Search NASA⌕ Search

SEARCH · Search NASA

Results for “Options”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Effects of selected R&D options on fuel usage in the commercial air system

The study on which this paper is based, known as RECAT (Study of Cost Benefit Tradeoffs for Reducing the Energy Consumption of the Commercial Air Transportation System), was sponsored by NASA to establish a basis for assigning priorities in its aircraft fuel-conservation R&D program. The study involved coordinated efforts by four independent contractors to conceive and quantify fuel-conserving technology alternatives, transform these alternatives into viable R&D options, and simulate each option in a general model of the U.S. domestic air transportation system. This paper deals primarily with the latter phase and concentrates on the results of the study, as revealed not only by estimated fuel usage but also by other impacts of the technology options, such as demand growth, operator economics, and fleet composition. However, while the paper focuses on results, the basic assumptions and technology inputs are documented, and a general description of the modeling approach is provided to demonstrate the level of detail considered in the analysis.

Gobetz, F. W.↗

Multirole cargo aircraft options and configurations

The paper discusses multirole cargo aircraft options and configurations. It was shown that derivatives of current wide-body aircraft would be economically attractive through 2008, but new dedicated airfreighters incorporating 1990 technology would offer little or no economic incentive. Option studies indicate that Mach 0.7 propfans would be economically attractive in trip cost, aircraft price, and airline ROI; spanloaders would be lower priced with higher ROI, but would have a relatively higher trip cost because of aerodynamic inefficiencies. Finally, air cushion landing gear configurations are identified as an option for avoiding runway constraints on airport accommodation of very large airfreighters.

Conner, D. W.↗

A survey of Saturn orbiter transfer options

This paper is a description of recent work to categorize and enumerate the various options available for transfer from earth to Saturn orbit. The fundamental period of investigation is the 20-year synodic period of Jupiter and Saturn which permits a scenario of Jupiter gravity assist trajectories for various trip times. Against the background of the Jupiter swingby trajectories are compared a number of other options including Delta V-EGA and VEGA trajectories, direct earth-Saturn transfers, and solar and nuclear electric propulsion options. All are compared and contrasted in the context of expected launch vehicle capabilities and realistic transfer times.

Uphoff, C.↗

TOPEX satellite concept. TOPEX option study report

Candidate bus equipment from the Viking, Applications Explorer Mission, and Small Scientific Satellite programs for application to the TOPEX mission options is assessed. Propulsion module equipment and subsystem candidates from the Applications Explorer Mission satellites and the Small Scientific Satellite spacecraft are evaluated for those TOPEX options. Several subsystem concepts appropriate to the TOPEX options are described. These descriptions consider performance characteristics of the subsystems. Cost and availability information on the candidate equipment and subsystems are also provided.

Meyer, D. P.↗

Architectural options and development issues

The design options for the space station are discussed in general terms, reflecting the approach taken by the NASA Concept Development Group. Primary aims are flexibility and transparency, to fulfill as many scientific and commercial user requirements as possible and to open the station to as many new users as possible; utilities, facilities, and functional support must be designed to meet these aims. General architecture options considered include the present STS, an extended STS, a limited-duration manned transportation node with unmanned platforms, and a manned station with unmanned platforms and transportation-node capability (OTV, TMS). The latter option is found most promising and developed further, with consideration of the technical challenges involved.

Powell, L. E.↗

The optimal number of menu options per panel

An evaluation is made of the effects of the 'funneling' phenomenon, in an analysis of hierarchical menu structures' optimal search times which builds on the work of Lee and MacGregor (1985). Funneling is a reduction in the total number of options processed through the design of a system of greater choice 'depth' and correspondingly restricted choice 'breadth'. Both random and ordered menus are treated. The available evidence is found to support the general conclusion that randomly ordered menu panels should have only a few (4-8) options, while organized menus should contain as many options as 64.

Paap, Kenneth R.↗

Launch packaging options for the photovoltaic power module cargo element

The National Aeronautics and Space Administration recently embarked on the Space Station Freedom program, which will utilize the Shuttle Orbiter for transportation to orbit. This task will be accomplished with a number of flights over several years. Each flight is unique in terms of the hardware that is manifested and the method by which it is integrated to form viable cargo elements. Work Package 4 is responsible for the electric power system for Space Station Freedom, and was delegated the authority to develop a photovoltaic (PV) power module cargo element. The PV power module consists of several unique assemblies. The first of these is the combined solar array/beta gimbal assembly. The remaining assemblies form the single combined integrated equipment assembly for each PV power module. These three combined assemblies are packaged into a launch cradle to form the PV power module cargo element, which is placed in the cargo bay of the Shuttle Orbiter for transportation to orbit. Various constraints determine the packaging options for the three PV power module combined assemblies. The size and shape of the combined assemblies in relation to the Shuttle Orbiter cargo bay dimensions and other manifested hardware are ultimately a factor in determining the acceptable packaging schemes for the PV power module cargo element. Several packaging options for the PV power module cargo element are presented. These options are discussed in terms of their impact on the overall flight hardware manifest as determined by the various constraints.

Hoberecht, Mark A.↗

The effect of interplanetary trajectory options on a manned Mars aerobrake configuration

Manned Mars missions originating in low Earth orbit (LEO) in the time frame 2010 to 2025 were analyzed to identify preferred mission opportunities and their associated vehicle and trajectory characteristics. Interplanetary and Mars atmospheric trajectory options were examined under the constraints of an initial manned exploration scenario. Two chemically propelled vehicle options were considered: (1) an all propulsive configuration, and (2) a configuration which employs aerobraking at Earth and Mars with low lift/drag (L/D) shapes. Both the interplanetary trajectory options as well as the Mars atmospheric passage are addressed to provide a coupled trajectory simulation. Direct and Venus swingby interplanetary transfers with a 60 day Mars stopover are considered. The range and variation in both Earth and Mars entry velocity are also defined. Two promising mission strategies emerged from the study: (1) a 1.0 to 2.0 year Venus swingby mission, and (2) a 2.0 to 2.5 year direct mission. Through careful trajectory selection, 11 mission opportunities are identified in which the Mars entry velocity is between 6 and 10 km/sec and Earth entry velocity ranges from 11.5 to 12.5 km/sec. Simulation of the Earth return aerobraking maneuver is not performed. It is shown that a low L/D configuration is not feasible for Mars aerobraking without substantial improvements in the interplanetary navigation system. However, even with an advanced navigation system, entry corridor and aerothermal requirements restrict the number of potential mission opportunities. It is also shown that for a large blunt Mars aerobrake configuration, the effects of radiative heating can be significant at entry velocities as low as 6.2 km/sec and will grow to dominate the aerothermal environment at entry velocities above 8.5 km/sec. Despite the additional system complexity associated with an aerobraking vehicle, the use of aerobraking was shown to significantly lower the required initial LEO weight. In comparison with an all propulsive mission, savings between 19 and 59 percent were obtained depending upon launch date.

Braun, Robert D.↗

Mars Rover options

The paper will describe a nested set of Mars Rover options which are being considered. The option ranges include: low-to-high levels of technology, especially in autonomous activities; low (400 kg) to high (1500 kg) allowable mass; and coarse (100-meter) to fine (1-meter) knowledge of the terrain to be traversed. The options which will be selected for further study at the end of FY 1988 will be heavily dependent on such factors as the availability of precursor mission data (especially imaging) and the bounds on mass and volume imposed by the launch, Martian entry, and landing systems.

Pivirotto, Donna Shirley↗

Launch packaging options for the PV power module cargo element

NASA recently embarked on the Space Station Freedom program, which will utilize the Shuttle Orbiter for transportation to orbit. Each flight is unique in terms of the hardware that is manifested and the method by which it is integrated to form viable cargo elements. Various constraints determine the packaging options for the three PV power module combined assemblies. Several packaging options for the PV power module cargo element are presented. These options are discussed in terms of their impact on the overall flight hardware manifest as determined by the various constraints.

Hoberecht, Mark A.↗

Advanced propulsion options for the Mars cargo mission

Several advanced propulsion options for a split-mission piloted Mars exploration scenario are presented. The primary study focus is on identifying concepts that can reduce total initial mass in low earth orbit (IMLEO) for the cargo delivery portion of the mission; in addition, concepts that can reduce the trip time of the piloted option are assessed. The propulsion options considered are nuclear thermal propulsion, solar sails, multimegawatt-class nuclear electric propulsion, solar electric propulsion, magnetic sails, mass drivers, rail guns, solar thermal rockets, beamed-energy propulsion systems, and tethers. For the cargo mission, solar sails are found to provide the greatest mass savings over the baseline chemical system, although they suffer from having very long trip times; a good performance compromise between a low IMLEO and a short trip time can be obtained using multimegawatt-class nuclear electric propulsion systems.

Frisbee, Robert H.↗

Advanced propulsion options for human exploration of Mars

The various propulsion options that can meet NASA's primary mission objectives of the Space Exploration Initiative are discussed. Technology developments and projections are considered for solar electric propulsion, nuclear electric propulsion, solid core nuclear thermal rockets, and gas core nuclear thermal rockets. Mission scenarios appropriate to the individual propulsion options are presented, and the advantages and drawbacks of each option are described.

Cothran, B. R.↗

Early Track NEP system options for SEI missions

A development option for nuclear electric propulsion, the 'Early Track' option, is considered from system and mission application viewpoints. The intent of this development option is to address demanding missions of the future, such as robotic outer planet exploration or the Space Exploration Initiative. The 'Early Track' scheme utilizes existing technologies, such as the SP-100 space reactor and radiator components, as well as subsystems scalable from existing programs, such as 50 to 100 kWe ion thrusters. Up to 1.5 MWe of powder can be generated by the existing 2.4 MWt SP-100 reactor through the use of dynamic Rankine or Brayton power conversion. The performance characteristics of these systems are projected, and assessed for SEI missions currently under consideration.

Gilland, J. H.↗

Takeoff Performance Monitoring System display options

The development of displays for the Takeoff Performance Monitoring System (TPMS) is described with attention given to the three concepts prepared for commercial applications. The TPMS algorithm is described and related to the display requirements for pilots of two-engine airplanes. Head-up and -down displays are considered for displaying the simple advisory data which indicate whether the takeoff is a 'Go' or 'No-go' based on engine failure, acceleration error, and runway length. Six pilots are shown the three display options which include: (1) basic information; (2) basic data with 'Go/No-go' advisory flags; and (3) basic data, advisory flags, and an abort-warning symbol. The pilots tended to select the option with the most advisory data available, but the inconclusive preference study led to the concept of presenting all three configurations as possible display options for the TPMS.

Middleton, David B.↗

Space Storable Rocket Technology program (SSRT). Option 1 program

The Space Storable Rocket Technology (SSRT) Option 1 Program was initiated in October 1991 after completion of the Basic Program. The program was restructured in mid-July 1992 to incorporate a Rhenium Technology Task and reduce the scope of the LO2-N2H4 engine development. The program was also extended to late February 1993 to allow for the Rhenium Technology Task completion. The Option 1 Program was devoted to evaluation of two new injector elements, evaluation of two different methods of thermal protection of the injector, evaluation of high temperature material properties of rhenium and evaluation of methods of joining the rhenium thrust chamber to the columbium injector and nozzle extension. In addition, critical experiments were conducted (Funded by Option 2) to evaluate mechanisms to understand the effects of GO2 injection into the chamber, helium injection into the main LO2, effect of the splash plate and effect of decreasing the aspect ratio of the 120-slot (-13a) element. The performance and thermal models were used to further correlate the test results with analyses. The results of the work accomplished are summarized.

Chazen, Melvin L.↗

The Far Ultraviolet (FUV) auroral imager for the Inner Magnetospheric Imager (IMI) mission: Options

The change from an intermediate mission (cost ceiling of $300 million) to a solar-terrestrial probe class mission (cost ceiling of $150 million) will require some major changes in the configuration of the IMI mission. One option being considered is to move to a small spin-stabilized spacecraft (with no despun platform) which could be launched with a smaller Taurus or Conestoga class booster. Such a change in spacecraft type would not present any fundamental problems (other than restrictions on mass and power) for the He plus 304 A plasmasphere imager, the high and low energy neutral atom imagers, and the geocoronal imager, but would present a challenge for the FUV auroral imager since the original plan called for this instrument to operate from a despun platform. Since the FUV instrument is part of the core payload it cannot be dropped from the instrument complement without jeopardizing the science goals of the mission. A way must be found to keep this instrument and to allow it to accomplish most, if not all, of its science objectives. One of the subjects discussed are options for building an FUV instrument for a spinning spacecraft. Since a number of spinning spacecraft have carried auroral imagers, a range of techniques exists. In addition, the option of flying the FUV imager on a separate micro-satellite launched with the main IMI spacecraft or with a separate pegasus launch, was considered and is discussed.

Wilson, Gordon R.↗

Lunar Transportation Facilities and Operations Study, option 1

Throughout the Option I period of the Lunar Transportation Facilities and Operations Study (LTFOS), McDonnell Douglas Space Systems Company - Kennedy Space Center (MDSSC-KSC) provided support to both the Planetary Surface Systems (PSS) Office at the National Aeronautics and Space Administration (NASA) at the Johnson Space Center and to the Flight and Ground Systems Projects Office (Payload Projects Management) at the Kennedy Space Center. The primary objective of the Option I phase of the study was to assist the above NASA centers in developing Space Exploration Initiative (SEI) concepts. MDSSC-KSC conducted three analyses which provided launch and landing detail to the proposed exploration concepts. One analysis, the Lunar Ejecta Assessment, was conducted to determine the effects of launch and landing a vehicle in a dusty environment. A second analysis, the Thermal/Micrometeoroid Protection Trade Study, was refined to determine the impacts that Reference Architecture Option 5A would have on thermal/micrometeoroid protection approaches. The third analysis, the Centaur Prelaunch Procedure Analysis, used a Centaur prelaunch test and checkout flow to identify key considerations that would be important if a Lunar Excursion Vehicle (LEV) was to use an expander cycle liquid oxygen-liquid hydrogen engine. Several 'quick look' assessments were also conducted. One quick look assessment, the Storable Propellant Quick Look Assessment, was conducted to identify design considerations that should be made if storable propellants were to be used instead of liquid oxygen and liquid hydrogen. The LEV Servicer Maintenance Analysis provided an early look at the effort required to maintain an LEV Servicer on the lunar surface. Also, support was provided to the PSS Logistics Manager to develop initial LEV Servicer cost inputs. Consideration was given to the advanced development that must be provided to accomplish a lunar and/or Mars mission. MDSS-KSC also provided support to both MASE and PSS by reviewing and commenting on architecture documents and concept definitions to ensure adequate considerations were given to the launch and landing function of an exploration initiative.

Source record↗

Vehicle and Mission Design Options for the Human Exploration of Mars/Phobos Using "Bimodal" NTR and LANTR Propulsion

The nuclear thermal rocket (NTR) is one of the leading propulsion options for future human missions to Mars because of its high specific impulse (Isp-850-1000 s) capability and its attractive engine thrust-to-weight ratio (approximately equal 3-10). To stay within the available mass and payload volume limits of a "Magnum" heavy lift vehicle, a high performance propulsion system is required for trans-Mars injection (TMI). An expendable TMI stage, powered by three 15 thousand pounds force (klbf) NTR engines is currently under consideration by NASA for its Design Reference Mission (DRM). However, because of the miniscule burnup of enriched uranium-235 during the Earth departure phase (approximately 10 grams out of 33 kilograms in each NTR core), disposal of the TMI stage and its engines after a single use is a costly and inefficient use of this high performance stage. By reconfiguring the engines for both propulsive thrust and modest power generation (referred to as "bimodal" operation), a robust, multiple burn, "power-rich" stage with propulsive Mars capture and reuse capability is possible, A family of modular "bimodal" NTR (BNTR) vehicles are described which utilize a common "core" stage powered by three 15 klbf BNTRs that produce 50 kWe of total electrical power for crew life support, an active refrigeration / reliquification system for long term, "zero-boiloff" liquid hydrogen (LH 2 ) storage, and high data rate communications. An innovative, spine-like "saddle truss" design connects the core stage and payload element and is open underneath to allow supplemental "in-line" propellant tanks and contingency crew consumables to be easily jettisoned to improve vehicle performance. A "modified" DRM using BNTR transfer vehicles requires fewer transportation system elements, reduces IMLEO and mission risk, and simplifies space operations. By taking the next logical step--use of the BNTR for propulsive capture of all payload elements into Mars orbit--the power available in Mars orbit grows to 150 kWe compared to 30 kWe for the DRM. Propulsive capture also eliminates the complex, higher risk aerobraking and capture maneuver which is replaced by a simpler reentry using a standardized, lower mass "aerodescent" shell. The attractiveness of the "all BNTR" option is further increased by the substitution of the lightweight, inflatable "TransHab" module in place of the heavier, hard-shell hab module. Use of TransHab introduces the potential for propulsive recovery and reuse of the BNTR/ERV. It also allows the crew to travel to and from Mar on the same BNTR transfer vehicle thereby cutting the duration of the ERV mission in half--from approximately 4.7 to 2.5 years. Finally, for difficult Mars options, such as Phobos rendezvous and sample return missions, volume (not mass) constraints limit the performance of the "all LH 2 " BNTR stage. The use of "LOX-augmented" NTR (LANTR) engines, operating at a modest oxygen-to-hydrogen mixutre ratio (MR) of 0.5, helps to increase "bulk" propellant density and total thrust during the TMI burn. On all subsequent burns, the bimodal LANTR engines operate on LH 2 only (MR=0) to maximize vehicle performance while staying within the lift capability of two Magnum launches.

Nuclear thermal rocket↗