Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operations Personnel”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Proposal to use the DOE-STD-3009-2014 Methodology to Prepare the Documented Safety Analysis (DSA) for Research Reactor Nuclear Facilities

Sandia National Laboratories (SNL) personnel operate a low power research reactor (the Annular Core Research Reactor, or ACRR), and a zero-power critical experiment assembly referred to as CX. In accordance with 10 CFR 830, Subpart B, Appendix A, the acceptable methodology for developing a Documented Safety Analysis (DSA) for DOE nuclear reactors is the Nuclear Regulatory Commission’s (NRC’s) Regulatory Guide 1.70 (RG 1.70). RG 1.70 does not address certain areas required by 10 CFR 830 and expected by DOE (e.g., full facility hazard analysis).Thus, the current DSAs for SNL’s reactor nuclear facilities are based on RG 1.70, but also of necessity supplemented by DOE-STD-3009-94 methods. SNL personnel, in consultation with the National Nuclear Security Administration (NNSA) Sandia Field Office (SFO), have concluded that an alternate methodology is preferred to RG 1.70. The details of the proposal, and the reasons motivating its development, are discussed in the order described below. The proposed alternate methodology will be applicable to the ACRR and the CX (i.e., it will be applicable to nuclear facilities in which a reactor and/or a critical assembly will be operated).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Selection of the Ground Segment for the Next Generation Space Telescope (NGST) Flight Demonstrator (Nexus)

Nexus was a technology demonstrator project that was designed to bridge from the Hubble Space Telescope (HST) to its successor, the Next Generation Space Telescope (NGST). This paper focuses on the process used in designing the ground segment for Nexus and the lessons learned in its development. Ground station cost drivers were: (1) Contact time, (2) Cost of transporting data between the ground stations and control center, and (3) Cost savings via ground automation. We found that reducing the communication requirement in just the first 100 days could have reduced the total ground station cost by 40%. Contact time cost dwarfed the cost trade between automation development and off-shift operations personnel. Real-time Telemetry and Control (T&C) system analysis was divided into: (1) Potential reuse of the Nexus real-time (T&C) system for NGST, (2) Feasibility of using a 'Finite State-Based Modeling' product, and (3) Selecting a Commercial Off the Shelf (COTS) versus Government Off The Shelf (GOTS) products. We found that each of the products evaluated in detail (ASIST, EPOCH 2000, and ITOS) could adequately support basic mission requirements. Lessons learned were: (1) Include operations at the beginning of the mission, and (2) Develop an operations concept as soon as possible.

Gal-Edd, Jonathan↗

Interplanetary Transit Simulations Using the International Space Station

We evaluated the space life sciences utility of the International Space Station (ISS) to simulate the outbound transit portion of missions to Mars and Near Earth Asteroids (NEA) to investigate biomedical and psychological aspects of such transits, to develop and test space operation procedures compatible with communication delays and outages, and to demonstrate and validate technologies and countermeasures. Two major categories of space life sciences activities can capitalize on ISS capabilities. The first includes studies that require ISS (or a comparable facility), typically for access to prolonged weightlessness. The second includes studies that do not strictly require ISS but can exploit it to maximize their scientific return more efficiently and productively than in ground-based simulations. For these studies, ISS offers a high fidelity analog for fundamental factors on future missions, such as crew composition, mission control personnel, operational tasks and workload, real-world risk, and isolation, and can mimic the effects of distance and limited accessibility. In addition to conducting Mars- and NEA-transit simulations on 6-month ISS increments, extending the current ISS increment duration from 6 months to 9 or even 12 months will provide opportunities for enhanced and focused research relevant to long duration Mars and NEA missions. Increasing the crew duration may pose little additional risk to crewmembers beyond that currently accepted on 6-month increments, but additional medical monitoring capabilities will be required beyond those currently used for ISS operations. Finally, while presenting major logistical challenges, such a simulation followed by a post-landing simulation of Mars exploration could provide quantitative evidence of capabilities in an actual mission. Thus, the use of ISS to simulate aspects of Mars and NEA missions seems practical. If it were to be implemented without major disruption of on-going ISS activities, then planning should begin soon, in close consultation with all international partners.

Charles, John B.↗

Small Lunar Base Camp and in Situ Resource Utilization Oxygen Production Facility Power System Comparison

This report examines the power requirements for operating an in situ resource utilization (ISRU) oxygen production system on the lunar surface and a small six-person base camp. The baseline ISRU system produced 1.63 kg/h for a total day and night production rate of 1,154 kg. It was estimated that this plant would require 25.83 kW of power to operate. The base camp power includes auxiliary equipment as well as a communications system. The required power estimate for the base camp was 28.05 kW. This estimation was used to size a power system and determine its mass for meeting these requirements. Three types of power systems were considered: a solar photovoltaic (PV) array system using batteries for energy storage, a PV array system using a regenerative fuel cell (RFC) for energy storage, and a modular 10-kW electrical output power Kilopower reactor system. Three separate cases were examined: a stand-alone ISRU oxygen production system, a base camp, and a combined ISRU oxygen production system and base camp. For the PV array-based system, the RFC energy storage method had a mass advantage over a battery- based energy storage system. For higher power nighttime power operation for all three cases, the RFC system’s specific energy was just over 830 Wh/kg. For the lower power nighttime “keep-alive” level used as part of the Case 1 analysis, the specific energy for the RFC was 456 Wh/kg. Both of these levels are significantly above the specific energy of 200 Wh/kg for the battery. Because of this higher specific energy, the RFC-based system provided significant mass advantages over the battery-based energy storage system. The baseline reactor system utilized shielding and separation distance to meet the desired maximum radiation dose level of 5 rem/yr for personnel operating within the vicinity of the power loads, base camp, and oxygen production facility. There are methods that could potentially be utilized to reduce the shielding requirements and separation distance. Implementing these would reduce the overall system mass for the reactor. Also, optimizing the reactor output to a specific mission would provide benefits in mass at the expense of modularity. The results of the power system comparison between a solar PV array-based system and a Kilopower reactor-based system has shown that for missions required to operate throughout the lunar night at power levels comparable to those used during the day, the reactor-based system provides a significant mass advantage. However, for applications that can meet their mission requirements while only having to operate during the daytime with minimal power required to survive the nighttime, the PV array-based system provides a mass advantage.

Colozza, Anthony J.↗

Improving Coal-Fired Plant Performance Through Integrated Predictive and Condition-Based Monitoring Tools

The project demonstrated the ability to improve boiler performance and reliability through the integrated use of condition-based monitoring (CBM) and predictions of the impacts of coal quality on boiler operations at a full-scale coal-fired power plant. The advanced tool developed actively monitors and manages coal quality and overall boiler conditions that maximizes availability and maintains generating capacity while reducing cost. The tool is used to forecast and alert plant operators and engineers about poor boiler conditions which may occur as a result of incoming coal and/or current power plant operating conditions. The Combustion System Performance Indices (CSPI) and CoalTracker (CT) programs predicts fireside performance of the plant including slagging, fouling, erosion, slag flow, strength development (sintering/densification), and slag layer thickness based on the composition of delivered coal. CT program is tailored for each plant and is used to track the coal from the point of delivery to the burner. The most successful application of the CSPI-CT has been at plants where the coal composition is determined through the use of a full stream elemental analyzers based on prompt gamma neutron analysis (PGNAA). The CSPI-CT program information is used by coal procurement, coal mining and plant operations personnel to select and blend coal properties for the best plant performance.

01 COAL, LIGNITE, AND PEAT↗

The Energy in Modular (EMOD) Buildings Method: A Guide to Energy-Efficient Design for Industrialized Construction of Modular Buildings

Industrialized construction has immense potential to address the growing need globally to build and upgrade the building stock to be affordable, energy-efficient, and resilient. It can also help achieve the United States' goal of a 50% reduction in U.S. greenhouse gas (GHG) emissions by 2030. Despite this potential, and the ever-increasing push for electrification and decarbonization of households in the United States, industrialized construction has not yet been leveraged specifically to help address these challenges and accelerate the pathway to meet these goals. The National Renewable Energy Laboratory (NREL) aims to claim this missed opportunity by focusing on delivering affordable, grid-efficient net-zero energy (NZE) modular buildings for underserved communities to ensure an equitable transition to the future of clean energy, accelerate decarbonization of the built environment, and support the development of a high-productivity construction and energy efficiency workforce. The Energy in Modular (EMOD) method is our approach to designing, producing, and delivering affordable, net-zero energy, low-carbon, and healthier buildings at scale. The following energy efficiency strategies are part of the scope of this guide: envelope thermal control, envelope infiltration control, mechanical, electrical, and plumbing systems, smart controls, and solar plus storage. We draw synergies between design for manufacturing and assembly, process optimization, retrofit technologies, and digitization. Our goal is to influence the improvement and production of buildings to increase performance, enhance energy efficiency, and reduce GHG emissions. This guide documents the research and development efforts initiated by a set of design objectives to "modularize" a set of energy efficiency and low-carbon strategies into a housing unit while preserving and enhancing energy efficiency benefits and decarbonization pathways. This guide is intended to serve as a framework for housing developers, housing agencies, architects, energy experts, and process engineers or factory operator personnel who are critical to today's modular builder teams. This guide focuses on specific energy efficiency strategies, decarbonization pathways, and associated processes as part of NREL's research efforts. Stakeholders may substitute other means, methods, and technologies for the ones evaluated in this study.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Robotics Plan in Support of DOME Testbed Operations

Various robotic tooling options have been evaluated for the NRIC DOME concept of operations (ConOps). Framatome was contracted to develop a wide-ranging list of commercial off the shelf (COTS) and custom robotic systems to be considered for performing the DOME ConOps functions. Subsequent project tasks from Framatome narrowed down the list and scored the most viable options. The abbreviated list, and associated scoring, has been reviewed and assessed to provide formal recommendations for the robotic ConOps functions of DOME. The overhead telescoping mast & Kraft arm assembly is recommended as the primary system for reactor demobilization and removal. The estimated cost is $\$700$K with a timeline to develop and deliver of about 2.5 years. The mast & Kraft arm would still require an overhead lift system for mobilization and installation. Either the refurbished polar crane or a new gantry crane delivery platform could both serve as the overhead lift and delivery system. The estimated costs for the refurbishment polar crane and new gantry crane systems are, respectively, $\$4.4$M and $\$3$M with about 2.5 years to develop and deliver. A Brokk + Kraft crawler & arm is recommended as a secondary robotic system to support the overhead mast & Kraft arm system. The Brokk + Kraft crawler & arm would cost an estimated $\$726$k and would take about 1.5 years to develop and deliver. The Boston Dynamics SPOT robot is also recommended for the in-service monitoring during experimentation operations. The estimated cost is $\$220$K with a timeline to deliver of 8-14 months. The Elios 3 aerial drone is recommended to perform large area radiation dose rate mapping and visual inspections. The estimated cost is a $\$100$K and will also need about 8-14 months to develop and deliver. A mockup rig is also recommended to be procured an employed to test & verify the robotic capabilities as well as provide needed training for operations personnel. It is estimated that a mockup rig would cost about $\$500$k and would take up to a year to develop and build.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Improved fire resistant radio frequency anechoic materials

Protective, flameproof foam covering improves the resistance to fire and surface contamination of low-cost radio frequency absorbing and shielding anechoic materials. This promotes safety of operating personnel and equipment being tested in an otherwise combustible anechoic chamber.

Robinson, D. A.↗

Biomedical sensing and display concept improves brain wave monitoring

Concept for increasing effectiveness of biomedical sensing and display promises greater monitoring capability while lessening high skill requirements in operating personnel. New concept overcomes deficiencies of current system by employing increased number of probes and microelectronic preamplifiers.

Trent, R. L.↗

Flight control in the Apollo Program

Apollo Program flight control operations personnel premission planning and training, discussing presolution of launch problems and emergencies

Covington, J. O.↗

Lightning protection practices applied to field station installations

Theoretical considerations of lightning phenomena and the effects of the magnetic, capacitive, and resistive components of lightning-induced voltages are discussed. A typical tracking station is analyzed from a lightning standpoint. Specific protective methods are discussed, including the implementation of high-surge-current voltage clippers for sensitive electrical and electronic circuits, grounding, counterpoises, and bonding. The safety of operating personnel is also treated as a prime consideration.

Blalock, T. J.↗

Zero-G flight test of a gauging system. Volume 1: Summary

The capability of a nucleonic gauging system to gauge the content of a reduced-scale storable liquid tank in a zero-g environment as provided by a KC-135 Zero-G Aircraft was demonstrated. Although the propellant-ullage interface never achieved the stable, zero-g equilibrium configuration, the gauging system gauged liquid quantity over all tank loadings to a total system accuracy the order of two percent. It was also determined that the gauging system presented no undue safety hazard to operating personnel in either ground and/or flight testing.

Source record↗

Apollo Experiment Report: Lunar-Sample Processing in the Lunar Receiving Laboratory High-Vacuum Complex

A high-vacuum complex composed of an atmospheric decontamination system, sample-processing chambers, storage chambers, and a transfer system was built to process and examine lunar material while maintaining quarantine status. Problems identified, equipment modifications, and procedure changes made for Apollo 11 and 12 sample processing are presented. The sample processing experiences indicate that only a few operating personnel are required to process the sample efficiently, safely, and rapidly in the high-vacuum complex. The high-vacuum complex was designed to handle the many contingencies, both quarantine and scientific, associated with handling an unknown entity such as the lunar sample. Lunar sample handling necessitated a complex system that could not respond rapidly to changing scientific requirements as the characteristics of the lunar sample were better defined. Although the complex successfully handled the processing of Apollo 11 and 12 lunar samples, the scientific requirement for vacuum samples was deleted after the Apollo 12 mission just as the vacuum system was reaching its full potential.

White, D. R.↗

Shrink tubing identifier

Modified typewriter is used to code small-batch lengths of shrink tubing. Method replaces heat-operated wire-marking machines, is faster, and less hazardous to operating personnel.

Plummer, R. F.↗

Acoustical Evaluation of the NASA Langley V/STOL Wind Tunnel

The results are presented of the acoustical measurements made to supply NASA Langley operating personnel with the acoustical characteristics of the tunnel test section needed for the planning of acoustical measurements and to identify the major noise sources. The results of the preliminary measurements of the spatial distribution of the sound field in the closed tunnel configuration indicate that the total sound power output of an unknown sound source placed in the test section could most probably be evaluated by measuring the sound pressure in two properly chosen locations in the duct - one upstream and one downstream of the test section. However, it is recommended that the practicability of this method of sound power output measurements be further investigated, preferably in a small scale model of the V/STOL Tunnel.

Ver, I. L.↗

Solar power satellite. System definition study. Part 1, volume 3: Construction, transportation and cost analyses

Concepts developed for both LEO and GEO construction of photovoltaic and thermal engine satellites are analyzed. Topics discussed include: satellite construction; crew scheduling; crew jobs and organizations; operator productivity rating; constructability rating; transportation systems for cargo launch, refueling operations, personnel transport, and orbit transfer; collision analysis, cost analysis, and radiation evironment and effects.

Source record↗