Search NASA⌕ Search

SEARCH · Search NASA

Results for “Maneuver plans”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Decentralized Formation Flying Control in a Multiple-Team Hierarchy

This paper presents the prototype of a system that addresses these objectives-a decentralized guidance and control system that is distributed across spacecraft using a multiple-team framework. The objective is to divide large clusters into teams of manageable size, so that the communication and computational demands driven by N decentralized units are related to the number of satellites in a team rather than the entire cluster. The system is designed to provide a high-level of autonomy, to support clusters with large numbers of satellites, to enable the number of spacecraft in the cluster to change post-launch, and to provide for on-orbit software modification. The distributed guidance and control system will be implemented in an object-oriented style using MANTA (Messaging Architecture for Networking and Threaded Applications). In this architecture, tasks may be remotely added, removed or replaced post-launch to increase mission flexibility and robustness. This built-in adaptability will allow software modifications to be made on-orbit in a robust manner. The prototype system, which is implemented in MATLAB, emulates the object-oriented and message-passing features of the MANTA software. In this paper, the multiple-team organization of the cluster is described, and the modular software architecture is presented. The relative dynamics in eccentric reference orbits is reviewed, and families of periodic, relative trajectories are identified, expressed as sets of static geometric parameters. The guidance law design is presented, and an example reconfiguration scenario is used to illustrate the distributed process of assigning geometric goals to the cluster. Next, a decentralized maneuver planning approach is presented that utilizes linear-programming methods to enact reconfiguration and coarse formation keeping maneuvers. Finally, a method for performing online collision avoidance is discussed, and an example is provided to gauge its performance.

Mueller, Joseph .↗

Designing Mission Operations for the Gravity Recovery and Interior Laboratory Mission

NASA's Gravity Recovery and Interior Laboratory (GRAIL) mission, to understand the internal structure and thermal evolution of the Moon, offered unique challenges to mission operations. From launch through end of mission, the twin GRAIL orbiters had to be operated in parallel. The journey to the Moon and into the low science orbit involved numerous maneuvers, planned on tight timelines, to ultimately place the orbiters into the required formation-flying configuration necessary. The baseline GRAIL mission is short, only 9 months in duration, but progressed quickly through seven very unique mission phases. Compressed into this short mission timeline, operations activities and maneuvers for both orbiters had to be planned and coordinated carefully. To prepare for these challenges, development of the GRAIL Mission Operations System began in 2008. Based on high heritage multi-mission operations developed by NASA's Jet Propulsion Laboratory and Lockheed Martin, the GRAIL mission operations system was adapted to meet the unique challenges posed by the GRAIL mission design. This paper describes GRAIL's system engineering development process for defining GRAIL's operations scenarios and generating requirements, tracing the evolution from operations concept through final design, implementation, and validation.

MOS↗

The geo-control system for station keeping and colocation of geostationary satellites

GeoControl is a compact but powerful and accurate software system for station keeping of single and colocated satellites, which has been developed at the German Space Operations Center. It includes four core modules for orbit determination (including maneuver estimation), maneuver planning, monitoring of proximities between colocated satellites, and interference and event prediction. A simple database containing state vector and maneuver information at selected epochs is maintained as a central interface between the modules. A menu driven shell utilizing form screens for data input serves as the central user interface. The software is written in Ada and FORTRAN and may be used on VAX workstations or mainframes under the VMS operating system.

Montenbruck, O.↗

Cassini Solstice Mission Maneuver Experience: Year Three

The Solstice Mission is the final extension of the Cassini spacecraft s tour of Saturn and its moons. To accommodate an end-of-mission in 2017, the maneuver decision process has been refined. For example, the Cassini Project now prioritizes saving propellant over minimizing maneuver cycles. This paper highlights 30 maneuvers planned from June 2012 through July 2013, targeted to nine Titan flybys and the final Rhea encounter in the mission. Of these maneuvers, 90% were performed to maintain the prescribed trajectory and preserve downstream delta V. Recent operational changes to maneuver executions based on execution-error modeling and analysis are also discussed.

Equinox Mission↗

Cassini Maneuver Performance Assessment and Execution-Error Modeling Through 2015

In its twelfth year touring Saturn, the Cassini spacecraft continues to gather valuable scientific data about the planet and its moons. Cassini has executed a total of 331 propulsive maneuvers through January 23, 2016. With more than 30 maneuvers planned through July 2017 before the mission ends in September 2017, a dwindling propellant supply has become a chief concern. This manuscript will report on the analysis of Cassini maneuvers performed through December 30, 2015 and recommend execution-error models for the remainder of the mission. Maneuver performance assessment techniques and execution-error model development methods will also be outlined.

Wagner, Sean V.↗

Cassini Maneuver Performance Assessment and Execution-Error Modeling Through 2015

In its twelfth year touring Saturn, the Cassini spacecraft continues to gather valuable scientific data about the planet and its moons. Cassini has executed a total of 331 propulsive maneuvers through January 23, 2016. With more than 30 maneuvers planned through July 2017 before the mission ends in September 2017, a dwindling propellant supply has become a chief concern. This manuscript will report on the analysis of Cassini maneuvers performed through December 30, 2015 and recommend execution-error models for the remainder of the mission. Maneuver performance assessment techniques and execution-error model development methods will also be outlined.

Wagner, Sean V.↗

A discrete adaptive guidance system for a roving vehicle

An adaptive guidance technique which provides a self-correcting path following capability in an environment sensitive semi-autonomous roving robot is described. A real-time maneuver planning function performs tradeoffs between speed, magnitude of expected deviations and accelerations to best satisfy the design goals of vehicle safety and reliability, subsystem autonomy, performance accuracy and operational efficiency. The appropriate combination of maneuver parameters is selected through an iterative process using knowledge of vehicle performance characteristics, environmental model updates and vehicle state

Miller, J. A.↗

Cassini-Huygens Maneuver Experience: Second Year of Saturn Tour

This paper documents the maneuver experience during the second year of the Cassini-Huygens mission at Saturn. Since Saturn arrival in July 2004, the Cassini orbiter has made many flybys of Titan and Saturn's icy satellites. From August 2005 to June 2006, there were 39 planned maneuvers designed to target Cassini to aimpoints near Titan, Hyperion, Dione, and Rhea. Highlights of this paper include maneuver designs and strategies, maneuver performance, maneuver cancellation rationales, and a new maneuver execution-error model based on maneuvers executed to date.

navigation↗

Orbit Control Operations for the Cassini-Huygens Mission

The Cassini-Huygens spacecraft was launched in 1997 as an international and collaborative mission to study Saturn and its many moons. After a seven-year cruise, Cassini began orbiting Saturn for a four- year tour. This tour consists of 157 planned maneuvers, and their back-up locations, designed to target 52 encounters, mostly of Saturn's largest moon Titan. One of the mission's first activities was to release the Huygens probe to Titan in December 2004. Currently in its last year of the prime mission, Cassini-Huygens continues to obtain valuable data on Saturn, Titan, and Saturn's other satellites. Return of this information is in large part due to a healthy spacecraft and successful navigation. A two-year extended mission, beginning July 2008, will offer the opportunity to continue science activities. With a demanding navigation schedule that compares with the prime tour, the Cassini Navigation team relies on operations procedures developed during the prime mission to carry-out the extended mission objectives. Current processes for orbit control operations evolved from the primary navigational requirement of staying close to predetermined targeting conditions according to Cassini science sequence planning. The reference trajectory is comprised of flyby conditions to be accomplished at minimal propellant cost. Control of the planned reference trajectory orbit, and any trajectory updates, is achieved with the execution of Orbit Trim Maneuvers (OTMs). The procedures for designing, processing, and analyzing OTMs during Cassini operations is presented. First, a brief overview of the Cassini-Huygens Mission is given, followed by a general description of navigation. Orbit control and maneuver execution methods are defined, along with an outline of the orbit control staffing and operations philosophy. Finally, an example schedule of orbit control operations is shown.

navigation↗

GOES-I/M ascent maneuvers from transfer orbit to station

The Geostationary Operational Environmental Satellite (GOES)-I/M station acquisition sequence consists nominally of three in-plane/out-of-plane maneuvers at apogee on the line of relative nodes and a small in-plane maneuver at perigee. Existing software to determine maneuver attitude, ignition time, and burn duration required modification to optimize the out-of-plane parts and admit the noninertial, three-axis stabilized attitude. The Modified Multiple Impulse Station Acquisition Maneuver Planning Program (SENARIO2) was developed from its predecessor, SCENARIO, to optimize the out-of-plane components of the impulsive delta-V vectors. Additional new features include commputation of short term J sub 2 perturbations and output of all premaneuver and postmaneuver orbit elements, coarse maneuver attitudes, propellant usage, spacecraft antenna aspect angles, and ground station coverage. The output data are intended to be used in the launch window computation and by the maneuver targeting computation (General Maneuver (GMAN) Program) software. The maneuver targeting computation in GMAN was modified to admit the GOES-I/M maneuver attitude. Appropriate combinations of ignition time, burn duration, and attitude enable any reasonable target orbit to be achieved.

Abeyagunawardene, S.↗

Space Technology 5 Launch and Operations

The three spacecraft that made up the Space Technology 5 (ST5) mission were successfully launched and deployed from their Pegasus launch vehicle on March 22, 2006. Final contact with the spacecraft occurred on June 30, 2006, with all Level 1 requirements met. By the end of the mission, all ST5 technologies had been validated, all on-board attitude control system (ACS) modes had been successfully demonstrated, and the desired constellation configurations had been achieved to demonstrate the ability of small spacecraft to take quality science measurements, However, during those 100 days (ST5 was planned to be a 90-day mission), there were a number of anomalies that made achieving the mission goals very challenging. This paper will discuss: the chronology of the ST5 launch and early operations, work performed to diagnose and work-around a sun sensor anomaly, spacecraft tests devised to demonstrate correct operation of all onboard ACS modes, the maneuver plan performed to achieve the desired constellation, investigations performed by members of the ST5 GN&C and Science teams of an anomalous spin down condition, and the end-of-life orbit and passivating operations performed on the three spacecraft.

O'Donnell, James R.↗

Orbit Operations at 433 Eros: Navigation for the NEAR Shoemaker Mission

NASA's Near Earth Asteroid Rendezvous Mission began its record-setting exploration of the asteroid 433 Eros by inserting the spacecraft into orbit about Eros on February 14, 2000. This is the first spacecraft from any country to orbit an asteroid. The mission has overcome a failed insertion burn attempt on December 20, 1998, an event that would have ended most planetary missions, to return to the same target and successfully begin its science mapping a little more than a year later. Shortly after the successful insertion into orbit, the mission was renamed NEAR Shoemaker (NEAR) in memory of the late astronomer and geologist Eugene Shoemaker. NEAR will gather science data at Eros until February 14, 2001, which is the nominal end of mission. The NEAR mission is managed by the Johns Hopkins University, Applied Physics Laboratory in Laurel, Maryland. Since the initial mission concept in 1992, the design and implementation of the NEAR navigation system have been the responsibility of the Jet Propulsion Laboratory, California Institute of Technology. This presentation will show some of the unique features of navigation and mission design related to orbiting an asteroid and to designing a robust navigation system for the NEAR spacecraft. The problem of navigating a spacecraft about an asteroid is made difficult by the relative uncertainty in the asteroid physical properties which perturb the orbit: i.e., the mass, gravity field, and spin state. To help solve this problem, the navigation system for NEAR uses traditional DSN radio metric Doppler and range tracking, along with new technologies of optical landmark tracking and laser ranging to the asteroid surface. The experiences to date for each of these data types in the navigation solutions will be presented. Plans for the remainder of the NEAR mission will be presented, which include low orbits (down to 35 km radius circular orbits), and close flybys that may pass within 1 km of the surface. In addition, at the end of mission, NASA has approved a controlled descent and hovering phase that will culminate with the spacecraft impacting the surface. The maneuver planning for this final phase will also be presented.

Williams, B. G.↗

Maneuver Analysis and Targeting Strategy for the Stardust Re-Entry Capsule

The Stardust Sample Return Capsule (SRC) returned to Earth on January 15, 2006 after seven years of collecting interstellar and comet particles over three heliocentric revolutions, as shown in Figure 1. The SRC was carried on board the Stardust spacecraft, as shown in Figure 2. Because the spacecraft was built with unbalanced thrusters, turns and attitude control maintenance resulted in undesirable delta-v being imparted to the trajectory. As a result, a carefully planned maneuver strategy was devised to accurately target the Stardust capsule to the Utah Test and Training Range (UTTR). This paper provides an overview of the Stardust spacecraft and mission and describes the maneuver strategy that was employed to achieve the stringent targeting requirements for landing in Utah. In addition, an overview of Stardust maneuver analysis tools and techniques will also be presented.

targeting↗

Attitude Drift Analysis for the WIND and POLAR Missions

The spin axis attitude drift due to environmental torques acting on the Global Geospace Science (GGS) Interplanetary Physics Laboratory (WIND) and the Polar Plasma Laboratory (POLAR) and the subsequent impact on the maneuver planning strategy for each mission is investigated. A brief overview of each mission is presented, including mission objectives, requirements, constraints, and spacecraft design. The environmental torques that act on the spacecraft and the relative importance of each is addressed. Analysis results are presented that provide the basis for recommendations made pre-launch to target the spin axis attitude to minimize attitude trim maneuvers for both spacecraft over their respective mission lives. It is demonstrated that attitude drift is not the dominant factor in maintaining the pointing requirement for each spacecraft. Further it is demonstrated that the WIND pointing cannot be met pas 4 months due to the Sun angle constraint, while the POLAR initial attitude can be chosen such that attitude trim maneuvers are not required during each 6 month viewing period.

Crouse, Patrick↗

Application of GPS to Enable Launch Vehicle Upper Stage Heliocentric Disposal

To properly dispose of the upper stage of the Space Launch System, the vehicle must perform a burn in Earth orbit to perform a close flyby of the Lunar surface to gain adequate energy to enter into heliocentric space. This architecture was selected to meet NASA requirements to limit orbital debris in the Earth-Moon system. The choice of a flyby for heliocentric disposal was driven by mission and vehicle constraints. This paper describes the SLS mission for Exploration Mission -1, a high level overview of the Block 1 vehicle, and the various disposal options considered. The research focuses on this analysis in terms of the mission design and navigation problem, focusing on the vehicle-level requirements that enable a successful mission. An inertial-only system is shown to be insufficient for heliocentric flyby due to large inertial integration errors from launch through disposal maneuver while on a trans-lunar trajectory. The various options for aiding the navigation system are presented and details are provided on the use of GPS to bound the state errors in orbit to improve the capability for stage disposal. The state estimation algorithm used is described as well as its capability in determination of the vehicle state at the start of the planned maneuver. This data, both dispersions on state and on errors, is then used to develop orbital targets to use for meeting the required Lunar flyby for entering onto a heliocentric trajectory. The effect of guidance and navigation errors on this capability is described as well as the identified constraints for achieving the disposal requirements. Additionally, discussion is provided on continued analysis and identification of system considerations that can drive the ability to integrate onto a vehicle intended for deep space.

Anzalone, Evan J.↗

Update on PISCES

An updated version of the Platform Independent Software Components for the Exploration of Space (PISCES) software library is available. A previous version was reported in Library for Developing Spacecraft-Mission-Planning Software (MSC-22983), NASA Tech Briefs, Vol. 25, No. 7 (July 2001), page 52. To recapitulate: This software provides for Web-based, collaborative development of computer programs for planning trajectories and trajectory- related aspects of spacecraft-mission design. The library was built using state-of-the-art object-oriented concepts and software-development methodologies. The components of PISCES include Java-language application programs arranged in a hierarchy of classes that facilitates the reuse of the components. As its full name suggests, the PISCES library affords platform-independence: The Java language makes it possible to use the classes and application programs with a Java virtual machine, which is available in most Web-browser programs. Another advantage is expandability: Object orientation facilitates expansion of the library through creation of a new class. Improvements in the library since the previous version include development of orbital-maneuver- planning and rendezvous-launch-window application programs, enhancement of capabilities for propagation of orbits, and development of a desktop user interface.

Pearson, Don↗

Stardust Navigation Covariance Analysis

The Stardust spacecraft was launched on February 7, 1999 aboard a Boeing Delta-II rocket. Mission participants include the National Aeronautics and Space Administration (NASA), the Jet Propulsion Laboratory (JPL), Lockheed Martin Astronautics (LMA) and the University of Washington. The primary objective of the mission is to collect in-situ samples of the coma of comet Wild-2 and return those samples to the Earth for analysis. Mission design and operational navigation for Stardust is performed by the Jet Propulsion Laboratory (JPL). This paper will describe the extensive JPL effort in support of the Stardust pre-launch analysis of the orbit determination component of the mission covariance study. A description of the mission and it's trajectory will be provided first, followed by a discussion of the covariance procedure and models. Predicted accuracy's will be examined as they relate to navigation delivery requirements for specific critical events during the mission. Stardust was launched into a heliocentric trajectory in early 1999. It will perform an Earth Gravity Assist (EGA) on January 15, 2001 to acquire an orbit for the eventual rendezvous with comet Wild-2. The spacecraft will fly through the coma (atmosphere) on the dayside of Wild-2 on January 2, 2004. At that time samples will be obtained using an aerogel collector. After the comet encounter Stardust will return to Earth when the Sample Return Capsule (SRC) will separate and land at the Utah Test Site (UTTR) on January 15, 2006. The spacecraft will however be deflected off into a heliocentric orbit. The mission is divided into three phases for the covariance analysis. They are 1) Launch to EGA, 2) EGA to Wild-2 encounter and 3) Wild-2 encounter to Earth reentry. Orbit determination assumptions for each phase are provided. These include estimated and consider parameters and their associated a-priori uncertainties. Major perturbations to the trajectory include 19 deterministic and statistical maneuvers planned for the mission. The spacecraft is three axis stabilized and has unbalanced thrusters for attitude control. Accelerations due to the attitude control system are treated stochastically. The tracking scenario for the study is patterned after the actual schedule employed during the different phases of the mission. Conventional X-band two-way Doppler and SRA range data was simulated and the standard accuracy for these data types was assumed throughout most of the mission. However, a deweighting scheme was used for the Doppler data during times of low Sun-Earth-Probe angles, especially in the case of the DSM. Optical data is assumed to be available starting at 50 days prior to the comet encounter. The optical data will be used to improve the ephemeris of Wild-2, which is considered crucial to properly target the comet flyby. Results of the covariance analysis are presented for all mission phases. Navigation capability will be discussed in terms of the uncertainty in the encounter B-Plane (B.R and B.T) and linearized time of flight. Delivery errors based on the final maneuver prior to the comet encounter will be presented. The most stringent navigation requirement is for the Earth reentry. The uncertainty in the flight path angle must be less than 0.02 degree (orbit determination and maneuver performance) to assure successful recovery of the SRC. Results presented show that this requirement can be met.

Menon, Premkumar R.↗

Single-axis attitude determination accuracy

This paper extends the analysis of attitude determination accuracy introduced at the 1975 American Astronautical Society/American Institute of Aeronautics and Astronautics (AAS/AIAA) Astrodynamics Conference. It contains more generalized expressions, new geometrical relations, and additional applications. A complete set of attitude accuracy equations for both arc-length (portion of a great circle) and rotation-angle (dihedral angle) measurements are presented. These expressions can then be applied to determine the geometrical conditions under which a specified accuracy can be achieved by using either the attitude or a selected reference-vector direction as the independent variable. Representative applications to attitude determination accuracy studies and launch window analyses are discussed. The clear physical interpretation and straightforward graphical procedures greatly simplify mission analysis, maneuver planning, hardware configuration studies, and interpretation of results.

Chen, L. C.↗