sampling and Analysis Plan, Addendum 1 (June 2023)

The purpose of this addendum is to amend and update the S300 Roadway Improvements – 817 Complex [project] Soil Sampling and Analysis Plan (SAP) dated May 2023. Field activities to implement the SAP were completed in May 2023 except for SB-17. SB-17 is therefore included in this addendum. In addition, this addendum amends the SAP by covering an expanded scope of work and project limits. The project limits have been expanded to include areas around Building 818. Sampling at the expanded project area is addressed in this addendum by two additional borings for geotechnical and environmental analyses. The project area consists of the access gate and existing access roads for the Process Area complex. Excavation depths are anticipated to be no deeper than 5 feet from current grade. None of the proposed disturbance areas are within known areas of contamination or mapped controlled excavation area (LLNL 2008). Therefore, this addendum proposes a sampling spacing in the vicinity of Building 818 of about 172 feet (Tier 2) in accordance with the Soil Screening and Management Plan (LLNL 2022). The information contained in this addendum supersedes the May 2023 SAP. However, this addendum only addresses elements of the May 2023 SAP that were modified. Elements of the May 2023 SAP that have not been modified are relevant and will remain in effect.

54 ENVIRONMENTAL SCIENCES↗

LANL Regular Employee Population and Demographics, FY15-21

This document summarizes an effort to compile and analyze the LANL regular employee population’s demographic attributes and trends between FY15-FY21 using MicroStrategy, a web-based data analytics and visualization tool. LANL’s HR Division collected and prepared data for the Weapons Program’s annual reporting activities for the 2017 through 2023 NNSA Stockpile Stewardship and Management Plan (SSMP). Los Alamos workforce data represent the fiscal year-end snapshot of the permanent employee population who are categorized by the Common Occupational Classification System (COCS). This work enables further analyses, including trends for all workforce attributes presented in the SSMPs as well as a definition of a crosswalk between COCS categorization and the internal laboratory job classification hierarchy. Data for other sites and the federal workforce, as shown in the SSMPs, are included and corresponding figures can be visualized within the MicroStrategy tool. A portable, Excel-based version of the tool was developed and shared with the multi-site workforce working group. This summary highlights selected aspects of the LANL regular workforce. The data analyses and visualizations communicate insights within three major themes regarding permanent LANL employees: 1) demographic transformation, 2) attrition, and 3) skills. Regarding demographic transformation, and consistent with the general trend across the enterprise, early career regular employees are the fastest growing group, with growth ranging between 12-34% year-to-year over the seven-year period analyzed. The data also reflect effects of internal and external factors on attrition; the large spike in separations in FY18 aligns with the contract transition from LANS to Triad and the dip in attrition between FY20-FY21 is likely a result of the global pandemic. The population of regular employees in general management, engineer, and operator COCS categories have the fastest growth rates amongst all the occupational categories. The MicroStrategy and Excel tools provide additional details and trends.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗