Search NASA⌕ Search

SEARCH · Search NASA

Results for “Manhattan Project”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Critical Assemblies: Dragon Burst Assembly and Solution Assemblies

This work reviews the historical literature associated with the Dragon experiment and water boiler reactors operated at Los Alamos during the Manhattan Project. Frisch’s invited talk given at the American Nuclear Society’s Fast Burst Reactor Conference held at the University of New Mexico in Albuquerque, New Mexico, in 1969 is quoted. From the literature review, basic models for the Dragon experiment and for a water boiler–type assembly (aqueous homogeneous reactor) were created that can be used for conducting multiphysics simulations for criticality excursion studies. This methodology utilizes the coupled neutronic-hydrodynamic method to perform a time-dependent dynamic simulation of a criticality excursion. MCNP® was utilized to calculate important nuclear kinetic parameters that were incorporated into the models. Simulation results compare reasonably well with historic data.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

INNOVATIVE ALARA TOOLS AND WORK PRACTICES USED AT THE DOE HANFORD SITE

The Hanford Nuclear Reservation occupies an area of 586 square miles in southeastern Washington state. The site was created as part of the World War II Manhattan Project to produce weapons grade plutonium. A multitude of old reactor plants, processing facilities, underground tank farms, contaminated soil and ground water remain and are part of an on-going environmental cleanup mission of the site. The Columbia River bisects Hanford, and the concern is that the river will become contaminated if the sources of contamination are not removed. Currently facilities are being removed, the ground water is being treated, and contaminated soil is being transferred to an approved burial ground about 15 miles away from the River located in the center of the Hanford Site The remaining facilities and adjacent structures are undergoing D&D (decontaminate and demolish) and to date, significant progress has been made. During this presentation, I will discuss how we are using innovative tools and work practices to D&D these Hanford Site facilities.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

High Angle Remediation of Legacy Mercury Contaminated Soil at LANL - 16276

Mercury contaminated soil was left behind by The Manhattan Project and early Cold War era operations at Los Alamos National Laboratory (LANL) in Los Alamos, NM. TerranearPMC (TPMC) was the subcontractor that successfully completed this high-angle, legacy cleanup project on a steep, difficult-to-access canyon wall in Upper Los Alamos Canyon Aggregate Area south of a busy shopping center parking lot. A Menzi Muck (spider excavator) was used in concert with a high capacity telescoping crane to remove approximately 158 cubic yards of contaminated rock and soil from the steep slope. The crane was also used to safely move personnel and equipment into and off of the site, as well as to retrieve packaged waste. All soil excavated from the site was containerised in soft-sided 1.77 cubic yard IP-1 containers and shipped to an approved, licensed, off-site disposal facility. Once excavation was completed, sampling confirmed that human health concerns and environmental risk issues had been mitigated. This proven technical approach will become the preferred method for cleaning up other similar, difficult-to access/steep legacy waste sites across the Upper Los Alamos Canyon Aggregate Area. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Collaboration in Long-Term Stewardship at DOE's Hanford Site - 13019

The U.S. Department of Energy's (DOE) Hanford Site comprises approximately 1,517 km{sup 2} (586 mi{sup 2}) of land in southeastern Washington. The site was established in 1943 as part of the Manhattan Project to produce plutonium for the nation's nuclear weapons program. As the Cold War era came to an end, the mission of the site transitioned from weapons production to environmental cleanup. As the River Corridor area of the site cleanup is completed, the mission for that portion of the site will transition from active cleanup to continued protection of environment through the Long-Term Stewardship (LTS) Program. The key to successful transition from cleanup to LTS is the unique collaboration among three (3) different DOE Programs and three (3) different prime contractors with each contractor having different contracts. The LTS Program at the site is a successful model of collaboration resulting in efficient resolution of issues and accelerated progress that supports DOE's Richland Office 2015 Vision for the Hanford Site. The 2015 Vision for the Hanford Site involves shrinking the active cleanup footprint of the surface area of the site to approximately 20 mi{sup 2} on the Central Plateau. Hanford's LTS Program is defined in DOE's planning document, Hanford Long-Term Stewardship Program Plan [1]. The Plan defines the relationship and respective responsibilities between the federal cleanup projects and the LTS Program along with their respective contractors. The LTS Program involves these different parties (cleanup program and contractors) who must work together to achieve the objective for transition of land parcels. Through the collaborative efforts with the prime contractors on site over the past two years,, 253.8 km{sup 2} (98 mi{sup 2}) of property has been successfully transitioned from the cleanup program to the LTS Program upon completion of active surface cleanup. Upcoming efforts in the near term will include transitioning another large parcel that includes one of the six (6) cocooned reactors on site. These accomplishments relied upon the transparency between DOE cleanup programs and their contractors working together to successfully transition the land while addressing the challenges that arise. All parties, the three different DOE Programs and their respective prime contractors are dedicated to working together and continuing the progress of transitioning land to LTS, in alignment with the Program Plan and compliant with contractual requirements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Destructive analysis capabilities for plutonium and uranium characterization at Los Alamos National Laboratory

Los Alamos National Laboratory's (LANL) Actinide Analytical Chemistry (AAC) group has been in existence since the Manhattan Project. It maintains a complete set of analytical capabilities for performing complete characterization (elemental assay, isotopic, metallic and non metallic trace impurities) of uranium and plutonium samples in different forms. For a majority of the customers there are strong quality assurance (QA) and quality control (QC) objectives including highest accuracy and precision with well defined uncertainties associated with the analytical results. Los Alamos participates in various international and national programs such as the Plutonium Metal Exchange Program, New Brunswick Laboratory's (NBL' s) Safeguards Measurement Evaluation Program (SME) and several other inter-laboratory round robin exercises to monitor and evaluate the data quality generated by AAC. These programs also provide independent verification of analytical measurement capabilities, and allow any technical problems with analytical measurements to be identified and corrected. This presentation will focus on key analytical capabilities for destructive analysis in AAC and also comparative data between LANL and peer groups for Pu assay and isotopic analysis.

36 MATERIALS SCIENCE↗

Introduction to Special Issue on the Early History of Nuclear Fusion

This introductory paper to the special issue of Fusion Science and Technology commemorates early research on fusion conducted at Los Alamos (the singular entity denoted Los Alamos Laboratory/Los Alamos Scientific Laboratory/Los Alamos National Laboratory at different times is designated “Los Alamos” in this paper) in support of the eventual H-bomb program. We survey the historical origins of the thermonuclear program, what was known of fusion reactions at the outbreak of the war, and the remarkable breakthroughs involving particularly the prospect of deuterium-tritium (DT) reactions conducted during the war, and we summarize the papers in this volume. Much of the nuclear fusion technical history presented herein has not been previously reported. Papers describe aspects of fusion science during these days, on shock hydrodynamics and on electron-radiation coupling, and on nuclear physics including the discoveries of resonances in both the DT cross section and in the lithium tritium-breeding cross section. Three papers follow our colleague Mark Paris’s finding Arthur Ruhlig’s 1938 paper on the first observation of DT fusion: one on how it influenced subsequent Manhattan Project research, another on a modern calculation of that historic experiment, and a third that has repeated the experiment using modern experimental capabilities. Other papers discuss how the first H-bomb test, Ivy Mike, led to the discovery of the new elements einsteinium and fermium and how the DT fusion processes played a key role in our universe’s development after the Big Bang. We also present a paper that analyzes the pioneering Cambridge University 1934 experiment by Marcus Oliphant, Paul Harteck, and Ernest Rutherford where deuterium-deuterium fusion was first observed and that describes how Ernest Lawrence missed identifying fusion in 1933. Finally, we present a summary of early concepts for controlled fusion energy that grew out of wartime discussions at Los Alamos. The papers show how J. Robert Oppenheimer played a leading technical role in the early developments of the H-bomb, before his later opposition—our first paper in this issue addresses the U.S. Department of Energy’s 2022 vacation of the earlier 1954 decision to revoke his security clearance.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Deactivation of the K-27 building at the east Tennessee Technology Park - 15554

In 1942, nearly 24,280 hectares (60,000 acres) of east Tennessee landscape became part of the most significant defense strategy in the history of the United States - the Manhattan Project. Three methods of uranium separation were pursued at the site in the effort to end World War II. What became the K-25 site, now known as the East Tennessee Technology Park, focused on the gaseous diffusion method of uranium enrichment. This paper focuses on the deactivation of the second of five gaseous diffusion plants built on the site. The four-level, rectangular-shaped K-27 came online in 1945 and was tied to the site's original gaseous diffusion plant, K-25. K-27 extended K-25's enriching stages to increase production. The plant supported weapons production and other security strategies until 1964. K-27 spans 35,582 square meters (383,000 square feet) and contains approximately 92,903 square meters (one million square feet) of floor space. During deactivation, workers will use an assembly line process to tackle the 540 process stages housed in 90 cells. While often the less publicized, less visible aspect of building decontamination and decommissioning, deactivation takes more than three times longer than demolition. Crews work in high-risk, high-hazard environments - exposed to extreme temperatures, radiological and chemical contaminants, and deteriorating infrastructure. Therefore, worker safety becomes the most rigorous task performed. K-27 is the fifth and final gaseous diffusion building in the Department of Energy's Oak Ridge Environmental Management program to be demolished. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

D and D Knowledge Management Information Tool - 2012 - 12106

Deactivation and decommissioning (D and D) work is a high priority activity across the Department of Energy (DOE) complex. Subject matter specialists (SMS) associated with the different ALARA (As-Low-As-Reasonably-Achievable) Centers, DOE sites, Energy Facility Contractors Group (EFCOG) and the D and D community have gained extensive knowledge and experience over the years in the cleanup of the legacy waste from the Manhattan Project. To prevent the D and D knowledge and expertise from being lost over time from the evolving and aging workforce, DOE and the Applied Research Center (ARC) at Florida International University (FIU) proposed to capture and maintain this valuable information in a universally available and easily usable system. D and D KM-IT provides single point access to all D and D related activities through its knowledge base. It is a community driven system. D and D KM-IT makes D and D knowledge available to the people who need it at the time they need it and in a readily usable format. It uses the World Wide Web as the primary source for content in addition to information collected from subject matter specialists and the D and D community. It brings information in real time through web based custom search processes and its dynamic knowledge repository. Future developments include developing a document library, providing D and D information access on mobile devices for the Technology module and Hotline, and coordinating multiple subject matter specialists to support the Hotline. The goal is to deploy a high-end sophisticated and secured system to serve as a single large knowledge base for all the D and D activities. The system consolidates a large amount of information available on the web and presents it to users in the simplest way possible. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Status of Environmental Management Initiatives to Accelerate the Reduction of Environmental Risks and Challenges Posed by the Legacy of the Cold War

Fifty years of nuclear weapons production and energy research in the United States during the Cold War generated large amounts of radioactive wastes, spent nuclear fuel (SNF), excess plutonium and uranium, thousands of contaminated facilities, and contaminated soil and groundwater. During most of that half century, the Nation did not have the environmental regulatory structure or nuclear waste cleanup technologies that exist today. The result was a legacy of nuclear waste that was stored and disposed of in ways now considered unacceptable. Cleaning up and ultimately disposing of these wastes is the responsibility of the U.S. Department of Energy (DOE). In 1989, DOE established the Office of Environmental Management (EM) to solve the large scale and technically challenging risks posed by the world's largest nuclear cleanup. This required EM to build a new nuclear cleanup infrastructure, assemble and train a technically specialized workforce, and develop the technologies and tools required to safely decontaminate, disassemble, stabilize, disposition, and remediate unique radiation hazards. The sites where nuclear activities produced legacy waste and contamination include the original Manhattan Project sites--Los Alamos, New Mexico; Hanford, Washington; and Oak Ridge, Tennessee--as well as major Cold War sites, such as Savannah River Site, South Carolina; the Idaho National Laboratory, Idaho; Rocky Flats Plant, Colorado; and Fernald, Ohio. Today EM has responsibility for nuclear cleanup activities at 21 sites covering more than two million acres in 13 states, and employs more than 30,000 Federal and contractor employees, including scientists, engineers and hazardous waste technicians. This cleanup poses unique, technically complex problems, which must be solved under the most hazardous of conditions, and which will require billions of dollars a year for several more decades. The EM program focus during its first 10 years was on managing the most urgent risks and maintaining safety at each site while negotiating state and Federal environmental compliance agreements. The program also concentrated on characterizing waste and nuclear materials and assessing the magnitude and extent of environmental contamination. By the late 1990s, EM had made significant progress in identifying and characterizing the extent of contamination and cleanup required and began transitioning from primarily a characterization and stabilization program to an active cleanup and closure program. During that time, EM formulated multi-year cleanup and closure plans, which contributed to cleanup progress; however, reducing the overall environmental risk associated with the cleanup program remained a challenge. In response, the Secretary of Energy directed a review of the EM program be undertaken. The resulting 'Top-to Bottom Review' re-directed the program focus from managing risks to accelerating the reduction of these risks.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Heritage Center Cleanup, Closure, and Revitalization - 17426

For the past 20 years, Heritage Center, located at the East Tennessee Technology Park (ETTP), has been undergoing re-industrialization (RI) at the same time that legacy contamination from the Manhattan Project has been cleaned up. The DOE Oak Ridge Office of Environmental Management (OREM), cleanup contractor URS - CH2M Oak Ridge LLC (UCOR), and the Community Reuse Organization of East Tennessee (CROET) have developed a roadmap to achieve the desired end state for the site. The plan builds on ETTP cleanup, which will complete remediation to regulatory requirements, followed by closure activities that have identified all of the activities necessary to fully transition the site from closure to Heritage Center Revitalization. The ultimate goal is to eliminate or minimize DOE's long-term financial responsibility by transferring ownership of all of the property within the former ETTP site. DOE OREM is in the unique position of nearing the completion of cleanup scope at ETTP, planned for fiscal year (FY) 2020, and finalizing closure of the site (minimizing DOE's long-term liability and responsibility). In tandem, CROET is revitalizing and transforming the site into a unique end state, including a private industrial park and a National Historical Park with conservation activities integrated around and through the site. The closure and revitalization planning efforts were initiated during FY 2016 and will be finalized in FY 2017. The Closure Plan identifies all of the potential gaps between environmental cleanup of the site per the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the ultimate preferred end state. CROET, involved throughout the development of the closure strategy, is building upon the Closure Plan by completing the Revitalization Plan. The Revitalization Plan takes advantage of the Heritage Center's diverse amenities and uniqueness while maximizing its economic development potential, including a private-sector industrial park, conservation area, National Historical Park, and proposed regional airport. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Removing the Cloak of Secrecy from Legacy Cleanup at Los Alamos national Laboratory - 20395

With the establishment in 2018 of the Los Alamos Legacy Cleanup Contract, the Department of Energy's (DOE) Environmental Management Los Alamos Field Office (EM-LA) and its contractor Newport News Nuclear BWXT Los Alamos (N3B) embarked on an expansive program to engage a broad range of local and regional stakeholders in the decision-making process for cleanup of legacy wastes (pre-1999) at the Los Alamos National Laboratory (LANL). From the inception of LANL during the Manhattan Project until the issuance of the new cleanup contract, the site was managed by a single management and operations (M and O) contactor whose main focus was national security. Segmenting from laboratory operations a separate cleanup contract managed by DoE's Office of Environmental Management (EM) brought new opportunities for the cleanup of legacy waste. That change likewise has opened new opportunities for engaging the community on legacy cleanup decisions. The new legacy cleanup contract - an unclassified contract - emphasizes public outreach, marking a cultural shift in how stakeholders in Los Alamos and throughout northern New Mexico are engaged. Without the constraints of classified work, EM-LA and N3B have increased the level of transparency with the public regarding cleanup activities. EM-LA and N3B have crafted an approach that best meets the values, priorities and needs of the neighboring communities by adapting the model successfully employed at Rocky Flats. Through enhanced stakeholder involvement, EM-LA will implement decisions that have considered broad input and deliver a safe and efficient cleanup of the site. EM-LA and N3B began the expanded stakeholder outreach program in January 2019, leading up to four Environmental Management Cleanup Forums held in the summer of 2019. EM-LA and N3B are now in the process of initiating a series of meetings with various stakeholder groups to determine their 'values' as they relate to cleanup using a novel approach that elicits and records values. The entire process is documented, ensuring that should questions arise about how, when and why decisions were made, they can be easily addressed. In addition to other public meetings to present cleanup scenarios and solicit active public involvement in cleanup decisions, the EM-LA and N3B approach involves discussions with stakeholders who want to explore specific technical issues and cleanup discussions in depth. EM-LA and N3B are also evaluating and implementing a variety of communications tools to help ensure the engagement plan sets the gold standard for transparency in legacy cleanup and stakeholder involvement. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mercury Cleanup at the Y-12 Nuclear Security Complex - 18304

The Y-12 National Security Complex (Y-12) is one of the nation's most important national security assets. The facility played a key role in producing the world's first atomic bomb during the Manhattan Project and since World War II has been a vital contributor to America's nuclear deterrent capability. Historically, mercury was used extensively in operations at Y-12 in connection with production of components for nuclear weapons. During peak usage - from 1950 to 1963 - approximately 11 million kilograms of mercury were used. Over the years, large quantities of mercury - as much as 330,000 kilograms -- were lost within buildings and to soil and surface water. Today, mercury is considered the greatest environmental risk on the Oak Ridge Reservation and mercury cleanup is a high priority for the Department of Energy's Oak Ridge Office of Environmental Management (OREM). Remediation of Y-12 and East Fork Poplar Creek (EFPC) to mitigate the mercury risk is based on a phased, adaptive management approach. The approach to address surface water includes treatment actions in the short term and research and technology development to evaluate longer-term solutions in the downstream environment. A number of formidable challenges must be addressed in order to assure safe, effective cleanup of mercury contamination at Y-12 and in EFPC. In the long term, understanding how mercury moves in the EFPC system is essential to the development of new technologies and remedial options and strategies for mercury contamination in the creek. OREM has developed and is currently executing a Mercury Technology Development Plan to address these long term needs. As a major component of the short term actions, UCOR has completed the design of the Outfall 200 Mercury Treatment Facility. Outfall 200 is the point at which the west end Y-12 storm drain system discharges to Upper East Fork Poplar Creek (UEFPC). Outfall 200 is consistently the largest single source of mercury to UEFPC. Construction and operation of this facility is critical to reduce mercury in UEFPC, and operation of this facility will be required before demolition of mercury contaminated facilities can begin. Once operational, the Mercury Treatment Facility will have a treatment capacity of 3,000 gallons per minute (gpm), a storm water capture rate of 40,000 gpm, and two million gallons of storm water storage capacity. The headworks with transfer pipeline is designed to capture flow from Outfall 200 and move it to the treatment facility. A contract for construction of the Outfall 200 Mercury Treatment Facility is expected to be awarded in 2018. Early site preparation began in 2017. The early site preparation scope includes utilities relocation, small structure demolition and creek bank secant wall installation. Initial operation of the Mercury Treatment Facility is planned for 2022. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technetium incorporation in glass for the Hanford Tank Waste treatment and immobilization plant - 15066

A priority of the United States Department of Energy (U.S. DOE) is to dispose of nuclear wastes accumulated in 177 underground tanks at the Hanford Nuclear Reservation in eastern Washington State. These nuclear wastes date from the Manhattan Project of World War II and from plutonium production during the Cold War. The DOE plans to separate high-level radioactive wastes from low activity wastes and to treat each of the waste streams by vitrification (immobilization of the nuclides in glass) for disposal. The immobilized low-activity waste will be disposed of here at Hanford and the immobilized high-level waste at the national geologic repository. Included in the inventory of highly radioactive wastes is large volumes of {sup 99}Tc (∼9 x 10 E2 TBq or ∼2.5 x 10{sup 4} Ci or ∼1500 kg). A problem facing safe disposal of Tc-bearing wastes is the processing of waste feed into in a chemically durable waste form. Technetium incorporates poorly into silicate glass in traditional glass melting. It readily evaporates during melting of glass feeds and out of the molten glass, leading to a spectrum of high-to-low retention (ca. 20 to 80%) in the cooled glass product. DOE-ORP currently has a program at Pacific Northwest National Laboratory (PNNL), in the Department of Materials Science and Engineering at Rutgers University and in the School of Mechanical and Materials Engineering at Washington State University that seeks to understand aspects of Tc retention by means of studying Tc partitioning, molten salt formation, volatilization pathways, and cold cap chemistry. Another problem involves the stability of Tc in glass in both the national geologic repository and on-site disposal after it has been immobilized. The major environmental concern with {sup 99}Tc is its high mobility in addition to a long half-life (2.1 x 10{sup 5} yrs). The pertechnetate ion (TcO{sup 4-}) is highly soluble in water and does not adsorb well onto the surface of minerals and so migrates nearly at the same velocity as groundwater. Long-term corrosion of glass waste forms is an area of current interest to the DOE, but attention to the release of Tc from glass has been little explored. It is expected that the release of Tc from glass should be highly dependent on the local glass structure as well as the chemistry of the surrounding environment, including groundwater pH. Though the speciation of Tc in glass has been previously studied, and the Tc species present in waste glass have been previously reported, environmental Tc release mechanisms are poorly understood. The recent advances in Tc chemistry that have given rise to an understanding of incorporation in the glass giving rise to significantly higher single-pass retention during vitrification are presented. Additionally, possible changes to the baseline flowsheet that allow for relatively minor volumes of Tc reporting to secondary waste treatment will be discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Vault: National Security Then and Now

The employees at Los Alamos National Laboratory have always been the key to our mission success, dating all the way back to our inception in 1939 as Project Y. This was the secret Los Alamos Lab of the Manhattan Project charged with designing and producing the world’s first atomic weapons to help end World War II. Back then, prospective Lab employees received letters that directed them to an office at 109 E. Palace in Santa Fe, New Mexico. There, they were greeted by Dorothy McKibbin, secretary to Lab Director J. Robert Oppenheimer. Before anyone headed up the hill to begin work, Dorothy typed up the new employee’s personal information on what quickly became known as the McKibbin Card. Lab employees also had official badges, the black and white photos of which have become iconic over time. Today’s staff at the National Security Research Center, the Lab’s classified library, are just as vital as the Lab’s first workforce was. Our highly trained experts partner with researchers to solve global challenges.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

ARRA Projects - LANL

Material Disposal Area B (MDA B) Overview: MDA B was a 1940’s vintage landfill used during Manhattan Project for disposal of radiological and hazardous waste; Approximately six acres in size and 1000’ long; Selected as ARRA project for complete excavation.

Environmental Sciences(54)↗

The Project Y Spies [Slides]

A talk on the subject of the various spies that were present at Los Alamos during the Manhattan Project.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Project Y Badge Photo Collection [Slides]

The NSRC has several hundred badge photos of staff who worked at Los Alamos during the wartime Manhattan Project. The collection held by the NSRC represents an estimated 30% of the total badge photos taken at the secret wartime lab in Los Alamos, called Project Y. It is believed the majority of the badge photos of Project Y employees were destroyed or lost decades ago. The badge photos in the NSRC collections include famous staff, such as Oppenheimer, Groves, and many Nobel laureates who worked at Los Alamos. The existing photos have deteriorated significantly over the decades due to normal aging and previous poor handling procedures. Many photos had tears and non-archival tape applied.

99 GENERAL AND MISCELLANEOUS↗