Search NASA⌕ Search

SEARCH · Search NASA

Results for “Office Equipment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Complete the first phase of the comprehensive characterization of repair welding performed on irradiated Ni alloy 182

This report describes the research activities on post-weld evaluation and characterization of the quality and properties of welds made on the first phase of repair welding campaign on irradiated Ni alloy 182. The equipment and capabilities of the campaign were developed jointly by the U.S. Department of Energy, Office of Nuclear Energy, Light Water Reactor Sustainability Program, the Electric Power Research Institute, Long Term Operations Program (and the Welding and Repair Technology Center), and Oak Ridge National Laboratory. Irradiated nickel alloy 182 with doped boron ranging from 5 wppm to 15 wppm, were laser welded in the hot cell. The weld samples were cross-sectioned and characterized. The significant, on-going effort to weld irradiated alloys with high helium concentrations and comprehensively analyze the results will eventually yield validated repair techniques and guidelines for use by the nuclear industry in extending the operational lifetimes of nuclear power plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

EDCATS: An Evaluation Tool

The purpose of this research is to explore the development of Marshall Space Flight Center Unique Programs. These academic tools provide the Education Program Office with important information from the Education Computer Aided Tracking System (EDCATS). This system is equipped to provide on-line data entry, evaluation, analysis, and report generation, with full archiving for all phases of the evaluation process. Another purpose is to develop reports and data that is tailored to Marshall Space Flight Center Unique Programs. It also attempts to acquire knowledge on how, why, and where information is derived. As a result, a user will be better prepared to decide which available tool is the most feasible for their reports.

Heard, Pamala D.↗

ENERGY STAR for Tenants: An Online Energy Estimation Tool for Commercial Office Building Tenants

The commercial building sector consumes over 18% of the total energy in the United States. According to the 2012 Commercial Building Energy Consumption Survey (CBECS), office buildings comprise nearly 16 billion square feet of floor space and consume 253 billion kWh of energy annually. Office buildings represent nearly one-fifth of the energy consumed by commercial buildings, more than any other building type. Therefore, monitoring and reducing energy consumption in office buildings has become an increasingly important focus across the United States. The goal of the ENERGY STAR for Tenants program is to recognize office building tenants who demonstrate commitment to energy efficiency and environmental stewardship. Tenants seeking recognition must complete five major steps: estimate energy use, meter energy use, use efficient lighting, use efficient equipment, and share data. NREL is responsible for the underlying analysis performed for step one, estimating energy use. An online survey was developed for tenants to input information about their office space and its internal loads. NREL performed a parametric analysis across a large parameter space of office buildings. The analysis results were processed to map the user inputs to output energy ranges. The mappings enable the web tool to provide users with instant energy usage estimates based on a limited number of inputs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

EMPOWERED Distributed Energy Resources Permit Accelerator Pilot

This report summarizes the EMPOWERED Distributed Energy Resources (DER) Permit Accelerator Pilot project. Its primary objective was to streamline the design, installation, permitting, and inspections of targeted Distributed Energy Resource (DER) solutions. Streamlining these processes is critical to strengthening and accelerating the adoption of DER solutions nationwide. Moreover, streamlined processes help expedite the clean energy transition and expand energy resilience by improving understanding and capability among key stakeholders like property owners, code officials, and the general workforce. The project team accomplished this by developing and deploying a set of design and permitting guides for simple DER solutions, which they rolled out via a permitting pilot program. The project team developed nine permitting and inspection guides for simple DER solutions, as follows: 1. Single-Family and Duplex: Electric Vehicle Service Equipment (EVSE), and Storage, Solar + Storage (each in two code cycles) 2. Multi-family and Office: EVSE, Storage, Solar + Storage (each in two code cycles) 3. A permitting process guide to support the implementation of the permitting guides. The guides cover key code requirements via plan review and field inspection checklists for code officials and building owners to follow to streamline the permitting and inspections process for DER solutions. Following the development of the initial set of guides, the project team formed two cohorts, each made up of four jurisdictions, to participate in the Permit Accelerator Pilot. Each cohort received training and technical assistance to support them in incorporating the guides into use. The project successfully engaged jurisdictions in two disparate US regions: Chelsea, Somerville, Natick, and Norwood in metro Boston; and Pima County, Town of Gilbert, Flagstaff, and Sedona in Arizona. Feedback gathered from the project was valuable in refining the guides to better address jurisdictional needs. After the pilot period, the project team developed final versions of the guides based on extensive feedback from the cohorts and from external technical peer review. Feedback included needs and barriers related to implementation, as well as detailed technical improvements from external peer review. The final guides were presented in a series of webinars with a national reach, with 192 attendees from 35 states in the live session of the final webinar, and the final guides are posted online and available for use nationwide. Key findings: • The most receptive jurisdictions were those adjacent to other jurisdictions that had already adopted similar initiatives. The least receptive jurisdictions were those in the midst of adopting new code cycles. • The most common barrier to jurisdictional adoption of new guidelines were internal administrative and process delays, more so than technical barriers. • The main technical barrier to adoption proved to be the concern of fire hazard risks posed by energy storage systems. There is some apprehension in the code enforcement community about the safety of the batteries. Education coordinated with fire and safety services will help alleviate concerns and increase confidence in the acceptance of innovative technologies. • Opportunities to further leverage and advance the guides and related resources include outreach, education, and jurisdictional support; updates to the resources to align with code cycle changes and local requirements; and advancements supporting emerging technologies.

14 SOLAR ENERGY↗

The NASA Space Processing Program

The program is intended to initiate utilization of spaceflight for economically beneficial activities in all branches of materials science and technology. In view of the prospect they offer for reducing the costs of space operations, the Spacelab and Space Shuttle are expected to become widely used for work on materials early in the 1980's. At first they will be employed for space experiments and for services, such as sample preparation, that support research and development activities on the ground. Orbital manufacturing operations are expected to develop as well when research has prepared an adequate basis for them. During the past year, NASA has initiated a series of rocket flights on which prospective participants in the Shuttle/Spacelab program can perform preliminary experiments. Participation in these flights is open to investigators from all countries, and experiments are being solicited from private sponsors also. NASA is performing concurrent definition studies of Shuttle/Spacelab payloads, and design work on equipment for the first two years of operations is planned to begin early in 1977. The Office of Applications currently plans to fly two space processing payloads on Orbital Flight Test missions in 1980 and two on operational Spacelab missions in 1981.

Bredt, J. H.↗

Link monitor and control operator assistant: A prototype demonstrating semiautomated monitor and control

This article describes the approach, results, and lessons learned from an applied research project demonstrating how artificial intelligence (AI) technology can be used to improve Deep Space Network operations. Configuring antenna and associated equipment necessary to support a communications link is a time-consuming process. The time spent configuring the equipment is essentially overhead and results in reduced time for actual mission support operations. The NASA Office of Space Communications (Code O) and the NASA Office of Advanced Concepts and Technology (Code C) jointly funded an applied research project to investigate technologies which can be used to reduce configuration time. This resulted in the development and application of AI-based automated operations technology in a prototype system, the Link Monitor and Control Operator Assistant (LMC OA). The LMC OA was tested over the course of three months in a parallel experimental mode on very long baseline interferometry (VLBI) operations at the Goldstone Deep Space Communications Center. The tests demonstrated a 44 percent reduction in pre-calibration time for a VLBI pass on the 70-m antenna. Currently, this technology is being developed further under Research and Technology Operating Plan (RTOP)-72 to demonstrate the applicability of the technology to operations in the entire Deep Space Network.

Lee, L. F.↗

Innovations for ISS Plug-In Plan (IPiP) Operations

Limited resources and increasing requirements will continue to influence decisions on ISS. The ISS Plug-In Plan (IPiP) supports power and data for utilization, systems, and daily operations through the Electrical Power System (EPS) Secondary Power/Data Subsystem. Given the fluid launch schedule, the focus of the Plug-In Plan has evolved to anticipate future requirements by judicious development and delivery of power supplies, power strips, Alternating Current (AC) power inverters, along with innovative deployment strategies. A partnership of ISS Program Office, Engineering Directorate, Mission Operations, and International Partners poses unique solutions with existing on-board equipment and resources.

Moore, Kevin D.↗

The Challenges of Integrating NASA's Human, Budget, and Data Capital within the Constellation Program's Exploration Launch Projects Office

The U.S. Vision for Space Exploration directs NASA to retire the Space Shuttle in 2010 and replace it with safe, reliable, and cost-effective space transportation systems for crew and cargo travel to the Moon, Mars, and beyond. Such emerging space transportation initiatives face massive organizational challenges, including building and nurturing an experienced, dedicated team with the right skills for the required tasks; allocating and tracking the fiscal capital invested in achieving technical progress against an integrated master schedule; and turning generated data into usehl knowledge that equips the team to design and develop superior products for customers and stakeholders. This paper discusses how NASA's Exploration Launch Projects Office, which is responsible for delivering these new launch vehicles, integrates these resources to create an engineering business environment that promotes mission success.

Kidd, Luanne↗

Fuel Cell Powered Airport GSE (Ground Support Equipment) Deployment

The Fuel Cell Powered Airport GSE (Ground Support Equipment) Deployment Project was initiated in 2013 between Plug Power and U. S. Department of Energy Fuel Cell Technologies Office (DOE). The project plan included development and deployment of fifteen fuel cell powered units for two years at an airport to understand the feasibility and economic viability of hydrogen powered GSE. Project participants were the Department of Energy, Plug Power, and FedEx. The Memphis, TN airport is the hub of FedEx’s freight operation and was selected as the site for the demonstration portion of the project.

08 HYDROGEN↗

Assessment of Low-Level Pu Isotope Ratio Measurements Using Multicollector Inductively Coupled Plasma Mass Spectrometry (MC-ICP-MS/MS) Equipped with a Pre-Mass Filter

We present an initial investigation into the performance of a multicollector inductively coupled plasmamass spectrometer equipped with a pre-mass filter (Neoma MC-ICP-MS/MS) for making plutonium (Pu) isotope ratio measurements on solutions containing low level (i.e., pg mL –1 ) Pu concentrations. This assessment was achieved by comparison of the 240 Pu/ 239 Pu, 241 Pu/ 239 Pu, and 242 Pu/ 239 Pu ratios attained over a one month period on the MC-ICP-MS/MS with the long-term (∼1 year) performance observed on the predecessor MC-ICP-MS (Neptune Plus) instrument each equipped with an equipped with an APEXΩ desolvating nebulizer for repeated measurements of certified reference materials from New Brunswick Program Office (NBL PO) CRM 136a and CRM 137. The MC-ICP-MS/MS performance of repeated measurement of CRM 136a (n = 20) resulted in mean values of 240 Pu/ 239 Pu = 0.1448 ± 0.0006, 241 Pu/ 239 Pu = 0.00371 ± 0.00006, and 242 Pu/ 239 Pu = 0.00682 ± 0.00006 (k = 2). The CRM 137 (n = 20), analyzed during the same analytical sessions, produced mean values for 240 Pu/ 239 Pu = 0.2414 ± 0.0006, 241 Pu/ 239 Pu = 0.00464 ± 0.00007, and 242 Pu/ 239 Pu = 0.0157 ± 0.0001 (k = 2). These results closely align with the certificate values for CRM 136a and CRM 137 and are within the k = 2 envelopes defined by the long-term performance of the traditional MC-ICP-MS approach (Neptune Plus). Examination of the performance of the various Pu isotope ratios as a function of total Pu content revealed accurate results (<3% relative difference, or RD) above ∼50 fg total Pu. The results presented here demonstrate the capability of the MC-ICP-MS/MS making accurate and precise low level Pu isotopic measurements. While the intent of this work was not to investigate the functionality of the collision cell, the pre-mass filter was employed. Future studies are warranted to investigate the entire capability of the MC-ICP-MS/MS collision cell and pre-cell mass filter optimization for performing low level Pu isotope measurements, even in mixed matrix samples.

CRM↗

Overview of the surface architecture and elements common to a wide range of Lunar and Mars missions

NASA has studied future missions to the moon and Mars since the 1960's, and most recently during the studies for the Space Exploration Initiative chartered by President Bush. With these most recent studies, the Lunar and Mars Exploration Program Office is looking at a number of possible options for the human exploration of the solar system. Objectives of these options include science and exploration, testing and learning centers, local planetary resource development, and self sufficient bases. To meet the objectives of any particular mission, efforts have focused primarily in three areas: (1) space transportation vehicles, (2) the associated space infrastructure to support these vehicles, and (3) the necessary infrastructure on the planet surface to carry out the mission objectives. This paper looks at work done by the Planet Surface Systems Office at JSC in the third area, and presents an overview of the approach to determining appropriate equipment and elements of the surface infrastructure needed for these mission alternatives. It describes the process of deriving appropriate surface architectures with consideration of mission objectives leading to system concepts, designation of elements and element placement.

Connolly, John F.↗

Zero-Emission Transit Bus Needs Assessment

The transition to zero-emissions vehicles (ZEVs) in public transit has gained traction due to significant federal investments from the Bipartisan Infrastructure Law (BIL) and the Inflation Reduction Act (IRA). This needs assessment, commissioned by the Joint Office of Energy and Transportation and conducted by researchers at the Idaho National Laboratory, explores the current state of electrification in transit agencies, identifying barriers to implementation, potential funding sources, and operational considerations necessary for a successful transition. The assessment involved qualitative interviews with representatives from 19 transit service providers across diverse geographic regions. Key findings highlight the challenges related to bus facilities and operations, which require careful planning for charging infrastructure and maintenance capabilities to accommodate battery electric buses (BEBs) and hydrogen fuel cell buses (HFCBs). Agencies reported operational hurdles due to the shorter range of BEBs compared to diesel buses, necessitating revised scheduling and routing strategies. Despite these challenges, many agencies expressed optimism about their capacity to adapt. Funding availability emerged as a critical factor influencing the transition to ZEVs. While agencies welcomed increased financial support, particularly from the Low or No Emission Grant Program (Lo-No), concerns about the sustainability of this funding and the ongoing operational costs were prevalent. The need for a comprehensive funding inventory was underscored to ensure transit agencies are aware of all available resources. Technological constraints were significant barriers to ZEV adoption. The limited range of BEBs was frequently cited as a concern, leading to operational challenges and reliability issues. Agencies reported difficulties in sourcing replacement parts, which exacerbated downtime and maintenance challenges. Workforce development and training were identified as pivotal for a successful transition. Many agencies rely heavily on manufacturers for technician training, highlighting the need for scalable training programs that equip staff with the necessary skills to maintain electric powertrains effectively. This assessment offers actionable recommendations for the Joint Office, including enhancing outreach to transit agencies, developing resources for effective utility partnerships, and facilitating comprehensive training programs. Establishing a zero-emission bus evaluation program to track performance metrics such as cost, range, and reliability could provide valuable insights for transit agencies. The needs assessment provides a detailed examination of the challenges and opportunities facing transit agencies in their transition to zero-emissions bus fleets. By addressing these issues through targeted support, stakeholders can collaboratively work towards a cleaner, more sustainable public transportation system that benefits all communities.

33 - ADVANCED PROPULSION SYSTEMS↗

A Cost Comparison of Alternative Approaches to Distance Education in Developing Countries

This paper presents a cost comparison of three approaches to two-way interactive distance learning systems for developing countries. Included are costs for distance learning hardware, terrestrial and satellite communication links, and designing instruction for two-way interactive courses. As part of this project, FSEC is developing a 30-hour course in photovoltaic system design that will be used in a variety of experiments using the Advanced Communications Technology Satellite (ACTS). A primary goal of the project is to develop an instructional design and delivery model that can be used for other education and training programs. Over two-thirds of the world photovoltaics market is in developing countries. One of the objectives of this NASA-sponsored project was to develop new and better energy education programs that take advantage of advances in telecommunications and computer technology. The combination of desktop video systems and the sharing of computer applications software is of special interest. Research is being performed to evaluate the effectiveness of some of these technologies as part of this project. The design of the distance learning origination and receive sites discussed in this paper were influenced by the educational community's growing interest in distance education. The following approach was used to develop comparative costs for delivering interactive distance education to developing countries: (1) Representative target locations for receive sites were chosen. The originating site was assumed to be Cocoa, Florida, where FSEC is located; (2) A range of course development costs were determined; (3) The cost of equipment for three alternative two-way interactive distance learning system configurations was determined or estimated. The types of system configurations ranged from a PC-based system that allows instructors to originate instruction from their office using desktop video and shared application software, to a high cost system that uses a electronic classroom; (4) A range of costs for both satellite and terrestrial communications was investigated; (5) The costs of equipment and operation of the alternative configurations for the origination and receive sites were determined; (6) A range of costs for several alternative delivery scenarios (i.e., a mix of live-interactive; asynchronous interactive;use of videotapes) was determined; and (7) A preferred delivery scenario, including cost estimate, was developed.

Ventre, Gerard G.↗

History of the Italian San Marco equatorial mobile range

Events leading to the development of the San Marco Equatorial Range are presented. Included are background information leading to the cooperative space program between the United States and Italy, conceptual planning, training activities, equipment design and fabrication, and range utilization. The technical support provided the San Marco Program by Scout Project Office, and other NASA installations is described.

Nesbitt, H. N.↗

Case history of FAA/SRI wind shear models

In order to understand the development of the FAA/SRI wind fields, it is important to understand the operating philosophy of the FAA's Wind Shear Program Office. The goal of the office was to ensure an integrated solution to the wind shear problem which addressed three area: ground based equipment and coordination; airborne systems and procedures; and weather prediction. This triply addressed goal was central to the development of the wind fields. The primary user of the wind shear modeling during the FAA's program was airborne simulation. The project requirement was to use wind shear models that resulted from accidents so that effective procedures and/or equipment could be found for hazardous wind shear encounters. The wind shear model development is discussed in detail.

Schlickenmaier, Herbert↗

International Space Station USOS Waste and Hygiene Compartment Development

The International Space Station (ISS) currently provides human waste collection and hygiene facilities in the Russian Segment Service Module (SM) which supports a three person crew. Additional hardware is planned for the United States Operational Segment (USOS) to support expansion of the crew to six person capability. The additional hardware will be integrated in an ISS standard equipment rack structure that was planned to be installed in the Node 3 element; however, the ISS Program Office recently directed implementation of the rack, or Waste and Hygiene Compartment (WHC), into the U.S. Laboratory element to provide early operational capability. In this configuration, preserved urine from the WHC waste collection system can be processed by the Urine Processor Assembly (UPA) in either the U.S. Lab or Node 3 to recover water for crew consumption or oxygen production. The human waste collection hardware is derived from the Service Module system and is provided by RSC-Energia. This paper describes the concepts, design, and integration of the WHC waste collection hardware into the USOS including integration with U.S. Lab and Node 3 systems.

Link, Dwight E., Jr.↗

Lambda Point Equipment

A compilation of the active research tasks as of the end of the fiscal year 1984 of the Microgravity Science and Applications Program, NASA-Office of Space Science and Applications, involving several NASA centers and other organizations is presented. The purpose is to provide an overview of the program scope for managers and scientists in industry, university, and government communities. An introductory description of the program, strategy and overall goal; identification of the organizational structures and people involved; and a description of each research task, together with a list of recent publications is presented. The tasks are grouped into six categories: Electronic Materials; Solidification of Metals, Alloys, and Composites; Fluid Dynamics and Transports; Biotechnology; Glasses and Ceramics; and Combustion.

Lipa, J. A.↗

Financial Analysis of Experimental Releases Conducted at Glen Canyon Dam during Water Year 2019

This report was prepared by Argonne National Laboratory in support of a financial analysis of the Glen Canyon Dam high-flow experimental release that is intended to mobilize the sand in the Colorado River with high-volume water releases from the dam and redeposit it downstream as sandbars along the river. These sandbars serve, among other things, as habitat for wildlife. This experimental release was conducted during the period from November 5 to November 8, 2018. This analysis was funded by the Colorado River Storage Project (CRSP) Office of the U.S. Department of Energy Western Area Power Administration (WAPA). CRSP markets electricity produced by hydroelectric facilities collectively known as the Salt Lake City Area Integrated Projects including dams equipped for power generation on the Colorado, Green, Gunnison, and Rio Grande Rivers and on Plateau Creek in the states of Arizona, Colorado, New Mexico, Utah, and Wyoming. Staff members in Argonne’s Energy Systems Division prepared this technical report with assistance from the WAPA CRSP and Energy Marketing and Management Offices.

13 HYDRO ENERGY↗