Search NASA⌕ Search

SEARCH · Search NASA

Results for “Network Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Evaluation of the Tellabs 1150 GPON Multiservice Access Platform

Over the last two years, Sandia National Laboratories made a significant investment in its network infrastructure with the Network Revitalization Project. There were two main components to this project: a Multiprotocol Label Switching (MPLS) enabled backbone network and a Gigabit Passive Optical Network (GPON) access layer. The GPON equipment used in the Network Revitalization Project is from Tellabs. This equipment includes the Tellabs 1150 Multiservice Access Platform (MSAP) Optical Line Terminal (OLT), the Tellabs ONT709 Optical Network Terminal (ONT), and the Panorama Integrated Network Manager (INM). In order to fully utilize this equipment to its greatest capacity, it needed to be thoroughly tested. This report documents that testing.

97 MATHEMATICS AND COMPUTING↗

Agua Caliente Wind/Solar Project at Whitewater Ranch

Agua Caliente Band of Cahuilla Indians (ACBCI) was awarded a grant by the Department of Energy (DOE) to study the feasibility of a wind and/or solar renewable energy project at the Whitewater Ranch (WWR) property of ACBCI. Red Mountain Energy Partners (RMEP) was engaged to conduct the study. The ACBCI tribal lands in the Coachella Valley have very rich renewable energy resources. The tribe has undertaken several studies to more fully understand the options available to them if they were to move forward with one or more renewable energy projects. With respect to the resources, the WWR property clearly has excellent wind and solar resources. The DOE National Renewable Energy Laboratory (NREL) has continued to upgrade and refine their library of resource maps. The newer, more precise maps quantify the resources as among the best in the world. The wind and solar technology available for deployment is also being improved. Both are reducing their costs to the point of being at or below the costs of fossil fuels. Technologies for energy storage and microgrids are also improving quickly and present additional ways to increase the wind and/or solar energy retained for later use with the network management flexibility to provide power to the appropriate locations when needed. As a result, renewable resources continue to gain more market share. The transitioning to renewables as the major resources for power will take some time as the conversion is complex and can have negative impacts if not managed well. While the economics for wind and solar systems continue to improve, the robustness of the WWR site was validated by the repeated queries of developers to place wind and/or solar there. The robust resources and improving technologies portends toward WWR land as a renewable energy site. The business case, however, is not so clear, especially when the potential investment portfolio for ACBCI has several very beneficial and profitable alternatives.

17 WIND ENERGY↗

Evaluation of the Tellabs 1150 GPON multiservice access platform

For over two years, Sandia National Laboratories has been using a Gigabit Passive Optical Network (GPON) access layer for selected networks. The GPON equipment includes the Tellabs 1150 Multiservice Access Platform (MSAP) Optical Line Terminal (OLT), the Tellabs ONT709 and ONT709GP Optical Network Terminals (ONTs), and the Panorama PON Network Manager. In late 2013, the Tellabs equipment was updated to Software Release FP27.1_015130. Because a new software release has the potential to affect performance and functionality, it needed to be thoroughly tested. This report documents that testing. It also provides a comparison between the current release and the previous Software Release FP25.5.1_013274 that was being used.

97 MATHEMATICS AND COMPUTING↗

Evaluation of the Tellabs 1150 GPON multiservice access platform

For over two years, Sandia National Laboratories has been using a Gigabit Passive Optical Network (GPON) access layer for selected networks. The GPON equipment includes the Tellabs 1150 Multiservice Access Platform (MSAP) Optical Line Terminal (OLT), the Tellabs ONT709 and ONT709GP Optical Network Terminals (ONTs), and the Panorama PON Network Manager. In late 2013, the Tellabs equipment was updated to Software Release FP27.1_015130. Because a new software release has the potential to affect performance and functionality, it needed to be thoroughly tested. This report documents that testing. It also provides a comparison between the current release and the previous Software Release FP25.5.1_013274 that was being used.

97 MATHEMATICS AND COMPUTING↗

Federal Workplace Charging Program Guide

The 2015 Fixing America's Surface Transportation (FAST) Act authorizes the installation, operation, and maintenance of electric vehicle supply equipment (EVSE) for the purpose of recharging employees' privately owned vehicles (POVs) under the custody or control of the General Services Administration (GSA) or a Federal agency. It requires the collection of fees to recover the costs of installing, operating, and maintaining this equipment and imposes reporting requirements. This program guide reviews those requirements, excerpts the relevant language in Appendix A, and describes when and how fees may be required to cover costs of electricity, network costs, EVSE units, and installations in various scenarios. This program guide is designed to support Federal agencies developing and refining workplace charging programs for employee POVs. While it provides guidance and best practices, it does not replace agencywide policies or agency-specific legal counsel. It contains a roadmap for agency workplace charging programs and defines roles and responsibilities. This guide explains how to determine the number of POVs likely to charge at a given site and contains a sample employee survey in Appendix B. It reviews EVSE planning, including unit selection and acquisition, charger location(s), accounting for available power capacity, using existing infrastructure, and funding an incentive program. It also discusses the costs associated with EVSE acquisition, installation, and network management. These costs inform the subsequently provided information, which describes how to amortize costs to determine appropriate fees for each charging session. The final two sections of this guide address aspects of ongoing program management that the facility coordinator should consider and the reporting requirements associated with the FAST Act. The insights in this guide are applicable to all agency-owned and GSA-leased buildings or facilities offering the use of EVSE or a 120-volt receptacle for the purpose of recharging an employee's POV. However, the FAST Act requirements typically do not apply to any building or facility operated and maintained by a third-party vendor offering the use of EVSE as part of a commercial building lease unless the agency is managing the station and/or energy on behalf of the building and collecting POV fees.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Feasibility Study for Photovoltaics, Wind, solar Hot Water and Hybrid Systems

Southwestern Indian Polytechnic Institute (SIPI) located in Albuquerque New Mexico is a community college that serves American Indians and Alaska Natives. SIPI’s student body represents over 100 Native American Tribes. SIPI completed a renewable energy feasibility study program and established renewable energy hardware on the SIPI campus, which supplements and creates an educational resource to teach renewable energy courses. The SIPI campus is located, and has as student origins, areas, in which power is an issue in remote reservations. The following hardware was installed and integrated into the campus facilities: small wind turbine, large photovoltaic array that is grid-connected, two photovoltaic arrays, one thin film type, and one polycrystalline type, one dual-axis active tracker and one passive tracker, a hot air system for heating a small building, a portable hybrid photovoltaic system for remote power, and a hot water system to preheat water used in the SIPI Child Care facility. Educational curriculum has been developed for two renewable energy courses one being the study of energy production and use, and especially the roles renewable energy forms like solar, wind, geothermal, hydro, and biomass plays, and the second course being a more advanced in-depth study of renewable energy system design, maintenance, installation, and applications. Both courses rely heavily on experiential learning techniques so that installed renewable energy hardware is continuously utilized in hand-on laboratory activities and are part of the Electronics program of studies. Renewable energy technologies and science has also been included in other SIPI programs of study such as Environmental Science, Natural Resources, Agriculture, Engineering, Network Management, and Geospatial Technology.

14 SOLAR ENERGY↗

Proton beam therapy control system

A tiered communications architecture for managing network traffic in a distributed system. Communication between client or control computers and a plurality of hardware devices is administered by agent and monitor devices whose activities are coordinated to reduce the number of open channels or sockets. The communications architecture also improves the transparency and scalability of the distributed system by reducing network mapping dependence. The architecture is desirably implemented in a proton beam therapy system to provide flexible security policies which improve patent safety and facilitate system maintenance and development.

Baumann, Michael A↗

Proton beam therapy control system

A tiered communications architecture for managing network traffic in a distributed system. Communication between client or control computers and a plurality of hardware devices is administered by agent and monitor devices whose activities are coordinated to reduce the number of open channels or sockets. The communications architecture also improves the transparency and scalability of the distributed system by reducing network mapping dependence. The architecture is desirably implemented in a proton beam therapy system to provide flexible security policies which improve patent safety and facilitate system maintenance and development.

97 MATHEMATICS AND COMPUTING↗

Proton beam therapy control system

A tiered communications architecture for managing network traffic in a distributed system. Communication between client or control computers and a plurality of hardware devices is administered by agent and monitor devices whose activities are coordinated to reduce the number of open channels or sockets. The communications architecture also improves the transparency and scalability of the distributed system by reducing network mapping dependence. The architecture is desirably implemented in a proton beam therapy system to provide flexible security policies which improve patent safety and facilitate system maintenance and development.

97 MATHEMATICS AND COMPUTING↗

AFECS. Multi-Agent Framework for Experiment Control Systems

AFECS is a pure Java based software framework for designing and implementing distributed control systems. AFECS creates a control system environment as a collection of software agents behaving as finite state machines. These agents can represent real entities, such as hardware devices, software tasks, or control subsystems. A special control oriented ontology language (COOL), based on RDFS (Resource Definition Framework Schema) is provided for control system description as well as for agent communication. AFECS agents can be distributed over a variety of platforms. Agents communicate with their associated physical components using range of communication protocols, including tcl-DP, cMsg (publish-subscribe communication system developed at Jefferson Lab), SNMP (simple network management protocol), EPICS channel access protocol and JDBC.

99 GENERAL AND MISCELLANEOUS↗

A User Driven Dynamic Circuit Network Implementation

The requirements for network predictability are becoming increasingly critical to the DoE science community where resources are widely distributed and collaborations are world-wide. To accommodate these emerging requirements, the Energy Sciences Network has established a Science Data Network to provide user driven guaranteed bandwidth allocations. In this paper we outline the design, implementation, and secure coordinated use of such a network, as well as some lessons learned.

97 MATHEMATICS AND COMPUTING↗

Proton beam therapy control system

A tiered communications architecture for managing network traffic in a distributed system. Communication between client or control computers and a plurality of hardware devices is administered by agent and monitor devices whose activities are coordinated to reduce the number of open channels or sockets. The communications architecture also improves the transparency and scalability of the distributed system by reducing network mapping dependence. The architecture is desirably implemented in a proton beam therapy system to provide flexible security policies which improve patent safety and facilitate system maintenance and development.

97 MATHEMATICS AND COMPUTING↗

A Learning-based Power Management Method for Networked Microgrids Under Incomplete Information

In this paper, we present a model-free reinforcement learning (RL)-based technique to solve the power management problem of networked microgrids (MGs), when the utility has only limited or no detailed knowledge of the MG asset models.The proposed method consists of two levels: at the first level, using an approximate RL strategy and aggregated data, a utility agent determines the locational price signals to maximize its profit under incomplete information on the MGs’ private data behind their points of common coupling (PCC). The proposed RL strategy enables the utility to adapt to changing system conditions and learn from previous experiences, while respecting the data ownership of the MGs. At the second level, the MGs receive the price signals to dispatch their generation/storage assets individually over look-ahead decision time window, while considering power flow constraints. The performance of the proposed RL technique has been verified under realistic operational scenarios.

Zhang, Qianzhi↗

Decentralized Energy Management System for Networked Microgrids in Grid-connected and Islanded Modes

This paper proposes a decentralized energy management system (EMS) for the coordinated operation of networked Microgirds (MGs) in a distribution system. In the grid-connected mode, the distribution network operator (DNO) and each MG are considered as distinct entities with individual objectives to minimize their own operation costs. It is assumed that both dispatchable and renewable energy source (RES)-based distributed generators (DGs) exist in the distribution network and the networked MGs. In order to coordinate the operation of all entities, we apply a decentralized bi-level algorithm to solve the problem with the first level to conduct negotiations among all entities and the second level to update the non-converging penalties. In the islanded mode, the objective of each MG is to maintain a reliable power supply to its customers. In order to take into account the uncertainties of DG outputs and load consumption, we formulate the problems as two-stage stochastic programs. The first stage is to determine base generation setpoints based on the forecasts and the second stage is to adjust the generation outputs based on the realized scenarios. Case studies of a distribution system with networked MGs demonstrate the effectiveness of the proposed methodology in both grid-connected and islanded modes.

Distributed Generator (DG)↗

Autonomous construction agents: An investigative framework for large sensor network self-management

Recent technological advances have made it cost effective to utilize massive, heterogeneous sensor networks. To gain appreciable value from these informational systems, there must be a control scheme that coordinates information flow to produce meaningful results. This paper will focus on tools developed to manage the coordination of autonomous construction agents using stigmergy, in which a set of basic low-level rules are implemented through various environmental cues. Using VE-Suite, an open-source virtual engineering software package, an interactive environment is created to explore various informational configurations for the construction problem. A simple test case is developed within the framework, and construction times are analyzed for possible functional relationships pertaining to performance of a particular set of parameters and a given control process. Initial experiments for the test case show sensor saturation occurs relatively quickly with 5-7 sensors, and construction time is generally independent of sensor range except for small numbers of sensors. Further experiments using this framework are needed to define other aspects of sensor performance. These trends can then be used to help decide what kinds of sensing capabilities are required to simultaneously achieve the most cost-effective solution and provide the required value of information when applied to the development of real world sensor applications.

97 MATHEMATICS AND COMPUTING↗

Systems and methods for revocation management in an AMI network

Systems and methods for certificate revocation management for advanced metering infrastructure networks are provided. An accumulation manager can be used to accumulate certificate revocation list (CRL) information and determine an accumulator value and a proof value based on the accumulated CRL information using a plurality of functions. These values can be sent on to smart meters, which can then use them for authentication purposes.

Cebe, Mumin↗

Cross-boundary collaboration in waste management research: A network analysis

Highlights: • No core scholars stood out from cross-boundary research collaboration networks. • No institution occupied a critical position. • Old-line developed countries stay in the center of research than developing ones. • More research has focused on “hard” technologies than “soft” measures. • CBRC from different perspectives were limited but increasing steadily over time. - Abstract: This paper aims to illustrate the cross-boundary research collaboration (CBRC) landscape of waste management (WM) by various collaboration networks. Through a set of rigorous procedures, a total of 15,396 research papers were extracted from eight subject-related journals published between 1981 and 2016. The authors utilized CiteSpace, a Java programme that helps visualize and dissect patterns in scientific literature, to evaluate the content through individual, institutional, national, and disciplinary perspectives. The evaluations of three former perspectives revealed a steady rise in CBRC within WM over the last thirty-five years, although the overall intensities proved fairly low. Inter-individual collaboration groups were limited to their respective regions and only loosely connected, but as more and more academic institutions and universities engaged in WM research, the number and quality of the collaborations increased. Developed countries, chiefly in North America and Western Europe, comprised the bulk of the WM research, whilst the mounting contributions from developing countries, China in particular, forecasts greater diversity in the future. The analysis also suggested that the intensity of the interdisciplinary collaboration network declined slightly, however, the intensity proved low to begin with. Previous WM research focused more on “hard” technologies than “soft” measures. Future endeavors to encourage CBRC in WM should promote more innovative research to tackle waste challenges globally in a sustainable way.

54 ENVIRONMENTAL SCIENCES↗