Search NASA⌕ Search

SEARCH · Search NASA

Results for “Mars Exploration Program Architecture Mars Missions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Space Launch System Accelerated Booster Development Cycle

With the retirement of the Space Shuttle, NASA is seeking to reinvigorate the national space program and recapture the public s interest in human space exploration by developing missions to the Moon, near-earth asteroids, Lagrange points, Mars, and beyond. The would-be successor to the Space Shuttle, NASA s Constellation Program, planned to take humans back to the Moon by 2020, but due to budgetary constraints was cancelled in 2010 in search of a more "affordable, sustainable, and realistic" concept2. Following a number of studies, the much anticipated Space Launch System (SLS) was unveiled in September of 2011. The SLS core architecture consists of a cryogenic first stage with five Space Shuttle Main Engines (SSMEs), and a cryogenic second stage using a new J-2X engine3. The baseline configuration employs two 5-segment solid rocket boosters to achieve a 70 metric ton payload capability, but a new, more capable booster system will be required to attain the goal of 130 metric tons to orbit. To this end, NASA s Marshall Space Flight Center recently released a NASA Research Announcement (NRA) entitled "Space Launch System (SLS) Advanced Booster Engineering Demonstration and/or Risk Reduction." The increased emphasis on affordability is evident in the language used in the NRA, which is focused on risk reduction "leading to an affordable Advanced Booster that meets the evolved capabilities of SLS" and "enabling competition" to "enhance SLS affordability. The purpose of the work presented in this paper is to perform an independent assessment of the elements that make up an affordable and realistic path forward for the SLS booster system, utilizing advanced design methods and technology evaluation techniques. The goal is to identify elements that will enable a more sustainable development program by exploring the trade space of heavy lift booster systems and focusing on affordability, operability, and reliability at the system and subsystem levels5. For this study, affordability is defined as lifecycle cost, which includes design, development, test, and engineering (DDT&E), production and operational costs (P&O). For this study, the system objectives include reducing DDT&E schedule by a factor of three, showing 99.9% reliability, flying up to four times per year, serving both crew and cargo missions, and evolving to a lift capability of 130 metric tons.3 After identifying gaps in the current system s capabilities, this study seeks to identify non-traditional and innovative technologies and processes that may improve performance in these areas and assess their impacts on booster system development. The DDT&E phase may be improved by incorporating incremental development testing and integrated demonstrations to mitigate risk. To further reduce DDT&E, this study will also consider how aspects of the booster system may have commonality with other users, such as the Department of Defense, commercial applications, or international partners; by sharing some of the risk and investment, the overall development cost may be reduced. Consideration is not limited to solid and liquid rocket boosters. A set of functional performance characteristics, such as engine thrust, specific impulse (Isp), mixture ratio, and throttle range are identified and their impacts on the system are evaluated. This study also identifies how such characteristics affect overall life cycle cost, including DDT&E and fixed and variable P&O.

Arockiam, Nicole↗

Ares V: Game Changer for National Security Launch

NASA is designing the Ares V cargo launch vehicle to vastly expand exploration of the Moon begun in the Apollo program and enable the exploration of Mars and beyond. As the largest launcher in history, Ares V also represents a national asset offering unprecedented opportunities for new science, national security, and commercial missions of unmatched size and scope. The Ares V is the heavy-lift component of NASA's dual-launch architecture that will replace the current space shuttle fleet, complete the International Space Station, and establish a permanent human presence on the Moon as a stepping-stone to destinations beyond. During extensive independent and internal architecture and vehicle trade studies as part of the Exploration Systems Architecture Study (ESAS), NASA selected the Ares I crew launch vehicle and the Ares V to support future exploration. The smaller Ares I will launch the Orion crew exploration vehicle with four to six astronauts into orbit. The Ares V is designed to carry the Altair lunar lander into orbit, rendezvous with Orion, and send the mated spacecraft toward lunar orbit. The Ares V will be the largest and most powerful launch vehicle in history, providing unprecedented payload mass and volume to establish a permanent lunar outpost and explore significantly more of the lunar surface than was done during the Apollo missions. The Ares V consists of a Core Stage, two Reusable Solid Rocket Boosters (RSRBs), Earth Departure Stage (EDS), and a payload shroud. For lunar missions, the shroud would cover the Lunar Surface Access Module (LSAM). The Ares V Core Stage is 33 feet in diameter and 212 feet in length, making it the largest rocket stage ever built. It is the same diameter as the Saturn V first stage, the S-IC. However, its length is about the same as the combined length of the Saturn V first and second stages. The Core Stage uses a cluster of five Pratt & Whitney Rocketdyne RS-68B rocket engines, each supplying about 700,000 pounds of thrust. Its propellants are liquid hydrogen and liquid oxygen. The two solid rocket boosters provide about 3.5 million pounds of thrust at liftoff. These 5.5-segment boosters are derived from the 4-segment boosters now used on the Space Shuttle, and are similar to those used in the Ares I first stage. The EDS is powered by one J-2X engine. The J-2X, which has roughly 294,000 pounds of thrust, also powers the Ares I Upper Stage. It is derived from the J-2 that powered the Saturn V second and third stages. The EDS performs two functions. Its initial suborbital burns will place the lunar lander into a stable Earth orbit. After the Orion crew vehicle, launched separately on an Ares I, docks with the lander/EDS stack, EDS will ignite a second time to put the combined 65-metric ton vehicle into a lunar transfer orbit. When it stands on the launch pad at Kennedy Space Center late in the next decade, the Ares V stack will be approximately 381 feet tall and have a gross liftoff mass of 8.1 million pounds. The current point-of-departure design exceeds Saturn V s mass capability by approximately 40 percent. Using the current payload shroud design, Ares V can carry 315,000 pounds to 29-degree low Earth orbit (LEO) or 77,000 pounds to a geosynchronous orbit. Another unique aspect of the Ares V is the 33-foot-diameter payload shroud, which encloses approximately 30,400 cubic feet of usable volume. A larger hypothetical shroud for encapsulating larger payloads has been studied. While Ares V makes possible larger payload masses and volumes, it may alternately make possible more cost-effective mission design if the relevant payload communities are willing to consider an alternative to the existing approach that has driven them to employ complexity to solve current launch vehicle mass and volume constraints. By using Ares V s mass and volume capabilities as margin, payload designers stand to reduce development risk and cost. Significant progress has been made on the Ares V to support a plaed fiscal 2011 authority-to-proceed (ATP) milestone. The Ares V team is actively reaching out to external organizations during this early concept phase to ensure that the Ares V vehicle can be leveraged for national security, science, and commercial development needs. This presentation will discuss Ares V vehicle configuration, the path to the current concept, accomplishments to date, and potential payload utilization opportunities.

Sumrall, Phil↗

NASA's Space Launch System Progress Report

Exploration beyond Earth orbit will be an enduring legacy for future generations, as it provides a platform for science and exploration that will define new knowledge and redefine known boundaries. NASA s Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is responsible for designing and developing the first exploration-class rocket since the Apollo Program s Saturn V that sent Americans to the Moon in the 1960s and 1970s. The SLS offers a flexible design that may be configured for the Orion Multi-Purpose Crew Vehicle with associated life-support equipment and provisions for long journeys or may be outfitted with a payload fairing that will accommodate flagship science instruments and a variety of high-priority experiments. Building on legacy systems, facilities, and expertise, the SLS will have an initial lift capability of 70 tonnes (t) in 2017 and will be evolvable to 130 t after 2021. While commercial launch vehicle providers service the International Space Station market, this capability will surpass all vehicles, past and present, providing the means to do entirely new missions, such as human exploration of Mars. Building on the foundation laid by over 50 years of human and scientific space flight and on the lessons learned from the Apollo, Space Shuttle, and Constellation Programs the SLS team is delivering both technical trade studies and business case analyses to ensure that the SLS architecture will be safe, affordable, reliable, and sustainable. This panel will address the planning and progress being made by NASA s SLS Program.

May, Todd A.↗

Moon to Mars (M2M) Habitation Considerations: A Snap Shot As of January 2022

The following NASA Technical Memorandum (TM) is intended to provide a snapshot in time of NASA’s current considerations (ground rules and assumptions, functional allocations, logistics) for habitation systems for the lunar surface (non-roving) and Mars transits. As NASA continues to refine the reference designs to meet the needs of an evolving architecture, it is expected that this information will also be updated as a result. Where appropriate, relevant publicly released documents will be referenced to provide further detail. NASA’s human lunar exploration plan under the Artemis program calls for achieving the goal of sending the first woman and first person of color to the surface of the Moon in the mid- 2020s and working toward sustainable exploration by the end of the decade. Working with both commercial and international partners, NASA will establish a permanent human presence on the Moon to uncover new scientific discoveries and lay the foundation for private companies to build a lunar economy. Longer duration missions on the lunar surface and in lunar orbit will also serve as a test bed for technologies to support future Mars exploration campaigns. The agency will use what we learn on the Moon to prepare for humanity's next giant leap – sending astronauts to Mars. NASA intends to establish a sustained lunar presence with the development of the Artemis Base Camp to prove technologies and capabilities that will one day enable humans to live and work on Mars, beginning with core elements including the Lunar Terrain Vehicle (LTV), the Pressurized Rover (PR), the lunar Surface Habitat (SH), power systems, and in-situ resource utilization (ISRU) systems. For in space operations and eventual transport of humans to Mars, NASA will utilize a Mars Transit Habitat (TH). Following deployment, the TH will complete a series of longer duration missions and shakedown testing while docked at Gateway, leveraging Gateway’s habitation redundancy for safety measures. Proposed Gateway-TH missions will far exceed the longest duration cislunar human missions to date. They will be the first operational readiness tests of our long-duration deep space systems, and of the split crew (two crew on the surface, two crew in space) operations that are vital to the approach for the first human Mars mission. Both the SH and TH are major architectural elements of NASA’s Moon to Mars (M2M) approach, each with very different concepts of operation. The SH is intended for use on the lunar surface as a home for astronauts, surface operations base, science facility, hub for communications, extravehicular activity (EVA) equipment repair site, waste processing facility, and supply hub. It serves as an enabler for a sustained surface presence and preparation for partial gravity operations during Mars missions. The SH will be designed to be self-sufficient for operations on the lunar surface. The SH will independently provide several functions, including its own power generation, energy storage capability, sleep quarters, hygiene areas, work areas, and dining areas. It will be capable of communicating with surface assets, orbital assets, and directly with Earth ground stations. It is planned to operate with two crew in the habitat for ~28- day stays with crew swap-outs in which the PR crew of two trades places with the habitat crew. During the swap-out, the habitat will nominally support four crew for a short period of time. For contingency scenarios, the habitat must also be capable of supporting four crew for up to 7 days. The TH will be designed to be capable of up to ~1,200-day Mars missions with the ability to carry all food and supplies needed to support a crew of four for this duration. An assumed Mars mission profile for the TH is to carry crew and supplies for ~850-day roundtrips between Earth and Mars orbit that allows 30-day stays on the Martian surface. To test the systems for this long journey, the TH will be used to extend the duration of missions at Gateway, enabling the orbiting outpost to be used as a Mars analog. These analog missions will be accomplished by attaching the TH to Gateway and conducting lunar surface operations from the TH. The TH may also need to perform free-flying shakedown missions to test out all systems prior to leaving for Mars. The habitat provides many critical functions including: a contingency airlock, crew quarters, galley, hygiene areas, safe haven capability, and science equipment. It can receive docked items from either axial end or on a radial port.

Habitat↗

Overview of Ka-band communications technology requirements for the space exploration initiative

In the Space Exploration Initiative, Ka-band frequencies are likely to carry the bulk of the communications traffic both in the vicinity of and on the return links from the moon and Mars. The four exploration architectures identified by the Synthesis Group are examined and Ka-band technology requirements to meet the data traffic needs and schedule are identified. Specific Ka-band technology requirements identified are: transmitters - 0.5 to 200 W with high efficiency; antennas - 5m and 9m diameter, with multiple beams and/or scanning beams; and spacecraft receivers - noise figure of 2 dB. For each component, the current state of technology is assessed and needed technology development programs are identified. It is concluded that to meet the schedules of lunar and Mars precursor missions beginning in approximately the year 2000, aggressive technology development and advanced development programs are required immediately for Ka-band communications systems components. Additionally, the greater data transmission rates for the cargo and piloted phases of the exploration program require further Ka-band communications technology developments targeted for operations beginning in about 2010.

Miller, Edward F.↗

HAVOC: High Altitude Venus Operational Concept - An Exploration Strategy for Venus

The atmosphere of Venus is an exciting destination for both further scientific study and future human exploration. A lighter-than-air vehicle can carry either a host of instruments and probes, or a habitat and ascent vehicle for a crew of two astronauts to explore Venus for up to a month. The mission requires less time to complete than a crewed Mars mission, and the environment at 50 km is relatively benign, with similar pressure, density, gravity, and radiation protection to the surface of Earth. A recent internal NASA study of a High Altitude Venus Operational Concept (HAVOC) led to the development of an evolutionary program for the exploration of Venus, with focus on the mission architecture and vehicle concept for a 30 day crewed mission into Venus's atmosphere. Key technical challenges for the mission include performing the aerocapture maneuvers at Venus and Earth, inserting and inflating the airship at Venus, and protecting the solar panels and structure from the sulfuric acid in the atmosphere. With advances in technology and further refinement of the concept, missions to the Venusian atmosphere can expand humanity's future in space.

Arney, Dale↗

Nuclear Thermal Rocket (Ntr) Propulsion: A Proven Game-Changing Technology for Future Human Exploration Missions

The NTR represents the next evolutionary step in high performance rocket propulsion. It generates high thrust and has a specific impulse (Isp) of approx.900 seconds (s) or more V twice that of today s best chemical rockets. The technology is also proven. During the previous Rover and NERVA (Nuclear Engine for Rocket Vehicle Applications) nuclear rocket programs, 20 rocket reactors were designed, built and ground tested. These tests demonstrated: (1) a wide range of thrust; (2) high temperature carbide-based nuclear fuel; (3) sustained engine operation; (4) accumulated lifetime; and (5) restart capability V all the requirements needed for a human mission to Mars. Ceramic metal cermet fuel was also pursued, as a backup option. The NTR also has significant growth and evolution potential. Configured as a bimodal system, it can generate electrical power for the spacecraft. Adding an oxygen afterburner nozzle introduces a variable thrust and Isp capability and allows bipropellant operation. In NASA s recent Mars Design Reference Architecture (DRA) 5.0 study, the NTR was selected as the preferred propulsion option because of its proven technology, higher performance, lower launch mass, simple assembly and mission operations. In contrast to other advanced propulsion options, NTP requires no large technology scale-ups. In fact, the smallest engine tested during the Rover program V the 25,000 lbf (25 klbf) Pewee engine is sufficient for human Mars missions when used in a clustered engine arrangement. The Copernicus crewed spacecraft design developed in DRA 5.0 has significant capability and a human exploration strategy is outlined here that uses Copernicus and its key components for precursor near Earth asteroid (NEA) and Mars orbital missions prior to a Mars landing mission. Initially, the basic Copernicus vehicle can enable reusable 1-year round trip human missions to candidate NEAs like 1991 JW and Apophis in the late 2020 s to check out vehicle systems. Afterwards, the Copernicus spacecraft and its 2 key components, now configured as an Earth Return Vehicle / propellant tanker, would be used for a short round trip (approx.18 - 20 months)/short orbital stay (60 days) Mars / Phobos survey mission in 2033 using a split mission approach. The paper also discusses NASA s current Foundational Technology Development activities and its pre-decisional plans for future system-level Technology Demonstrations that include ground testing a small (approx.7.5 klbf) scalable NTR before the decade is out with a flight test shortly thereafter.

Borowski, Stanley K.↗

Logistics Lessons Learned in NASA Space Flight

The Vision for Space Exploration sets out a number of goals, involving both strategic and tactical objectives. These include returning the Space Shuttle to flight, completing the International Space Station, and conducting human expeditions to the Moon by 2020. Each of these goals has profound logistics implications. In the consideration of these objectives,a need for a study on NASA logistics lessons learned was recognized. The study endeavors to identify both needs for space exploration and challenges in the development of past logistics architectures, as well as in the design of space systems. This study may also be appropriately applied as guidance in the development of an integrated logistics architecture for future human missions to the Moon and Mars. This report first summarizes current logistics practices for the Space Shuttle Program (SSP) and the International Space Station (ISS) and examines the practices of manifesting, stowage, inventory tracking, waste disposal, and return logistics. The key findings of this examination are that while the current practices do have many positive aspects, there are also several shortcomings. These shortcomings include a high-level of excess complexity, redundancy of information/lack of a common database, and a large human-in-the-loop component. Later sections of this report describe the methodology and results of our work to systematically gather logistics lessons learned from past and current human spaceflight programs as well as validating these lessons through a survey of the opinions of current space logisticians. To consider the perspectives on logistics lessons, we searched several sources within NASA, including organizations with direct and indirect connections with the system flow in mission planning. We utilized crew debriefs, the John Commonsense lessons repository for the JSC Mission Operations Directorate, and the Skylab Lessons Learned. Additionally, we searched the public version of the Lessons Learned Information System (LLIS) and verified that we received the same result using the internal version of LLIS for our logistics lesson searches. In conducting the research, information from multiple databases was consolidated into a single spreadsheet of 300 lessons learned. Keywords were applied for the purpose of sorting and evaluation. Once the lessons had been compiled, an analysis of the resulting data was performed, first sorting it by keyword, then finding duplication and root cause, and finally sorting by root cause. The data was then distilled into the top 7 lessons learned across programs, centers, and activities.

Evans, William A.↗

NASA Envisioned Future Priorities for In Situ Resource Utilization

A major objective of the United States National Aeronautics and Space Administration’s Artemis program is to create a sustainable human lunar exploration program through the establishment of lunar infrastructure and commercial space operations. A key aspect in achieving this objective is characterizing the resources that exist on the Moon and Mars, and learning how to utilize them to create products for crew, power, transportation, and infrastructure growth. Commonly known as In Situ Resource Utilization (ISRU), the ability to make products from local materials instead of bringing everything from Earth has the potential to significantly reduce mission costs, mass, risks, and dependency on Earth. To achieve this vision, NASA’s Space Technology Mission Directorate (STMD) established a strategic framework, called the Strategic Technology Architecture Roundtable (STAR) process, to coordinate development of critical capabilities around four major Thrusts (Go, Land, Live, and Explore). To guide and drive the development of critical mission capabilities, the STAR process involves establishing a ‘grand vision’ known as an Envisioned Future for each of these capabilities. For ISRU, the Envisioned Future is “Scalable ISRU production/utilization capabilities including sustainable commodities on the lunar and Mars Surface”. This paper will discuss the STAR process, and the strategic plan and near-term priorities for achieving the ISRU Envisioned Future.

In Situ Resources Utilization↗

The Space Exploration Initiative - An information system perspective

The authors look at the Space Exploration Initiative (SEI) from an information system perspective an discuss information system definition effort being conducted in support of NASAs Lunar Mars Exploration Program Office (LMEPO) Johnson Space Center (JSC). The development of an integrated, effective SEI information system (SIS) is recognized as crucial to the success of the SEI missions. Some of the new and unique challenges for the SIS as evidenced in the Lunar and the Mars missions are outlined along with some preliminary conceptual approaches, both architectural and technological, being investigated to address them.

Hartenstein, Ray↗

Scientific Goals and Objectives for the Human Exploration of Mars: 1. Biology and Atmosphere/Climate

To prepare for the exploration of Mars by humans, as outlined in the new national vision for Space Exploration (VSE), the Mars Exploration Program Analysis Group (MEPAG), chartered by NASA's Mars Exploration Program (MEP), formed a Human Exploration of Mars Science Analysis Group (HEM-SAG), in March 2007. HEM-SAG was chartered to develop the scientific goals and objectives for the human exploration of Mars based on the Mars Scientific Goals, Objectives, Investigations, and Priorities.1 The HEM-SAG is one of several humans to Mars scientific, engineering and mission architecture studies chartered in 2007 to support NASA s plans for the human exploration of Mars. The HEM-SAG is composed of about 30 Mars scientists representing the disciplines of Mars biology, climate/atmosphere, geology and geophysics from the U.S., Canada, England, France, Italy and Spain. MEPAG selected Drs. James B. Garvin (NASA Goddard Space Flight Center) and Joel S. Levine (NASA Langley Research Center) to serve as HEMSAG co-chairs. The HEM-SAG team conducted 20 telecons and convened three face-to-face meetings from March through October 2007. The management of MEP and MEPAG were briefed on the HEM-SAG interim findings in May. The HEM-SAG final report was presented on-line to the full MEPAG membership and was presented at the MEPAG meeting on February 20-21, 2008. This presentation will outline the HEM-SAG biology and climate/atmosphere goals and objectives. A companion paper will outline the HEM-SAG geology and geophysics goals and objectives.

Levine, Joel S.↗

Parallel Architectures for Planetary Exploration Requirements (PAPER)

The project's main contributions have been in the area of student support. Throughout the project, at least one, in some cases two, undergraduate students have been supported. By working with the project, these students gained valuable knowledge involving the scientific research project, including the not-so-pleasant reporting requirements to the funding agencies. The other important contribution was towards the establishment of a graduate program in computer science at Hampton University. Primarily, the PAPER project has served as the main research basis in seeking funds from other agencies, such as the National Science Foundation, for establishing a research infrastructure in the department. In technical areas, especially in the first phase, we believe the trip to Jet Propulsion Laboratory, and gathering together all the pertinent information involving experimental computer architectures aimed for planetary explorations was very helpful. Indeed, if this effort is to be revived in the future due to congressional funding for planetary explorations, say an unmanned mission to Mars, our interim report will be an important starting point. In other technical areas, our simulator has pinpointed and highlighted several important performance issues related to the design of operating system kernels for MIMD machines. In particular, the critical issue of how the kernel itself will run in parallel on a multiple-processor system has been addressed through the various ready list organization and access policies. In the area of neural computing, our main contribution was an introductory tutorial package to familiarize the researchers at NASA with this new and promising field zone axes (20). Finally, we have introduced the notion of reversibility in programming systems which may find applications in various areas of space research.

Cezzar, Ruknet↗

In-Space Transportation for NASA's Evolvable Mars Campaign

As the nation embarks on a new and bold journey to Mars, significant work is being done to determine what that mission and those architectural elements will look like. The Evolvable Mars Campaign, or EMC, is being evaluated as a potential approach to getting humans to Mars. Built on the premise of leveraging current technology investments and maximizing element commonality to reduce cost and development schedule, the EMC transportation architecture is focused on developing the elements required to move crew and equipment to Mars as efficiently and effectively as possible both from a performance and a programmatic standpoint. Over the last 18 months the team has been evaluating potential options for those transportation elements. One of the key aspects of the EMC is leveraging investments being made today in missions like the Asteroid Redirect Mission (ARM) mission using derived versions of the Solar Electric Propulsion (SEP) propulsion systems and coupling them with other chemical propulsion elements that maximize commonality across the architecture between both transportation and Mars operations elements. This paper outlines the broad trade space being evaluated including the different technologies being assessed for transportation elements and how those elements are assembled into an architecture. Impacts to potential operational scenarios at Mars are also investigated. Trades are being made on the size and power level of the SEP vehicle for delivering cargo as well as the size of the chemical propulsion systems and various mission aspects including Inspace assembly and sequencing. Maximizing payload delivery to Mars with the SEP vehicle will better support the operational scenarios at Mars by enabling the delivery of landers and habitation elements that are appropriately sized for the mission. The purpose of this investigation is not to find the solution but rather a suite of solutions with potential application to the challenge of sending cargo and crew to Mars. The goal is that, by building an architecture intelligently with all aspects considered, the sustainable Mars program wisely invests limited resources enabling a long-term human Mars exploration program.

Percy, Thomas K.↗

Exploration EVA System Concept of Operations

The Exploration Extravehicular Activity (xEVA) System concept of operations (con ops) captures the National Aeronautics and Space Administration’s (NASA’s) current aims future missions to all potential Exploration destinations. This document captures the mission architectures, stakeholder expectations, and high level definitions of the capabilities and interfaces associated with the xEVA System. This includes missions to Gateway in cislunar space, the lunar surface, a redirected asteroid in cislunar space, Near Earth Asteroids (NEA), Mars’ orbit, the moons of Mars (Phobos and Deimos), and the surface of Mars. These missions, which include microgravity, milli-gravity, and partial-gravity surface EVAs, will involve a variety of engineering (maintenance, contingency, pioneering, construction) and science tasks. This document also captures information concerning vehicles and habitats with which the xEVA System will interface. The concepts of operations (con ops) detailed in this document are informed by the Artemis Program and a multitude of Exploration studies, and are also influenced by various integrated operational analog testing.

David Coan↗

International Human Mission to Mars: Analyzing A Conceptual Launch and Assembly Campaign

In July of 2013, U.S. Congressman Kennedy (D-Mass.) successfully offered an amendment to H.R. 2687, the National Aeronautics and Space Administration Authorization Act of 2013. "International Participation—The President should invite the United States partners in the International Space Station program and other nations, as appropriate, to participate in an international initiative under the leadership of the United States to achieve the goal of successfully conducting a crewed mission to the surface of Mars." This paper presents a concept for an international campaign to launch and assemble a crewed Mars Transfer Vehicle. NASA’s “Human Exploration of Mars: Design Reference Architecture 5.0” (DRA 5.0) was used as the point of departure for this concept. DRA 5.0 assumed that the launch and assembly campaign would be conducted using NASA launch vehicles. The concept presented utilizes a mixed fleet of NASA Space Launch System (SLS), U.S. commercial and international launch vehicles to accomplish the launch and assembly campaign. This concept has the benefit of potentially reducing the campaign duration. However, the additional complexity of the campaign must also be considered. The reliability of the launch and assembly campaign utilizing SLS launches augmented with commercial and international launch vehicles is analyzed and compared using discrete event simulation.

Cates, Grant↗

Cryogenic Fluid Management Technology for Moon and Mars Missions

In support of the U.S. Space Exploration Policy, focused cryogenic fluid management technology efforts are underway within the National Aeronautics and Space Administration. Under the auspices of the Exploration Technology Development Program, cryogenic fluid management technology efforts are being conducted by the Cryogenic Fluid Management Project. Cryogenic Fluid Management Project objectives are to develop storage, transfer, and handling technologies for cryogens to support high performance demands of lunar, and ultimately, Mars missions in the application areas of propulsion, surface systems, and Earth-based ground operations. The targeted use of cryogens and cryogenic technologies for these application areas is anticipated to significantly reduce propellant launch mass and required on-orbit margins, to reduce and even eliminate storage tank boil-off losses for long term missions, to economize ground pad storage and transfer operations, and to expand operational and architectural operations at destination. This paper organizes Cryogenic Fluid Management Project technology efforts according to Exploration Architecture target areas, and discusses the scope of trade studies, analytical modeling, and test efforts presently underway, as well as future plans, to address those target areas. The target areas are: liquid methane/liquid oxygen for propelling the Altair Lander Ascent Stage, liquid hydrogen/liquid oxygen for propelling the Altair Lander Descent Stage and Ares V Earth Departure Stage, liquefaction, zero boil-off, and propellant scavenging for Lunar Surface Systems, cold helium and zero boil-off technologies for Earth-Based Ground Operations, and architecture definition studies for long term storage and on-orbit transfer and pressurization of LH2, cryogenic Mars landing and ascent vehicles, and cryogenic production via in situ resource utilization on Mars.

Doherty, Michael P.↗

Ares V: Progress Toward Unprecedented Heavy Lift

Every major examination of America s spaceflight capability since the Apollo program has highlighted and reinforced the need for a heavy lift vehicle for human exploration, science, national security, and commercial development. The Ares V is NASA s most recent effort to address this gap and provide the needed heavy lift capability for NASA and the nation. An Ares V-class heavy lift capability is important to supporting beyond earth orbit (BEO) human exploration. Initially, that consists of exploration of the Moon vastly expanded from the narrow equatorial Apollo missions to a global capability that includes the interesting polar regions. It also enables a permanent human outpost. Under the current program of record, both the Ares V and the lunar exploration it enables serve as a significant part of the technology and experience base for exploration beyond the Moon, including Mars, asteroids, and other destinations. The Ares V is part of NASA s Constellation Program architecture. The Ares V remains in an early stage of concept development, while NASA focused on development of the Ares I crew launch vehicle to replace the Space Shuttle fleet. However, Ares V development has benefitted from its commonality with Ares I, the Shuttle, and contemporary programs on which its design is based. The Constellation program is currently slated for cancellation under the proposed 2011 federal budget, pending review by the legislative branch. However, White House guidance on its 2011 budget retains funding for heavy lift research. This paper will discuss progress to date on the Ares V and its potential utility to payload users.

Sumrall, Phil↗

NASA Lunar Mining and Construction Activities and Plans

The Space Exploration Policy enacted by the US Congress in 2005 calls for the US National Aeronautics and Space Administration (NASA) to implement a sustained and affordable human and robotic program to explore the solar system and beyond; Extend human presence across the solar system, starting with a human return to the Moon by the year 2020, in preparation for human exploration of Mars and other destinations; Develop the innovative technologies, knowledge, and infrastructures both to explore and to support decisions about the destinations for human exploration; and Promote international and commercial participation in exploration to further U.S. scientific, security, and economic interests. In 2006, NASA released the Lunar Architecture Study, which proposed establishing a lunar Outpost on the Moon with international participation to extend human presence beyond Earth's orbit, pursue scientific activities, use the Moon to prepare for future human missions to Mars, and expand Earth s economic sphere. The establishment of sustained human presence on the Moon for science and exploration combines the design, integration, and operation challenges experienced from both the short Apollo lunar missions and the build-up and sustained crew operations of the International Space Station (ISS). Apollo experience reminds developers and mission planners that hardware must operate under extremely harsh environmental and abrasive conditions and every kilogram of mass and payload must be critical to achieve the mission s objectives due to the difficulty and cost of reaching the lunar surface. Experience from the ISS reminds developers and mission planners that integration of all hardware must be designed and planned from the start of the program, operations and evolution of capabilities on a continuous basis are important, and long-term life-cycle costs and logistical needs are equally or more important than minimizing early development and test costs. Overarching all of this is the need to implement efforts that are sustainable and affordable. One area NASA is developing that can significantly change how systems required for sustained human presence are designed and integrated, as well as potentially break our reliance on Earth supplied logistics, is In-Situ Resource Utilization (ISRU). ISRU, also known living off the land, involves the extraction and processing of local resources into useful products. In particular, the ability to make propellants, life support consumables, fuel cell reagents, and radiation shielding can significantly reduce the cost, mass, and risk of sustained human activities beyond Earth. Also, the ability to modify the lunar landscape for safer landing, transfer of payloads from the lander an outpost, dust generation mitigation, and infrastructure placement and buildup are also extremely important for long-term lunar operations. While extra-terrestrial excavation, material handling and processing, and site preparation and construction may be new to NASA and other space agencies, there is extensive terrestrial hardware and commercial experience that can be leveraged. This paper will provide an overview of current NASA activities in lunar ISRU mining and construction and how terrestrial experience in these areas are important to achieving the goal of affordable and sustainable human exploration.

Sanders, Gerald B.↗