Vehicle routing for the last mile of power system restoration

This paper studied a novel problem in power system restoration: the Power Restoration Vehicle Routing Problem (PRVRP). The goal of PRVRPs is to decide how coordinate repair crews effectively in order to recover from blackouts as fast as possible after a disaster has occurred. PRVRPs are complex problems that combine vehicle routing and power restoration scheduling problems. The paper proposed a multi-stage optimization algorithm based on the idea of constraint injection that meets the aggressive runtime constraints necessary for disaster recovery. The algorithms were validated on benchmarks produced by the Los Alamos National Laboratory, using the infrastructure of the United States. The disaster scenarios were generated by state-of-the-art hurricane simulation tools similar to those used by the National Hurricane Center. Experimental results show that the constraint-injection algorithms can reduce the blackouts by 50% or more over field practices. Moreover, the results show that the constraint-injection algorithm using large neighborhood search over a blackbox simulator provide competitive quality and scales better than using a MIP solver on the subproblems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hydrogen Fuel Cell Performance as Telecommunications Backup Power in the United States

Working in collaboration with the U.S. Department of Energy (DOE) and industry project partners, the National Renewable Energy Laboratory (NREL) acts as the central data repository for the data collected from real-world operation of fuel cell backup power systems. With American Recovery and Reinvestment Act of 2009 (ARRA) co-funding awarded through DOE's Fuel Cell Technologies Office, more than 1,300 fuel cell units were deployed over a three-plus-year period in stationary, material handling equipment, auxiliary power, and backup power applications. This surpassed a Fuel Cell Technologies Office ARRA objective to spur commercialization of an early market technology by installing 1,000 fuel cell units across several different applications, including backup power. By December 2013, 852 backup power units out of 1,330 fuel cell units deployed were providing backup service, mainly for telecommunications towers. For 136 of the fuel cell backup units, project participants provided detailed operational data to the National Fuel Cell Technology Evaluation Center for analysis by NREL's technology validation team. NREL analyzed operational data collected from these government co-funded demonstration projects to characterize key fuel cell backup power performance metrics, including reliability and operation trends, and to highlight the business case for using fuel cells in these early market applications. NREL's analyses include these critical metrics, along with deployment, U.S. grid outage statistics, and infrastructure operation.

30 DIRECT ENERGY CONVERSION↗

Distribution System Blackstart and Restoration Using DERs and Dynamically Formed Microgrids

Extreme weather events have led to long-duration outages in the distribution system (DS), necessitating novel approaches to blackstart and restore the system. Existing blackstart solutions utilize blackstart units to establish multiple microgrids (MGs), sequentially energize non-blackstart units, and restore loads. However, these approaches often result in isolated MGs. In DERs-aided blackstart, the continuous operation of these MGs is limited by the finite energy capacity of commonly used blackstart units like battery energy storage (BES)-based gridforming inverters (GFMIs). To address this issue, this article proposes a holistic blackstart and restoration framework that incorporates synchronization between dynamic MGs and the entire DS with the transmission grid (TG). To support synchronization, we leveraged virtual synchronous generator-based control for GFMIs to estimate their frequency response to load pick-up events using only initial/final quasi-steady-state points. Subsequently, a synchronization switching condition is developed to model synchronizing switches, aligning them seamlessly with a linearized branch flow problem. Finally, we designed a bottomup blackstart and restoration framework that considers the switching structure of the DS, energizing/synchronizing switches, DERs with grid-following inverters, and BES-based GFMIs with frequency security constraints. In conclusion, the proposed framework is validated in IEEE-123-bus system, considering cases with two and four GFMIs under various TG recovery instants.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The SURE House (Solar Decathlon 2015)

Coastal towns and cities across the Northeastern US, with their high population density, aged utility infrastructure, and unique geography, are increasingly vulnerable to climate change related storm events. In October 2012 superstorm Sandy highlighted the fragility of our current coastal building types and made clear the need for a new model of design and construction which works to understand and mitigate these weaknesses. Dramatic changes in public policy, championed by both The Federal Emergency Management Agency (FEMA) and the National Flood Insurance Program (NFIP) are driving the rebuilding of these shore communities, often resulting in costly renovations, un-sustainable neighborhood configurations and in direct conflict with concurrent government policies such as The American with Disabilities Act (ADA). The SURE HOUSE demonstrates a series of new design solutions to these conflicting public policies and environmental imperatives. At Stevens Institute of Technology, the 2015 Solar Decathlon started with the challenge: Can we design a home for coastal New Jersey that dramatically reduces its energy use while protecting itself from the realities of a changing, more extreme climate? The SURE HOUSE merges the iconic 20th century shore home with 21st century building science. Utilizing innovative renewable energy technologies, a ‘Passive House’ level building envelope, and rugged glass-fiber-composite materials to flood-proof the home, the SURE HOUSE is a high-performance, net-zero-energy home, armored against extreme weather, designed for the contemporary lifestyle of the Jersey Shore and other vulnerable coastal communities. SUSTAINABLE At Stevens, we recognize that energy use in the home and workplace is directly connected to the growing problem of climate change. Reducing our energy consumption by designing higher performing, compact homes that are both functional, comfortable and desirable is the first critical step towards a modern, sustainable architecture for New Jersey and beyond. This is what informed the architectural design of the house. Configured about a compact form, thickly insulated and air-sealed walls eliminate thermal bridging and minimize energy losses while advanced glazing brings in free solar heat during the winter months. As a result of these passive design strategies, the SURE HOUSE has a greatly reduced carbon footprint requiring 91% less energy than a typical New Jersey home. Photovoltaic (PV) arrays on both the rooftop and operable shutters easily provide energy in excess of the home’s modest demands. The Stevens team considers a truly sustainable home in the era of climate change, one that prioritizes low energy use, and integrates right-sized renewable generation to supply the home’s needs. Low consumption, low production. RESILIENT In October of 2012, Hurricane Sandy wreaked havoc along the east coast of the US. In New Jersey alone there was an estimated 29.4 billion dollars in damages, 346,000 homes affected, and almost two and a half million people left without power, in some cases for over 10 days. Recovery from this storm and associated flooding is ongoing to this day, as many New Jersey homeowners grapple with the large costs of rebuilding and struggle to adapt to complicated new home building regulations. Damage from this storm to Hoboken, the home of the Stevens Institute of Technology’s campus, and to the New Jersey shore was extensive and many students on the SURE HOUSE team were directly affected by this historic event. The Stevens design team recognizes that in a world of more frequent and stronger storms, the ability to absorb and adapt to change is more important than ever. Successfully weathering the next storm and its aftermath is one of the primary goals in the design of the SURE HOUSE prototype. The SURE HOUSE introduces unique ‘dry flood-proofing’ methods to residential construction. Innovative wall and floor flood-proofing, utilizing durable composite sheathing materials adapted from the boating industry, were developed by the student team to render the SURE House’s building envelope flood proof up to the FEMA AE 6/7 Zone (+ 6/7 feet of water above sea-level). Designed and fabricated utilizing glass-fiber composite materials, the custom storm shutter system serves to protect the large glazed openings of the home from both air-borne debris impact and water infiltration during a storm event while also providing deterrence from the vandalism that often occurs in the aftermath of a calamitous event. During extended power outages, a ‘resilient’ solar array is capable of supplying critical amounts of energy and hot water to the home, without the use of battery storage or grid infrastructure. PV Description AC GRID-TIED PV SYSTEM The SURE HOUSE solar system consists of two distinct arrays, the grid-tied rooftop array which produces AC Powerand the shutter-mounted array which converts DC power generated by the modules directly into usable heat for the domestic hot water (DHW). The roof-mounted AC grid-tied array is comprised of three strings, two 11 module strings connected to an SMA SB 5000TL-US-223 inverter and a single 10 module string equipped and an SMA SB 3000TL-US-22 central inverter. All modules for the rooftop AC array are LG MonoX 2804 watt solar panels, chosen for their durability and efficiency. Inverter sizing and string size are optimized to the electrical characteristics of the chosen PV modules and the desired energy production, see Appendix 5B. The SURE HOUSE is projected to produce 12,353 kWh per year to meet 6,157 kWh per year of estimated consumption. Solar modules for the two AC grid-tied sub arrays are mounted on the main roof surface of the SURE HOUSE with a 10 degree tilt angle using a partially-ballasted polyethylene roof mounting system made by Renusol, which is particularly suited to the corrosive salt air of a coastal environment. This method was chosen for its installation simplicity and to limit detrimental roof penetrations. The 10 degree tilt optimizes the energy generated per roof area at a lower price, see Appendix 5A, and ensures that there is minimal wind uplift. DC SOLAR ELECTRIC DOMESTIC HOT WATER The SURE HOUSE’s approach to sustainable and resilient domestic hot water (DHW) consists of a unique, custom engineered DC solar electric hot water system. Employing the use of Advanced Energy’s DC electric PV heater (DCPVH)5 to heat domestic water well beyond the draw temperature, the SURE HOUSE is able to obtain a remarkably high solar fraction of 75% or more. The custom modified 80 gallon Vaughn DHW tank acts as a large solar ‘battery’ that stores heat energy in the form of hot water at almost 150 degrees, harvesting energy when the sun is out for use later in the day or overnight. The system, which uses electricity rather than heated fluid, is distinct from traditional ‘solar thermal’ systems by eliminating the dangers and associated maintenance issues of fluid based systems. By forgoing the use of external fluid loops, overheated solar collectors and pipes are not an issue for the SURE HOUSE system which never needs any yearly or seasonal flushing. In weather conditions where the integrated DCPVH unit cannot produce enough hot water via solar energy alone, the Vaughn hot water tank comes factory made with an AC powered 2.6 COP heat pump and a AC heating coil that serve as back-up heating elements. The DCPVH is powered by a DC array consisting of 10 custom-made Solbian by PVilion 180 watt, monocrystalline, flexible solar modules6. The Solbian modules are directly mounted to the top half of the operable storm shutters on the south façade of the SURE HOUSE. The SURE HOUSE team worked closely with PVillion, a PV system designer specializing in flexible architectural photovoltaics, to design an adhesive system that works with the glass-fiber storm shutter surface in a reliable manner over an extended period. Because this system operates in DC-only mode and never connects to the municipal power grid, the system can continue to create hot water safely and effectively even during grid disruption events. This hot water, and the energy stored within it, could be used for a range of activities including washing and cooking to more elaborate hydronic heating systems as desired. See Appendix 6 for system engineering, sizing and modeling.

14 SOLAR ENERGY↗

Modular Controllable Transformers (MCT)

Large Power Transformers (LPTs) are at the heart of the electricity infrastructure and are critical pieces in today’s grid. Aging assets, long turn-around times, transportation delays and dependence on foreign manufacturing for these components have created conditions for points of failure across the system. Moreover, there is no available dynamic control on these passive sections of the grid. For all the automation embedded on the low voltage side of the low voltage side of the system there is absolutely no flexibility on the high voltage side. Changes in power flow patterns are brought about by altering dispatch patterns for generators which requires a coordinated effort and is often time consuming. Traditional FACTS based approaches such as UPFC or HVDC light involve massive modifications to the existing infrastructure. Recent instances of physical attacks on LPTs and the slow recovery process associated with fixing or replacing these damaged units has created an increased awareness for this issue. LPT designs are highly customized owing to specific field requirements. Long lead times coupled with transportation delays make procuring and installing LPTs a lengthy process. In an attempt to minimize the recovery time following an LPT failure, transformer manufacturers have developed mobile transformer units. These units typically consist of either a single-phase or three-phase transformer mounted on a truck and characterized by compact form factors. By reducing the assembly time and transport time these units offer a fast and temporary solution to LPT failures. Several efforts led by DOE, Edison Electric Company (EEI) and North American Electric Reliability Corporation (NERC) have led to the RecX program. RecX transformers consist of single phase transformers transported on specialized assemblies to enable fast restoration and minimal installation time. NERC and EEI have instituted transformer sharing programs like Spare Equipment Database (SED) as well as Spare Transformer Equipment Database (STEP) which encourage utilities to maintain and share a fleet of LPTs. Mobile transformers are typically limited to less than 100 MVA to enable transportation on a trailer. Also, the efficiency of mobile transformer units and RecX transformers is lower since they are temporary solutions. The ideal replacement solution would be one that could utilize a set of standardized transformers while incorporating flexibility to influence metrics like power flow, apparent impedance and voltage profiles. In view of these issues the team at Georgia Tech proposed a concept called Modular Controllable Transformers (MCTs). This project was commissioned as a part of DOE’s Transformer Resiliency and Advance Component (TRAC) program. The approach consists of splitting one large unit rated upwards of 100 MVA with smaller modular, standardized units. Each of these smaller units are augmented with a converter to add power flow, voltage and impedance control. Splitting the power level into multiple units has two important implications. By making smaller units, the transportation times can be reduced drastically. Moreover, even though these units have very specific impedance and other parameters, the augmented converters can make it emulate the unit being replaced. Thus, faster replacement times and added controls are achieved making this an extremely resilient approach. In the event of one modular units failure, the other two controllable units can operate in the most resilient fashion keeping the net system overloads to a minimum. Moreover, for the same probability of failure only a fraction of the system capacity is lost. The converter is augmented on to the tertiary winding of the transformer making it retrofittable in the field without massive modifications to the system. The material proposed in this report highlights design considerations to minimize recovery time as well as results displaying overall improvement in resiliency. The cost analysis of this approach shows significant savings compared to UPFC and HVDC lite based approaches. Extensive analysis was conducted on numerous aspects of this project over the course of this project. Simulation studies were conducted to prove the 5MVA converter design. Challenging BIL constraints and transient issues were addressed over the course of this project. Simulations on EMTP platform presented in consequent sections were used to finely tune the control for the same. A final design for a back-to-back 5MVA neutral-point-clamped (NPC) converter was completed in this project. Furthermore, switching components like high power IGBTs from IXYS Westcode Press-Pack series and ABB Stackpack series were identified for this application. These devices exhibit a blocking voltage of 6.5 kV and a nominal collector current of 900 A. Potential housing options as well as existing commercial option were identified for this converter design. A 56 MVA modular transformer unit was designed with Delta Star Inc. with consultation and inputs from all project members. The transformer cooling systems were chosen to be Oil Natural Air Forced (ONAF) to optimize ease of transport. A full Product Requirement Document (PRD) for the converter and the transformer was generated. The team also investigated key aspects of resiliency and how to quantify the same. A metric was developed to analyze resiliency and numerous simulation cases were presented. Increased (N-1) resiliency and outage resistance was showcased through simulation on the Texas Large scale power system. Dynamic control capabilities were also showcased on numerous system level simulations. An IEEE 30 bus system was used to show the ability of the MCT approach to reduce line congestion. Power flow control; a part of the MCTs abilities, showcased a 29% reduction in transformer loading on the same system. Full control over tie line flows was demonstrated on a modified IEEE 13 bus system. Dynamic LTC capabilities were shown through simulation and were compared to traditional LTCs. Furthermore, the ability of the MCTs to alter apparent transformer impedance was simulated to promote standardization of modular transformer units while retaining the ability to emulate a varied range of impedance characteristics. Thus granular control over power flow, voltages, impedances and was presented. Regulatory analysis conducted by Oak Ridge National Laboratory (ORNL) further bolstered the efficacy of the MCT approach and verified the added resiliency achieved due to this approach. As a conclusion, it was proved that the resilience improvement obtained from using the MCT approach is justified by just one failure in a 30-year period. This means that the benefits obtained from using the MCT approach far outweigh the cost of setting this approach up. As a part of the future efforts, the team is proposing building a (12.47-24) kV/400 kVA scaled down unit to control 5MVA of power flows. Emphasis would be laid on using commercial components to speed up the build of these units. Further the actual transport of the modular transformer unit would be a part of this operation and would provide insight into transportation issues. The approach shows much promise and adds key dynamic control on passive sub transmission and transmission sectors.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impact of Uncertainty on Calculations for Recovery from Loss of Offsite Power

Uncertainty, both aleatory and epistemic, can have a significant impact on estimated probabilities of recovering from loss of offsite power within a specified time window, and such probabilities are an input to risk-informed decisions as to the significance of inspection findings in the U.S. Nuclear Regulatory Commission’s Reactor Oversight Process. In particular, the choice of aleatory model for offsite power recovery time can have a significant impact on the estimated nonrecovery probability, especially if epistemic uncertainty regarding parameters in the aleatory model is accounted for properly. In past and current analyses, such uncertainty has largely been ignored. This paper examines the impact of both aleatory and epistemic uncertainty on the results, using modern open-source Bayesian inference software, which implements Markov chain Monte Carlo sampling. It includes examples of time-dependent convolution calculations to show the impact that uncertainty can have on this increasingly frequent type of calculation, also. The results show that the “point estimate” result, which is an input to risk-informed decisions, can easily be uncertain by a factor of 10 if both aleatory and epistemic uncertainties are considered. The paper also illustrates the use of Bayesian model selection criteria to aid in the choice of aleatory model.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The LSBmax algorithm for boosting resilience of electric grids post (N‐2) contingencies

Abstract A computationally improved algorithm is presented to find the best transmission switching (TS) candidate for boosting resilience of electricity grids subject to ( N ‐2) contingencies. Here, resilience is computed as the reduction in load shed after the above‐mentioned ( N‐ ) contingencies. TS is a planned line outage, and past research shows that changing the transmission system's topology changes the power flow and removes post contingency violations. Finding the best TS candidate in a computationally suitable time for effectively boosting resilience is a challenge. The best TS candidate is found using a novel heuristic method by decreasing the search space based on proximity to the bus with the maximum load shedding (LSB). The LSB algorithm is faster than existing algorithms in the literature; and, it is compatible with both the AC and DC optimal power flow formulations. To validate the authors' claims of speedup and accuracy, two metrics are used to analyze the results from the IEEE 39‐bus and 118‐bus systems. Finally, the inherent parallelism of the LSB algorithm is leveraged on a high‐performance computing platform and applied to the large‐scale Polish 2383‐bus test system to validate scalability in both size and speedup in computation time.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Enhancing Distribution System Resiliency through a Novel Transactive Energy Systems Framework

Restoration of end-use loads during bulk transmission system outages is a key challenge for electric utilities. During those outages, utilities often do not have enough resources to fully restore the end-use loads. Additionally, not all available switching options are feasible due to voltage and load limits. Incentivizing non-utility flexible assets to provide their flexibility during resiliency events is a potential solution to improve resiliency. This paper presents a new transactive energy system framework (TESF) to incentivize distributed energy resources (DERs) to provide reactive power for supporting the self-healing functions of distribution management system (DMS). TESF engages non-utility DERs during resiliency events by incentivizing them through transactive signals computed using marginal cost of producing reactive power and marginal benefit of additional switching operations. TESF calculates additional switching options, which DMS then leverages to identify new optimal switching plans to restore additional loads. Test system consisting of multiple IEEE-13 node distribution feeders is used to demonstrate the performance of the proposed method. For the given system configuration and use-case, TESF results in 24.82 % additional load restoration and one additional switching operation.

Distribution system, reconfiguration, resiliency, ↗

Technology Maturation of Wireless Harsh Environment Sensors For Improved Condition Based Monitoring Of Coal Fired Power Generation

The overall goal of this project was to demonstrate and develop the usage of high-temperature (HT) harsh-environment (HE) wireless surface acoustic wave resonator (SAWR) sensor technology to promote reliable maintenance through condition-based maintenance (CBM) for field applications in harsh service conditions associated with power plant environments. The project aimed to advance the HT HE wireless SAWR sensor technology from TRL 5 to TRL 7. In addition to HT HE wireless temperature sensing, efforts were dedicated during this project to investigate, develop and increase the TRL from 3 to 5 for the following technologies: (a) HT HE strain sensors to address additional CBM monitoring needs, such as boiler tube mechanical / thermal stresses, which can provide early indications for boiler tube cracking and failure; and (b) HT aluminum nitride (AlN) and scandium aluminum nitride (ScAlN) based piezoelectric thin film fabrication and implementation of SAW sensors, with the goal of releasing the need to use single crystal piezoelectric materials for SAWRs and thus broaden possible technology applications to non-planar and harder to modify surfaces. To achieve the goals mentioned above, UMaine and its partner, Environetix Technologies Corporation, established partnerships with the following power plants: Longview Power (Maidsville, WV), a coal-fired power plant; Penobscot Energy Recovery Corp (PERC, Orrington, ME), a waste-to-energy power plant; and the UMaine Steam Plant (Orono, ME), an oil / natural gas power plant. To realize wireless HT HE SAWR sensor systems in these harsh service conditions, the University of Maine research team worked with Environetix and these power plants to define, design, fabricate, test and validate a mature prototype wireless temperature SAWR sensor system for boiler tube applications within the HT HE of the reheater pass damper chamber to directly and wirelessly monitor the temperature at eighteen independent boiler tube locations. The system included three levels, or “tiers”, of wireless communication to enable remote monitoring: Tier 1, the wireless link in the reheater pass damper chamber directly accessing the sensors on the boilers; Tier 2, the wireless local area network link, transmitting processed sensor information within the power plant to the Tier 3, a commercial wireless signal carrier company for secure remote data monitoring outside of the power plant. Regarding the wireless sensor system installed at Longview Power, temperature information from the boilers was continuously transmitted from the Longview boilers at Maidsville, WV, to Environetix headquarters, Orono, ME, over a 34 month period, when the system was finally decommissioned. Strain sensors and piezoelectric ScAlN thin film sensors were successfully installed on the exhaust duct at the UMaine Steam Power plant. The advances in wireless strain sensors and thin film piezoelectric film fabrication and testing were performed mostly in UMaine laboratories and field tested at the UMaine Steam Plant, due to its close proximity to UMaine/Environetix, access to the plant facility, and due to difficulties in accessing the other power plants during the COVID shut-down period. The project accomplished the TRL level increase of the targeted CBM technologies through the successful fabrication, installation, test, and validation of dedicated and commercial wireless sensor systems, utilizing the three different power plants. The outcomes of this project, including the wireless sensor data capability, are expected to yield an advance for CBM in harsh power plant environments. The reduction of maintenance costs, improved safety during plant operation, and increased power plant efficiency will lead to increased revenues (i.e., fewer forced outages) due to better process monitoring enabled by the wireless HT HE SAWR temperature sensor technology.

20 FOSSIL-FUELED POWER PLANTS↗

Isotope Specific Remediation Media and Systems - 13614

On March 11, 2011, now two years ago, the magnitude 9.0 Great East Japan earthquake, Tohoku, hit off the Fukushima coast of Japan. While, of course, most of the outcome of this unprecedented natural and manmade disaster was a negative, both in Japan and worldwide, there have been some extremely invaluable lessons learned and new emergency recovery technologies and systems developed. As always, the mother of invention is necessity. Among these developments has been the development and full-scale implementation of proven isotope specific media (ISMs) with the intent of surgically removing specific hazardous isotopes for the purpose of minimizing dose to workers and the environment. The first such ISMs to be deployed at the Fukushima site were those removing cesium (Cs-137) and iodine (I-129). Since deployment on June 17, 2011, along with treated cooling water recycle, some 70% of the curies in the building liquid wastes have been removed by the Kurion system alone. The current levels of cesium are now only 2% of the original levels. Such an unprecedented, 'external cooling system' not only allowed the eventual cold shut down of the reactors in mid-December, 2011, but has allowed workers to concentrate on the cleanup of other areas of the site. Water treatment will continue for quite some time due to continued leakage into the buildings and the eventual goal of cleaning up the reactors and fuel pools themselves. With the cesium removal now in routine operation, other isotopes of concern are likely to become priorities. One such isotope is that of strontium, and yttrium (Sr-90 and Y-90), which is still at original levels causing further dose issues as well as impediments to discharge of the treated waste waters. For over a year now, a new synthetic strontium specific media has been under development and testing both in our licensed facility in Oak Ridge, Tennessee, but also in confirmatory tests by the Japan Atomic Energy Agency (JAEA) in Japan for Tokyo Electric Power Company (TEPCO). The tests have proven quite successful, even in high salt conditions, and, with loading and dose calculations being completed, will be proposed to add to the existing cesium system. There is no doubt, as high gamma isotopes are removed, other recalcitrant isotopes such as this will require innovative removal media, systems and techniques. Also coming out of this international effort are other ISM media and systems that can be applied more broadly to both Commercial Nuclear Power Plants (NPPs) as well as in Department of Energy (DOE) applications. This cesium and strontium specific media has further been successfully tested in 2012 at a Magnox station in the UK. The resulting proposed mitigation systems for pond and vault cleanup look quite promising. An extremely unusual ISM for carbon 14 (C-14), nickel (Ni-63) and cesium (Cs-137) has been developed for Diablo Canyon NPP for dose reduction testing in their fuel pool. These media will be deployed in Submersible Media Filter (SMF) and Submersible Columns (SC) systems adapted to standard Tri-Nuclear{sup R} housings common in the U.S. and UK. External Vessel Systems (mini-Fukushima) have also been developed as a second mitigation system for D and D and outages. Finally, technetium (Tc- 99) specific media developed for the Waste Treatment Plant (WTP) recycle or condensate (secondary) waste streams (WM 2011) are being further perfected and tested for At-Tank Tc-99 removal, as well as At Tank Cs media. In addition to the on-going media development, systems for deploying such media have developed over the last year and are in laboratory- and full-scale testing. These systems include the fore mentioned Submersible Media Filters (SMF), Submersible Columns (SC) and external pilot- and full-scale, lead-lag, canister systems. This paper will include the media development and testing, as well as that of the deployment systems themselves. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗