Search NASASearch

SEARCH · Search NASA

Results for “PHOTOVOLTAIC POWER SUPPLIES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

709 records · Page 5

Electricity Rate Designs for Large Loads: Evolving Practices and Opportunities 2026 Update

Electricity demand from large-load customers such as data centers is projected to grow significantly in the near term. While these large loads play an important role in advancing technology innovation and economic growth in the United States, meeting their energy needs requires utilities and regulators to consider important operational and financial risks, such as insufficient energy supply or underutilized investments, that can impact all customers. This paper builds on similar research published in January 2025, providing an overview of how utilities and regulators are managing these risks through different tariffs, including rate structures and electric service agreements. Regulators, utilities, customers, and other stakeholders can use this paper as a foundation when discussing issues and sharing perspectives on developing or reviewing large-load tariffs.

24 POWER TRANSMISSION AND DISTRIBUTION

Integrating AI Data Centers with the Power Grid

The rapid expansion of artificial intelligence (AI) has triggered an unprecedented surge in electricity demand, with US data center energy use projected to double or triple 2023 levels by 2028. This exponential growth places strain on grid infrastructure, which can hinder timely construction of desired computing capacity. To bridge this supply-demand gap, utilities and AI developers are increasingly turning to demand flexibility, a strategy that incentivizes shifting or reducing power use during peak periods of grid stress. Data centers are uniquely equipped for flexible operations due to their digital workloads, built-in redundancy, and onsite energy assets. This article outlines four primary mechanisms to enable data center flexibility: computational load flexibility (shifting tasks temporally or geographically), flexible use of core facility infrastructure adjustments, energy storage utilization, and onsite electricity generation. To encourage adoption, utilities are deploying new tariff designs, including voluntary interruptible service riders, mandated flexibility requirements, and streamlined interconnection processes for flexible loads. For the highly capitalized and rapidly growing AI industry, the primary motivators for embracing these strategies are expediting facility interconnection, satisfying emerging regulatory mandates, and mitigating community resistance. While demand flexibility cannot substitute the long-term need for new bulk power generation, it serves as an essential, immediate solution for enabling near-term deployment. By transforming data centers from grid stressors into stabilizing assets, flexible operations can ensure reliable grid integration, ease market pressures, and support a resilient power system.

24 POWER TRANSMISSION AND DISTRIBUTION

Nuclear Reactor Heat Extraction for Synthetic Fuel Plants

This report looks at the viability and best approach when producing synthetic fuels using heat and power supplied by advanced nuclear energy systems. The report looks at a low temperature integration pathway with four types of advanced reactors: a pressurized water reactor (PWR), an advanced light water reactor (A-LWR), a sodium fast reactor (SFR), and a high-temperature gas-cooled reactor (HTGR). A failure modes and effects analysis (FMEA) of the coupling system between the nuclear plant and the synthetic fuel systems is performed with the goal of identifying the reliability of such a thermal delivery system. Furthermore, a high temperature pathway is investigated for synfuel coupling to determine if this is more efficient and more cost effective as a coupling approach.

10 - SYNTHETIC FUELS

A Unified Scaling Framework for Comparative Analysis of Major Electrical Machine Topologies

This paper presents a unified framework for comparing major electrical machine topologies under identical output and thermal constraints, with emphasis on supply-chain-aware selection among rare-earth-intensive, reduced-rare-earth, and rare-earth-free solutions. Using power factor and air-gap flux density as the principal descriptors, the framework links topology choice to relative size, copper demand, magnet dependence, cost sensitivity, and inertia. To support robust early-stage screening, the deterministic scaling model is combined with uncertainty representation, Monte Carlo scenario propagation, and hesitationaware ranking. The results show that rare-earth-rich machines remain compact and dense, whereas reduced-rare-earth and rare-earth-free alternatives become more attractive under specific material-risk and cost scenarios.

Kumar, Praveen [ORNL] (ORCID:0000000291877857)

Co-Location of Cellulosic Bioethanol and Alcohol-to-Jet (ATJ) Production Facilities for Targeted Scale-Up of Sustainable Aviation Fuel (SAF) Production

Achieving aerospace industry net-zero emissions by 2050 requires rapid scaling of sustainable aviation fuel (SAF) production. Leveraging existing infrastructure, proven technologies like Alcohol-to-Jet (ATJ), and low carbon intensity (CI) feedstocks (e.g., switchgrass and miscanthus) can support this transition and help achieve near-term emissions reduction targets. This study evaluates the implications of lignocellulosic ethanol biorefinery siting and integration with petroleum refineries to produce SAF across 1000 sites randomly sampled from areas suitable for perennial grasses in the U.S. rainfed region. To better understand the logistics of material transport and handoffs, we integrated models of biomass harvest, transport, ethanol, and ATJ production in a stochastic framework based on Monte Carlo simulations to characterize SAF minimum selling price (MSP) and carbon intensity (CI), considering site-specific parameters (e.g., feedstock production, transportation, taxes, incentives). The results indicate trade-offs between MSP and CI across locations, with median MSP ranging from 7.9 to 12.8 USD·gal −1 and CI from −9.7 to 39.4 gCO 2 e·MJ −1 . Despite high estimated decarbonization costs (580 USD·tonCO 2 e −1 ), our results indicate that site-specific deployment of ATJ with low-CI feedstocks can improve sustainability outcomes. The framework provides a systematic approach to assess cost and sustainability trade-offs across locations, considering the end-to-end supply chain and supporting an informed investment in SAF production.

09 BIOMASS FUELS

Advancing the Oxygen Generation Assembly Design to Increase Reliability and Reduce Costs for a Future Long Duration Mission

The state-of-the-art Oxygen Generation Assembly (OGA) has been reliably producing breathing oxygen for the crew aboard the International Space Station (ISS) for over eight years. Lessons learned from operating the ISS OGA have led to proposing incremental improvements to advance the baseline design for use in a future long duration mission. These improvements are intended to reduce system weight, crew maintenance time and resupply mass from Earth while increasing reliability. The proposed improvements include replacing the cell stack membrane material, deleting the nitrogen purge equipment, replacing the hydrogen sensors, deleting the wastewater interface, replacing the hydrogen dome and redesigning the cell stack power supply. The development work to date will be discussed and forward work will be outlined. Additionally, a redesigned system architecture will be proposed.

Kevin C Takada

New Lithium-ion Polymer Battery for the Extravehicular Mobility Unit Suit

The Extravehicular Mobility Unit (EMU) suit currently has a silver-zinc battery that is 20.5 V and 45 Ah capacity. The EMU's portable life support system (PLSS) will draw power from the battery during the entire period of an EVA. Due to the disadvantages of using the silver-zinc battery in terms of cost and performance, a new high energy density battery is being developed for future use, The new battery (Lithium-ion battery or LIB) will consist of Li-ion polymer cells that will provide power to the EMU suit. The battery design consists of five 8 Ah cells in parallel to form a single module of 40 Ah and five such modules will be placed in series to give a 20.5 V, 40 Ah battery. Charging will be accomplished on the Shuttle or Station using the new LIB charger or the existing ALPS (Air Lock Power Supply) charger. The LIB delivers a maximum of 3.8 A on the average, for seven continuous hours, at voltages ranging from 20.5 V to 16.0 V and it should be capable of supporting transient pulses during start up and once every hour to support PLSS fan and pump operation. Figure 1 shows the placement of the battery in the backpack area of the EMU suit. The battery and cells will undergo testing under different conditions to understand its performance and safety characteristics.

Jeevarajan, J. A.

Hazard and risk analysis framework for nuclear power plant–based integrated energy systems

Employing integrated energy systems (IESs) with nuclear power plants (NPPs) can improve NPP utilization by leveraging dedicated thermal and electric power delivery, but it may also increase operational safety risks. This paper presents a framework to identify and quantify hazards and risks for such IESs. The framework combines accidentology to review past industrial accidents with failure modes and effects analysis (FMEA) to identify potential future incidents. Hydrogen explosion and toxic chemical release hazards are of particular concern. Explosion consequences are quantified using the Bauwens-Dorofeev (Bauwens) and trinitrotoluene equivalent mass (TNT-EM) methods, while chemical release consequences are computed using the Gaussian atmospheric dispersion method. Operational disturbances from direct electrical and thermal integration that may affect NPP safety are modeled using probabilistic risk analysis (PRA). Hazards and risks are then evaluated for regulatory compliance. The framework is applied to IESs comprising pressurized or boiling water reactors supplying three levels of thermal and electrical power to industrial customers. Case studies include high-temperature steam electrolysis hydrogen plants of varying capacities and a synthetic fuel production plant. Sensitivity analysis examines piping component failures in the PRA model as a precursor to cost estimation for thermal extraction line design. Additionally, Fussel-Vessely (FV) and risk increase importance (RII) measures identify risk-informed design improvements for the thermal extraction system. FMEA highlights hazards such as loss of offsite power, prompt loss of electrical load, loss of thermal output, and immediate steam diversion, in addition to hydrogen explosions and toxic chemical releases. Both Bauwens and TNT-EM methods suggest maintaining several hundred meters of separation between the NPP and hydrogen facility to mitigate explosion risks. PRA results show a maximum initiating event frequency increase of 1.15% and an overall risk increase of 0.28%. Importance measure analysis identifies upstream pipe leak isolation components as critical. Evaluating the results against safety regulations, it is concluded that hazards and risks can be managed to comply with regulations through risk-informed thermal and electrical connection designs, component selection, maintenance programs, and safe separation distances between NPPs and integrated industrial facilities.

08 - HYDROGEN

A Novel Low-Profile High-Efficiency Three-Phase Matrix Transformer

High step-down isolated DC-DC conversion from an 800 V DC bus to low-voltage, high-current outputs is required in automotive auxiliary converters and data center power supplies. In such applications, conventional transformer-based converters require large turns ratios, which increase winding resistance, leakage inductance, and magnetic height. This paper proposes a novel low-profile three-phase matrix transformer that realizes a large effective voltage ratio through flux division among multiple secondary legs, without increasing the physical turns count of each winding. As a result, the proposed structure reduces copper usage and transformer height while preserving the voltage conversion capability of a conventional three-phase transformer. Finite element analysis shows that the proposed design reduces magnetic height by 27%, ferrite volume by 34%, and copper volume by 28%. Circuit-level simulations of an 800 V/12 V,3 kW CLLLC dual-active-bridge converter further show that the lower winding resistance reduces total system loss by 91% and increases DC-DC efficiency from 82.6% to 97.6% at 3 kW output.

Inoue, Shuntaro [ORNL] (ORCID:0000000262637627)

PACT Center: Perovskite PV Accelerator for Commercializing Technologies (Final Technical Report)

The Perovskite PV Accelerator for Commercializing Technologies (PACT) center was established in July 2021 as a national resource to accelerate the commercialization of perovskite photovoltaic (PV) technology in the United States. Since its inception, PACT has been led by Sandia National Laboratories (Sandia) in partnership with the National Laboratory of the Rockies (NLR), formerly known as NREL. From FY20-FY23, Los Alamos National Laboratory (LANL), CFV Labs, Black & Veatch (B&V), and the Electric Power Research Institute (EPRI) were part of the project team. LANL brought expertise in perovskite PV device designs and processing, CFV Labs (now GroundWork Renewables) provided initial indoor and outdoor measurement hardware technology, B&V led the initial effort on perovskite PV bankability, and EPRI worked on reviewing testing standards, identifying commercialization gaps, and helping to run PACT’s Industry Advisory Board, a group including representatives from commercial testing labs, independent engineering firms, insurance companies, state regulators, and electric utilities. To source perovskite PV module samples, PACT contracted with the University of North Carolina (UNC), the University of Toledo, the University of Washington, and SLAC/Stanford University to provide a steady stream of research-grade perovskite mini modules, enabling protocol development in advance of commercial module availability. The project period ran from July 1, 2021, through December 31, 2025, including a No Cost Extension. Starting in FY25, the project was continued as a Core Capability in the Lab Call portfolio and continues at a reduced budget with only Sandia and NLR as funded recipients. Notably, starting in FY25 PACT expanded its scope beyond MHP modules to accept all emerging PV mini module technologies for testing, including organic PV (OPV) and all-thin-film tandems, with the aim of supporting commercialization across the broader emerging PV ecosystem. With this change in scope the program was renamed the PV Accelerator for Commercializing Technologies, dropping perovskite from the name.

14 SOLAR ENERGY

Equivalent System Mass Comparison of ECLSS CO2 Removal Technologies

This project employs equivalent system mass (ESM) analyses to evaluate and compare state-of-the-art spacecraft CO2 removal systems. The ESM methodology converts sizing characteristics such as volume, power, and cooling requirements into a unified metric of mass, allowing for simple quantitative comparison of equipment impacts on a system level. Comparison of six high TRL technologies – the Carbon Dioxide Removal System (CDRS), Thermal Amine Scrubber (TAS), Carbon Dioxide Removal Assembly (CDRA), Four-Bed CO2 Scrubber (4BCO2), CO2 and Humidity Control Swing Bed (CHC), and the Carbon Dioxide Removal by Ionic Liquid Sorbent (CDRILS) – was achieved using an existing ESM spreadsheet tool that formerly ranked such technologies for consideration on Gateway. Fidelity of the tool was increased through revision with the most up-to-date sizing and performance data for each technology. ESM values were then estimated using NASA-supplied Lunar, Martian, and low-Earth orbit habitat infrastructure costs. This paper details the ESM approach used, lists major performance variables for each CO2 removal option, and summarizes conclusions of the technology comparison. The results are intended to act as a guide to assist programs in their selection of CO2 technologies best suited for a specific vehicle or mission.

Madeleine C Oliver

Equivalent System Mass Comparison of ECLSS CO 2 Removal Technologies

This project employs equivalent system mass (ESM) analyses to evaluate and compare state-of-the-art spacecraft CO 2 removal systems. The ESM methodology converts sizing characteristics such as volume, power, and cooling requirements into a unified metric of mass, allowing for simple quantitative comparison of equipment impacts on a system level. Comparison of six high TRL technologies – the Carbon Dioxide Removal System (CDRS), Thermal Amine Scrubber (TAS), Carbon Dioxide Removal Assembly (CDRA), Four-Bed CO 2 Scrubber (4BCO2), CO 2 and Humidity Control Swing Bed (CHC), and the Carbon Dioxide Removal by Ionic Liquid Sorbent (CDRILS) – was achieved using an existing ESM spreadsheet tool that formerly ranked such technologies for consideration on Gateway. Fidelity of the tool was increased through revision with the most up-to-date sizing and performance data for each technology. ESM values were then estimated using NASA-supplied Lunar, Martian, and low-Earth orbit habitat infrastructure costs. This paper details the ESM approach used, lists major performance variables for each CO 2 removal option, and summarizes conclusions of the technology comparison. The results are intended to act as a guide to assist programs in their selection of CO 2 technologies best suited for a specific vehicle or mission.

Madeleine Oliver

Nuclear Safety [Vol. 30, No. 3, July-September 1989]

Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS: 325 Safety of Framatome Advanced Nuclear Steam Supply Systems Designs by J. A. Charles and D. Lange, 333 Book Review of Nuclear Accidents: Intervention Levels for the Protection of the Public by H. B. Piper; ACCIDENT ANALYSIS: 335 Living PRA Computer Systems by S. C. Dinsmore and H.-P. Balfanz, 343 Summary of ICAP Assessments of RELAP5/MOD2 by W. E. Driskell and R. G. Hanson; CONTROL AND INSTRUMENTATION: 352 Thermal Performance Monitoring System at Maanshan Nuclear Power Plant by H.-J. Chao, Y.-P. Lin, G.-H. Jou, L.-Y. Liao, and Y.-B. Chen; DESIGN FEATURES: 358 Warning Systems for Nuclear Power Plant Emergencies by J. H. Sorensen and D. S. Mileti; WASTE AND SPENT FUEL MANAGEMENT: 371 Activities Related to Waste Management Compiled by E G. Silver; OPERATING EXPERIENCES: 382 Steam Generator Tube Performance: Experience with Water-Cooled Nuclear Power Reactors During 1985 by O. S. Tatone and R. L. Tapping, 400 Systems Interaction Analyses: Concepts and Techniques (Part II) by M. D. Muhlheim and G. A. Murphy, 413 Reactor Shutdown Experience Compiled by J. W. Cletcher, 416 Operating U.S. Power Reactors Compiled by E G. Silver; RECENT DEVELOPMENTS: 440 General Administrative Activities Compiled by E G. Silver, 460 Reports, Standards, and Safety Guides by D. S. Queener, 466 Status of Power-Reactor Licensing Activities Compiled by E G. Silver, 470 Proposed Rule Changes as of Mar. 31, 1989; ANNOUNCEMENTS: 334 Proceedings Published, 351 CEC Seminar on Methods and Codes for Assessing the Off-Site Consequences of Nuclear Accidents, 357 Short Course on Multiphase Flow and Heat Transfer: Bases and Applications in A: The Nuclear Power Industry B: The Process Industries, 357 International Conference on Probabilistic Safety Assessment and Management, 478 International Topical Meeting on the Safety, Status, and Future of Non-Commercial Reactors and Irradiation Facilities, 475 The Authors.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Battery Pack Shape Optimization using Transient Heat Conduction Coupled with Cell-Discharge Analysis

Battery electric systems exhibit significant time-dependence, especially when evaluated in the context of an aircraft mission profile with continually changing power demands. Additionally, when evaluating battery-powered aircraft concepts, it is important to accurately compute the temperature of the batteries and properly characterize the thermal response of the system. The temperature of the batteries has a significant impact on cell performance, in addition to safety considerations of maintaining battery temperatures below their operating limit. Because of these considerations, battery models for preliminary design and optimization of aircraft should include the capability to accurately compute the temperature distribution within the battery pack. Furthermore, battery pack designs should be as light-weight as possible to maximize the pack energy density, while also considering battery temperature limits. Here, we demonstrate a simultaneous trajectory and shape optimization of a battery pack concept, using a transient heat transfer finite element model coupled with a time-varying cell-discharge battery model to provide this capability. Including the transient finite element problem in the loop enables accurate temperatures that can be passed back to the cell discharge model, while the cell discharge model can supply the finite element model with time-varying heat boundary conditions to the finite element problem, further benefiting the fidelity of the thermal response of the batteries. We first demonstrate the coupling capability between the battery cell-discharge model and the transient finite-element heat transfer through an optimization which computes the optimal current profile for the battery pack while ensuring the battery temperatures remain below their operational limit. We then build on this optimization by adding shape optimization to the problem, which allows us to consider a composite objective function which also minimizes the mass of the battery pack, while also producing an optimal current discharge profile.

Optimization

Case Study of Integrating High-Temperature Heat Pump with LiBr-H2O Absorption Chiller for Data Center Liquid Cooling

Data centers (DCs) are physical infrastructures that support artificial intelligence workloads. The rapid growth of artificial intelligence is putting substantial pressure on the US power grid. Most of electricity consumed by IT equipment, accounting for 50%-60% of total DC power, ultimately becomes waste heat. This heat is dissipated by DC’s cooling facilities, accounting for an additional 30%-40% of total DC power. Recovering and repurposing this waste heat offers a significant opportunity to enhance energy efficiency and reduce operating costs of DCs. One potential pathway is converting heat to cold using thermal-driven absorption chillers, therefore, reducing the power consumption in DC cooling facilities. Existing studies mainly demonstrate the technical and economic feasibility of repurposing DC’s waste heat for cooling applications but provide limited technical details on how to integrate the thermal-driven absorption chillers with DC cooling systems. In addition, the low-grade waste heat available from DCs must be upgraded to higher temperatures suitable for absorption chillers. This paper presents a case study on integrating high-temperature heat pumps with a LiBr-H2O absorption chiller to use DC waste heat for cooling. A thermodynamic model of single-effect, LiBr-H2O absorption chiller and an empirical model of high-temperature heat pumps were built. The case study considers ASHRAE W17 liquid-cooled DC, with facility service water supplied at 17.0℃ and returned at 25.3℃. The thermal behaviors of absorption chiller components were predicted for the generation temperature ranging from 75.0℃ to 115.0℃. Based on the available waste heat in the integrated system, two waste heat recovery strategies were evaluated: a facility service water-based strategy and cooling water-based strategy. Results indicated that the cooling water-based strategy achieves higher Coefficient of Performance (COPs) than the facility service water-based strategy. The relatively low cooling COPs of single-effect LiBr-H2O absorption chillers could be offset by high heating COP of high temperature heat pumps. The maximum cooling COP of absorption chiller and the overall COP of integrated systems occur at lower generation temperatures, but these conditions also yield lower cooling capacities. In practice, system operation should balance the trade-off between the COP and cooling capacity

Wang, Pengtao [ORNL] (ORCID:0000000214713429)

R&D GREET Battery Carbon Footprint Calculator

The Battery Carbon Footprint (CF) Calculator was developed to help U.S. battery manufacturers meet the carbon footprint reporting requirements of the EU Battery Regulation (EU) 2023/1542. The calculator incorporates several major battery carbon footprint frameworks, including the Joint Research Centre's Rules for the Calculation of the Carbon Footprint of Electric Vehicle Batteries (CFB-EV), RECHARGE's Product Environmental Footprint Category Rules for High Specific Energy Rechargeable Batteries for Mobile Applications (PEFCR), the Catena-X Product Carbon Footprint Rulebook (CX-PCF Rules), Battery Pass's Battery Carbon Footprint: Rules for Calculating the Carbon Footprint of the "Distribution" and "End-of-Life and Recycling" Life Cycle Stages, the Global Battery Alliance's Greenhouse Gas Rulebook: Generic Rules, Version 2.1, and the Ministry of Economy, Trade and Industry's draft Carbon Footprint Calculation Method for Automotive Batteries. The tool pairs these frameworks with foreground data from Argonne's R&D GREET models and integrates user-supplied background data covering battery manufacturing and supply chain activities. By bringing multiple international methodologies together in a single platform, the calculator enables manufacturers to evaluate product carbon footprints, improve data consistency, and prepare for evolving regulatory compliance and global market reporting requirements.

Zhang, Jingyi

Nuclear Safety [Vol. 30, No. 3, July-September 1989]

Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS: 325 Safety of Framatome Advanced Nuclear Steam Supply Systems Designs by J. A. Charles and D. Lange, 333 Book Review of Nuclear Accidents: Intervention Levels for the Protection of the Public by H. B. Piper; ACCIDENT ANALYSIS: 335 Living PRA Computer Systems by S. C. Dinsmore and H.-P. Balfanz, 343 Summary of ICAP Assessments of RELAP5/MOD2 by W. E. Driskell and R. G. Hanson; CONTROL AND INSTRUMENTATION: 352 Thermal Performance Monitoring System at Maanshan Nuclear Power Plant by H.-J. Chao, Y.-P. Lin, G.-H. Jou, L.-Y. Liao, and Y.-B. Chen; DESIGN FEATURES: 358 Warning Systems for Nuclear Power Plant Emergencies by J. H. Sorensen and D. S. Mileti; WASTE AND SPENT FUEL MANAGEMENT: 371 Activities Related to Waste Management Compiled by E G. Silver; OPERATING EXPERIENCES: 382 Steam Generator Tube Performance: Experience with Water-Cooled Nuclear Power Reactors During 1985 by O. S. Tatone and R. L. Tapping, 400 Systems Interaction Analyses: Concepts and Techniques (Part II) by M. D. Muhlheim and G. A. Murphy, 413 Reactor Shutdown Experience Compiled by J. W. Cletcher, 416 Operating U.S. Power Reactors Compiled by E G. Silver; RECENT DEVELOPMENTS: 440 General Administrative Activities Compiled by E G. Silver, 460 Reports, Standards, and Safety Guides by D. S. Queener, 466 Status of Power-Reactor Licensing Activities Compiled by E G. Silver, 470 Proposed Rule Changes as of Mar. 31, 1989; ANNOUNCEMENTS: 334 Proceedings Published, 351 CEC Seminar on Methods and Codes for Assessing the Off-Site Consequences of Nuclear Accidents, 357 Short Course on Multiphase Flow and Heat Transfer: Bases and Applications in A: The Nuclear Power Industry B: The Process Industries, 357 International Conference on Probabilistic Safety Assessment and Management, 478 International Topical Meeting on the Safety, Status, and Future of Non-Commercial Reactors and Irradiation Facilities, 475 The Authors.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS