Search NASA⌕ Search

SEARCH · Search NASA

Results for “Orbiter Landing Loads”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Comparative analysis of on-orbit dynamic performance of several large antenna concepts

A comparative analysis of the on-orbit dynamic performance of four large anetanna concepts is presented. Among the antenna concepts evaluated are: the box truss; tetrahedral truss; warp-radial rib; and the hoop and column antenna designs. The characteristics and magnitudes of the antennas' dynamic response were evaluated in terms of structural displacements and member loads incurred during various slew-rate maneuvers. The results of the dynamic response analysis are compared to the design requirements of the Land Mobile Satellite System (LMSS) with respect to surface accuracy, decenter, defocus, and angular rocking. Comments are made on the effectiveness of structural damping and the application of active controls for vibrational response reduction. Schematic illustrations of the antenna design concepts are provided.

Andersen, G. C.↗

Tethered Space Satellite-1 (TSS-1): Wound About a Bolt

In the early 1990's US and Italian scientists collaborated to study the electrodynamics on a long tether between two satellites as it moved through the electrically charged portion of Earth's atmosphere called the ionosphere. Potential uses for the electrical current induced in the long wire include power and thrust generation for a satellite, momentum exchange, artificial gravity, deployment of sensors or antennas, and gravity-gradient stabilization. The Tethered Space Satellite (TSS) was a first-of-its-kind experiment with long tethers in space. It consisted of a satellite with science experiments attached to a 12.5 mile long, very thin (0.10 inch diameter) copper wire assembly wound around a spool in the deployer reel mechanism. The whole mechanism sits on a pallet that is installed into the Shuttle bay. At an altitude of 160 nautical miles above earth, the satellite would be deplodeployed from the Shuttle bay by raising it on a boom facing away from Earth. Once cleared of the bay, the deployer mechanism would slowly feed out the 12-plus miles of tether. Scientific data would be collected throughout the operation, after which the satellite would be reeled back in. A receiver spool to catch the 12.5 mile tether as it was being unwound by the deployer reel mechanism was set up to do the system-level test of deployer real mechanism prior to installing the loaded pallet into the Shuttle bay. The system level tests were required before the pallet could be installed into the Space Shuttle cargo bay. A few months before flight, the system level tests, including unreeling and reeling the tether, were completed at Kennedy Space Center (KSC) and the TSS payload was installed onto the Spacelab pallet. Some of this testing equipment was then shipped back to the contractor, Martin Marietta. Integration with the Shuttle began. Systems-level load analyses, which cannot be run until all information about each payload is finalized, was run in parallel with the physical integration of the hardware into the Shuttle payload bay. An analysis, called Coupled loads analysis, incorporates any updates to the model due to system level tests of all the different payloads, and any changes that were found during integration. Engineering analysis examines the worst case scenarios for the loads the hardware will see. The two times during the mission where the dynamic loads are the worst were 1) the first 10-second portion of Shuttle lift off, and 2) a 2-second time during landing when the landing gears hit the ground. The coupled loads analysis using the final verification loads showed that a single bolt attaching the deployer reel mechanism to the support structure had a "negative margin" - which is an indication that it might fail - during touch down. Hardware certification rules do not allow for hardware to fly with negative margins. A structural failure of one payload could have serious or catastrophic consequences to other payloads, or may significantly damage the Orbiter. The issue had to be resolved before the flight.

O'Connor, Brian↗

Technical issues in dynamics and control of large space structures

Examples of large space systems currently being considered by NASA include a large communications antenna system (the Land Mobile Satellite System), a precision antenna system (the Large Deployable Reflector System), and a preliminary concept for NASA's space station. Each system has low natural vibration frequencies, stringent pointing requirements, and, for the antennas, demanding surface accuracy requirements. A review is provided of the progress being made in structural ground tests with respect to surface accuracy, deployment, and erection of large structures. Attention is given to the dynamic loads on large space structures, on-orbit testing, space vibration control devices, and the characteristics of distributed control.

Card, M. F.↗

Entry aeromaneuvering capabilities of transatmospheric vehicles

The landing footprint of a conceptual high-lift transatmospheric vehicle is defined for aeromaneuvering entry from a typical low-earth orbit. The flight strategy for trajectory construction to maximize the landing area by extending downrange and crossrange as far as possible is developed in four phases by optimal programming of the vehicle's roll angle. Trajectories that reach any given landing site were calculated with the corresponding heating rates at three critical vehicle locations (stagnation point, wing leading edge, and body centerline). An optimization methodology was developed that demonstrates the trades between crossrange, peak heating and total heat loads as a function of three key flight parameters (altitude, flight-path angle, and vehicle roll angle). The maximum extent of the landing footprint was found to be 29,690 km downrange and 6560 km crossrange. Large variations in the ballistic coefficient had negligible effect on the extent of the footprint but could significantly affect heating. However, the footprint's longitude was displaced downstream or upstream with increasing or decreasing ballistic coefficient, respectively.

Menees, Gene P.↗

STS-110 Post Flight Presentation

The crewmembers of STS-110 (Michael Bloomfield, Commander; Stephen Frick, Pilot; Mission Specialists Ellen Ochoa, Jerry Ross, Rex Walheim, Steve Smith and Lee Morin) narrate this video as footage from the mission is seen, starting with crew suit up, and launch of Atlantis. Various on-orbit activities are shown, including the opening of the payload bay doors, the rendezvous and docking of Atlantis with the International Space Station (ISS). Crew activities shown include loading operations, extravehicular activities (EVAs), robot arm operation and crew living conditions. Specific EVAs footage includes the unloading of the S0 truss from the Atlantis payload bay and installation onto the ISS. The crew is also shown preparing the Mobile Transporter for future use. The video ends with Atlantis undocking from the ISS and landing at Kennedy Space Center.

Source record↗

Review of End-of-Life Thermal Control Coating Performance

White thermal control coatings capable of long term performance are needed for Fission Surface Power (FSP) where heat from a nuclear reactor placed on the surface of the Moon must be rejected to the environment. The threats to thermal control coating durability on the lunar surface are electrons, protons, and ultraviolet radiation. The anticipated damage to the coating is a gradual darkening over time. The increase in solar absorptance would, in essence, add a cyclic heat load to the radiator. The greater the darkening, the greater the added heat load. The cyclic heat load could ultimately impart a cyclic influence on FSP system performance. No significant change in emittance is anticipated. Optical properties degradation data were found in the open literature for the Z-93 series of thermal control paints. Additional optical properties degradation data were found from the Lunar Orbiter V mission, the Optical Properties Monitor, and the Materials International Space Station Experiment. Anticipated end-of-life thermal control coating performance for a FSP installation is postulated. With the FSP installation located away from landing and launching areas, and out of line-of-sight, lunar dust from human activity may not be a threat. The benefits of investing in next generation thermal control paint chemistry are explored.

Jaworske, Donald A.↗

Orion Multi-Purpose Crew Vehicle Solving and Mitigating the Two Main Cluster Pendulum Problem

The Orion Multi-purpose Crew Vehicle (MPCV) Orion spacecraft will return humans from beyond earth's orbit, including Mars and will be required to land 20,000 pounds of mass safely in the ocean. The parachute system nominally lands under 3 main parachutes, but the system is designed to be fault tolerant and land under 2 main parachutes. During several of the parachute development tests, it was observed that a pendulum, or swinging, motion could develop while the Crew Module (CM) was descending under two parachutes. This pendulum effect had not been previously predicted by modeling. Landing impact analysis showed that the landing loads would double in some places across the spacecraft. The CM structural design limits would be exceeded upon landing if this pendulum motion were to occur. The Orion descent and landing team was faced with potentially millions of dollars in structural modifications and a severe mass increase. A multidisciplinary team was formed to determine root cause, model the pendulum motion, study alternate canopy planforms and assess alternate operational vehicle controls & operations providing mitigation options resulting in a reliability level deemed safe for human spaceflight. The problem and solution is a balance of risk to a known solution versus a chance to improve the landing performance for the next human-rated spacecraft.

Ali, Yasmin↗

Mars Sample Return Landed with Red Dragon

A Mars Sample Return (MSR) mission is the highest priority science mission for the next decade as recommended by the recent Decadal Survey of Planetary Science. However, an affordable program to carry this out has not been defined. This paper describes a study that examined use of emerging commercial capabilities to land the sample return elements, with the goal of reducing mission cost. A team at NASA Ames examined the feasibility of the following scenario for MSR: A Falcon Heavy launcher injects a SpaceX Dragon crew capsule and trunk onto a Trans Mars Injection trajectory. The capsule is modified to carry all the hardware needed to return samples collected on Mars including a Mars Ascent Vehicle (MAV), an Earth Return Vehicle (ERV) and Sample Collection and Storage hardware. The Dragon descends to land on the surface of Mars using SuperSonic Retro Propulsion (SSRP) as described by Braun and Manning [IEEEAC paper 0076, 2005]. Samples are acquired and deliverd to the MAV by a prelanded asset, possibly the proposed 2020 rover. After samples are obtained and stored in the ERV, the MAV launches the sample-containing ERV from the surface of Mars. We examined cases where the ERV is delivered to either low Mars orbit (LMO), C3 = 0 (Mars escape), or an intermediate energy state. The ERV then provides the rest of the energy (delta V) required to perform trans-Earth injection (TEI), cruise, and insertion into a Moon-trailing Earth Orbit (MTEO). A later mission, possibly a crewed Dragon launched by a Falcon Heavy (not part of the current study) retrieves the sample container, packages the sample, and performs a controlled Earth re-entry to prevent Mars materials from accidentally contaminating Earth. The key analysis methods used in the study employed a set of parametric mass estimating relationships (MERs) and standard aerospace analysis software codes modified for the MAV class of launch vehicle to determine the range of performance parameters that produced converged spacecraft designs capable of meeting mission requirements. Subsystems modeled in this study included structures, power system, propulsion system, nose fairing, thermal insulation, actuation devices, and GN&C. Best practice application of loads and design margins for all resources were used. Both storable and cryogenic propellant systems were examined. The landed mass and lander capsule size provide boundary conditions for the MAV design and packaging. We estimated the maximum mass the Dragon capsule is capable of landing. This and the volume capability to store the MAV was deduced from publically available data from SpaceX as well as our own engineering and aerodynamic estimates. Minimum gross-liftoff mass (GLOM) for the MAV were obtained for configurations that used pump-fed storable bi-propellant rocket engines for both the MAV and the ERV stage. The GLOM required fits within our internal estimate of the mass that Dragon can land at low elevation/optimal seasons on Mars. Based on the analysis, we show that a single Mars launch sample return mission is feasible using current commercial capabilities to deliver the return spacecraft assets.

Mars Ascent Vehicle (MAV)↗

Cytochemical localization of reserves during seed development in Arabidopsis thaliana under spaceflight conditions

Successful development of seeds under spaceflight conditions has been an elusive goal of numerous long-duration experiments with plants on orbital spacecraft. Because carbohydrate metabolism undergoes changes when plants are grown in microgravity, developing seed storage reserves might be detrimentally affected during spaceflight. Seed development in Arabidopsis thaliana plants that flowered during 11 d in space on shuttle mission STS-68 has been investigated in this study. Plants were grown to the rosette stage (13 d) on a nutrient agar medium on the ground and loaded into the Plant Growth Unit flight hardware 18 h prior to lift-off. Plants were retrieved 3 h after landing and siliques were immediately removed from plants. Young seeds were fixed and processed for microscopic observation. Seeds in both the ground control and flight plants are similar in their morphology and size. The oldest seeds from these plants contain completely developed embryos and seed coats. These embryos developed radicle, hypocotyl, meristematic apical tissue, and differentiated cotyledons. Protoderm, procambium, and primary ground tissue had differentiated. Reserves such as starch and protein were deposited in the embryos during tissue differentiation. The aleurone layer contains a large quantity of storage protein and starch grains. A seed coat developed from integuments of the ovule with gradual change in cell composition and cell material deposition. Carbohydrates were deposited in outer integument cells especially in the outside cell walls. Starch grains decreased in number per cell in the integument during seed coat development. All these characteristics during seed development represent normal features in the ground control plants and show that the spaceflight environment does not prevent normal development of seeds in Arabidopsis.

STS-68 Shuttle Project↗

Pluto Hop, Skip, and Jump

This is the Final Report from Global Aerospace Corporation on this NIAC effort (Grant Nos.: NNX17AJ71G and 80NSSC18K0062) to develop the Pluto Hop, Skip, and Jump mission concept. We sought out to establish the feasibility of using a large inflatable drag device to decelerate and land on Pluto from interplanetary speed (~14 km/s) using only the Pluto atmosphere and just a few kilograms of propellant. The design and analysis efforts in Phase I indicated that this is feasible. Aerodynamic heating and loads were found to be orders of magnitude less than typical planetary entries due to the ultra-low ballistic coefficient craft and the low density and large scale height of the Pluto atmosphere. The deceleration system is capable of delivering a 200-kg lander-hopper to the surface or inserting an orbiter of a similar mass using aerocapture. Mission analysis work led to a reference mission with Earth launch in 2029, Jupiter assist in 2030, and Pluto arrival in 2040.

Goldman, Benjamin↗

Shuttle operations, maintenance, and safety.

Review of a systematic search for practical solutions in the areas of space shuttle cryogenics, flight operations, ground operations, and safety. The insulation of the main-propulsion hydrogen tanks for both booster and orbiter to prevent water condensation is considered, as well as the insulation of the orbiter's orbital cryogen tanks for ground storage. Two approaches to the feeding of cryogens are outlined - namely, an approach depending on a periodic axial force to settle propellants and refill the basket, and a method of continuous feed through a capillary network adjacent to the walls throughout the tank, the latter method being independent of vehicle thrust. The development of reliable cryogen components is discussed, and the results of studies of launch-abort problems, shuttle approach and landing techniques, and the tolerance of ?deconditioned' crew and passengers to shuttle reentry g-loads are cited.

Beddingfield, S. T.↗

Space Shuttle development update

The development efforts, since the STS-4 flight, in the Space Shuttle (SS) program are presented. The SS improvements introduced in the last two years include lower-weight loads, communication through the Tracking and Data Relay Satellite, expanded extravehicular activity capability, a maneuvering backpack and the manipulator foot restraint, the improvements in thermal projection system, the 'optional terminal area management targeting' guidance software, a rendezvous system with radar and star tracker sensors, and improved on-orbit living conditions. The flight demonstrations include advanced launch techniques (e.g., night launch and direct insertion to orbit); the on-orbit demonstrations; and added entry and launching capabilities. The entry aerodynamic analysis and entry flight control fine tuning are described. Reusability, improved ascent performance, intact abort and landing flexibility, rollout control, and 'smart speedbrakes' are among the many improvements planned for the future.

Brand, V.↗

Payload Performance Analysis for a Reusable Two-Stage-to-Orbit Vehicle

This paper investigates a unique approach in the development of a reusable launch vehicle where, instead of designing the vehicle to be reusable from its inception, as was done for the Space Shuttle, an expendable two stage launch vehicle is evolved over time into a reusable launch vehicle. To accomplish this objective, each stage is made reusable by adding the systems necessary to perform functions such as thermal protection and landing, without significantly altering the primary subsystems and outer mold line of the original expendable vehicle. In addition, some of the propellant normally used for ascent is used instead for additional propulsive maneuvers after staging in order to return both stages to the launch site, keep loads within acceptable limits and perform a soft landing. This paper presents a performance analysis that was performed to investigate the feasibility of this approach by quantifying the reduction in payload capability of the original expendable launch vehicle after accounting for the mass additions, trajectory changes and increased propellant requirements necessary for reusability. Results show that it is feasible to return both stages to the launch site with a positive payload capability equal to approximately 50 percent of an equivalent expendable launch vehicle. Further discussion examines the ability to return a crew/cargo capsule to the launch site and presents technical challenges that would have to be overcome.

Tartabini, Paul V.↗

STS-108-Endeavour/ISS UF-1/Pre-Launch/Launch/On Orbit/Landing/Crew Egress

This video shows footage from throughout the STS-108 mission. The crew of Space Shuttle Enveavour (Commander Dominic Gorie, Pilot Mark Kelly, and Mission Specialists Linda Godwin and Daniel Tani) together with the International Space Station (ISS) Expedition 4 crew (Commander Yuri Onufrienko and Flight Engineers Carl Walz and Daniel Bursch) are shown at their pre-flight meal, putting on flight suits, and boarding Endeavour. A special segment shows maintainance performed on Endeavour prior to the orbiter reaching the launch pad. Endeavour is shown arriving at Kennedy Space Center mounted on a 747, and is prepared for launch in the Orbiter Processing Facility. The mating of the External Tank and the Solid Rocket Boosters in shown in the Vehicle Assembly Building (VAB). The Raffaello Multi-Purpose Logistics Module (MPLM) and the Starshine satellite are shown being loaded into Endeavour's payload bay. Launch views include: Beach Tracker, VAB, Pad-B, Tower-1, DLTR-3, Grandstand, DOAMS, Playalinda DOAMS (with a close-up of the Endeavour's main engine, and UCS-23. On-orbit tasks include: docking with the ISS, greetings and enthusiastic crew transfer with the Expedition 3 crew (Commander Frank Culbertson, Jr. and Flight Engineers Mikhail Turin and Vladimir Dezhurov), Mission Control and crew reflections upon the 9/11 attacks, Raffaello docking with and being removed from the ISS, and an extravehicular activity (EVA) by Godwin and Tani. Landing views include: VAB, Tower-1, Mid-Field, South End SLF, North End SLF, Tower-2, Playalinda DOAMS, and Pilot Point of View (PPOV). Each of the four Endeavour crew members gives a short speech after landing.

Source record↗

Study and development of a cryogenic heat exchanger for life support systems

A prototype cryogenic heat exchanger for removal of waste heat from a spacecraft environmental control life support system was developed. The heat exchanger uses the heat sink capabilities of the cryogenic propellants and, hence, can operate over all mission phases from prelaunch to orbit, to post landing, with quiescent periods during orbit. A survey of candidate warm fluids resulted in the selection of E-2, a fluorocarbon compound, because of its low freezing point and high boiling point. The final design and testing of the heat exchanger was carried out, however, using Freon-21, which is similar to E-2 except for its low boiling point. This change was motivated by the desire for cost effectiveness of the experimental program. The transient performance of the heat exchanger was demonstrated by an analog simulation of the heat sink system. Under the realistic transient heat load conditions (20 sec ramp from minimum to maximum Freon-21 inlet temperature), the control system was able to maintain the warm fluid outlet temperature within + or - 3 F. For a 20-sec ramp from 0 F to -400 F in the hydrogen inlet temperature, at maximum heat load, the warm fluid outlet temperature was maintained within + or - 7 F.

Soliman, M. M.↗

Acoustic fatigue: Overview of activities at NASA Langley

A number of aircraft and spacecraft configurations are being considered for future development. These include high-speed turboprop aircraft, advanced vertical take-off and landing fighter aircraft, and aerospace planes for hypersonic intercontinental cruise or flight to orbit and return. Review of the acoustic environment expected for these vehicles indicates levels high enough that acoustic fatigue must be considered. Unfortunately, the sonic fatique design technology used for current aircraft may not be adequate for these future vehicles. This has resulted in renewed emphasis on acoustic fatigue research at the NASA Langley Research Center. The overall objective of the Langley program is to develop methods and information for design of aerospace vehicles that will resist acoustic fatigue. The program includes definition of the acoustic loads acting on structures due to exhaust jets of boundary layers, and subsequent determination of the stresses within the structure due to these acoustic loads. Material fatigue associated with the high frequency structural stress reversal patterns resulting from acoustic loadings is considered to be an area requiring study, but no activity is currently underway.

Mixson, John S.↗

Fuel cell powerplant operation in Apollo spacecraft.

Primary electrical power for loads in the Apollo Command and Service Modules is furnished by a system of three fuel cell powerplants. The powerplants convert cryogenic hydrogen and oxygen into direct current. Water formed in the fuel cell reactions is supplied to the spacecraft for crew use. Waste heat is rejected through a coolant loop to a spacecraft radiator. The ability of the fuel cell to meet its voltage-power requirements and to control its own operating temperature under the environmental extremes of launch, ascent, earth orbit, translunar flight, and lunar orbit was demonstrated on successively more difficult missions leading up to the first lunar landing.

Ching, A. C.↗

Test Plan. GCPS Task 4, subtask 4.2 thrust structure development

The Single Stage To Orbit (SSTO) vehicle is designed to lift off from a vertical position, go into orbit, return to earth for a horizontal landing, and be reusable for the next mission. (NASA baseline only) In order to meet its performance goals, the SSTO relies on light weight structure and the use of 8 tri-propellant engines. These engines are mounted to the thrust structure. This test plan addresses selection of the material for this structure, and the integrity of the design through testing of elements and a full-scale subcomponent. This test plan supports the development of the design for an advanced composite thrust structure for a Single Stage to Orbit manned, heavy launch vehicle. The thrust structure is designed to transmit very high thrust loads from the engines to the rest of the vehicle (see Figure 1 ). The thrust structure will also be used for primary attachment of the twin vertical tails and possibly act as the aft attach point for the wing. The combination of high loading, high vibration, long service life and high acoustic environments will need to be evaluated by tests. To minimize design risk, a building block approach will be used. We will first screen materials to determine which materials show the most promise for this application. Factors in this screening will be the suitability of these materials for chosen design concepts, particularly concerning specific strength, environmental compatibility and applicability to fabrication processes. Next we will characterize two material systems that will be used in the design; the characterization will allow us to generate preliminary design data that will be used for the analysis. Element testing will be performed to evaluate critical structural locations under load. Final testing on the full scale test article will be performed to verify the design and to demonstrate predictability of the analysis. Additionally, risks associated with fabricating full scale thrust structures will be reduced through testing activities. One of the major concerns that stems from full scale fabrication is the realities of size and the associated complexities of handling, manufacturing, and assembly. The need exists to fabricate, assemble and test_representative joint specimens to achieve_confidence in the design and manufacturing technologies being proposed.

Greenberg, H. S.↗