SEARCH · Search NASA
Results for “PILOT PLANTS”
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Development of the Generation 3 Particle Pilot Plant Falling Particle Receiver.
Abstract not provided.
A Next-Generation Transport Simulator for the Waste Isolation Pilot Plant (WIPP) Performance Assessment.
Abstract not provided.
Moving from 2D to 3D Flow Modeling for the Waste Isolation Pilot Plant Performance Assessment.
Abstract not provided.
Impact of Inventory Changes on the Waste Isolation Pilot Plant Performance Assessment.
Abstract not provided.
Summary of the Brine Availability Test in Salt (BATS), Including Extended Plan for Experiments at the Waste Isolation Pilot Plant (WIPP)
This document lays out a set of near-future investigations in salt, the third phase of BATS (BATS 3). This phase is planned to answer the few remaining issues from the first two phases of BATS (BATS 1 and BATS 2), and to prepare for a subsequent large-scale demonstration phase. The BATS experiments are the first part of a larger plan to conduct field experiments to answer specific technical questions, improve the technical basis for disposal of heat-generating radioactive waste in salt (Stauffer et al., 2015; SNL et al., 2020), and demonstrate readiness for disposal of radioactive waste in salt, including large, hot waste packages.
Controls and Operational Strategy for Gen 3 Particle Pilot Plant
Explore the source record for details and available documents.
Anoxic Iron Corrosion Characterization in the Waste Isolation Pilot Plant
Explore the source record for details and available documents.
Development and Testing of a Well Model for Performance Assessment at the Waste Isolation Pilot Plant (WIPP)
Explore the source record for details and available documents.
Changes Impacting the Performance Assessment of the Waste Isolation Pilot Plant
Explore the source record for details and available documents.
Standard Analysis Report INV-SAR-81, Revision 0 Chemical and Cement Components 2023 Inventory Estimates for the Interim State Performance Assessment of the Waste Isolation Pilot Plant
This standard analysis report provides the estimates for the chemical (oxyanions and complexing agents) and cement components with a data collection cut-off date of December 31, 2023. These estimates will be included in a Performance Assessment Inventory Report developed for the U.S. Department of Energy (DOE) interim state repository configuration performance assessment (PA) for the 2026 Compliance Recertification Application (CRA).
Fusion Pilot Plant and ITER Scenarios and Control
The principal goals of this project were to develop key physics understandings and control solutions necessary for the realization of a steady-state fusion reactor by adapting high performance plasma scenarios from DIII-D to long pulse operation on the Experimental Advanced Superconducting Tokamak (EAST) in Hefei, China. Specific research objectives include the development of physics and control solutions necessary for demonstrating disruption-free long-pulse plasmas at high physics performance sustained simultaneously with the capability of handling the plasma exhaust and plasma-wall interactions using reactor-relevant materials surrounding the plasma.
Gen3 CSP Particle Pilot Plant (G3P3): Update
Explore the source record for details and available documents.
Advancing Plasma-Facing Materials for Fusion Pilot Plants at DIII-D
Explore the source record for details and available documents.
Overview of Advanced Plasma-Facing Materials Testing for Fusion Pilot Plants at DIII-D
Explore the source record for details and available documents.
2019 Performance Assessment Calculations for the Recertification of the Waste Isolation Pilot Plant.
Abstract not provided.
Acoustic Emission Monitoring of Thermal Cycling in Salt at the Waste Isolation Pilot Plant.
Abstract not provided.
Metagenomes and Metagenome-Assembled Genomes from Microbial Communities in the Hamptons Road Sanitary District (HRSD) Biological Nutrient Removal Pilot Plant Operated with High and Low Dissolved Oxygen Conditions
In this study, we aimed to evaluate BNR and investigate microbial community changes when the DO is reduced in the aerated portions of wastewater treatment trains. We present a dataset of metagenomes obtained from activated sludge collected from the Hamptons Road Sanitary District treatment plant at the beginning of operation, when the DO was high, and at the end of operation, when the DO was low