Search NASA⌕ Search

SEARCH · Search NASA

Results for “Optimal Allocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Optimizing multiple reliable forward contracts for reservoir allocation using multitime scale streamflow forecasts

Streamflow forecasts at multiple time scales provide a new opportunity for reservoir management to address competing objectives. Market instruments such as forward contracts with specified reliability are considered as a tool that may help address the perceived risk associated with the use of such forecasts in lieu of traditional operation and allocation strategies. A water allocation process that enables multiple contracts for water supply and hydropower production with different durations, while maintaining a prescribed level of flood risk reduction, is presented. The allocation process is supported by an optimization model that considers multitime scale ensemble forecasts of monthly streamflow and flood volume over the upcoming season and year, the desired reliability and pricing of proposed contracts for hydropower and water supply. It solves for the size of contracts at each reliability level that can be allocated for each future period, while meeting target end of period reservoir storage with a prescribed reliability. The contracts may be insurable, given that their reliability is verified through retrospective modeling. The process can allow reservoir operators to overcome their concerns as to the appropriate skill of probabilistic forecasts, while providing water users with short–term and long–term guarantees as to how much water or energy they may be allocated. An application of the optimization model to the Bhakra Dam, India, provides an illustration of the process. In conclusion, the issues of forecast skill and contract performance are examined. A field engagement of the idea is useful to develop a real–world perspective and needs a suitable institutional environment.

54 ENVIRONMENTAL SCIENCES↗

Collaborative Geodesign and Spatial Optimization for Fragmentation-Free Land Allocation

Demand for agricultural food production is projected to increase dramatically in the coming decades, putting at risk our clean water supply and prospects for sustainable development. Fragmentation-free land allocation (FF-LA) aims to improve returns on ecosystem services by determining both space partitioning of a study area and choice of land-use/land-cover management practice (LMP) for each partition under a budget constraint. In the context of large-scale industrialized food production, fragmentation (e.g., tiny LMP patches) discourages the use of modern farm equipment (e.g., 10- to 20-m-wide combine harvesters) and must be avoided in the allocation. FF-LA is a computationally challenging NP-hard problem. We introduce three frameworks for land allocation planning, namely collaborative geodesign, spatial optimization and a hybrid model of the two, to help stakeholders resolve the dilemma between increasing food production capacity and improving water quality. A detailed case study is carried out at the Seven Mile Creek watershed in the midwestern US. The results show the challenges of generating near-optimal solutions through collaborative geodesign, and the potential benefits of spatial optimization in assisting the decision-making process.

Xie, Yiqun↗

Economic Impact of Harvesting Corn Stover under Time Constraint: The Case of North Dakota

This study examines the impact of stochastic harvest field time on profit maximizing potential of corn cob/stover collection in North Dakota. Three harvest options are analyzed using mathematical programming models. Our findings show that under the first corn grain only harvest option, farmers are able to complete harvesting corn grain and achieve maximum net income in a fairly short amount of time with existing combine technology. However, under the second simultaneous corn grain and cob (one-pass) harvest option, farmers generate lower net income compared to the net income of the first option. This is due to the slowdown in combine harvest capacity as a consequence of harvesting corn cobs. Under the third option of separate corn grain and stover (two-pass) harvest option, time allocation is the main challenge and our evidence shows that with limited harvest field time available, farmers find it optimal to allocate most of their time harvesting grain and then proceed to harvest and bale stover if time permits at the end of harvest season. The overall findings suggest is that it would be more economically efficient to allow a firm that is specialized in collecting biomass feedstock to participate in cob/stover harvest business.

Maung, Thein A.↗

Divergence Reduction in Monte Carlo Neutron Transport with On-GPU Asynchronous Scheduling

While Monte Carlo Neutron Transport (MCNT) is near-embarrasingly parallel, the effectively unpredictable lifetime of neutrons can lead to divergence when MCNT is evaluated on GPUs. Divergence is the phenomenon of adjacent threads in a warp executing different control flow paths; on GPUS, it reduces performance because each work group may only execute one path at a time. The process of Thread Data Remapping (TDR) resolves these discrepancies by moving data across hardware such that data in the same warp will be processed through similar paths. A common issue among prior implementations of TDR is the synchronous nature of its remapping and processing cycles, which exhaustively sort data produced by prior processing passes and exhaustively evaluate the sorted data. In another work, we defined a method of remapping data through an asynchronous scheduler which allows for work to be stored in shared memory and deferred arbitrarily until that work is a viable option for low-divergence evaluation. This article surveys a wider set of cases, with the goal of characterizing performance trends across a more comprehensive set of parameters. These parameters include cross sections of scattering/capturing/fission, use of implicit capture, source neutron counts, simulation time spans, and tuned memory allocations. Across these cases, we have recorded minimum and average execution times, as well as a heuristically tuned near-optimal memory allocation size for both synchronous and asynchronous scheduling. Across the collected data, it is shown that the asynchronous method is faster and more memory efficient in the majority of cases, and that it requires less tuning to achieve competitive performance.

Computer Science↗

Alternative mixed integer linear programming optimization for joint job scheduling and data allocation in grid computing

This paper presents a novel approach to the joint optimization of job scheduling and data allocation in grid computing environments. We formulate this joint optimization problem as a mixed integer quadratically constrained program. To tackle the nonlinearity in the constraint, we alternatively fix a subset of decision variables and optimize the remaining ones via Mixed Integer Linear Programming (MILP). We solve the MILP problem at each iteration via an off-the-shelf MILP solver. Our experimental results show that our method significantly outperforms existing heuristic methods, employing either independent optimization or joint optimization strategies. We have also verified the generalization ability of our method over grid environments with various sizes and its high robustness to the algorithm setting.

97 MATHEMATICS AND COMPUTING↗

Optimization Of Real-time Capacity Allocation

ORCA is a modeling toolset to accelerate real-time control and optimization of digital twins, including virtual models of facilities, physical facilities, and interconnections to allow optimal control of physical facilities using virtual models. ORCA is enabled by INL's RAVEN and DeepLynx software codes.

Talbot, Paul [Idaho National Laboratory] (00000002↗

Outage Forecast-Based Preventative Scheduling Model for Distribution System Resilience Enhancement: Preprint

Distribution system resilience enhancement is an important topic to ensure customers have access to the power supply during extreme events. In fact, certain weather-related extreme events can be predicted ahead of time. Therefore, it is important to investigate how to predict grid outages using extreme weather forecasts, and how outage predictions can be incorporated into distribution system resilience enhancement. In this paper, a preventative scheduling model for distribution systems is proposed. The model targets at allocating resources, especially mobile responsive resources such as mobile backup generators and mobile energy storage systems, to prepare for an extreme event in the day-ahead context. To achieve efficient resource allocation and scheduling, a machine learning-based outage prediction module is developed to predict vulnerable or risky segments of the distribution system based on historical operating records and extreme weather event forecasts. By integrating the outage prediction results into the scheduling model, optimal resource allocation can be derived to help distribution systems prepare for an upcoming event and improve resilience performance. A real distribution feeder in North Carolina, U.S. is used in the case study to validate the proposed approach.

distributed energy resources↗

Outage Forecast-Based Preventative Scheduling Model for Distribution System Resilience Enhancement

Distribution system resilience enhancement is an important topic to ensure customers have access to power supply during extreme events. In fact, certain weather-related extreme events can be predicted ahead of time. Therefore, it is important to investigate how to predict grid outages using extreme weather forecasts, and how outage predictions can be incorporated into distribution system resilience enhancement. In this paper, a preventative scheduling model for distribution systems is proposed. The model targets at allocating resources, especially mobile responsive resources such as mobile backup generators and mobile energy storage systems, to prepare for an extreme event in the day-ahead context. To achieve efficient resource allocation and scheduling, a machine learning-based outage prediction module is developed to predict vulnerable or risky segments of the distribution system based on historical operating records and extreme weather event forecast. By integrating the outage prediction results into the scheduling model, optimal resource allocation can be derived to help distribution systems prepare for an upcoming event and improve resilience performance. A real distribution feeder in North Carolina, U.S. is used in the case study to validate the proposed approach.

distributed energy resources↗

Simulating competition in the US bioeconomy to produce hard‐to‐electrify transportation fuels using limited biomass resources

This study presents a novel bioeconomy optimization framework, BiOpt, designed to address critical questions regarding the strategic use of limited US biomass resources for biofuel production. By integrating detailed techno-economic analyses, life cycle assessments, and resource assessment data, BiOpt optimizes resource distributions across competing technologies to maximize economic performance and/or minimize greenhouse gas emissions. Using feedstock scenarios from the 2023 Billion Ton Study, the analysis explores optimal biomass allocations across sustainable aviation fuel, diesel, and marine biofuel conversion pathways given varying production targets and policy incentives. Results demonstrate distinct feedstock preferences and pathway utilizations when prioritizing economic returns vs. emissions reductions. For instance, fats, oils, and greases were highly favored in cost-optimized scenarios, while low-carbon feedstocks such as wet waste dominated greenhouse gas-minimized strategies. The findings underscore the pivotal role of policy incentives and technological advances in shaping biofuel supply chains and provide actionable insights for scaling sustainable biofuel production to decarbonize hard-to-electrify sectors. This framework offers a robust tool for policymakers and stakeholders to evaluate biofuel strategies that balance energy output, economic viability, and environmental impact.

09 BIOMASS FUELS↗

Optimal deployment of resources for maximizing impact in spreading processes

Significance Spreading processes play an increasingly important role in marketing, opinion setting, and epidemic modeling. Most existing algorithms for optimal resource allocation in spreading processes are based on topological characteristics of the underlying network and aim to maximize impact at infinite time. Clearly, realistic and efficient real-time allocation policies should consider both network properties and details of the dynamics; additionally, control may be applied only to a restricted set of accessible nodes, and impact should be maximized in a limited time window. We introduce a probabilistic targeting framework that incorporates the dynamics and encompasses previously considered optimization formulations. It is based on a scalable dynamic message-passing approach that allows for the solution of large real-world network instances.

60 APPLIED LIFE SCIENCES↗

Artificial-intelligence-driven shot reduction in quantum measurement

Variational Quantum Eigensolver (VQE) provides a powerful solution for approximating molecular ground state energies by combining quantum circuits and classical computers. However, estimating probabilistic outcomes on quantum hardware requires repeated measurements (shots), incurring significant costs as accuracy increases. Optimizing shot allocation is thus critical for improving the efficiency of VQE. Current strategies rely heavily on hand-crafted heuristics requiring extensive expert knowledge. This paper proposes a reinforcement learning (RL)-based approach that automatically learns shot assignment policies to minimize total measurement shots while achieving convergence to the minimum of the energy expectation in VQE. The RL agent assigns measurement shots across VQE optimization iterations based on the progress of the optimization. This approach reduces VQE's dependence on static heuristics and human expertise. When the RL-enabled VQE is applied to a small molecule, a shot reduction policy is learned. The policy demonstrates transferability across systems and compatibility with other wavefunction Ansätze. In addition to these specific findings, this work highlights the potential of RL for automatically discovering efficient and scalable quantum optimization strategies.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Optimal Iterative Method for Network Utility Maximization with Intertemporal Constraints

Network utility maximization (NUM) has been widely used to solve the optimal resource allocation problem in wireless network and power systems. The network planner aims to allocate generation and demand over producers and consumers such that social welfare is maximized while supply and demand are balanced, and network constraints such as branch capacity constraints are satisfied. However, when taking into account dynamics of agents, such as ramp rate constraints on power output for suppliers and impact of cumulative prior consumption on current demand for consumers, a single-period formulation is not sufficient. We propose an iterative method for the multi-period NUM with intertemporal constraints based on dual decomposition. It features a price iteration scheme that achieves optimal social welfare, and the algorithm is guaranteed to converge if proper concavity condition holds. We illustrate the iterative algorithm by power system examples. It is shown that similar to locational marginal price (LMP) in power systems, time-varying congestion prices arise when there exists binding branch constraints. Simulation results also demonstrate that there is increase in social welfare compared to a single-period formulation.

Ma, Ke↗

Revenue-Maximizing Shared Parking and Electric Vehicle Charging Management in Multi-Unit Dwellings

In urban areas, searching for parking and electric vehicle (EV) charging can result in cruising, congestion, and environmental externalities. Recognizing the business opportunity of offering private parking and charging infrastructure access within multi-unit dwellings (MUDs) during daytime, we model a shared parking and EV charging management system. We maximize the revenue of MUD charging hubs in mixed land use, catering to public demand. Our approach accounts for the objectives of the two stakeholders involved: a demand model is fitted on the choices of EV charging users, and the supply model optimizes the allocation of parking and charging requests in an MUD parking lot. A binary integer linear programming model for the allocation of parking and charging spaces with a rolling horizon is integrated with matching rules that handle both parking and charging requests. In our numerical experiments in a neighborhood of Chicago, Illinois, we estimate the performance of the MUD parking and charging system with metrics that include revenue, number of matchings, and utilization rates. At any given time, MUDs with lower prices attract more charging requests, particularly those of longer duration, resulting in higher revenue and greater charging utilization. Dynamic pricing facilitates a more equitable distribution of requests; as MUD parking lots reach capacity and their fees increase, other MUDs become more competitive, attracting additional requests. Comparing our method against first-come-first-served and optimal-solution benchmarks, we demonstrate our model’s effectiveness in dynamically managing mixed parking and charging demand in MUD charging hubs.

electric vehicle, multi-unit dwelling, charging in↗

Queue wait time prediction in high performance computing (HPC) systems

High Performance Computing (HPC) systems are critical enablers for groundbreaking scientific research across various domains. Efficient resource allocation, facilitated by job scheduling, is paramount for maximizing the utilization of HPC systems. However, the variability in wait times for queued jobs poses challenges for users, necessitating accurate job wait time estimation. This paper explores the influence of job characteristics, including job size (the number of nodes requested and walltime), the queue to which the job is submitted and other resource requirements, on job wait times in leadership-class HPC systems. Focusing on the Theta Cray XC40 and Polaris machines at Argonne National Laboratory, the study evaluates the performance of different supervised learning algorithms in predicting job wait times. It also evaluates the impact of data preprocessing, including outlier detection, Principal Component Analysis (PCA), and feature selection, on the performance of wait time prediction models. The findings reveal insights into the relationship between job characteristics and wait times, offering a foundation for optimizing resource allocation and enhancing user experience. The methodologies and tools developed in this study are adaptable to other leadership-class HPC systems, providing a valuable contribution to the broader HPC community aiming to improve job scheduling efficiency and user satisfaction.

Okafor, Nwamaka↗

Optimal operation of multi-plant steam district heating systems for enhanced efficiency and sustainability

Despite their crucial role in supplying heat and power to universities, industries, and healthcare facilities, many steam-based district heating systems rely on outdated control methods. Among these, multi-central plant districts are particularly challenging due to the complexities of coordinating multiple plants, optimizing load distributions, and managing system downtime. In response, new operational strategies are developed to enhance the efficiency and sustainability of steam districts while utilizing existing resources. These strategies include reducing plant operational pressure without compromising the reliable supply to buildings and optimizing load allocation across multiple plants. The load allocation considers boiler part-load efficiency, runtime, network losses, and building pressure set points, and is compared with traditional multi-boiler controls. To support this exploration, new dynamic Modelica models are developed. In addition, methods to reduce modeling complexities are incorporated, enhancing their suitability for practical applications. A holistic district-wide analysis using a real university case study demonstrates a 4.7% fuel savings by lowering boiler operational pressure from 900 kPa to 600 kPa, along with a 13.3% reduction in condensation losses across the distribution network. Furthermore, the load allocation approach results in a 13.1% reduction in fuel consumption during peak winter periods and 15.3% during shoulder periods, with corresponding decreases in carbon emissions and fuel costs. This approach can also save maintenance costs by reducing the boiler runtime by 49.6%. In conclusion, this research underscores the benefits of retrofitting aging steam district heating systems, offering immediate operational improvements by enhancing efficiency, meeting regulatory compliance, and extending infrastructure lifespans while delaying costly overhauls.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Risk-informed Physical Security Using Dynamic Force-on-Force Modelling Tools (ABSTRACT)

Physical security requirement of nuclear power plants (NPPs) in the US is regulated in a mainly prescriptive manner. This “one size fits all” approach may consequently overlook plant-specific characteristics which are beneficial for the inherent safety and security of the plant. Although a performance-based security measure has been promulgated in 10 CFR 73.55(r), current evaluation methods generally emphasize static and conservative assumptions on physical security uncertainties. This conservatism contributes to the overall operational and maintenance costs, which account to 70% of total operating expenditures for an NPP. This paper describes an ongoing work at the Idaho National Laboratory within the Light Water Reactor Sustainability pathway, which aims to optimize physical protection system with regards to system effectiveness and dollar costs. To achieve this goal, a risk-informed approach to physical security is proposed. This approach leverages the Event Modeling Risk Assessment using Linked Diagrams (EMRALD) tool to model facility infiltration and Force-on-Force (FoF) engagement in a dynamic manner. The dynamic FoF analysis was conducted by coupling human performance uncertainties modeled in EMRALD to existing commercial 3-dimensional FoF software, i.e. SCRIBE3D, AVERT and Simajin. Meanwhile, risk analysis was accomplished by coupling the attack outcomes to existing plant Probabilistic Risk Assessment (PRA) model with FLEX strategy. This approach reduces the conservatisms in security modeling and further acknowledges the possibility for plant operators to mitigate the attack outcomes. A sabotage attack on a hypothetical NPP facility was devised to demonstrate the proposed methodology. Dynamic FoF rules were implemented in EMRALD coupled to SCRIBE3D. This dynamic evaluation revealed an additional 21% system effectiveness in protecting the target set relative to the static modelling approach. Furthermore, the conditional core damage probability could be reduced by up to 46% by crediting operator actions in mitigating the sabotage outcomes. We evaluated the relative importance of each component of the physical security posture included in the model and assessed tradeoffs between components to identify potential opportunities for cost reduction while maintaining a specific level of system effectiveness. Results of the cost analysis will be presented in the conference. This study is expected to help NPP operators in allocating resources optimally to satisfy the security requirements.

97 MATHEMATICS AND COMPUTING↗

Predictive Maturity of Multi-Scale Simulation Models for Fuel Performance

The project proposed to provide a Predictive Maturity Framework with its companion metrics that (1) introduce a formalized, quantitative means to communicate information between interested parties, (2) provide scientifically dependable means to claim completion of Validation and Uncertainty Quantification (VU) activities, and (3) guide the decision makers in the allocation of Nuclear Energy’s resources for code development and physical experiments. The project team proposed to develop this framework based on two complimentary criteria: (1) the extent of experimental evidence available for the calibration of simulation models and (2) the sophistication of the physics incorporated in simulation models. The proposed framework is capable of quantifying the interaction between the required number of physical experiments and degree of physics sophistication. The project team has developed this framework and implemented it with a multi-scale model for simulating creep of a core reactor cladding. The multi-scale model is composed of the viscoplastic self-consistent (VPSC) code at the meso-scale, which represents the visco-plastic behavior and changing properties of a highly anisotropic material and a Finite Element (FE) code at the macro-scale to represent the elastic behavior and apply the loading. The framework developed takes advantage of the transparency provided by partitioned analysis, where independent constituent codes are coupled in an iterative manner. This transparency allows model developers to better understand and remedy the source of biases and uncertainties, whether they stem from the constituents or the coupling interface by exploiting separate-effect experiments conducted within the constituent domain and integral-effect experiments conducted within the full-system domain. The project team has implemented this procedure with the multi- scale VPSC-FE model and demonstrated its ability to improve the predictive capability of the model. Within this framework, the project team has focused on optimizing resource allocation for improving numerical models through further code development and experimentation. Related to further code development, we have developed a code prioritization index (CPI) for coupled numerical models. CPI is implemented to effectively improve the predictive capability of the coupled model by increasing the sophistication of constituent codes. In relation to designing new experiments, we investigated the information gained by the addition of each new experiment used for calibration and bias correction of a simulation model. Additionally, the variability of ‘information gain’ through the design domain has been investigated in order to identify the experiment settings where maximum information gain occurs and thus guide the experimenters in the selection of the experiment settings. This idea was extended to evaluate the information gain from each experiment can be improved by intelligently selecting the experiments, leading to the development of the Batch Sequential Design (BSD) technique. Additionally, we evaluated the importance of sufficiently exploring the domain of applicability in experiment-based validation of high-consequence modeling and simulation by developing a new metric to quantify coverage. This metric has also been incorporated into the design of new experiments. Finally, we have proposed a data-aware calibration approach for the calibration of numerical models. This new method considers the complexity of a numerical model (the number of parameters to be calibrated, parameter uncertainty, and form of the model) and seeks to identify the number of experiments necessary to calibrate the model based on the level of sophistication of the physics. The final component in the project team’s work to improve model calibration and validation methods is the incorporation of robustness to non-probabilistic uncertainty in the input parameters. This is an improvement to model validation and uncertainty quantification stemming beyond the originally proposed scope of the project. We have introduced a new metric for incorporating the concept of robustness into experiment-based validation of numerical models. This project has accounted for the graduation of two Ph.D. students (Kendra Van Buren and Josh Hegenderfer) and two M.S. students (Matthew Egeberg and Parker Shields). One of the doctoral students is now working in the nuclear engineering field and the other one is a post-doctoral fellow at the Los Alamos National Laboratory. Additionally, two more Ph.D. students (Garrison Stevens and Tunc Kulaksiz) who are working towards graduation have been supported by this project.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Hierarchical Charging Control of Plug-in Electric Vehicles with Simple Flexibility Model

The demand for plug-in electric vehicles (PEVs) is increasing exponentially, which could have significant effects on the power grid, because charging one PEV is nearly equivalent to adding three houses to the power system. Even though PEVs increase demand on the electric grid, their capability to actively interact with the grid presents excellent opportunities for load management, demand response, and various other grid services. This paper proposes an innovative scheduling and control framework to enable smart PEV charging for grid services while meeting PEV owners’ travel needs. In the proposed framework, each set of electric vehicle supply equipment (EVSE) is equipped with a controller that estimates charging power and energy flexibility based on vehicle characteristics, EVSE power rating, battery energy state, and upcoming trip information. With the charging flexibility model received from each EVSE controller, the central coordinator determines the optimal power allocation for a look-ahead time window for the given grid services. The proposed charging coordination strategy can help reduce the computational complexity and communication requirement compared with existing methods. It is also scalable to the expanding PEV fleet and robust to uncertainties in upcoming vehicle trips and future system condition. The proposed method is studied using a prototypical feeder developed at Pacific Northwest National Laboratory and detailed trip information extracted from the National Household Travel Survey.

Wu, Di↗