Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operations coordination plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Data Interfaces for Automated Vehicle Services - A Municipality Perspective

As Automated Vehicle (AV) services proliferate, data sharing between AV operators and municipal agents is assuming greater importance. Information on the dynamic nature of the road system such as incidents to avoid, weather hazards (such as flooding), construction and detours, as well as active safety concerns (e.g. - riots) is important for AV operators. Such information cannot be directly sensed from a vehicle's sensor array, but instead must be communicated in a timely and trustworthy channel. Municipalities are interested in pushing this information to AV operators to support emergency response efforts, reduce traffic in construction zones, and generally improve operation of the system. Similarly, information on vehicle safety such as disengagements, as well as critical information on the use of roadway system (trips, origin and destination patterns) are important performance factors for municipalities to understand utilization and plan for appropriate infrastructure. As mobility shifts to on-demand options, the need for safe and coordinated pick-up and drop-off zones will increase (potentially reducing parking needs). For all of these reasons, communication flows between AV operators and municipalities are becoming increasingly important. This paper investigates the functions, emerging practices and protocols for sharing of such critical data, and identifies gaps in and challenges in existing practices. Additionally, case studies are used to highlight the impacts of data sharing between AV operators and municipalities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Key Recovery Planning Factors for a Biological Terrorism Event Draft: April 11, 2012 Key Planning Factors for Recovery from Biological Terrorism Event

If a biological terrorism incident were to occur in a major U.S. city, current response and recovery planning would not support a rapid regional recovery. Identifying issues that should be examined and planned ahead of time will save time, resources, and lives. We have identified Key Planning Factors that will lead to knowledge or planning efforts with the potential to substantially influence the recovery process. Their influence extends to increasing the rate of recovery, reducing recovery costs, improving public health and safety, or addressing major resource limitations or critical decisions that may impact overall recovery success. This document does not provide solutions but lists areas local planners in conjunction with local federal experts (such as EPA On-Scene Coordinators (OSCs)) should consider in advance. Key Planning Factors describe some, but not all, areas where prior planning will significantly aid emergency operations in the event of an incident.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Umatilla Basin Fish Facilities Operation & Maintenance : Annual Report Fiscal Year 2008.

Westland Irrigation District, as contractor to Bonneville Power Administration, and West Extension Irrigation District, as subcontractor to Westland, provide labor, equipment, and material necessary for the operation, care, and maintenance of fish facilities on the Umatilla River. Westland Irrigation District is the contractor of record. Job sites that are covered: Three Mile Right, Three Mile Left, Three Mile Adult Spawning, WEID Sampling Facility, Maxwell Screen Site, Westland Screen Site/Ladder/Juvenile Sampling Facility, Feed Canal Ladder/Screen Site, Stanfield Ladder/Screen Site, Minthorn Holding Facility, Thornhollow Acclimation Site, Imeques Acclimation Site, Pendleton Acclimation Site, and South Fork Walla Walla Spawning Facility. O & M personnel coordinate with the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) personnel in performing tasks under this contract including scheduling of trap and haul, sampling, acclimation site maintenance, and other related activities as needed. The input from ODFW biologists Bill Duke and Ken Loffink, and CTUIR biologist Preston Bronson is indispensable to the success of the project, and is gratefully acknowledged. All tasks associated with the project were successfully completed during the fiscal year 2008 work period of October, 2007 through September, 2008. The project provides operations and maintenance throughout the year on five fish screen sites with a total of thirty-four rotating drum-screens, and four fish ladders in the Umatilla River Basin; additionally, periodic operations and maintenance is performed at holding, acclimation, and spawning sites in the Basin. Three people are employed full-time to perform these tasks. The FY08 budget for this project was $492,405 and actual expenditures were $490,267.01. Selected work activities and concerns: (1) Feed Dam Passage Improvement Project - A project to improve fish passage over the short term at the Feed Canal Diversion Dam site (Umatilla River mile 28.7) was implemented with local U.S. Bureau of Reclamation field office personnel coordinating project activities. Operation and Maintenance Project personnel assisted with labor, materials, and equipment to ensure the project was completed as planned. Discussions are under way to determine feasible alternatives for longer term solutions to passage issues at the site. (2) Three Mile Right (east bank) Facilities - The pump for supplying water to the fish handling facility holding pond was reconstructed successfully to achieve the desired increase in flow output necessary when increased quantities of fish are present. (3) Fish Screen Rehab at Stanfield Canal Diversion - Working with the Washington Department of Fish and Wildlife screen shop personnel, three rotating drum screens at the Stanfield Canal diversion site (Umatilla River mile 33.3) were serviced and overhauled with new bearings, seals, paint, and reinforcing bars. Work was completed, and screens reinstalled prior to water diversions beginning in the spring. (4) O & M personnel performed daily, weekly, and monthly operations and maintenance duties at the screen and ladder sites including, but not limited to, desilting of mud and debris, lubrication of mechanical parts, replacement of screen seals and screen motor components, adjustment of ladder gates, removal of large trees and woody debris deposited during high river flow conditions, servicing of pumps and screens for fish handling operations and sampling studies, in addition to general site clean-up, vegetative control, and security. Crew members responded as needed during evenings and after-hours according to weather conditions, river flows, and fish passage facility needs.

13 HYDRO ENERGY↗

Layered Coordination Architecture for Resilient Restoration of Power Distribution Systems

The current practices for restoring critical services in the distribution system during a disaster, align with the traditional centralized ideology of distribution systems operations. A central processor evaluates the distribution system after a disruption and attains a restoration plan. However, the centralized operational paradigm is susceptible to single-point failures, requires full situational awareness of the distribution system, and poses scalability challenges for large multifeeder distribution systems. This motivates a distributed decision-making paradigm where multiple agents solve smaller subproblems and jointly coordinate their individual decisions to achieve the global/network-level objective. Toward this goal, we propose a layered architecture for distributed algorithms for resilience and a two-stage distributed algorithm for distribution system restoration. The proposed distributed decision-making framework enables the bottom-up restoration of the distribution system using all available resources, including distributed generation, while only requiring local awareness and limited communications with neighboring connected regions. The proposed framework is robust to single-point failures, enables autonomy using distributed algorithms, and had reduced computational cost compared to centralized optimization solutions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

IDC Re-Engineering Phase 3 Development Plan.

Sandia National Laboratories has prepared a project development plan that proposes how the parties interested in the IDC Re-Engineering system will coordinate its development, testing and transition to operations.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Microphonics control for Project X

The proposed multi-MW Project X facility at Fermilab will employ cavities with bandwidths as narrow as 20 Hz. This combination of high RF power with narrow bandwidths combined requires careful attention to detuning control if these cavities are to be operated successfully. Detuning control for Projects X will require a coordinated effort between the groups responsible for various machine subsystems. Considerable progress in this area has been made over the past year. Detuning levels in the Project X cavities, specifically the Low and High {beta} 650 MHz elliptical types, can have a significant impact on the overall cost of the project. The narrow bandwidths, and the high RF Power requirements, and the large number of these cavities mean that careful attention to detuning control will be required if these cavities are to operate successfully. Limiting cavity detuning in Project X will require a coordinated effort between the groups responsible for various subsystems of the planned machine. Considerable progress towards this goal has been made by each of these groups over the past year.

43 PARTICLE ACCELERATORS↗

Integrating Variable Renewable Energy in Electric Power Markets: Best Practices from International Experience (Fact Sheet)

Many countries--reflecting very different geographies, markets, and power systems--are successfully managing high levels of variable renewable energy (RE) on the grid. Australia (South Australia), Denmark, Germany, Ireland, Spain, and the United States (Colorado and Texas), for example, have effectively integrated variable RE utilizing diverse approaches. Analysis of the results from these case studies reveals a wide range of mechanisms that can be used to accommodate high penetrations of variable RE (e.g., from new market designs to centralized planning). Nevertheless, the myriad approaches collectively suggest that governments can best enable variable RE grid integration by implementing best practices in five areas of intervention: lead public engagement, particularly for new transmission; coordinate and integrate planning; develop rules for market evolution that enable system flexibility; expand access to diverse resources and geographic footprint of operations; and improve system operations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Harnessing Virtual Power Plants Reliably: Enabling tools for increased observability, controllability, operation, and aggregation of distributed energy resources

Harnessing virtual power plants enhances the integration of distributed energy resources into utility grids for a sustainable energy future. Virtual power plants (VPPs) aggregate DERs to enhance resource adequacy and reduce emissions. U.S. utilities are exploring various technologies to manage DERs effectively. FERC Order 2222 allows DERs to participate in both wholesale and retail markets. Enhancing observability and controllability of behind-the-meter (BTM) DERs is essential for reliable grid operations. A hierarchical control architecture can improve coordination among residential energy resources. Field tests showed nearly 20% energy savings and 30% peak power reduction during grid events. Effective management of DERs requires enhanced situational awareness to prevent grid congestion. Integrating DER management systems (DERMS) with existing planning tools can improve operational security. Near-real-time grid models can validate optimal resource set points against resource uncertainty. Traditional uninterruptible power supplies (UPS) can be upgraded to support grid services and become part of VPPs. Upgrading UPS systems can reduce costs by 75% and unlock significant battery capacity. New battery management systems and grid-aware controllers are essential for optimizing UPS performance. Continued research and development are necessary to address challenges in integrating DERs into utility grids. Encouraging customer participation in pilot programs is vital for the evolution of VPPs. Here, the shift towards price-responsive DERs and VPPs is expected to enhance energy distribution efficiency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Remediation Guidance for Major Airports after a Bioterrorist Attack

This document provides general guidelines for airport managers, local officials, and other stakeholders for developing a response and recovery plan for a major airport following the release of a biological warfare agent, with specific guidance for remediation. San Francisco International Airport was selected as the example airport during development of the guidance to illustrate specific details. The spore-forming bacterium Bacillus anthracis was selected as the biological agent of primary concern because it is the most difficult of known bioterrorism agents to inactivate and is considered to be one of the agents most likely to be used as a biological weapon. The focus of the guidance is on cleanup and disposal activities associated with the Characterization, Decontamination, and Clearance Phases that are defined herein. Activities associated with the Notification and First-Response Phases are brieÀy discussed in Appendixes A and B, respectively. In addition to the main text of this Remediation Guidance document and associated appendixes, a data supplement was developed specifically for San Francisco International Airport. Requests for the data supplement must be made directly to the Emergency Planning Operations Division of San Francisco International Airport. This document does not describe public health responses to release of a biological warfare agent. If laboratory analytical results confirm the presence of a biological agent, the responsible public health agency involved in the response will commence appropriate public health actions, such as treatment (CDC 2004) and decontamination of potentially contaminated individuals, distribution of prophylaxis, and medical examinations. See the Centers for Disease Control and Prevention web site for more information on emergency public health responses (http://www.bt.cdc.gov/). Effective communication with the media and the public is an essential component of airport remediation and recovery. Whereas such communication is beyond the scope of this document, many helpful resources are available. (See Section 1.1 for more information.) The concept of operations described in this document for cleanup of a Bacillus anthracis release at a major airport conforms to the National Response Framework (NRF) (DHS 2008) and implementation of the National Incident Management System (NIMS 2004). In most cases, a Unified Command would be formed to direct the cleanup process jointly and to take ultimate responsibility for all cleanup decisions. The Unified Command would likely include the Airport Manager or Airport Emergency Operations Manager, representatives from state and local public health and emergency management agencies, and Federal agencies, such as the U.S. Environmental Protection Agency. The Unified Command and Incident Command Staff would ideally be co-located in an Incident Command Post in an uncontaminated area of the airport. If a release is large or complex, co-location of all key players may not be possible. If a major incident is declared, a Principal Federal Official may be appointed by the Department of Homeland Security to facilitate Federal support to the Unified Command. In some facilities and jurisdictions, additional response plans or procedures (such as BioWatch or other emergency response plans, procedures, or protocols) may govern notification and first response. Facility personnel, responders, and emergency management coordinators should be aware of all applicable plans and procedures and how to implement them. Cleanups following the anthrax attacks of 2001 in the U.S. pre-dated the NRF and NIMS and did not make use of a NIMS Incident Command System as we know it today. Most Incident Commanders for the larger of those cleanups chose to convene a Technical Working Group (TWG) of multi-agency, multi-disciplinary, outside experts to advise in developing sampling and decontamination plans. Most of the Incident Commanders also convened a separate Environmental Clearance Committee (ECC) to independently review pre- and post decontamination sampling data as well as data on decontamination parameters, to evaluate whether the decontamination was effective, and to add credibility regarding a decision that decontaminated areas may be reoccupied. Use of such specialized technical expertise is strongly recommended, although it would now operate within the construct of the NIMS Incident Command System. The TWG, if convened, would act in an advisory capacity to the Environmental Unit within the Planning Section. Likewise, the ECC, if convened, would provide independent peer review of products and recommendations by the Environmental Unit. For maximum impartiality, the ECC could also provide recommendations directly to the Unified Command. Cleanup activities commence with site characterization. The principal goal of characterization is to define the extent of contamination and to gather information needed to design the decontamination approach. Initial sampling data collected by first responders are assessed to approximate the location(s) of contamination. Confirmation of the agent type and viability is obtained from a Laboratory Response Network laboratory. Additional characterization data are collected to determine the extent of contamination and where decontamination actions are needed. Areas suspected of being contaminated are contained and isolated to the degree possible to prevent further movement of an agent to uncontaminated areas or the environment, and to reduce the potential for future exposure from the agent or fumigant, if fumigation is needed. Agent air monitoring in areas adjacent to the contained contamination zones is done to ensure the protection of remediation personnel and to monitor any release from the contained zones. Various sampling approaches are considered. For example, wipe samples can be used to sample hard, nonporous surfaces. Swab samples can be used to sample nooks, crannies, joints, and seams. Appendix I is a template for preparing an incident-specific, operational characterization plan. Upon completion of the characterization plan, an internal review is initiated. Upon approval of the plan by the Unified Command, characterization commences. The Site Safety Officer develops a Health and Safety Plan to ensure that coordinated health and safety measures are in place for all responding personnel. This plan describes physical, chemical, and biological hazards at the site, personal protective equipment, personal decontamination procedures, and emergency procedures to be used by sampling and remediation personnel. An incident-specific Remediation Action Plan is developed, which describes the decontamination methods to be used and other details, including waste disposal. Under NIMS, this overall plan, as well as other plans described below, are implemented through a series of standardized, shorter-term Incident Action Plans, which describe specific activities that will take place during a shift or a day. The template in Appendix J is designed to facilitate preparation of the Remediation Action Plan. If fumigation will be done, a Sampling and Analysis Plan will be needed, as well as an Ambient Air Monitoring Plan, which can be a component of the Remediation Action Plan. These three plans are needed to obtain a crisis exemption from the U.S. Environmental Protection Agency for authorized use of an unregistered sterilant or pesticide during cleanup. If pesticide products become registered for inactivation of B. anthracis in the future, the three plans will likely be required by the product’s labeling, but the plans would no longer be submitted to the U.S. Environmental Protection Agency for approval; rather, the Incident Commander would approve them. If fumigation is used, an Emergency Response Plan is also recommended, although such a plan is not required for a crisis exemption. For some nonpersistent biological warfare agents, natural attenuation may be an adequate decontamination option. In cases where contamination is not extensive or an agent is not persistent, application of surface decontaminants or other methods of medical infection control may be effective. For extensive contamination by persistent agents, such as Bacillus anthracis, fumigation may be necessary. In those cases, the Decontamination Phase commences with source reduction, such as pre-cleaning surfaces to reduce the contaminant load. To expedite cleanup and prevent costs from escalating unnecessarily, a cost–benefit analysis should be incorporated in the decision process related to retention versus disposal of facility items and materials. Certain materials and structural components can be decontaminated for reuse, but it may not be feasible or cost-effective to decontaminate other items. Those items must be pre-treated, packaged (with the package decontaminated externally), and removed for disposal as waste. Site preparation includes sealing openings to prevent leaks and setting up equipment. Decontamination reagents and delivery systems are selected, and pre-testing all systems is done before carrying out chemical treatment(s). The important choice of decontamination technologies depends on characteristics of the agent, the nature and extent of contamination, and other site parameters identified during characterization. Decontamination-related decisions can have a major impact on waste-disposal costs, and it is necessary to develop a disposal plan that identifies a means of disposal, necessary approvals, transportation, and other details. A clearance strategy is developed to ensure that after decontamination, the risk of exposure to residual contamination is negligible. A clearance sampling plan is developed, which sets clearance criteria, specifies how to determine whether the criteria have been met, and describes how and where to collect clearance samples after decontamination. In most cases, clearance sampling includes both surface and aggressive air samples. Appendix K is a clearance plan template that identifies the types of required information. To determine whether the decontaminated area may be reoccupied, the Environmental Unit (and the ECC separately, if one is convened) evaluates the results of clearance samples. For the anthrax incidents to date, and given methods that have been used, cleanup was considered successful only when there was no growth of B. anthracis cultured from any environmental samples taken after decontamination. Other factors that will be considered include the decontamination process parameters (e.g., temperature, relative humidity, decontaminant concentration, and contact time) and the results from post-decontamination culture of biological indicators that may have been used during fumigation or sterilization processes. From such an evaluation the Environmental Unit or ECC, or both, recommend whether the area may be reoccupied, or whether further decontamination is necessary. The UC makes the final decision that a facility is appropriately decontaminated for reoccupancy. The facility owner or responsible public health agency makes the final decision to reopen a decontaminated facility. A theme that is emphasized throughout this document is that many activities can greatly reduce the time required to restore airport operations if those activities are conducted prior to an actual release of biological warfare agent. A summary of specific resources (such as Federal, state, and local agency contacts; contractors; prospective team members; subject-matter experts; laboratory facilities; and other entities) that should be identified in advance by airport officials is provided in each pertinent section of this document, and summary contact lists of such resources are provided in Appendix L. A summary of overall pre-planning actions that should be completed by airport officials is presented at the end of this document.

59 BASIC BIOLOGICAL SCIENCES↗

NRIC Asset Suite Engineering and Operations Data Integration Plan

The National Reactor Innovation Center (NRIC), established by the U.S. Department of Energy (DOE) in August 2019, accelerates the demonstration and deployment of advanced nuclear energy through its mission to inspire stakeholders and the public, empower innovators, and deliver successful outcomes through efficient coordination of partners and resources. NRIC is a national program led by Idaho National Laboratory (INL), enabling collaborators to harness the world-class capabilities of the U.S. National Laboratory System. Committed to demonstrating advanced reactors by the end of 2025, NRIC is designed to bridge the gap between research, development, and the marketplace to help convert some of the Nation’s most promising advanced nuclear reactors into commercial applications by 2030. To meet these needs, NRIC is developing two reactor demonstration test beds at Idaho National Laboratory (INL), the Laboratory for Operation and Testing in the United States (LOTUS) and the Demonstration and Operation of Microreactor Experiments (DOME) test bed. Each test bed involves the modification of existing facilities at INL’s Materials and Fuels Complex (MFC). Retrofitting these facilities to accommodate novel reactors, as well as subsequent but similar NRIC projects, is a non-trivial engineering task and is expected to generate a significant amount of new and revised documentation. Leveraging digital engineering practices, this documentation will be managed in a purpose-built data management tool to facilitate origination, review, and approval while coordinating with the design contractor. The subsequent upload and review of documentation to INL’s existing document control system comprises a long and unnecessarily manual task. An opportunity exists to automate this upload process and save job-hours while continuing to adhere to INL/MFC document management procedures.

99 GENERAL AND MISCELLANEOUS↗

Research, Development, and Testing of a Master Controller with Applications to the Bronzeville Community Microgrid System

The objective of this project was to research, develop and test a Microgrid Master Controller (MMC) with applications to the Bronzeville Community Microgrid (BCM), capable of monitoring and controlling a microgrid cluster, as well as to demonstrate its performance in an environment that will closely resemble actual operation of the microgrid. During the project, a hierarchical control strategy of the MMC consisting of primary, secondary, and tertiary layers of control was developed, to operate the MMC in conjunction with the IIT microgrid controller for the coordinated operation of the microgrid cluster, including the control of DERs and facilitation of power flow between the microgrids. A detailed laboratory test plan, including methodology, test setup, test scenarios, and techniques for data gathering and analysis, was developed to verify the MMC functionalities and to validate the performance of the control algorithms under various microgrid operating conditions and potential system contingencies. The MMC underwent a thorough lab testing with more than 320 test cases assigned to 14 performance categories. The final project review and technology feasibility demonstration was held with Department of Energy (DOE) team, in the ComEd’s Grid of the Future lab. During this review, technical performance of the MMC was demonstrated in all key scenarios where the proper performance of the MMC was witnessed under a wide array of scenarios, including planned islanding, unplanned islanding, re-synchronization, load restoration, and basic dispatch in grid-connected and islanded mode. The demonstration was based on use cases focused on main microgrid capabilities and features, which further and the microgrid performance. The following cases were shown to DOE: Planned Islanding; Re-synchronization; Load Restoration; Basic Dispatch (grid-connected mode); Basic Dispatch (islanded mode); Unplanned Islanding. The outcome of this project is a viable microgrid control technology that served as a basis for further enhancement and commercialization of the utility-grade microgrid controller that will be employed for control of the BCM.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Columbia River Treaty 2014/2024 Review: Phase 1 Technical Studies

Since 1964, the Columbia River Treaty has provided significant benefits to the United States and Canada through coordinated river management by the two countries. It remains the standard against which other international water coordination agreements around the world are compared. When the Treaty was negotiated, its goals were to provide significant flood control and power generation benefits to both countries. However, the Treaty contains two provisions that may significantly change these benefits as early as the year 2024. First, in 2024 the 60 years of purchased flood control space in Canadian Treaty projects expires. Instead of a coordinated and managed plan to regulate both Canadian and U.S. projects for flood control, the Treaty calls for a shift to a Canadian operation under which the United States can call upon Canada for flood control assistance. The United States can request this “called upon” assistance as needed but only to the extent necessary to meet forecast flood control needs in the United States that cannot adequately be met by U.S. projects. When called upon is requested, the United States will then have to pay Canada for its operational costs and any economic losses resulting from the called upon flood control operation. Second, while the Treaty has no specified end date, it does allow either Canada or the United States the option to terminate most of the provisions of the Treaty on or after Sept. 16, 2024, with a minimum of 10 years advance written notice. Thus, the year 2024 is the first year a notice of termination would take effect assuming written notice of termination is given by the Canadian or U.S. governments by 2014. Unless the Treaty is terminated or the federal governments elect to modify the Treaty, its provisions continue indefinitely, except for the changes in flood control discussed above. Given the significance of both of these provisions, it is important that the parties to the Treaty understand the implications for post-2024 Treaty planning and Columbia River operations. The U.S. Army Corps of Engineers and the Bonneville Power Administration, the agencies that implement the Treaty in the United States on behalf of the U.S. Entity (see Treaty Governance sidebar), are conducting a multi-year effort to understand these implications. This effort is called the 2014/2024 Columbia River Treaty Review.

Columbia River Treaty, United States, Canada, tech↗

The Fire and Smoke Model Evaluation Experiment—A Plan for Integrated, Large Fire–Atmosphere Field Campaigns

The Fire and Smoke Model Evaluation Experiment (FASMEE) is designed to collect integrated observations from large wildland fires and provide evaluation datasets for new models and operational systems. Wildland fire, smoke dispersion, and atmospheric chemistry models have become more sophisticated, and next-generation operational models will require evaluation datasets that are coordinated and comprehensive for their evaluation and advancement. Integrated measurements are required, including ground-based observations of fuels and fire behavior, estimates of fire-emitted heat and emissions fluxes, and observations of near-source micrometeorology, plume properties, smoke dispersion, and atmospheric chemistry. To address these requirements the FASMEE campaign design includes a study plan to guide the suite of required measurements in forested sites representative of many prescribed burning programs in the southeastern United States and increasingly common high-intensity fires in the western United States. Here we provide an overview of the proposed experiment and recommendations for key measurements. The FASMEE study provides a template for additional large-scale experimental campaigns to advance fire science and operational fire and smoke models.

54 ENVIRONMENTAL SCIENCES↗

WIPP Status and Plans - 2013 - 13379

An up-to-date look at the many aspects of America's only deep geologic long-lived radioactive waste repository is presented in this paper. WIPP's mission includes coordination of all Department of Energy (DOE) sites to prepare, package and characterize defense transuranic waste for final shipment and emplacement in WIPP. The Waste Isolation Pilot Plant (WIPP) is completing its 14. year of operations. Five of the ten planned disposal panels have been filled and sealed from ventilation, with about half of the legislated volume capacity consumed. About 11,000 shipments have been made successfully, traveling more than 40 million kilometers across the nation's highways. A fleet of new Type B shipping packages, the TRUPACT-III, has been added to the transportation capability, with an ongoing campaign to de-inventory large waste items from the Savannah River Site, while minimizing size reduction and repackaging. A new shipping and emplacement method for remote handled waste in shielded containers has been approved for disposal, and will significantly improve operational efficiency. Remote handled waste packaged in these shielded containers will be shipped, handled and emplaced as contact handled waste. Also described is a new criticality control over-pack container, which will improve efficiency when shipping high fissile-content waste streams consisting of Special Nuclear Material declared as waste from nuclear weapons sites. The paper describes the importance of the infrastructure at WIPP to ensure disposal site availability for defense transuranic waste sites across the weapons complex. With the facility reaching its original design lifetime, there are many infrastructure maintenance and improvements being planned and performed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Facilitation of the Estuary/Ocean Subgroup for Federal Research, Monitoring, and Evaluation, FY10 Annual Report

The Estuary/Ocean Subgroup (EOS) is part of the research, monitoring, and evaluation (RME) effort that the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to obligations arising from the Endangered Species Act as applied to operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbia River and estuary. The EOS is one of multiple work groups in the federal research, monitoring, and evaluation (RME) effort developed in response to responsibilities arising from the Endangered Species Act as a result of operation of the FCRPS. The EOS is tasked by NOAA Fisheries and the Action Agencies to design and coordinate implementation of the federal RME plan for the lower Columbia River and estuary, including the plume.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Atlantic Offshore Wind Transmission Study

The Atlantic Offshore Wind Transmission Study (AOSWTS) is part of the U.S. Department of Energy's (DOE) efforts to understand and facilitate the transmission of electricity from wind in the Atlantic Ocean. It was informed by the Atlantic Offshore Wind Transmission Literature Review and Gaps Analysis (Bothwell et al. 2021) and the convening workshops hosted in 2022-2023 by DOE and the U.S. Department of the Interior's Bureau of Ocean Energy Management. The study results help to inform An Action Plan for Offshore Wind Transmission Development in the U.S. Atlantic Region (Baker et al. 2023). DOE's Wind Energy Technologies Office funded AOSWTS. The AOSWTS identifies and evaluates pathways to enable offshore wind energy deployment in the Atlantic Ocean through coordinated offshore transmission solutions in the near term (by 2030) and long term (by 2050). The study fills gaps in prior analyses by providing a multiregional planning perspective that evaluates offshore wind generation development with transmission planning. It incorporates environmental, ocean co-use, and other siting considerations into defining potential offshore transmission routes. The study also compares different multiregional offshore transmission topologies and their associated costs (using potential cable routes) and benefits (in terms of production cost savings and enhanced resource adequacy). In addition, the AOSWTS analyzes reliability impacts from a multiregional perspective. The study provides guidance for policymakers and transmission stakeholders on possible outcomes resulting from a proactive, coordinated, and interregional approach to transmission planning for offshore wind energy development in the Atlantic. While this study presents possibilities, additional work following system operator methods and procedures can help build on this analysis.

17 WIND ENERGY↗

Atlantic Offshore Wind Transmission Study: Executive Summary

The Atlantic Offshore Wind Transmission Study (AOSWTS) is part of the U.S. Department of Energy's (DOE) efforts to understand and facilitate the transmission of electricity from wind in the Atlantic Ocean. It was informed by the Atlantic Offshore Wind Transmission Literature Review and Gaps Analysis (Bothwell et al. 2021) and the convening workshops hosted in 2022-2023 by DOE and the U.S. Department of the Interior's Bureau of Ocean Energy Management. The study results help to inform An Action Plan for Offshore Wind Transmission Development in the U.S. Atlantic Region (Baker et al. 2023). DOE's Wind Energy Technologies Office funded AOSWTS. The AOSWTS identifies and evaluates pathways to enable offshore wind energy deployment in the Atlantic Ocean through coordinated offshore transmission solutions in the near term (by 2030) and long term (by 2050). The study fills gaps in prior analyses by providing a multiregional planning perspective that evaluates offshore wind generation development with transmission planning. It incorporates environmental, ocean co-use, and other siting considerations into defining potential offshore transmission routes. The study also compares different multiregional offshore transmission topologies and their associated costs (using potential cable routes) and benefits (in terms of production cost savings and enhanced resource adequacy). In addition, the AOSWTS analyzes reliability impacts from a multiregional perspective. The study provides guidance for policymakers and transmission stakeholders on possible outcomes resulting from a proactive, coordinated, and interregional approach to transmission planning for offshore wind energy development in the Atlantic. While this study presents possibilities, additional work following system operator methods and procedures can help build on this analysis.

17 WIND ENERGY↗

Flexibility Reserve Reductions from an Energy Imbalance Market with High Levels of Wind Energy in the Western Interconnection

The anticipated increase in variable generation in the Western Interconnection (WI) over the next several years has raised concerns about how to maintain system balance, especially in smaller Balancing Areas (BAs). Given renewable portfolio standards in the West, it is possible that more than 50 gigawatts (GW) of wind capacity will be installed by 2020. Significant quantities of solar generationare likely to be added as well. The consequent increase in variability and uncertainty that must be managed by the conventional generation fleet and responsive load make it attractive to consider ways in which Balancing Area Authorities (BAAs) can pool their variability and response resources, thus taking advantage of geographic and temporal diversity to increase overall operational efficiency.Our analysis considers several alternative forms of an Energy Imbalance Market (EIM) that have been proposed in the non-market areas of the WI. The proposed EIM includes two changes in operating practices that independently reduce variability and increase access to responsive resources: BAA cooperation and sub-hourly dispatch. As proposed, the EIM does not consider any form of coordinated unitcommitment; however, over time it is possible that BAAs would develop formal or informal coordination plans. This report examines the benefits of several possible EIM implementations, both separately and in concert.

17 WIND ENERGY↗