Search NASA⌕ Search

SEARCH · Search NASA

Results for “Optimized Plant Dispatch”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Testing of Strategies for the Acceleration of the Cost Optimization

The general problem addressed in the Nuclear-Renewable Hybrid Energy System (N-R HES) project is finding the optimum economical dispatch (ED) and capacity planning solutions for the hybrid energy systems. In the present test-problem configuration, the N-R HES unit is composed of three electrical power-generating components, i.e. the Balance of Plant (BOP), the Secondary Energy Source (SES), and the Energy Storage (ES). In addition, there is an Industrial Process (IP), which is devoted to hydrogen generation. At this preliminary stage, the goal is to find the power outputs of each one of the N-R HES unit components (BOP, SES, ES) and the IP hydrogen production level that maximizes the unit profit by simultaneously satisfying individual component operational constraints. The optimization problem is meant to be solved in the Risk Analysis Virtual Environment (RAVEN) framework. The dynamic response of the N-R HES unit components is simulated by using dedicated object-oriented models written in the Modelica modeling language. Though this code coupling provides for very accurate predictions, the ensuing optimization problem is characterized by a very large number of solution variables. To ease the computational burden and to improve the path to a converged solution, a method to better estimate the initial guess for the optimization problem solution was developed. The proposed approach led to the definition of a suitable Monte Carlo-based optimization algorithm (called the preconditioner), which provides an initial guess for the optimal N-R HES power dispatch and the optimal installed capacity for each one of the unit components. The preconditioner samples a set of stochastic power scenarios for each one of the N-R HES unit components, and then for each of them the corresponding value of a suitably defined cost function is evaluated. After having simulated a sufficient number of power histories, the configuration which ensures the highest profit is selected as the optimal one. The component physical dynamics are represented through suitable ramp constraints, which considerably simplify the numerical solving. In order to test the capabilities of the proposed approach, in the present report, the dispatch problem only is tackled, i.e. a reference unit configuration is assumed, and each one of the N-R HES unit components is assumed to have a fixed installed capacity. As for the next steps, the main improvement will concern the operation strategy of the ES facility. In particular, in order to describe a more realistic battery commitment strategy, the ES operation will be regulated according to the electricity price forecasts.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Chance Constrained Optimal Power Flow: Risk-Aware Network Control under Uncertainty

When uncontrollable resources fluctuate, Optimum Power Flow (OPF), routinely used by the electric power industry to re-dispatch hourly controllable generation (coal, gas and hydro plants) over control areas of transmission networks, can result in grid instability, and, potentially, cascading outages. This risk arises be cause OPF dispatch is computed without awareness of major uncertainty, in particular fluctuations in renewable output. As a result, grid operation under the OPF with renewable variability can lead to frequent conditions where power line flow ratings are significantly exceeded. Such a condition, which is borne by simulations of real grids, would likely resulting in automatic line tripping to protect lines from thermal stress, a risky and undesirable outcome which compromises stability. Smart grid goals include a commitment to large penetration of highly fluctuating renewables, thus calling to reconsider current practices, in particular the use of standard OPF. Our Chance Constrained (CC) OPF corrects the problem and mitigates dangerous renewable fluctuations with minimal changes in the current operational procedure. Assuming availability of a reliable wind forecast parameterizing the distribution function of the uncertain generation, our CC-OPF satisfies all the constraints with high probability while simultaneously minimizing the cost of economic re-dispatch. CC-OPF allows efficient implementation, e.g. solving a typical instance over the 2746-bus Polish network in 20s on a standard laptop.

Energy Planning, Policy, & Economy(29)↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I -- National Study

The use of renewable energy (RE) sources, primarily wind and solar generation, is poised to grow significantly within the Indian power system. The Government of India has established a target of 175 gigawatts (GW) of installed RE capacity by 2022, including 60 GW of wind and 100 GW of solar, up from 29 GW wind and 9 GW solar at the beginning of 2017. Thanks to advanced weather and power system modeling made for this project, the study team is able to explore operational impacts of meeting India's RE targets and identify actions that may be favorable for integration. Our primary tool is a detailed production cost model, which simulates optimal scheduling and dispatch of available generation in a future year (2022) by minimizing total production costs subject to physical, operational, and market constraints. Our team comprises a core group from the Power System Operation Corporation, Ltd. (POSOCO), which is the national grid operator (with representation from the National, Southern, and Western Regional Load Dispatch Centers) under Ministry of Power, National Renewable Energy Laboratory (NREL), and Lawrence Berkeley National Laboratory (LBNL), and a broader modeling team that includes Central Electricity Authority (CEA), POWERGRID (the central transmission utility, CTU), and State Load Dispatch Centers in Maharashtra, Gujarat, Tamil Nadu, Karnataka, Rajasthan, and Andhra Pradesh. Our model includes high-resolution wind and solar data (forecasts and actuals), unique properties for each generator, CEA/CTU's anticipated buildout of the power system, and enforced state-to-state transmission flows. Assuming the fulfillment of current efforts to provide better access to the physical flexibility of the power system, we find that power system balancing with 100 GW of solar and 60 GW of wind is achievable at 15-minute operational timescales with minimal RE curtailment. This RE capacity meets 22% of total projected 2022 electricity consumption in India with annual RE curtailment of 1.4%, in line with experiences in other countries with significant RE penetrations (Bird et al. 2016). Changes to operational practice can further reduce the cost of operating the power system and reduce RE curtailment. Coordinating scheduling and dispatch over a broader area is the largest driver to reduce costs, saving INR 6300 crore (USD $920 million) annually when optimized regionally. Lowering minimum operating levels of coal plants (from 70% to 40%) is the biggest driver to reduce RE curtailment - from 3.5% down to 0.76%. In fact, this operating property is more influential than faster thermal generation ramp rates in lowering the projected levels of curtailment. While this study does not answer every question relevant to planning for India's 2022 RE targets, it is an important step toward analyzing operational challenges and cost saving opportunities using state-of-the-art power system planning tools. Further analysis can build upon this basis to explore optimal renewable resource and intrastate transmission siting, system stability during contingencies, and the influence of total power system investment costs on customer tariffs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India’s Electric Grid, Vol. 1. National Study

The use of renewable energy (RE) sources, primarily wind and solar generation, is poised to grow significantly within the Indian power system. The Government of India has established a target of 175 gigawatts (GW) of installed RE capacity by 2022, including 60 GW of wind and 100 GW of solar, up from 29 GW wind and 9 GW solar at the beginning of 2017. Using advanced weather and power system modeling made for this project, the study team is able to explore operational impacts of meeting India’s RE targets and identify actions that may be favorable for integration. Our primary tool is a detailed production cost model, which simulates optimal scheduling and dispatch of available generation in a future year (2022) by minimizing total production costs subject to physical, operational, and market constraints. Our team comprises a core group from the Power System Operation Corporation, Ltd. (POSOCO), which is the national grid operator (with representation from the National, Southern, and Western Regional Load Dispatch Centers) under Ministry of Power, National Renewable Energy Laboratory (NREL), and Lawrence Berkeley National Laboratory (Berkeley Lab), and a broader modeling team that includes Central Electricity Authority (CEA), POWERGRID (the central transmission utility, CTU), and State Load Dispatch Centers in Maharashtra, Gujarat, Tamil Nadu, Karnataka, Rajasthan, and Andhra Pradesh. Our model includes high-resolution wind and solar data (forecasts and actuals), unique properties for each generator, CEA/CTU’s anticipated buildout of the power system, and enforced state-to-state transmission flows. Assuming the fulfillment of current efforts to provide better access to the physical flexibility of the power system, we find that power system balancing with 100 GW of solar and 60 GW of wind is achievable at 15-minute operational timescales with minimal RE curtailment. This RE capacity meets 22% of total projected 2022 electricity consumption in India with annual RE curtailment of 1.4%, in line with experiences in other countries with significant RE penetrations (Bird et al. 2016). Changes to operational practice can further reduce the cost of operating the power system and reduce RE curtailment. Coordinating scheduling and dispatch over a broader area is the largest driver to reduce costs, saving INR 6300 crore (USD 980 million) annually when optimized regionally. Lowering minimum operating levels of coal plants (from 70% to 40%) is the biggest driver to reduce RE curtailment—from 3.5% down to 0.76%. In fact, this operating property is more influential than faster thermal generation ramp rates in lowering the projected levels of curtailment. While this study does not answer every question relevant to planning for India’s 2022 RE targets, it is an important step toward analyzing operational challenges and cost saving opportunities using state-of-the-art power system planning tools. Further analysis can build upon this basis to explore optimal renewable resource and intrastate transmission siting, system stability during contingencies, and the influence of total power system investment costs on customer tariffs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Case Study: Hybrid Carbon Conversion Using Low-Carbon Energy Sources in Coal-Producing States

The demand for more carbon efficient power sources and a decrease in natural gas prices has decreased the desire for coal power. This decrease in demand has led to massive job losses in coal mining regions over the past decade. The purpose of this project is to develop a hybrid energy system utilizing both a coal power plant and advanced reactor, which is competitive with natural gas by improving on profitability and decreasing carbon emissions. This report details the problem with a summary of the impact on the coal industry and the availability of renewable energy sources in the Appalachian region. Because of the geography of the region, variable renewable energy sources are not available without significant size and siting restrictions. However, biomass in the form of wood waste is abundant and can be used as a carbon neutral energy source. Combining biomass and coal processing, in addition to thermal power plants, can increase system profits and efficiency by providing peaking power and conversion opportunities for secondary markets. The electric load is based on publicly available demand data from Appalachian Power, which services the western Virginia and southern West Virginia in the Appalachian region. The demand information is combined by service, normalized, and scaled to an average demand of 1000 kW, which will be the basis for sizing the hybrid energy system. A traditional screening curve analysis for a coal plant and advanced reactor shows that the least cost design varies significantly based on the assumed discount rate and capital recovery period. An optimization program to size the design in TEAL based on the load curve gives 10 optimal designs, all with a negative resulting net present value (NPV) and a coal plant capacity of less than 15%. Including profits from selling captured carbon at a flat rate results in a positive NPV; however, the coal capacity factor only increases to about 40%. There are limitations with this optimization as well since the price of CO2 is likely to decrease as more is sold to the conversion market. The suggested design will combine coal power, an advanced reactor, and coal and biomass coprocessing to produce a variety of products that can be sold to the conversion market while increasing system efficiency. The analysis of conversion pathways for coal and biomass reveals that multiple options will need to be included in the analysis to produce the optimal system design. Three systems will be optimized and compared to determine the best design based on the figures of merit of total NPV and cost of carbon avoided. The first system will include a coal power plant and an advanced reactor that will sell electricity to the grid to meet demand and sell captured carbon to the conversion market. The second system adds a high-temperature steam electrolysis plant, which will utilize electricity during times of low demand to produce hydrogen and sell it to the conversion market. The third system adds biomass and coal processing with options for hydrocarbon oils, syngas to be produced for the conversion market, and electricity generation to power components within the system or provide peaking power. This analysis will be based on a new approach that combines traditional screening curve methods with a dispatch algorithm that optimizes the system based on the opportunity cost of different production options. The resulting optimization algorithm should provide results with less processing time than HERON’s decision tree method. The results from this analysis will determine an optimal design and reinforce the benefits of coal power when used in a hybrid energy system. The initial results show that the addition of a secondary market for carbon sales could result in a positive NPV and increases the capacity factor of the coal plant as compared to a design with only sales to the electricity market. The addition of more markets and additional coal consumption from biomass coprocessing could increase NPV further, replace carbon in other markets through the sale of biomass-derived hydrocarbons, and demonstrate the value of coal power technology.

01 COAL, LIGNITE, AND PEAT↗

Models and Simulation Environment for the Design and Optimization of Hybrid Energy Systems

The energy landscape in the U.S. is changing with proposed federal regulations limiting carbon dioxide emissions and with government credits for 'clean' energy technologies. This shift in the market conditions, especially in deregulated markets, has already resulted in the closing of coal power plants. Previously these coal plants served to balance variation in load. The resulting loss of electricity production is being made up in part with increased renewable generation. This set of governmental policy changes potentially presents expanded opportunities for both renewable energy and nuclear energy to become significant energy sources in the future. Potential synergies exist that can reduce greenhouse gas (GHG) emissions and provide affordable, sustainable energy. Combining multiple energy production, conversion, storage, and consumption facilities can leverage these potential synergies. This research focuses on integrating nuclear power plants within systems with increased renewable penetration, referred to as a nuclear renewable hybrid energy system (NRHES). Industrial-scale nuclear renewable hybrid energy systems have the potential to provide grid services such as dispatchable generation, storage, ancillary services, and power regulation. The problem of designing, analyzing, and optimizing the NHRES is being undertaken by a multi-laboratory team. The effort requires the collaboration of experts across engineering disciplines with methods and results to be shared by these experts. To facilitate collaborations a common system modeling and analysis language is adopted along with open-source libraries and interface standards that support data exchange among the models. Modelica was selected as the common language based on its prior use by team members at each of Idaho National Laboratory, Oak Ridge National Laboratory, and Argonne National Laboratory.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Dynamic Optimal Dispatch of Energy Systems with Intermittent Renewables and Damage Model

With the increasing penetration of intermittent renewable energy sources into the grid, there is a growing need for process systems-based strategies that integrate dispatchable and variable energy systems for supplying the demand while maintaining grid reliability. The proposed framework corresponds to a dynamic mixed-integer linear programming optimization approach that integrates coal-fired and natural gas-fired power plants, NaS batteries for energy storage, and solar/wind energy to supply the demand. This optimization approach considers an economic goal and constraints to provide power balance while maintaining the overall damage of the natural gas combined cycle (NGCC) power plant drum under a maximum stress as well as avoiding the overheating of the NGCC superheater and reheater. Renewable curtailment levels are also retained at minimum levels. Case studies are analyzed considering different loads and renewable penetration levels. The results show that the demand was met for all cases. Grid flexibility was mostly provided by the NGCC, while the batteries were used sparingly. In addition, considering a CO 2 equivalent analysis, the environmental performance was intrinsically connected to grid flexibility and the level of renewable penetration. Stress analysis results reinforced the necessity for an equipment health-related constraint.

97 MATHEMATICS AND COMPUTING↗

Techno-Economic Analysis of CSP Incorporating sCO2 Brayton Power Cycles: Trade-Off Between Cost and Performance

Concentrating solar power (CSP) plants, thanks to the implementation of cost-competitive thermal energy storage, represent a dispatchable zero-emission alternative to traditional fossil fuel power plants. Next generation solar towers are expected to adopt high temperature receivers (>700 degrees C) coupled to sCO2-based power blocks, which optimal design is generally pushed towards the maximum cycle efficiency, often neglecting the economic impact with the justification that the main share of the capital cost is represented by the heliostat field. As result, the scientific literature lacks in comprehensive studies on techno-economic evaluation of CSP+sCO2 power plants addressing the important correlation that exists between system cost and performances. This work provides a preliminary techno-economic analysis of a solar power tower comparing four different cycle configurations for the sCO2 power block. Results have been reported on a Pareto front, highlighting the tradeoff between the plant investment cost and the solar-to-electricity plant efficiency. The trends of the optimization variables and cycle results have been reported to give useful insights about proper assumptions for the sCO2 power block design. The recompressed cycle with intercooling resulted as the most promising configuration and it has been further analyzed through a comparison of different solutions on the Pareto front. The cost breakdown of the sCO2 power block has been reported to highlight which components have the greatest impact on the overall plant cost and how they vary along the optimal solutions front. Eventually, the optimization has been repeated introducing a correlation to compute the turbomachinery isentropic efficiencies, to investigate their effect on the techno- economic analysis.

concentrated solar power↗

Modeling and Optimization of a Nuclear Integrated Energy System for the Remote Microgrid on El Hierro

Nuclear microreactors are a potential technology to provide heat and electricity for remote microgrids. There is potential for the microgrid on the island of El Hierro to use a microreactor, within an integrated energy system (IES), to generate electricity and provide desalinated water. This work proposes a workflow for optimizing and analyzing IESs for microgrids. In this study, an IES incorporating a microreactor, thermal energy storage (TES) system, combined heat and power plant, and a thermal desalination plant was designed, optimized, and analyzed using Idaho National Laboratory’s Framework for Optimization of Resources and Economics (FORCE) toolset. The optimization tool, Holistic Energy Resource Optimization Network (HERON), was used to determine the optimal capacity sizes and dispatch for the reactor and thermal energy storage systems to meet demand. The optimized reactor and TES sizes were found to be 11.61 MWth and 58.47 MWhth, respectively, when optimizing the IES to replace 95% of the island’s existing diesel generation needs. A dynamic model of the system was created in the Modelica language, using models from the HYBRID repository, to analyze and verify the dispatch from the optimizer. The dynamic model was able to meet the ramp rates while maintaining reactor power with minimal control adjustments.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Performance analysis of integrated Nuclear-Solar Energy system sharing same molten salt thermal energy storage

Advanced nuclear reactors may be deployed with integrated thermal energy storage to improve flexibility and maximize revenue. This presents opportunities for thermal integration with concentrating solar power (CSP) to generate component synergies and/or improve performance. Here in this study, a computational model is developed for an integrated nuclear and CSP system that both share the same molten salt thermal energy storage (TES). Optimized dispatch schedules are developed subject to various market conditions, and the ratio of the nuclear to CSP thermal output is also varied. Performance of the combined system is compared to separate nuclear and solar plants, to determine if there is an overall benefit that can be derived from sharing the TES. Given sufficient volatility in electricity prices (e.g., under CAISO market conditions), synergies of up to 8% in net revenue are observed as a result of sharing the same TES, primarily due to improved revenue from enabling operation of the turbine closer to its design point, as well as being able to better take advantage of higher electricity prices. The synergy benefits are largest when the nuclear and solar plants have similar thermal output. However, when prices are less volatile the opposite behavior can be observed and it can be preferable to operate the nuclear plant as a baseload generator.

14 SOLAR ENERGY↗

Optimizing dispatch for a concentrated solar power tower

Concentrating solar power (CSP) systems employ a sophisticated thermal receiver, power cycle, and a heliostat field, comprised of thousands of mirrors spread over hundreds of acres of land, and are most cost-effective with relatively large quantities of energy storage which can be scheduled for dispatch. We exercise an existing optimization model that maximizes revenue over a year-long time horizon, solved using a standard 48-h look-ahead policy at hourly fidelity on a CSP system under development in California. The system employs molten salt power tower technology with a 150 MWe (net) turbine, eight hours of thermal storage at full load, and a solar field that provides 1.75 times the rated turbine thermal power. The model considers system configuration and interoperability aspects, such as storage tank size, production capacities, and ramp rates, and determines decisions that expedite financing, permitting, and plant design. Relative to results achieved via industry practice, the existing optimization model reduces the number of power cycle (i.e., turbine) start-up events by 86.4%, thereby improving net revenue by more than 8.5% annually; this corresponds to an approximately $140 M increase in net revenue over the lifetime of the plant, taking a step towards advancing the long-term economic viability of large-scale renewable energy systems. Sensitivity analysis on uncertain parameter values provides insight regarding those values that influence profit most significantly.

14 SOLAR ENERGY↗

Hybridizing a geothermal power plant with concentrating solar power and thermal storage to increase power generation and dispatchability

Geothermal power plants often deploy less than their full power capacity due to declining geothermal resources. Integrating heat from a concentrating solar power (CSP) collector field increases the power output at low cost. This article considers five methods of solar heat addition in a double-flash geothermal plant. The most promising solution converts solar heat into electrical work with an efficiency of 24.3%. The economic feasibility and optimal sizing of the solar field and thermal stores are evaluated. A hybrid plant that increases power generation from 22 to 24 MWe has a Levelized Cost of Electricity (LCOE) of 0.07 +/- 0.01 $/kWhe. Adding three hours of storage increases the LCOE to 0.08 +/- 0.01 $/kWhe. Photovoltaic systems are considered to be a low-cost renewable technology, but an equivalent photovoltaic system with battery storage costs 0.15 +/- 0.07 $/kWhe due to the high cost and replacement rate of batteries compared to thermal storage. The hybrid plant also has a lower LCOE than a conventional CSP plant. If the dispatchability that thermal storage provides is rewarded with higher electricity prices, calculations indicate storage becomes an attractive investment when discharged power receives 1.75 times the typical price of electricity.

15 GEOTHERMAL ENERGY↗

Status Report on Modelling and Simulation Capabilities for Nuclear-Renewable Hybrid Energy Systems

This report summarizes the current status of the modeling and simulation capabilities developed for the economic assessment of Nuclear-Renewable Hybrid Energy Systems (N-R HES). The increasing penetration of variable renewables is altering the profile of the net demand, with which the other generators on the grid have to cope. N-R HES analyses are being conducted to determine the potential feasibility of mitigating the resultant volatility in the net electricity demand by adding industrial processes that utilize either thermal or electrical energy as stabilizing loads. This coordination of energy generators and users is proposed to mitigate the increase in electricity cost and cost volatility through the production of a saleable commodity. Overall, the financial performance of a system that is comprised of peaking units (i.e. gas turbine), baseload supply (i.e. nuclear power plant), and an industrial process (e.g. hydrogen plant) should be optimized under the constraint of satisfying an electricity demand profile with a certain level of variable renewable (wind) penetration. The optimization should entail both the sizing of the components/subsystems that comprise the system and the optimal dispatch strategy (output at any given moment in time from the different subsystems). Some of the capabilities here described have been reported separately in [1, 2, 3]. The purpose of this report is to provide an update on the improvement and extension of those capabilities and to illustrate their integrated application in the economic assessment of N-R HES.

97 MATHEMATICS AND COMPUTING↗

Assessment of Model-Based Schemes for Accelerating Optimization by RAVEN

Nuclear-Renewable Hybrid Energy Systems (N-R HES) combine different energy technologies in a synergistic way with the objective of achieving a more economical energy production. In this report the particular hybrid system dealt with includes a PWR nuclear reactor, the associated Rankine-based energy conversion cycle (Balance of Plant, BOP), an Industrial Process (IP) for hydrogen production, a gas turbine (Second Energy Source, SES), and a battery (Energy Storage, ES). The RAVEN-based HYBRID framework is used to find the optimal installed capacity and the optimal economical dispatch of each component of the N-R HES. HYBRID solves the coupled capacity planning-economic and dispatch optimization problem with the objective of minimizing the Levelized Cost of Electricity (LCOE). In the optimization of the power dispatch strategy, the HYBRID framework takes into account the time-dependent dynamics of each subsystem by including a Dymola object-oriented model of the process dynamics. To ease the computational burden of the optimization process, an initial guess for the dispatch optimization problem is provided by a preconditioner. The solution guess is calculated by means of a least-marginal cost approach which applies the same criterion behind the screening curve method. Though this algorithm allows evaluating an economically adapted generation mix for a target load duration curve within a few seconds, it neglects the constraints due to the single component dynamics, and it is not able to adequately represent the ES. An improved treatment of the pre-conditioner problem was addressed by introducing a Monte Carlo based optimization algorithm. The new approach takes into account limits on power rates for the system subcomponents, which was not previously done. Additionally, this new Monte-Carlo based preconditioner addresses the problem with the ES component through improved modeling of that component. The new algorithm has been implemented in the HYBRID framework and tested to assess its performance. The results obtained with the new Monte Carlobased preconditioner were benchmarked against those obtained through the reference deterministic approach. The comparison shows that the Monte-Carlo based approach provides improved solution accuracy to the power dispatch optimization problem. Also in this report, the treatment of the penalty function on LCOE is discussed, and an improved penalty function for missed demand is suggested and tested.

Maronati, Giovanni↗

Impacts Analysis of Amendments to Mexico's Unit Commitment and Dispatch Rules

In Mexico, there are various amendments, approved and under discussion to significantly modify the order in which generation units are committed and dispatched. This report quantifies the potential impacts on Mexico's power system, utilizing a production cost model of the Mexican power system that analyzes the hourly optimal electricity dispatch of the Mexican electricity system for 1 year under four scenarios, a reference scenario, and three alternative scenarios. These scenarios are meant to evaluate the potential impacts of increasing participation of the state-owned power plants in generation mix, electricity production costs, emissions, and renewable curtailment.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Deep reinforcement learning based optimization for a tightly coupled nuclear renewable integrated energy system

New ways to integrate energy systems to maximize efficiency are being sought to meet carbon emissions goals. Nuclear-renewable integrated energy system (NR-IES) concepts are a leading solution that couples a nuclear power plant with renewable energy, hydrogen generation plants, and energy storage systems, such that thermal and electrical power are dispatchable to fulfill grid-flexibility requirements while also producing hydrogen and maximizing revenue. Here, this paper introduces a deep reinforcement learning (DRL)-based framework to address the complex decision-making tasks for NR-IES. The objective is to maximize revenue by generating and selling hydrogen and electricity simultaneously according to their time-varying prices while keeping the energy flow in the subsystems in balance. A Python-based simulator for a NR-IES concept has been developed to integrate with OpenAI Gym and Ray/RLlib to enable an efficient and flexible computational framework for DRL research and development. Three state-of-the-art DRL algorithms have been investigated, including two-delayed deep deterministic policy gradient (TD3), soft-actor critic (SAC), proximal policy optimization (PPO), to illustrate DRL’s superiority for controlling NR-IES by comparing it with a conventional control approach, particle swarm optimization (PSO). In this effort, PPO has shown more-stable performance and also better generalization capability than SAC and TD3. Comparisons with PSO have demonstrated that, on average, PPO can achieve 13.9% more mean episode returns from the training process and 29.4% more mean episode returns from the testing process when different hydrogen-production targets are applied.

08 HYDROGEN↗

Scale and Regionality of Nonelectric Markets for U.S. Nuclear Light Water Reactors

This study assesses existing and potential industries that could conceivably be directly coupled to existing nuclear reactors. The goal is to identify the scale, location, and accessibility of the candidate industrial-product markets, as well as process feedstocks that are available near the plants to establish new industries. For example, CO 2 as a feedstock can be combined with H 2 to produce formic acid (FA), transportation fuels, and lubricants. These new plants can be entirely supported with the heat and electricity provided by a nearby NPP. The potential demand for nonelectric industrial products was assessed by documenting current and possible growth of nonelectricity product markets considered. This assessment used DOE- and industry-supported tools, data, and projections to capture regional industrial market opportunities. Electricity-capacity markets that reward large and reliable generators, such as NPPs, were considered because the electricity market will likely continue to be an important revenue source to NPPs. The key is to balance the needs of energy customers so as to optimize revenue for the affiliated energy customers or partners. In most cases, flexible plant energy delivery and power generation for the grid will require either energy storage or a stock of intermediate products to sustain the industrial customers when the NPP dispatches electricity to the grid. A diverse mix of temperate regions with operating NPPs around the U.S.—representing a variety of operating markets, local generation mix, and seasonal climates—were chosen for this market study. Both current and future market opportunities for candidate industrial-product markets surrounding these NPPs were studied. Figure 2 illustrates the regions chosen for this study. The success of developing nonelectric industrial-product markets as alternative revenue-generating sources for LWRs depends, not only on demand from growing existing markets, such as petroleum refining and NH 3 production, but also on the development of new markets such as light-duty (LD) and heavy-duty (HD) hydrogen FCEVs, synfuels, chemical production, biofuels, metal refining, injection of hydrogen into NG pipelines for gas power-generating units, FA, polymers, and close-coupled industrial heat applications, all of which can significantly increase demand relative to current levels while decarbonizing energy sectors. This study also presents a sample analysis of the economics of hydrogen production in an area of Minnesota, considering the capital and operating costs of a hydrogen plant as well as the local market demand for hydrogen. It includes some assumptions on electricity-grid pricing, showing how hydrogen could be integrated with an NPP and be competitive with the incumbent hydrogen-production process, steam methane reforming (SMR). The objectives of this study include: Provide U.S. NPP operators a robust sampling of the market demand location, scale, and accessibility (including storage and transportation) of the wide variety of industrial-product choices that can be produced using nuclear thermal energy and electricity proximate to a subset of U.S. NPPs to inform the industry of the potential opportunity; show examples and trade-off analyses of how U.S. LWR operators can access these markets, including storage and transportation of industrial products to their intended markets; and present a general analysis example for one industrial product (hydrogen) in one region (Minnesota area), including production, storage, and transportation, to show how nuclear-hybrid integrated energy systems (IESs) could access local markets and improve the profitability of an NPP.

03 NATURAL GAS↗