Search NASA⌕ Search

SEARCH · Search NASA

Results for “Nuclear waste management program*”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Stakeholder opinions on the use of the added value approach in siting radioactive waste management facilities

In some countries nuclear waste facility siting programs include social and economic benefits, compensation, local empowerment and motivation measures and other incentives for the potential host community. This can generally be referred to as an 'added value approach'. Demonstration of the safety of a repository is seen as a precondition of an added value approach. Recently much focus has been placed on studying and developing public participation approaches but less on the use of such incentive and community benefit packages, although they are becoming a more common element in many site selection strategies for nuclear waste management facilities. The primary objective of this paper is to report on an ongoing study of stakeholders' opinions of the use of an added value approach in siting a radioactive waste facility in the Czech Republic, Poland and Slovenia. The paper argues that an added value approach should adapt to the interests and needs of stakeholders during different stages of a siting process. The main question posed in the study is as follows: What are the measures which should be included in 'added value approach' according to the stakeholders? The research data consists of stakeholders' responses to a survey focusing on the use of added value (community benefits) and incentives in siting nuclear waste management facilities. The survey involved use of a questionnaire developed as part of the EU-funded IPPA* project in three countries: the Czech Republic, Poland and Slovenia. (* Implementing Public Participation Approaches in Radioactive Waste Disposal, FP7 Contract Number: 269849). The target audiences for the questionnaires were the stakeholders represented in the national stakeholder groups established to discuss site selection for a nuclear waste repository in their country. A total of 105 questionnaires were sent to the stakeholders between November 2011 and January 2012. 44 questionnaires were returned, resulting in a total response rate of 41% (10/29 in the Czech Republic, 11/14 in Poland and in 23/64 in Slovenia). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Factors Influencing the Evaluation of Spent Fuel Rail Routes - 19010

The U.S. Department of Energy (DOE) is considering use of rail transport for future shipments of commercial spent nuclear fuel (SNF) from where it currently resides to storage or disposal facilities. Rail carriers transporting in commerce certain quantities of 'rail security sensitive materials,' including SNF, face a regulatory requirement from the U.S. Department of Transportation to perform route risk assessments on an annual basis. In performing these assessments, each affected rail carrier must take into consideration twenty-seven different route factors, and document its rationale for selecting preferred and alternative routes on the basis of the safety and security risk analysis results. The major freight rail carriers operating in the U.S. have invested in the development of a proprietary tool, for rail carrier use only, to assist them in making route selections. This tool utilizes operations data input by each affected rail carrier in conjunction with geographic information systems (GIS) data to represent proximate risk factors, to be integrated and assigned to individual points and segments on the railroad network. Separate safety and security risk values are generated for each rail route under consideration. These values are then placed on an equivalent scoring basis and summed together to allow direct comparison between different route options and to rank order each route in terms of its relative attractiveness. Each affected rail carrier files an annual report for evaluation by the Federal Railroad Administration (FRA) that documents its route risk assessment approach and analysis results. DOE has developed its own decision-support tool, Stakeholder Tool for Assessing Radioactive Transportation (START), which is capable of generating and analyzing routing options for transporting SNF by rail in addition to other freight modes. To better understand how affected rail carriers are likely to route SNF shipments in accordance with regulatory requirements and those route factors likely to be most influential in impacting DoE's evaluation of alternative SNF rail routes, a study was undertaken by DOE with the following objectives: - Review the shipment routes that have been historically used by rail carriers to move high hazard materials, including SNF; - Identify the physical, operational and proximate characteristics (attributes) associated with the rail segments that comprise these routes; - Evaluate the relationships between these attributes; - Make suggestions for how to streamline the factors used in DoE's rail route evaluations; - Contrast these relationships with how the factors are used by the rail carriers in applying their tool This paper describes the study approach, analysis results, and implications for rail route selection methodology. Differences between this evaluation and railroad industry information about rail route assessments are also discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Major Achievements of the Springfields Decommissioning Program - 16512

Since the 1940's, Springfields has manufactured fuel products for the UK's nuclear power stations and for international customers. The early operations were in support of the atomic weapons program, closely followed by fuel manufacture for electricity generation via the Magnox power stations commencing in the late 1950's. In 2005, responsibility for the assets and liabilities of Springfields was transferred to the Nuclear Decommissioning Authority (NDA). A new company, Springfields Fuels Limited, was created to run the site, which was managed and operated by Westinghouse Electric UK Ltd on the NDA's behalf. On April 1, 2010, Westinghouse entered into an agreement with the NDA for a long-term lease of the Springfields site, which transferred responsibility for the commercial fuel manufacturing business and Springfields Fuels Limited to Westinghouse. Today, the main Springfields activities include: - Oxide fuels for Advanced Gas-cooled and Light Water Reactors, as well as intermediate fuel products, such as powders, granules and pellets, - Manufacture of Uranium Hexafluoride (now in Care and Maintenance), - Processing and recovery of Uranium residues, - Decommissioning and demolition of redundant plants and buildings. Some 120 plant buildings and support facilities have been successfully decommissioned and demolished in the period 1996 to date. These range from 1940's buildings, subsequently converted for nuclear fuel manufacture, together with some of the formerly sealed chemical agent manufacture and storage facilities. Decommissioning of the now redundant Magnox manufacturing facilities is ongoing at Springfields without compromising the other site operations. Westinghouse is managing all activities related to the whole lifecycle, planning, design, safety case, radiation protection, Post Operational Clean Out (POCO), service diversions, characterization, decommissioning all phases through to ground remediation, waste disposal and agreed end states. Decommissioning of process plants starts with the removal of the majority of radiological activity or hazard contained within the plant. This is known as Post Operational Clean Out. Once this is complete, the plant may be dismantled. Work is scoped and defined within packages (at plant or cell level) to aid control and commercial monitoring as the decommissioning is progressed. This package approach also enables clean or lightly contaminated items to be removed separately to aid potential re-cycling and minimize decontamination and waste disposal costs. Westinghouse is further optimising work package delivery by planning parallel POCO and Decommissioning work phases within plant at a cell level to systematically remove redundant plant and reduce hazard earlier, whilst optimising use of both internal and external resources to reduce total project cost. Waste and Residues from all phases are disposed of via authorized disposal routes and in accordance with our environmental authorizations. On completion of decommissioning and removal of plant and equipment the building is re-assessed radiologically, categorized and appropriate remediation work progressed to render it safe for conventional demolition. The major elements of the success achieved to date can be attributed to the following elements: - Overall programme management with extensive experience of planning, cost, and risk management. Integration of the programme within a major commercial site without compromising safety or operations. - Complete site EHS management working within a complex regulatory framework including the Nuclear Site Licenses, Environmental Authorisations and Security requirements. - Avoiding safety complacency by use of rigorous and systematic process to emphasise safety over competing goals. Including structured use of Human Performance and Corrective Action and Learning processes. - Unique safety experiences attained through complex hazard reduction across a broad range of uranium manufacturing and chemical hazard/agent facilities. - Project leadership and excellence utilizing a core site team to deploy repeatable processes and safe practices to deliver complex scope within budget and schedule. - Optimised use of internal and external resources, with extensive use of Operating Experience to drive continuous improvement and problem resolution. - Management of Contractors from initial selection, pre-qualification, tender assessment and Performance using varied contract forms across delivery phases. - Use of Westinghouse expertise for safety case, waste management, uranium recovery, health physics and design. - Implementation of a work package to ensure gated discreet manageable packages. Underpinned by package specific method statements, with appropriate hold points to maintain management and control of the works. - Continuous local safety focus via safety planning, induction, plant specific training, proactive risk assessment, and a defined approach to decoupling operating plant safety cases enabling focussed and usable documentation. This paper will provide an overview of the latest decommissioning activities achieved on the Springfields site and will focus on best practices that allowed Westinghouse to maintain the program on time and on budget. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Safety Design Strategy for the Remote Handled Low-Level Waste Disposal Project

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3A, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3A and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Remote-Handled Low-Level Waste Disposal Project.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Safety Design Strategy for the Remote Handled Low-Level Waste Disposal Project

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3A, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3A and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Remote-Handled Low-Level Waste Disposal Project.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Safety Design Strategy for the Remote Handled Low-Level Waste Disposal Project

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3A, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3A and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Remote-Handled Low-Level Waste Disposal Project.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Teaching Radioactive Waste Management in an Undergraduate Engineering Program - 13269

The University of Ontario Institute of Technology is Ontario's newest university and the only one in Canada that offers an accredited Bachelor of Nuclear Engineering (Honours) degree. The nuclear engineering program consists of 48 full-semester courses, including one on radioactive waste management. This is a design course that challenges young engineers to develop a fundamental understanding of how to manage the storage and disposal of various types and forms of radioactive waste, and to recognize the social consequences of their practices and decisions. Students are tasked with developing a major project based on an environmental assessment of a simple conceptual design for a waste disposal facility. They use collaborative learning and self-directed exploration to gain the requisite knowledge of the waste management system. The project constitutes 70% of their mark, but is broken down into several small components that include, an environmental assessment comprehensive study report, a technical review, a facility design, and a public defense of their proposal. Many aspects of the project mirror industry team project situations, including the various levels of participation. The success of the students is correlated with their engagement in the project, the highest final examination scores achieved by students with the strongest effort in the project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Iraq liquid radioactive waste tanks maintenance and monitoring program plan.

The purpose of this report is to develop a project management plan for maintaining and monitoring liquid radioactive waste tanks at Iraq's Al-Tuwaitha Nuclear Research Center. Based on information from several sources, the Al-Tuwaitha site has approximately 30 waste tanks that contain varying amounts of liquid or sludge radioactive waste. All of the tanks have been non-operational for over 20 years and most have limited characterization. The program plan embodied in this document provides guidance on conducting radiological surveys, posting radiation control areas and controlling access, performing tank hazard assessments to remove debris and gain access, and conducting routine tank inspections. This program plan provides general advice on how to sample and characterize tank contents, and how to prioritize tanks for soil sampling and borehole monitoring.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Iraq nuclear facility dismantlement and disposal project (NDs Project).

The Al Tuwaitha nuclear complex near Baghdad contains a number of facilities from Saddam Hussan's nuclear weapons program. Past military operations, lack of upkeep and looting have created an enormous radioactive waste problem at the Al Tuwaitha complex, which contains various, uncharacterized radioactive wastes, yellow cake, sealed radioactive sources, and contaminated metals that must be constantly guarded. Iraq has never had a radioactive waste disposal facility and the lack of a disposal facility means that ever increasing quantities of radioactive material must be held in guarded storage. The Iraq Nuclear Facility Dismantlement and Disposal Program (the NDs Program) has been initiated by the U.S. Department of State (DOS) to assist the Government of Iraq (GOI) in eliminating the threats from poorly controlled radioactive materials, while building human capacities so that the GOI can manage other environmental cleanups in their country. The DOS is funding the IAEA to provide technical assistance via Technical Cooperation projects. Program coordination will be provided by the DOS, consistent with GOI policies, and Sandia National Laboratories will be responsible for coordination of participants and waste management support. Texas Tech University will continue to provide in-country assistance, including radioactive waste characterization and the stand-up of the Iraq Nuclear Services Company. The GOI owns the problems in Iraq and will be responsible for implementation of the NDs Program.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Disposing of waste package with respect to physico-chemical characteristics - 15041

The waste inventory to be taken into account for the design of the Cigeo project is defined in the industrial program for waste management established in cooperation between nuclear operators (EDF, AREVA, CEA) and Andra. This waste inventory has been constituted with a list of different families of radioactive waste packages from High Level Waste (HLW) to Intermediate Level Long-lived Waste (IL-LLW). IL-LLW include a large variety of items such as structural elements from fuel assemblies (cladding from the fuel rods called 'hulls', end pieces called 'end caps' and assembly spacer grids, etc.), sludge from effluent treatment or miscellaneous equipment (filters, pumps, etc.). Most ILLW (except solidified sludges) are basically metallic but organic and inorganic components such as plastics (cellulose, PVC...) and salts may also be included. The rules used for designing Cigeo are based on the separation of waste having different physico-chemical characteristics in different cells. However it could be possible to dispose of waste packages with different physico-chemical characteristics in the same cell if we can demonstrate that a type of waste does not generate significant physico-chemical perturbations on other co-stored families. The first step of our analysis has been the identification of categories of materials present in waste likely to interact with each other. The second step consisted in analysing qualitatively the physico-chemical interactions between these materials. In the third step, we defined criteria allowing evaluation of the consequences of these interactions on (i) gas production (mainly H{sub 2}), (ii) radionuclide release and transfer and (iii) degradation of concrete components of the disposal cell. We built then a table allowing qualitative comparison of the consequences of the interactions between the materials types defined in the first step. The conclusion of this study shows that it is necessary to pay a very careful attention before disposing of waste packages containing organic components nearby waste packages containing actinides radionuclides. The geochemical phenomena coupling must also be quantitatively evaluated so as to analyse possible interaction processes between the released organic compounds and the cementitious components of the cells, the near-field clay-stone and the radionuclides migration. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Opportunities for an Integrated Web-Based Workbench for Data Access and Analysis - 20244

Management of environmental issues can require integration of multiple types of data and information, conducting data analysis and interpretation, and providing data visualization for effective communications. These data elements are important for site management to support regulator interactions and provide defensibility for remedial decisions. Databases and information repositories are core elements of managing data; however, efficient data access and analysis also enable effective site management. The U.S. Department of Energy (DOE) Hanford Site is an example of a complex site with a voluminous quantity of environmental data and a need for efficient site management. Different tiers of data and information tools have been developed and deployed to address site needs. These tools are configured for ready access via the web site interfaces and meet the rigorous quality requirements for environmental site management. Evolving efforts are focused on an integrated platform to meet site environmental management needs. In this platform, users can access site information at multiple levels of detail based on their need and permissions, so that data and associated analyses are presented within the context of the site mission and the user's management or technical needs. This concept is not only applicable at individual sites like Hanford but also applicable at other sites within the DOE complex. An integrated web-based architecture that links data visualization, data analytics, and management tools can provide holistic access to large data sets, minimize complexity, and maximize interactivity and technical communication. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The U.S. Nuclear Waste Technical Review Board Intern Program: Developing Next Generation Nuclear Waste Professionals - 16102

The U.S. Nuclear Waste Technical Review Board (Board) created an internship program in the fall of 2013 for undergraduate and graduate students interested in management and disposal of spent nuclear fuel and high-level radioactive waste. Interns must select a project topic in a technical area related to the Board's mission and prepare a well-supported briefing for the agency. The ability to review technical and scientific information in a critical and unbiased manner is essential for completion of the intern's project and this is a particular focus of the interaction between the mentor and the intern. The interns from 2014 and 2015 selected and reviewed topics related to the areas of commingling waste forms for disposal and deep borehole disposal. In addition to the technical project, interns acquire a broad perspective of the federal agencies involved in managing and disposing of radioactive waste while participating in inter-agency networking opportunities. In this review of the Board internship experience, two past interns discuss the personal impact of the program and how they believe the experience prepared them to face the challenges of a career in management and disposal of spent nuclear fuel and high-level radioactive waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of System Integration Analysis Activities for Integrated Waste Management

Spent nuclear fuel (SNF) generated by the current fleet of commercial nuclear reactors is being stored at reactor sites in spent fuel pools (SFPs) and in dry independent spent fuel storage installations (ISFSIs). The U.S. Department of Energy Office of Nuclear Energy (DOE-NE) Integrated Waste Management (IWM) program is examining a suite of IWM system options and conducting supporting analyses to enable future informed choices. The IWM program is currently organized into the following four major areas: (1) IWM facilities and equipment concepts and development, (2) transportation capability analysis and support, (3) information technology solutions and support, and (4) system integration analysis and support. This paper focuses on the activities ongoing in the IWM system integration analysis and support area. Two main research activities in this area are: data and tools development, validation, and maintenance; and special studies, analyses, and assessments.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Development of disposal option for radioactive waste

The development of a lasting solution to radioactive waste management is a critical issue for future nuclear applications. When assessing radioactive waste disposal options factors such as volume of waste and sustainability of the plan must be considered. This paper describes basic plans for the disposal of Low- and intermediate-level radioactive wastes (LILW) expected to be generated from nuclear power plants for countries starting nuclear power program for the first time. The purpose of this paper was to develop a disposal option for Low and intermediate level radioactive wastes for new comer countries planning to build at least two nuclear power units. A LILW disposal plan was developed by considering countries' radioactive waste generation data from pressurized water nuclear reactors. An on-site storage facility of 1,000 m{sup 3} for LILW at NPPs sites for a period 10 years pending final disposal was recommended. It was concluded that storage and disposal processes are complementary with each other, therefore; both programs should be complemented for effective management and control of radioactive wastes. This study is important as an initial implementation of a national Low-and intermediate level wastes (LILW) disposal program for countries planning to build nuclear power plants for the first time. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Bradwell - The first UK Nuclear Site to Enter Care and Maintenance - 18152

Magnox Ltd, a Cavendish Fluor company, is currently decommissioning twelve nuclear sites on behalf of the UK Nuclear Decommissioning Authority (NDA). Ten of these sites are former Power Stations; the other two are closed Research and Development facilities. An overall strategy for decommissioning the Magnox sites has been agreed between Magnox and the NDA. For all but one of these sites the decommissioning strategy involves an extended quiescent period, known as Care and Maintenance (C and M), during which remaining radiological hazards reduce naturally through radioactive decay. After this quiescent period the sites will be restored to an agreed end state through further decommissioning and clearance work. Sites in C and M will not be permanently manned. They will be passively safe such that prompt action will not be required in response to an alarm or fault. Preparing a nuclear site for C and M involves several inter-related strands of work including definition of the intended physical configuration of the site during C and M (the C and M entry state), establishing a safety case to support that configuration, carrying out the physical works needed to deliver the C and M entry state, preparing arrangements and a team to manage the site during C and M and consolidating the knowledge and information needed to support C and M and final clearance of the site. To enter C and M there needs to be a carefully controlled transition of site, personnel and management system into the agreed C and M configuration. Bradwell, a site on the east coast of England, was selected as part of the overall decommissioning strategy for 'early' entry into C and M; Bradwell is scheduled to enter C and M in late 2018, several years in advance of the next scheduled site, with the intent of carrying learning forward from Bradwell to the subsequent sites. Bradwell is now in the final stages of preparation for C and M. Decommissioning commenced on completion of defueling in 2005. A clearly defined C and M entry state was established early in decommissioning and, through interaction with Regulators and internal and external stakeholders, developed as a shared target, thus providing certainty to the scope of the overall decommissioning project. The site has subsequently been systematically decommissioned to meet this target C and M entry state. All legacy waste has been retrieved and packaged into robust disposal containers, the reactor buildings have a new weather envelope, and much of the site is empty space with concrete hardstanding where facilities used to exist and bare rooms where plant used to operate. The remaining radiological and environmental hazards are not significant. During C and M, which is anticipated to last for 70 years, Bradwell will be managed remotely without the requirement for personnel to be present on site, with the possible exception of an ongoing security presence when the site first enters C and M. In terms of UK decommissioning, many of the projects undertaken at Bradwell were first of a kind. The company operates under a programmed organisational and delivery model, which will enable innovation and learning from Bradwell to be carried forward across the whole Magnox fleet. In addition to decommissioning tools and techniques, processes to manage decommissioning, optimise the C and M entry state to reduce the burden on the UK taxpayer and to transition a site into C and M have been developed. This, in addition to taking people from Bradwell and seeding them into Magnox and the broader UK nuclear industry, should help to provide long term cost savings and delivery efficiencies across the entire NDA estate. This paper describes the journey of Bradwell Site through decommissioning and into C and M, highlighting the innovation and challenges that have contributed to the success of delivering the first UK nuclear site into Care and Maintenance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Prioritizing and Managing Technology Needs to Meet River Protection Project Mission Objectives - 16462

Over 56 million gallons of radioactive waste are stored in 177 large underground tanks at the Hanford Site, located in southeastern Washington State. This nuclear waste resulted from plutonium production for the nation's nuclear defense program. The River Protection Project (RPP) mission is to: - Safeguard and safely manage waste stored in the Hanford tanks, - Treat the waste using the Waste Treatment and Immobilization Plant (WTP), - Ensure safe disposition of the waste to protect the Columbia River and the environment. Each aspect of the mission requires some application of technology in order to meet the mission objectives. The RPP Technology Roadmap document presents a comprehensive, integrated assessment of the technology-related advances needed to ensure successful completion of the Hanford tank waste cleanup mission. This paper describes the development of the RPP Technology Roadmap, summarizes its content, describes integration and collaboration with the Department of Energy's national laboratories to support the work identified, and defines how priorities were identified to ensure near-term RPP mission commitments can be accomplished while preserving the longer term technology development elements necessary for mission completion. The Challenge - Managing a wide variety of technology needs that involve multiple organizations, contractors, and national laboratories presents additional challenges when funding constraints are factored in. A process was needed to ensure the technology needs supporting near term mission priorities were appropriately identified, prioritized, and supported through the fiscal year planning process. Additionally, the national laboratory resources necessary to support many of the technologies require coordination to ensure the most appropriate resources are applied at the appropriate level without duplication or contradiction of effort. The Solution - The RPP Technology Roadmap was developed with the primary purposes to: - Identify technology related items needed to support or enhance the River Protection Project (RPP) mission, - Prioritize technology needs to support fiscal year planning processes, - Organize National laboratory support of the RPP mission and communicate needs to the participating contractors. The Technology Roadmap is consistent with Department of Energy (DOE) Hanford mission priorities and is also in alignment with other Hanford Site technical initiatives and policy and planning documents. The Technology Roadmap highlights the current estimated technology needs and identifies where planning shortfalls exist and where national laboratory participation is needed to support mission success. This information assists fiscal year planning and national laboratory contracting processes to ensure that technology needs are supported. In addition to supporting the RPP baseline mission, the Technology Roadmap provides a basis for strategic planning by identifying opportunities to use technology solutions to enhance mission efficiency. This waste management paper describes the innovative and collaborative processes used to develop, validate, and communicate the results so the project owners and the national laboratories can most effectively plan work scope and resources. A discussion of the following processes is included: - Technology needs and task owner identification, - Functional area grouping and area lead identification, - Needs prioritization, - High priority needs ranking (including validation), - Results compilation and planning gap identification, - Results presentation by project and functional area, - National laboratory coordination and collaboration. Application - The process used to develop the RPP technology roadmap is applicable to any site where multiple national laboratories and contractors are involved in identifying and implementing technology based solutions. This process is also applicable to the DOE HQ role to provide prioritization and coordination of the nationwide technology development activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Comparative Study of the Standards and Guides of a Management System Applicable to Radioactive Waste - Paper 18292

A Management System may be defined as a set of standardized and interrelated practices that aim to improve effectiveness and produce better results. This system should be structured in such a way as to allow essential information to flow properly within the organization, including technical, administrative, production and human resources information, among others, within an adopted compliance model. There are, currently, several standards and guidelines for structuring a compliance model related to a management system. A system that covers various aspects of management in a single system is usually called integrated. Only the International Atomic Energy Agency - IAEA has a guide with this approach for radioactive waste: GS-G-3.3, 'The Management System for the Processing, Handling and Storage of Radioactive Waste' and GS-G-3.4, 'The Management System for the Disposal of Radioactive Waste'. The objective of this work is to present a comparison between existing standards, even if not specific for the management of radioactive waste, but which are widely used by companies. In due course, the result of this work will be object of proposal for specific standard to be presented to regulatory agency for this type of activity. This study should be useful for countries where there are no specific guidelines by the regulatory agency, adopting the best standard or guide as a conformity standards, creating and establishing a hybrid structure best suited to the safety and security aspects of the local culture. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Next Generation System Analysis Model Recently Added Features and Future Plans - Abstract

The Nuclear Waste Policy Act of 1982, as amended (NWPA 1982), established the federal government’s responsibility to accept spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from waste owners and generators for ultimate disposition. SNF generated by the current fleet of commercial nuclear reactors is being stored at the reactor sites in spent fuel pools (SFPs) and in dry independent spent fuel storage installations (ISFSIs). The US Department of Energy Office of Nuclear Energy (DOE-NE) is developing an Integrated Waste Management Program (IWMP) comprising a suite of options and supporting analyses to enable future informed choices. The IWMP is applying integrated waste management system architecture analysis, system engineering, and decision analysis principles to inform potential future decisions regarding potential nuclear waste management system architectures. Architecture analyses of the IWM system are being conducted to support the future deployment of a comprehensive system for managing nuclear waste that considers all major aspects of the back end of the nuclear fuel cycle (i.e., transportation, storage, and disposal). The Next Generation System Analysis Model (NGSAM) is an agent-based simulation software tool designed for the express purpose of modeling the IWM system. NGSAM imports data from the Oak Ridge National Laboratory (ORNL) Unified Database (e.g., historic assembly information, thermal profiles for assembly heat, at-reactor dry storage loadings) to ensure that the simulation initializes with a realistic representation of the state of commercial SNF in the United States. Recent major enhancements that have been implemented into NGSAM since NGSAM was last presented at the WM2019 conference include: • Tracking of railroad escort and buffer car acquisition. • Addition of heavy haul and barge routes for some sites, as well as support for user-defined inter-modal routes. • Updates to the logic that checks the thermal maps prior to package transport. • Addition of an allocation method that predicts when reactor sites will pack assemblies from their pools for dry storage and allocates packages to those reactor sites in the preceding periods, favoring direct transport packages and reducing the number of packages that reactor sites pack for dry storage at their ISFSIs. • Addition of reactor site family operational limits, which are used to limit the number of loads from the pool and from dry storage at a given reactor site per year. • Support has been added for multiple canister loading maps and packages having multiple compatible transportation overpacks. • Updates in the handling of non-commercial fuel, including a new database containing data to support the updates. • Support for repackaging at reactor sites. • Implementing additional output reports or modifying existing reports. • User edits can now be created and edited via the NGSAM website. • Ability to load packages for dry storage at ISF pools. • Same-type package blending at DOE sites. • Support for multi-mode transloading at reactor sites. These new features have improved NGSAM capabilities and/or improve the user experience with the model and will be discussed in more detail. The initial NGSAM requirements for advanced reactor fuels, reprocessing, treatment, and conditioning are preliminary and are described at a high level in this paper: analysts will provide more specific requirements to the NGSAM team in the future. Additionally, there are many data needs associated with modeling advanced reactors in NGSAM, but many of the data or plans are still in progress and/or yet to be fully defined. However, this document describes an initial exploration of the data relevant to this program. Advanced reactor data will likely require revision as concepts evolve and new considerations are made. This is a technical paper that does not take into account contractual limitations or obligations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). For example, under the provisions of the Standard Contract, spent nuclear fuel in multi-assembly canisters is not an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract governs the obligations of the parties, and this paper in no manner supersedes, overrides, or amends the Standard Contract. This paper reflects technical work which could support future decision making by DOE. No inferences should be drawn from this paper regarding future actions by DOE, which are limited both by the terms of the Standard Contract and Congressional appropriations for the Department to fulfill its obligations under the Nuclear Waste Policy Act including licensing and construction of a spent nuclear fuel repository.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗