Search NASA⌕ Search

SEARCH · Search NASA

Results for “OTE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

80 records · Page 5

Troubleshooting Challenges on the James Webb Space Telescope (JWST)

This presentation provides a summary of troubleshooting efforts on the power interface of the James Webb Space Telescope (JWST) during cryovac testing at Johnson Space Center (JSC). [Of special interest: OTIS (OTE (Optical Telescope Element) and ISIM (Integrated Science Instrument Module))].

Electromagnetics↗

25 Years of Contamination Control on the James Webb Space Telescope

The James Webb Space Telescope (JWST) has actively been in process since 1996, and at last, on Christmas Day 2021, it launched. This launch was the fulfillment of an astounding level of work performed by thousands of people across the globe in dozens of disciplines. From the start, effective contamination control was considered essential for the JWST mission due to the large, exposed optics and tight sensitivity required to measure first light and faint signals at the dawn of the universe. This paper will present the JWST mission and requirements overview, including mission requirements that led to optimizing performance for collecting light in the Near Infrared (NIR, 0.6μm) – Mid Infrared (MIR, 29μm) range. Molecular films absorb in the IR bands and can alter thermal emissivity, resulting in increased noise at the longer wavelengths (MIRI). Particles increase light scatter and background noise levels at the shorter wavelengths (NIRSpec, NIRCam and FGS). The passively cooled design of JWST led to an open architecture for the optical telescope element (OTE), presenting the challenge of maintaining cleanliness throughout assembly, integration, and test in a multitude of environments. The paper will describe the mission and will introduce the specific areas of contamination control developed and advanced to keep JWST clean at an unsurpassed level of cleanliness.

Contamination Control↗

Commissioning the James Webb Space Telescope Optical Telescope Element

The James Webb Space Telescope (JWST) launched on December 25th, 2021. The observatory was deployed and commissioned during its first six months. The Optical Telescope Element includes both large deployments of the Deployable Tower Assembly, Secondary Mirror Support Structure and the Primary Mirror Wings and it includes the deployment and alignment of the 18 primary mirror segments and the secondary mirror. The initial phase included cooldown and ice mitigation efforts followed by telescope deployments, mirror deployment and wavefront sensing and control. This paper will discuss the entire OTE commissioning from deployment through alignment including a discussion of results and lessons learned.

Lee D Feinberg↗

25 Years of Contamination Control on the James Webb Space Telescope

The James Webb Space Telescope (JWST) has actively been in process since 1996, and at last, on Christmas Day 2021, it launched. This launch was the fulfillment of an astounding level of work performed by thousands of people across the globe in dozens of disciplines. From the start, effective contamination control (CC) was considered essential for the JWST mission due to the large, exposed optics and tight sensitivity required to measure first light and faint signals at the dawn of the universe. This presentation will present the JWST mission and requirements overview, including mission requirements that led to optimizing performance for collecting light in the Near Infrared (NIR, 0.6μm) – Mid Infrared (MIR, 29μm) range. Molecular films absorb in the IR bands and can alter thermal emissivity, resulting in increased noise at the longer wavelengths (MIRI). Particles increase light scatter and background noise levels at the shorter wavelengths (NIRSpec, NIRCam and FGS). The passively cooled design of JWST led to an open architecture for the optical telescope element (OTE), presenting the challenge of maintaining cleanliness throughout assembly, integration, and test in a multitude of environments for over 2 decades. The presentation will describe CC for the mission starting with the first architecture in 1996, then introducing the specific areas of contamination control developed and advanced to keep JWST clean at an unsurpassed level of cleanliness.

Contamination Control↗

Mitigation of Leakage and Water Ingress for a Promising Phase Change Material (PCM) Containing Polythylene Glycol (PEG): Preprint

A promising and cost-effective phase change material (PCM) containing polyethylene glycol (PEG) 600, 800, and/or 1000 has been synthesized. It is shape stabilized using a sol-gel method and displays promising thermal properties. These properties make the PCMs good candidates for thermal batteries and other thermal energy storage applications in the building sector. However, PEG leakage is observed at elevated temperatures, and due to the hygroscopic nature of PEG, moisture ingress is also observed, which can have a significant effect on performance and durability. Thus, we have developed hydrophobic coatings to prevent PEG leakage and mitigate moisture ingress. The selected approach involves a secondary sol-gel process during which a thin layer formulated with hydrophobic precursors is deposited onto the surface of the PCM samples. Several coating formulations have been investigated, including formulations composed of tetraethyl orthosilicate (TEOS), diethoxy(dimethyl)silane (DEDMS), triethoxymethylsilane (TEMS), and n- octyltriethoxysilane (OTES). We find that this is effective at increasing hydrophobicity of the PCM substrates. It also decreases substrate leakage.

ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION↗

Looking Back in Time: Building the James Webb Space Telescope (JWST) Optical Telescope Element

When it launches in 2018, the James Webb Space Telescope (JWST) will look back in time at the earliest stars and galaxies forming in the universe. This talk will look back in time at the development of the JWST telescope. This will include a discussion of the design, technology development, mirror development, wave front sensing and control algorithms, lightweight cryogenic deployable structure, pathfinder telescope, and integration and test program evolution and status. The talk will provide the engineering answers on why the mirrors are made of Beryllium, why there are 18 segments, where and how the mirrors were made, how the mirrors get aligned using the main science camera, and how the telescope is being tested. It will also look back in time at the many dedicated people all over the country who helped build it.

JWST OTE↗

Thermal Model Performance for the James Webb Space Telescope OTIS Cryo-Vacuum Test

The James Webb Space Telescope (JWST), set to launch in mid-2020, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, has recently been completed at the Johnson Space Center's Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A system-level pre-test thermal model was constructed which fully captured the behavior of the payload, ground support equipment, and surrounding test chamber. This thermal model simulated both the transient cooldown to and warmup from a 20 K flight-like environment, as well as predicted the payload performance at cryo-stable conditions. The current work is an assessment of thermal model pre-test prediction performance against actual payload response during the OTIS CV test. Overall, the thermal model performed exceedingly well at predicting schedule and payload response. Looking in depth, this work examines both the benefits and shortcomings of assumptions made pre-test to simplify model execution when compared against test data. It explores in detail the role of temperature-dependent emissivities during transition to cryogenic temperatures, as well as the impact that model geometry simplifications have on tracking of critical hardware limits and constraints. This work concludes with a list of recommendations to improve the accuracy of thermal modeling for future large cryogenic tests. The insight gained from the OTIS CV test thermal modeling will benefit planning and execution for upcoming cryogenic missions.

Testing↗

Thermal Model Performance for the James Webb Space Telescope OTIS Cryo-Vacuum Test

The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, has recently been completed at the Johnson Space Center's Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A system-level pre-test thermal model was constructed which fully captured the behavior of the payload, ground support equipment, and surrounding test chamber. This thermal model simulated both the transient cooldown to and warmup from a 20K flight-like environment, as well as predicted the payload performance at cryo-stable conditions. The current work is a preliminary assessment of thermal model performance against actual payload response during the OTIS CV test. It examines both the benefits and shortcomings of assumptions made pre-test to simplify model execution when compared against test data. It explores in detail the role of temperature-dependent emissivities during transition to cryogenic temperatures, as well as the impact that model geometry simplifications have on tracking of critical hardware limits and constraints. This work concludes with a list of recommendations to improve the accuracy of thermal modeling for future large cryogenic tests. It is hoped that the insight gained from the OTIS CV test thermal modeling will benefit planning and execution for upcoming cryogenic missions.

JWST↗