Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operations and Maintenance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Bridging Equipment Reliability Data and Robust Decisions in a Plant Operation Context

In order to reduce operation and maintenance (O&M) costs, nuclear power plants (NPPs) are moving from corrective and periodic maintenance to predictive maintenance strategies. Such transition requires changes on the data that needs to be retrieved and on the type of decision processes to be employed. Advanced monitoring and data analysis technologies are essential to support predictive strategies. They can in fact provide precise information about health of a component, track its degradation trends, and provide information of its expected failure time. With such information, maintenance operations for a component can be performed right before its expected failure time. This dynamic context of O&M operations requires new methods to analyze data, propagate component health information from the component to the system level, and optimize plant resources. In this respect, the risk informed asset management (RIAM) project has been tasked to develop and test this new class of methods into a risk analytics toolset. This toolset consists of data analytics tools coupled with reliability methods designed to manage plant assets and performances in a predictive maintenance context. This report shows the latest improvements on such development and the initial testing of our methods on the three main research areas that the RIAM project is focusing on. These areas are the following: equipment reliability data analytics, system reliability modeling, and plant resources optimization methods. We show how the methods developed in these areas can support predictive maintenance strategies by: 1) analyzing equipment reliability data (either in numeric and textual form), 2) assessing component and system health through an innovative margin-based reliability approach, and 3) identifying the most critical components and set optimal maintenance schedule based on plant economic and operational constraints.

97 MATHEMATICS AND COMPUTING↗

Remote operations and maintenance framework for molten salt reactors

Remote, highly-automated operations and maintenance is key for economically successful deployment of molten salt reactors (MSRs). Liquid-fueled MSRs will have high dose rates within containment following initial start-up due to the proximity of the fuel salt and gaseous fission products. The challenges of performing O&M in high dose environments has long been recognized and many of the required technology components have been developed for use in similar high radiation environments.Future MSRs will need to have much lower labor costs than existing nuclear power plants to be competitive. The advance of digital technologies provides the opportunity to automate maintenance activities. Advances in modeling and simulation (M&S) may enable shifting the role of the operator from remotely performing tasks to overseeing automated systems. Dynamically updating a plant’s digital twin representation through integrating multiple sensor signals will be key to automating complex process tasks. Complex, highly-automated maintenance in high-radiation areas has not been previously proven and adequate demonstration will be required to validate its performance.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Wind Plant Operations and Maintenance Challenges and Research Opportunities

Global wind industry has experienced tremendous growth during the past two decades and the trend does not appear changing in near future. However, the industry is still challenged by premature component failures and high operations & maintenance (O&M) costs, which can account for up to 35% of levelized cost of energy. It is imperative for the industry to improve performance, reliability and reduce O&M costs through advanced technologies, enabled by research in related disciplines, to be competitive. This talk will first briefly discuss the challenges with wind plant O&M, then give an overview of related NREL research in the areas of performance, reliability, and O&M cost modeling, finally touch on future R&D opportunities in related areas. The authors hope some of these challenges are of interested to and can be addressed by the INFORMS community in future.

costs↗

Installation, Operation, and Maintenance Strategies to Reduce the Cost of Offshore Wind Energy

Currently, installation, operation, and maintenance (IO&M) costs contribute approximately 30% to the LCOE of offshore wind plants. To reduce LCOE while ensuring safety, this paper identifies principal cost drivers associated with IO&M and quantifies their impacts on LCOE. The paper identifies technology improvement opportunities and provides a basis for evaluating innovative engineering and scientific concepts developed subsequently to the study. Through the completion of a case study, an optimum IO&M strategy for a hypothetical offshore wind project is identified.

17 WIND ENERGY↗

Windfarm Operations and Maintenance cost-Benefit Analysis Tool (WOMBAT)

This report provides technical documentation and background on the newly-developed Wind Operations and Maintenance cost-Benefit Analysis Tool (WOMBAT) software. WOMBAT is an open-source model that can be used to obtain cost estimates for operations and maintenance of land-based or offshore wind power plants. The software was designed to be flexible and modular to allow for implementation of new strategies and technological innovations for wind plant maintenance. WOMBAT uses a process-based simulation approach to model day-to-day operations, repairs, and weather conditions. High-level outputs from WOMBAT, including time-based availability and annual operating costs, are found to agree with published results from other models.

17 WIND ENERGY↗

Deploying Extended Reality (XR) for Digital Operations and Maintenance (O&M) at the Mechanisms Engineering Test Loop (METL)

This report documents the preliminary efforts to digitize operation and maintenance (O&M) activities for the Mechanisms Engineering Test Loop (METL). METL became operational in September 2018 with the mission to provide an ecosystem for Advanced Reactor Development (ARD). METLs flagship facility’s primary purpose is conducting small to intermediate scale tests for Sodium Fast Reactors (SFR). Its resemblance to commercial SFR’s intermediate heat transport system, prototypic operating conditions, and industrial construction practices/materials provides the overarching benefit of establishing a proving ground for emerging operations and maintenance (O&M) activities such as incorporating Extended Reality (XR) applications throughout the program lifecycle.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cover, Columbia, South Carolina

Information concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water is presented. Principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system are presented. Troubleshooting charts and maintenance schedules are presented.

Source record↗

Data Collection for Current U.S. Wind Energy Projects: Component Costs, Financing, Operations, and Maintenance (January 2011 - September 2011)

DNV Renewables (USA) Inc. (DNV) used an Operations and Maintenance (O&M) Cost Model to evaluate ten distinct cost scenarios encountered under variations in wind turbine component failure rates. The analysis considers 1) a Reference Scenario using the default part failure rates within the O&M Cost Model, 2) High Failure Rate Scenarios that increase the failure rates of three major components(blades, gearboxes, and generators) individually, 3) 100% Replacement Scenarios that model full replacement of these components over a 20 year operating life, and 4) Serial Failure Scenarios that model full replacement of blades, gearboxes, and generators in years 4 to 6 of the wind project. DNV selected these scenarios to represent a broad range of possible operational experiences. Also in thisreport, DNV summarizes the predominant financing arrangements used to develop wind energy projects over the past several years and provides summary data on various financial metrics describing those arrangements.

17 WIND ENERGY↗

Build-to-Replace Strategy to Reduce Operations and Maintenance Costs for Advanced Reactors

This paper targets the reduction of fixed operations and maintenance (O&M) costs for advanced reactor (AR) designs. This goal will be severely constrained if the underlying assumptions of O&M approaches and practices are not questioned and reexamined, especially today when changes can be implemented effectively and efficiently. Achieving a reduction in AR O&M costs requires a completely new way of thinking -a paradigm shift- not through incremental, technology-focused approaches alone. Here, we address this challenge by evaluating the impact of moving to a shorter design life for major structures, systems, and components and shorter, more predictable refurbishment cycles as modeled by the commercial airline industry: the build-to-replace approach. This paper provides a brief overview of this different mindset to O&M applied to ARs and it provided a set of analytical tools based on multi-objective optimization to identify the benefits of such an approach. In conclusion, we provide a direct example analysis of a build-to-replace scenario by identifying and evaluating scenarios for reduced system and component lifetimes and associated replacement and refurbishment schedules to evaluate impacts on O&M costs and other lifecycle elements, such as structure, system, and component reliability.

97 - MATHEMATICS AND COMPUTING↗

Well Design, Operation and Maintenance and Proactive Rehabilitation to Optimize Remediation Well Performance - 18605

Optimizing performance of extraction, injection and monitoring wells, which are integral components of groundwater remediation systems, result in lower life cycle costs and a higher probability of meeting project objectives. These wells provide the means to extract contaminated groundwater, inject reagents, treated water and clean water to create groundwater reaction/flushing zones, and to provide groundwater level, contaminant concentration and geochemical data. Initial costs associated with well installation and associated pipelines and treatment systems are significant project expenditures related to site remediation. However, the life cycle costs for wells are dominated by the long-term operation and maintenance (O and M) expenditures. Remediation wells are particularly susceptible to various types of fouling that impact well performance and, therefore, drive up operating costs. Simply defined, fouling is the result of any biological, geochemical or physical process that negatively impacts the intended performance of a remediation well. Fouling decreases well performance by effectively reducing hydraulic communication between the well and the surrounding formation. Oftentimes this occurs via clogging screens and/or gravel pack/formation pore space by bacterial or chemical byproducts and gases, which can lead to corrosion of metal components and spreading fouling deposits to pipelines and surface treatment systems. Ultimately, this results in reduced hydraulic performance in extraction and injection wells and result in erroneous water level and chemical parameter concentration measurements in monitoring wells. Remediation well fouling cannot be eliminated, and natural fouling processes are exacerbated by the installation and operation of remedial systems. Steps required to extend the life of remediation wells and to lower life cycle costs are discussed in this paper in order to establish the required approach to effective system management. These optimization approaches have been developed through years of operation and maintenance of complex large-scale plume remediation systems utilizing a variety of subsurface in-situ and ex-situ technologies. Remediation well performance can be improved by: - careful site characterization, - appropriate well design, - proper well installation and development, - thoughtful and adaptable operation and maintenance, - well performance maintenance tracking and, - proactive well rehabilitation. Clear understanding of the site hydro-stratigraphy and geochemical settings places constraints on the compatibility of well materials and the configurations of well screens. Proper well design, including collection and analysis (sieve/grain-size) of screen zone formation samples, assures that wells can be optimally installed, developed and redeveloped during well rehabilitation. Design considerations should include proper sizing of filter packs and well screens, casing/screen diameter, well material selection/compatibility, expected life/use, and well head configuration to allow for future access. Applying appropriate and effective well installation and development methods are of paramount importance and rely on a good understanding of site characteristics (e.g., geologic setting) as well as local drilling company expertise and experience. Different approaches to operation and maintenance can greatly affect the degree of fouling, these include limiting reagent concentrations, maintaining submerged well screens and filtering injection water to prevent the introduction of fouling enhancing constituents. Tracking well performance by monitoring changes in system operation and metrics such as specific capacity or injectivity for extraction and injection wells, respectively, or turbidity and chemical analyses for monitoring wells is key to identifying well maintenance issues early when well rehabilitation can be most effective. Proactive well rehabilitation can include mechanical brushing, surging and jetting, chemical treatment or other specialized approaches; however, the approach needs to be based on a site-specific understanding of the predominant fouling mechanisms. Collection and analyses of fouling deposits can provide guidance for selection of rehabilitation methods and chemicals that will be most effective. Application of these approaches have led to extended operational life for reagent injection wells, which can foul quickly, from months to years. Additionally, proper maintenance will often lead to increased and extended productivity of the well. For extraction wells, this translates to a higher sustainable yield, which means shorter cleanup times. Similarly, for injection wells, proper maintenance allows for the introduction of a greater volume of reagents over a shorter period, thus, shorter cleanup times that reduce overall project costs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Operation and Maintenance of PV Systems: Data Science, Analysis, and Standards

This effort improves the effectiveness and reduce uncertainty in O&M cost through four primary objectives/tasks: 1) institutionalize standards for reliability and availability reporting for large PV power plants; 2) bridge systemic O&M knowledge gaps around important topics affecting O&M; 3) characterize systemic failure modes and patterns and accelerate O&M experiential learning cycles using field data; and 4) establish a baseline understanding of UPVS O&M cost drivers. Key results of this effort include publication of IEC standards, published topical papers on O&M topics, training, and characterize field data for climate- and service-related patterns (additional details below). Integrating these results serves to reduce performance risk and facilitate improvement in the way solar projects are operated and maintained. Results are well received and two publications are among the most successful SETO publications at NREL ("Model of Operation and Maintenance Costs for Photovoltaic Systems with over 40,000 downloads and "Best Practices in Operation and Maintenance of PV Systems, 3rd Ed." with over 90,000 downloads).

14 SOLAR ENERGY↗

A Comprehensive Assessment Tool for Low-TRL Current Energy Converters: Preprint

Along with a market-competitive levelized cost of energy, a current energy converter technology strongly benefits from an extensive consideration of socioeconomic, environmental, and regulatory factors early in the design process. As part of a technology performance level assessment, a series of assessment questions and guidance are developed and presented to evaluate an early-stage current energy technology on holistic criteria considering the entire device lifecycle. The assessment represents an accumulation of industry and research experience to date and relies on regular updates to ensure alignment with industry best-practices, regulatory requirements, and up-to-date technical understanding. A cradle-to-grave (materials, manufacturing, installation and deployment, operations and maintenance, and end-of-life) assessment of capabilities and functional requirements for tidal, river, and ocean current technologies has been completed. This work presents the evaluation questions and qualitative performance criteria for current energy converters deployed in tidal, ocean current, and/or river applications. Key considerations related to manufacturing and installation include supply chain robustness, manufacturability and related job creation in the end-user and/or adjacent communities, and the time-to-repayment of the embodied energy debt. During deployment and maintenance operations, the safety of the device and subsystems during disconnect or grid failure, the difficulty and frequency of offshore heavy-lift activities, the avoidance or mitigation of area use conflicts, the sea-states and weather conditions that permit maintenance access, and the availability of contingency plans (should conditions change unexpectedly) are a portion of the considered assessment criteria. Results include the potential impact of early-stage design decisions on the socioeconomic, environmental, and regulatory performance of a technology that allows developers to increase the product value and probability of success, and minimize costly late-stage design iterations through early and broad consideration of factors affecting overall performance and acceptability.

industry support↗

A Comprehensive Assessment Tool for Low-TRL Current Energy Converters

Along with a market-competitive levelized cost of energy, a current energy converter technology strongly benefits from an extensive consideration of socioeconomic, environmental, and regulatory factors early in the design process. As part of a technology performance level assessment, a series of assessment questions and guidance are developed and presented to evaluate an early-stage current energy technology on holistic criteria considering the entire device lifecycle. The assessment represents an accumulation of industry and research experience to date and relies on regular updates to ensure alignment with industry best-practices, regulatory requirements, and up-to-date technical understanding. A cradle-to-grave (materials, manufacturing, installation and deployment, operations and maintenance, and end-of-life) assessment of capabilities and functional requirements for tidal, river, and ocean current technologies has been completed. This work presents the evaluation questions and qualitative performance criteria for current energy converters deployed in tidal, ocean current, and/or river applications. Key considerations related to manufacturing and installation include supply chain robustness, manufacturability and related job creation in the end-user and/or adjacent communities, and the time-to-repayment of the embodied energy debt. During deployment and maintenance operations, the safety of the device and subsystems during disconnect or grid failure, the difficulty and frequency of offshore heavy-lift activities, the avoidance or mitigation of area use conflicts, the sea-states and weather conditions that permit maintenance access, and the availability of contingency plans (should conditions change unexpectedly) are a portion of the considered assessment criteria. Results include the potential impact of early-stage design decisions on the socioeconomic, environmental, and regulatory performance of a technology that allows developers to increase the product value and probability of success, and minimize costly late-stage design iterations through early and broad consideration of factors affecting overall performance and acceptability.

converter↗

A Comprehensive Assessment Tool for Low-TRL Current Energy Converters

Along with a market-competitive levelized cost of energy, a current energy converter technology strongly benefits from an extensive consideration of socioeconomic, environmental, and regulatory factors early in the design process. As part of a technology performance level assessment, a series of assessment questions and guidance are developed and presented to evaluate an early-stage current energy technology on holistic criteria considering the entire device lifecycle. The assessment represents an accumulation of industry and research experience to date and relies on regular updates to ensure alignment with industry best-practices, regulatory requirements, and up-to-date technical understanding. A cradle-to-grave (materials, manufacturing, installation and deployment, operations and maintenance, and end-of-life) assessment of capabilities and functional requirements (i.e., high, medium, and low) performance criteria for current energy converters deployed in tidal, ocean current, and/or river applications. Key considerations related to manufacturing and installation include supply chain robustness, manufacturability and related job creation in the end-user and/or adjacent communities, and the time-to-repayment of the embodied energy debt. During deployment and maintenance operations, the safety of the device and subsystems during disconnect or grid failure, the difficulty and frequency of offshore heavy-lift activities, the avoidance or mitigation of area-use conflicts, the sea-states and weather conditions that permit maintenance access, and the availability of contingency plans (should conditions change unexpectedly) are a portion of the considered assessment criteria. Results include the potential impact of early-stage design decisions on the socioeconomic, environmental, and regulatory performance of a technology that allows developers to increase the product value and probability of success, and minimize costly late-stage design iterations through early and broad consideration of factors affecting overall performance and acceptability.

life cycle analysis↗

Jose Cabrera dismantling and decommissioning project

The Jose Cabrera Nuclear Power Plant (NPP) was the first commercial power reactor (Westinghouse 1 loop PWR 510 MWth, 160 MWe) commissioned in Spain and provided the base for future development and training. The reactor construction started in 1963 and it was officially on-line by 1969. The NPP operated from 1969 until 2006 when it became the first reactor to be shut down after completing its operational period. The containment is reinforced concrete with a stainless steel head. In 2010 responsibility for D and D was transferred to Enresa to achieve IAEA level 3 (a green field site available for unrestricted re-uses) by 2017. Of the total of more than 104,000 tons of materials that will be generated during dismantling, it is estimated that only ∼4,000 tons will be radioactive waste, some of which, 40 t are considered as intermediate level long-lived wastes and the rest (3,960 t) will be categorized as VLLW and ILLW. The Project is divided into five phases: Phase 0 - Removal of fuel and preliminary work.. Phase 1 - Preparatory Activities for D and D. complete. Phase 2 - Dismantling of Major Components. Phase 3 - Removal of Auxiliary Installations, Decontamination and Demolition. Phase 4 - Environmental Restoration. Phase 2, is currently ongoing (50% completed). To manage the diverse aspects of decommissioning operations, Enresa uses an internally developed computerized project management tool. The tool, based on knowledge gathered from other Enresa projects, can process operations management, maintenance operations, materials, waste, storage areas, procedures, work permits, operator dose management and records. Enresa considers that communication is important for both internal and external stakeholder relations and can be used to inform, to neutralize negative opinions and attitudes, to remove false expectations and for training. Enresa has created a new multi-purpose area (exhibition/visitor centre) and encourages visits from the public, local schools, local and national politicians and technical groups. Greenfield is the final end state objective. The total cost of this project, including a 20% contingency as estimated in 2003 is 135 Meuros. This figure does not include the management of the plant spent fuel, which has constituted an independent project that has been completed in 2009 (35 Meuros). Enresa, with 15 staff on site are managing a team of ∼250 workers, 40 of whom belong to the previous operator. The spent fuel is On-Site prior to the final destination in the future Spain Centralized Spent Fuel Installation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗