Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operations and Life Cycle”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Research on catalysts for long-life closed-cycle CO2 laser oaperation

Long-life, closed-cycle operation of pulsed CO2 lasers requires catalytic CO-O2 recombination both to remove O2, which is formed by discharge-induced CO2 decomposition, and to regenerate CO2. Platinum metal on a tin-oxide substrate (Pt/SnO2) has been found to be an effective catalyst for such recombination in the desired temperature range of 25 to 100 C. This paper presents a description of ongoing research at NASA-Langley on Pt/SnO2 catalyzed CO-O2 recombination. Included are studies with rare-isotope gases since rare-isotope CO2 is desirable as a laser gas for enhanced atmospheric transmission. Results presented include: (1) the effects of various catalyst pretreatment techniques on catalyst efficiency; (2) development of a technique, verified in a 30-hour test, to prevent isotopic scrambling when C(O-18) and (O-18)2 are reacted in the presence of a common-isotope Pt/Sn(O-16)2 catalyst; and (3) development of a mathematical model of a laser discharge prior to catalyst introduction.

Sidney, Barry D.↗

Pretreatment of CO oxidation catalysts

CO oxidation catalysts with high activity in the range of 25 C to 100 C are important for long-life, closed-cycle operation of pulsed carbon dioxide 2 lasers. A reductive pretreatment with either CO or H sub 2 was shown to significantly enhance the activity of a commerically-available platinum on tin (IV) oxide (Pt/SnO2) catalyst relative to an oxidative or inert pretreatment or no pretreatment. Pretreatment at temperatures of 175 C and above caused an initial dip in observed CO or O sub 2 loss or CO sub 2 formation in a test gas mixture of 1 percent CO and 0.5 percent O sub 2 in a He gas matrix before a steady-state yield was obtained. This dip was found to be caused by dehydration of the surface of the catalyst and was readily eliminated by humidifying the catalyst or the test gas mixture. It was also found that too much moisture resulted in a lower overall yield of CO sub 2. Under similar conditions, it is hypothesized that the effect of the humidification is to increase the concentration of OH groups on the surface of the catalyst. The effect of having high concentration of CO sub 2 in the test gas mixture upon the loss of CO and O sub 2 as well as the effect of periods of relaxation of the catalyst under non-test gas conditions was studied. The purpose of these studies was to gain an insight into the mechanism of CO oxidation on this type of catalyst.

Vannorman, John D.↗

The effect of H2O and pretreatment on the activity of a Pt/SnO2 catalyst

CO oxidation catalysts with high activity at 25 C to 100 C are important for long-life, closed-cycle operation of pulsed CO2 lasers. A reductive pretreatment with either CO or H2 has been shown to significantly enhance the activity of a commercially available platinum on tin (IV) oxide (Pt/SnO2) catalyst relative to an oxidative or inert pretreatment or no pretreatment. Pretreatment at temperatures of 175 C and above causes an initial dip in the observed CO2 yield before the steady-state yield is attained. This dip has been found to be caused by dehydration of the catalyst during pretreatment and is readily eliminated by humidifying the catalyst or the reaction gas mixture. It is hypothesized that the effect of humidification is to increase the concentration of OH groups on the catalyst surface which play a role in the reaction mechanism.

Vannorman, John D.↗

Examination of the evolutionary growth requirement of the U.S. Space Station Freedom propulsion system

A trade study, performed to examine different propulsion systems into which the modular hydrazine system may evolve after the completion of the assembly phase, is discussed and results of this study are presented. Propulsion system options include: the modular hydrazine system, a modified hydrazine system, hypergolic bipropellant systems, an oxygen-hydrogen system, hypergolic bipropellant/hydrazine hybrid systems, and the oxygen-hydrogen/hydrazine hybrid system. Trade study criteria and methodology are reviewed. Water availability and growth and nongrowth configurations are discussed. Recommendations are made on the type of Space Station propulsion system that should be developed for long-term operations at minimal life cycle cost. It is suggested that, due to growth of the station shown in the assembly complete configuration, the oxygen-hydrogen propulsion system should be further developed so that related technology will be mature by assembly complete.

Morano, Joseph S.↗

A review of findings of a study of rocket based combined cycle engines applied to extensively axisymmetric single stage to orbit vehicles

Extensively axisymmetric and non-axisymmetric Single Stage To Orbit (SSTO) vehicles are considered. The information is presented in viewgraph form and the following topics are presented: payload comparisons; payload as a percent of dry weight - a system hardware cost indicator; life cycle cost estimations; operations and support costs estimation; selected engine type; and rocket engine specific impulse calculation.

Foster, Richard W.↗

Design challenges for tomorrow's manned launch systems

This paper attempts to capture some of the technical and national challenges facing the design of America's next manned launch system (MLS). There are three basic paths for pursuing tomorrow's MLS; each with variations. Some characteristics that will be sought regardless of the concept selected include low development (or front-end) and life-cycle costs, safety, operability, availability, and a host of other 'ilities'. In order to discriminate among the concepts, a robust design environment and a variety of new and improved analysis tools are needed that produce critical metrics in a timely, efficient manner from a large study space. This paper presents some of the challenges in development, integration, and application of optimization, costing, operations modeling, and several engineering disciplinary tools including geometry modeling, structures, aerodynamics/aeroheating, and trajectory/performance.

Rowell, Lawrence F.↗

Re-engineering NASA's space communications to remain viable in a constrained fiscal environment

Along with the Red and Blue Teams commissioned by the NASA Administrator in 1992, NASA's Associate Administrator for Space Communications commissioned a Blue Team to review the Office of Space Communications (Code O) Core Program and determine how the program could be conducted faster, better, and cheaper. Since there was no corresponding Red Team for the Code O Blue Team, the Blue Team assumed a Red Team independent attitude and challenged the status quo, including current work processes, functional distinctions, interfaces, and information flow, as well as traditional management and system development practices. The Blue Team's unconstrained, non-parochial, and imaginative look at NASA's space communications program produced a simplified representation of the space communications infrastructure that transcends organizational and functional boundaries, in addition to existing systems and facilities. Further, the Blue Team adapted the 'faster, better, cheaper' charter to be relevant to the multi-mission, continuous nature of the space communications program and to serve as a gauge for improving customer services concurrent with achieving more efficient operations and infrastructure life cycle economies. This simplified representation, together with the adapted metrics, offers a future view and process model for reengineering NASA's space communications to remain viable in a constrained fiscal environment. Code O remains firm in its commitment to improve productivity, effectiveness, and efficiency. In October 1992, the Associate Administrator reconstituted the Blue Team as the Code O Success Team (COST) to serve as a catalyst for change. In this paper, the COST presents the chronicle and significance of the simplified representation and adapted metrics, and their application during the FY 1993-1994 activities.

Hornstein, Rhoda Shaller↗

Space Power Requirements for Future NASA Missions

The key technology issues for the power requirements of future NASA space missions are: reduction in mass to enable smaller launch vehicles, faster trip time and lower cost; simpler more autonomous operations to reduce life cycle cost; reduce design, development , and qualification time to enable frequent low-cost missions; increase payload fraction and science return; enable next generation missions; stimulate U.S. industry to promote strong world leadership capability; and incorporate dual-use strategy into technology development.

Mulville, Daniel R.↗

Optical Measurements for Intelligent Aerospace Propulsion

There is growing interest in applying intelligent technologies to aerospace propulsion systems to reap expected benefits in cost, performance, and environmental compliance. Cost benefits span the engine life cycle from development, operations, and maintenance. Performance gains are anticipated in reduced fuel consumption, increased thrust-toweight ratios, and operability. Environmental benefits include generating fewer pollutants and less noise. Critical enabling technologies to realize these potential benefits include sensors, actuators, logic, electronics, materials, and structures. For propulsion applications, the challenge is to increase the robustness of these technologies so that they can withstand harsh temperatures, vibrations, and grime while providing extremely reliable performance. This paper addresses the role that optical metrology is playing in providing solutions to these challenges. Optics for ground-based testing (development cycle), flight sensing (operations), and inspection (maintenance) are described. Opportunities for future work are presented.

Mercer, Carolyn R.↗

Prototype Lithium-Ion Battery Developed for Mars 2001 Lander

In fiscal year 1997, NASA, the Jet Propulsion Laboratory, and the U.S. Air Force established a joint program to competitively develop high-power, rechargeable lithium-ion battery technology for aerospace applications. The goal was to address Department of Defense and NASA requirements not met by commercial battery developments. Under this program, contracts have been awarded to Yardney Technical Products, Eagle- Picher Technologies, LLC, BlueStar Advanced Technology Corporation, and SAFT America, Inc., to develop cylindrical and prismatic cell and battery systems for a variety of NASA and U.S. Air Force applications. The battery systems being developed range from low-capacity (7 to 20 A-hr) and low-voltage (14 to 28 V) systems for planetary landers and rovers to systems for aircraft that require up to 270 V and for Unmanned Aerial Vehicles that require capacities up to 200 A-hr. Low-Earth-orbit and geosynchronousorbit spacecraft pose additional challenges to system operation with long cycle life (>30,000 cycles) and long calendar life (>10 years), respectively.

Manzo, Michelle A.↗

NASA Crew and Cargo Launch Vehicle Development Approach Builds on Lessons from Past and Present Missions

The United States (US) Vision for Space Exploration, announced in January 2004, outlines the National Aeronautics and Space Administration's (NASA) strategic goals and objectives, including retiring the Space Shuttle and replacing it with new space transportation systems for missions to the Moon, Mars, and beyond. The Crew Exploration Vehicle (CEV) that the new human-rated Crew Launch Vehicle (CLV) lofts into space early next decade will initially ferry astronauts to the International Space Station (ISS) Toward the end of the next decade, a heavy-lift Cargo Launch Vehicle (CaLV) will deliver the Earth Departure Stage (EDS) carrying the Lunar Surface Access Module (LSAM) to low-Earth orbit (LEO), where it will rendezvous with the CEV launched on the CLV and return astronauts to the Moon for the first time in over 30 years. This paper outlines how NASA is building these new space transportation systems on a foundation of legacy technical and management knowledge, using extensive experience gained from past and ongoing launch vehicle programs to maximize its design and development approach, with the objective of reducing total life cycle costs through operational efficiencies such as hardware commonality. For example, the CLV in-line configuration is composed of a 5-segment Reusable Solid Rocket Booster (RSRB), which is an upgrade of the current Space Shuttle 4- segment RSRB, and a new upper stage powered by the liquid oxygen/liquid hydrogen (LOX/LH2) J-2X engine, which is an evolution of the J-2 engine that powered the Apollo Program s Saturn V second and third stages in the 1960s and 1970s. The CaLV configuration consists of a propulsion system composed of two 5-segment RSRBs and a 33- foot core stage that will provide the LOX/LED needed for five commercially available RS-68 main engines. The J-2X also will power the EDS. The Exploration Launch Projects, managed by the Exploration Launch Office located at NASA's Marshall Space Flight Center, is leading the design, development, testing, and operations planning for these new space transportation systems. Utilizing a foundation of heritage hardware and management lessons learned mitigates both technical and programmatic risk. Project engineers and managers work closely with the Space Shuttle Program to transition hardware, infrastructure, and workforce assets to the new launch systems, leveraging a wealth of knowledge from Shuffle operations. In addition, NASA and its industry partners have tapped into valuable Apollo databases and are applying corporate wisdom conveyed firsthand by Apollo-era veterans of America s original Moon missions. Learning from its successes and failures, NASA employs rigorous systems engineering and systems management processes and principles in a disciplined, integrated fashion to further improve the probability of mission success.

Dumbacher, Daniel L.↗

Vertically Aligned Graphene/Metal Oxide Based Lightweight Super Strong, Energy Storage Carbon Fiber Composites

In this era of budding smart technologies, flexible and smart wearable textiles are a long awaited product which are anticipated to reach a $10 B market in few years.1 Supercapacitors are an excellent power source for these smart textiles, because they are light in weight, safe in operation, provide longer life cycle, high flexibility, and faster charge discharge capabilities.

Energy storage↗

Plug cluster module demonstration

The low pressure, film cooled rocket engine design concept developed during two previous ALRC programs was re-evaluated for application as a module for a plug cluster engine capable of performing space shuttle OTV missions. The nominal engine mixture ratio was 5.5 and the engine life requirements were 1200 thermal cycles and 10 hours total operating life. The program consisted of pretest analysis; engine tests, performed using residual components; and posttest analysis. The pretest analysis indicated that operation of the operation of the film cooled engine at O/F = 5.5 was feasible. During the engine tests, steady state wall temperature and performance measurement were obtained over a range of film cooling flow rates, and the durability of the engine was demonstrated by firing the test engine 1220 times at a nominal performance ranging from 430 - 432 seconds. The performance of the test engine was limited by film coolant sleeve damage which had occurred during previous testing. The post-test analyses indicated that the nominal performance level can be increased to 436 seconds.

Rousar, D. C.↗

Digital electronic engine control history

Full authority digital electronic engine controls (DEECs) were studied, developed, and ground tested because of projected benefits in operability, improved performance, reduced maintenance, improved reliability, and lower life cycle costs. The issues of operability and improved performance, however, are assessed in a flight test program. The DEEC on a F100 engine in an F-15 aircraft was demonstrated and evaluated. The events leading to the flight test program are chronicled and important management and technical results are identified.

Putnam, T. W.↗

Workstation-Based Real-Time Mesoscale Modeling Designed for Weather Support to Operations at the Kennedy Space Center and Cape Canaveral Air Station

This paper describes the capabilities and operational utility of a version of the Mesoscale Atmospheric Simulation System (MASS) that has been developed to support operational weather forecasting at the Kennedy Space Center (KSC) and Cape Canaveral Air Station (CCAS). The implementation of local, mesoscale modeling systems at KSC/CCAS is designed to provide detailed short-range (less than 24 h) forecasts of winds, clouds, and hazardous weather such as thunderstorms. Short-range forecasting is a challenge for daily operations, and manned and unmanned launches since KSC/CCAS is located in central Florida where the weather during the warm season is dominated by mesoscale circulations like the sea breeze. For this application, MASS has been modified to run on a Stardent 3000 workstation. Workstation-based, real-time numerical modeling requires a compromise between the requirement to run the system fast enough so that the output can be used before expiration balanced against the desire to improve the simulations by increasing resolution and using more detailed physical parameterizations. It is now feasible to run high-resolution mesoscale models such as MASS on local workstations to provide timely forecasts at a fraction of the cost required to run these models on mainframe supercomputers. MASS has been running in the Applied Meteorology Unit (AMU) at KSC/CCAS since January 1994 for the purpose of system evaluation. In March 1995, the AMU began sending real-time MASS output to the forecasters and meteorologists at CCAS, Spaceflight Meteorology Group (Johnson Space Center, Houston, Texas), and the National Weather Service (Melbourne, Florida). However, MASS is not yet an operational system. The final decision whether to transition MASS for operational use will depend on a combination of forecaster feedback, the AMU's final evaluation results, and the life-cycle costs of the operational system.

Manobianco, John↗

Exploration Extravehicular Mobility Unit (xEMU) Pressure Garment System (PGS) Cycle Testing Overview and Results

With the development of NASA’s next generation spacesuit, the hardware life expectations for the new spacesuit required evaluation. The xPGS team designed and performed a test series to assess the new hardware against the life requirements. The EMU on the International Space Station (ISS) today tests the life of the suit and new components by performing isometric individual joint cycle motions with the requirements based on previously performed Extra-Vehicular Activities (EVAs). The xPGS includes new designs for suit components to provide increased mobility for performance of lunar operations, thus the requirements for the life cycle of the suit had to be developed and tested with these new operations in mind. Cycle requirements shifted to cycles of functional tasks in lieu of isometric cycles to better understand the life of the suit. Manned cycle testing of the xPGS was conducted by performing repetitions of a series of tasks that reflect predicted Lunar EVA operations. The test series utilized a gravity offload system to simulate Lunar gravity environment. Cycle testing concluded after 30 test days in October of 2022 with lessons learned that will be critical for future spacesuit design. Specific lessons learned with regards to suit performance and test methodology will be provided.

spacesuit↗

The HL-20 lifting-body personnel launch system

The HL-20 early lifting-body personnel launch system (PSL) research, expected PSL mission requirements, the HL-20 concept design status, and those features which enhance aerodynamic and aerothermodynamic performance, operation, efficiency, maintainability, reliability, and crew safety are described. Results of the HL-20 PLS research to date show that the concept has definite advantages for efficiently satisfying future needs for assured manned access to space. The vehicle is designed with operational efficiency, low life-cycle costs, reliability, and safety as the primary criteria. It is shown that the HL-20 PLS can be developed and put into operation in the same timeframe that the Space Station Freedom is deployed.

Stone, Howard W.↗

Performance characterization tests of three 0.44-N (0.1 lbf) hydrazine catalytic thrusters

The 0.44-N (0.1-lbf) class of hydrazine catalytic thruster has been evaluated to assess its capability for spacecraft limit-cycle attitude control with thruster pulse durations on the order of 10 milliseconds. Dynamic-environment and limit-cycle simulation tests were performed on three commercially available thruster/valve assemblies, purchased from three different manufacturers. The results indicate that this class of thruster can sustain a launch environment and, when properly temperature-conditioned, can perform limit-cycle operations over the anticipated life span of a multi-year mission. The minimum operating temperature for very short pulse durations was determined for each thruster. Pulsing life tests were then conducted on each thruster under a thermally controlled condition which maintained the catalyst bed at both a nominal 93 C (200 F) and 205 C (400 F). These were the temperatures believed to be slightly below and very near the minimum recommended operating temperature, respectively. The ensuing life tests ranged from 100,000 to 250,000 pulses at these temperatures, as would be required for spacecraft limit-cycle attitude control applications.

Moynihan, P. I.↗