Search NASA⌕ Search

SEARCH · Search NASA

Results for “Probabilistic Safety Assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

A functional global sensitivity measure and efficient reliability sensitivity analysis with respect to statistical parameters

Sensitivity analysis and reliability assessment are two important aspects of structural and system safety. Epistemic uncertainty with respect to probabilistic model of input parameters due to lack of knowledge is present in many scarce-data applications and complicates the characterization of uncertainty in model response. In this article, we present two importance measures to evaluate the impact of distribution parameters on the probability distribution function (PDF) of the output and the failure probability. The epistemic uncertainty associated with the distribution parameters is modeled as random variables. Additionally, a modified extended polynomial chaos expansion (MEPCE) approach is introduced in which aleatory and epistemic random variables are modeled and propagated simultaneously while allowing the separate assessment for any single epistemic variable. A MEPCE-based kernel density estimation (KDE) construction provides a composite map from each epistemic variable to the response PDF. The functional global sensitivity index of the PDF with respect to the distribution parameters is thus derived, as a function of output, which is both more informative and more efficient than standard scalar sensitivity measures. Reliability sensitivity indices can be readily evaluated by integrating the global sensitivity index function over the failure zone. Three illustrative examples are used to demonstrate the proposed methodology.

42 ENGINEERING↗

Advancing Multi-Hazard Risk and Safety Considerations for Aging Nuclear Facilities (Revision 1)

This project will demonstrate a multi-hazard time-dependent probabilistic risk assessment (PRA) approach for nuclear facilities considering aging-related deterioration of structures. A generic pressurized water reactor (PWR) reactor subjected to seismic mainshock-aftershock sequences considering the aging of the containment structure will be used as a case study to demonstrate the multi-hazard PRA approach. Using advanced modeling and simulation, seismic mainshock-aftershock fragility functions will be simulated for the containment structure considering aging effects. A multi-hazard PRA model for a generic PWR reactor will be built to quantify the multi-hazard core damage frequency (CDF) and large early release frequency (LERF) with explicit time-dependent modeling of event sequences. To date, the cascading impacts of multi-hazards are not adequately accounted for in the PRA models for nuclear facilities. In addition, for both initial and periodic evaluation of facilities to withstand natural phenomena hazards (NPH), deterioration of the SSCs due to aging and other effects is not adequately considered. By advancing multi-hazard considerations accounting for aging effects, this project will contribute to improved understanding of the safety of aging nuclear facilities. Project outcomes such as the multi-hazard CDF and LERF will also allow facility owners to optimize upgrade and retrofit protocols. This project is divided into two components: (1) advanced modeling and simulations; and (2) multi-hazard PRA. For the first component, Idaho National Laboratory’s (INL) Multi-hazard Analysis for STOchastic time-DOmaiN phenomena (MASTODON) and BlackBear codes will be used to simulate the seismic response and damage of a containment structure under cascading mainshock-aftershock sequences with aging effects. Uncertainties related to the seismic inputs, material parameters, and environmental factors such as temperature and humidity will be identified and propagated to the fragility functions. These fragility functions, which consider aging effects, will be time dependent. The second component will take the fragility information from the first component to build a multi-hazard time-dependent PRA model starting from a generic PWR model to evaluate the multi-hazard CDF and LERF and characterize the associated consequences. For this component, OpenPRA Web Application and SAPHIRE code will be used. Events such as the Fukushima Daiichi accident have highlighted the importance of considering the cascading impacts of multi-hazards for PRA. Moreover, many of the reactors in the current nuclear fleet in the United States (US) are already operating well beyond their initially planned design life, and applications for further extensions to operating licenses are being considered. Therefore, considering multi-hazard effects and aging deterioration in the NPH risk assessment process will contribute to the safety of both existing and future nuclear facilities. Outcomes of this project will thus directly benefit the standards DOE-STD-1020-16 and DOE-HDBK-1224-18.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Enhancement of Industry Legacy Probabilistic Risk Assessment Methods and Tools

Probabilistic risk assessments (PRAs) are integral to nuclear power plant (NPP) operations, having tremendously benefitted the safety of the U.S. reactor fleet for decades. Insights obtained from the models have provided perspectives on a variety of applications, both at the plant and for the regulator. While these models are very useful, they are now being asked to represent and analyze aspects of the plant that were never envisioned by the initial PRA practitioners. Furthermore, heightened demands on the PRA models have led to increased computing power requirements. Additionally, as the complexity of the PRA models increased, the difficulty experienced by non-PRA experts in trying to understand these models, grasp the insights they provide, and effectively use that information has become problematic. The need for research to address key issues regarding PRA tools and methods has never been greater. Although the nuclear power industry has largely been well-served by these tools and methods, the underlying science is dated, remaining mostly unchanged for over two decades. Three areas were identified as most beneficial to address to maintain and improve the usefulness of the current practice legacy PRA tools: improvement in quantification speed, increased ability to efficiently model multi-hazard models, and improvement in modeling human action dependency in PRA. This report provides the outcomes from the FY2021 research into these three areas, identifying potential technical gaps and solutions, and charting the next steps forward to address current PRA challenges.

42 ENGINEERING↗

Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Risk-Informed and Performance-Based Evaluation of Defense-in-Depth Adequacy

This document supports the work contained in Nuclear Energy Institute (NEI) 18-04 “Risk-Informed Performance-Based Technology Inclusive Guidance for Advanced Reactor Licensing Basis Development” Revision 0. NEI 18-04 presents a modern, technology-inclusive, risk-informed, and performance-based (TI-RIPB) process for selection of Licensing Basis Events (LBEs); safety classification of structures, systems, and components (SSCs) and associated risk-informed special treatments; and determination of defense-in-depth (DID) adequacy for non-LWRs. The NEI guidance document provides one acceptable means for addressing the aforementioned topics as part of demonstrating a specific design provides reasonable assurance of adequate radiological protection. This report provides the framework and associated methodology guidelines and discussion for establishing, then evaluating, confirming, and documenting the adequacy of defense-in-depth (DID) for advanced non-light-water reactor technologies. It was developed as part of the Licensing Modernization Project led by Southern Company and cost-shared by the United States Department of Energy and has benefited from considerable NRC formal reviews and public workshops. The methodology converts the DID philosophy into a structured process that is implementable, embraces existing United States and international definitions and philosophies of DID that set the foundation for the process. It builds on the DID framework developed in the Department of Energy Next Generation Nuclear Plant Project and earlier works on this subject. The approach to establishing DID adequacy involves the incorporation of DID attributes into the plant capabilities and programmatic elements of DID. The integrated evaluation of DID adequacy includes both quantitative elements to incorporate risk-informed and performance-based (RIPB) considerations and qualitative elements that address uncertainties and limitations in the quantitative models and supporting data. Demonstration of DID adequacy ensures that there are multiple layers of defense for risk-significant challenges to the design and that the plant capabilities and programs that support each layer are provided in a manner that minimizes dependencies among these layers. The focus of this report is assurance of DID adequacy with respect to protection of the public from radiological exposures resulting from accidental releases of radioactive material. While other hazards are not specifically addressed, this methodology is expected to be beneficial for determining DID adequacy for them as well. Risk-informed evaluation of DID considers the integrated performance of all plant SSCs and associated programs to manage daily operational activities, transients, and accidents, including the evaluation of strategies for accident prevention and mitigation. The RIPB LBE scenario methodology used in this evaluation defines the challenges to the plant safety features included in the plant design basis and beyond, and the scope of all deterministic and probabilistic safety evaluations. By examining event sequences across the whole spectrum of LBEs, a systematic assessment of DID can be accomplished.

42 ENGINEERING↗

A framework to implement human reliability analysis during early design stages of advanced reactors

Nuclear power plants require human actions throughout their lifecycle from design, construction, operation, and decommissioning. However, for advanced reactors (e.g., Generation IV), the reliance on human intervention in safety-related actions is expected to be reduced or completely replaced by automated actions. The Probabilistic Risk Assessment (PRA) Standard for Advanced Non-LWR Nuclear Power Plants requires that the impacts of all operator actions are captured and incorporated in the risk of the modeled plant. Moreover, the Modernization of Technical Requirements for Licensing Advanced Reactors requires human reliability analysis (HRA) to be included throughout all design and PRA development stages. However, due to the lack of details during the early design stages, HRA is often postponed until the design is mature enough. Conducting HRA in later design stages, though it may be adequate in capturing pre-, at-, and post-initiators comes short of informing the design itself in the iterative design lifecycle. Hence, this paper presents a framework to include HRA during the design's early stages, pre-conceptual or conceptual. The proposed framework provides a process for the removal of operator actions that do not contribute to the risk and the identification of all key operator actions that are critical to the safety of the design. The results of this framework are then used to inform the design of those safety-related operator actions to update the design further. Then, using information from the updated design, this framework can be reapplied to investigate the impact of the design update on human reliability. The PRA model of the X-energy's pre-conceptual Xe-100 high-temperature gas-cooled pebble-bed reactor (HTGR-PB) design is used to demonstrate the approach. In the pre-conceptual Xe-100 PRA model, also called Phase 0 PRA model, human actions were considered an integral part of analyzing the plant response to different initiating events. Hence, in this paper, all possible human actions in the Xe-100 PRA model are identified, analyzed, and removed to emulate a design relying only on the available automated control systems. The preliminary results of this assessment show how safe the Xe-100 design is even without crediting any human actions. The results also list necessary sequences in which operator actions are critical to the risk profile of the design.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Solutions for Enhanced Legacy Probabilistic Risk Assessment Tools and Methodologies: Improving Efficiency of Model Development and Processing via Innovative Human Reliability Dependency Analysis

Probabilistic risk assessments (PRAs) are integral to nuclear power plant (NPP) operations, having tremendously benefitted the safety of the U.S. reactor fleet for decades. Insights obtained from the models have provided perspectives on a variety of applications, both at the plant and for the regulator. While these models are very useful, they are now being asked to represent and analyze aspects of the plant that were never envisioned by the initial PRA practitioners. Furthermore, heightened demands on the PRA models have led to increased computing power requirements. Additionally, as the complexity of the PRA models increased, the difficulty experienced by non-PRA experts in trying to understand these models, grasp the insights they provide, and effectively use that information has become problematic. The need for research to address key issues regarding PRA tools and methods has never been greater. Although the nuclear power industry has largely been well-served by these tools and methods, the underlying science is dated, remaining mostly unchanged for over two decades. Three areas were identified as most beneficial to address to maintain and improve the usefulness of the current practice legacy PRA tools: improved quantification speed, increased ability to efficiently model multi-hazard models, and improved modeling human action dependency in PRA. This report is focused on the third critical area, improvements in dependency analysis of human actions conducted as part of a typical human reliability assessment.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Development and Validation of a Probabilistic Risk Assessment Model for a Generic Modular High Temperature Gas-Cooled Reactor

This study looks to develop and validate a probabilistic risk assessment (PRA) model for the modular high temperature gas-cooled reactor (MHTGR) using INL’s Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) software. Validation against a General Atomics design involves matching event and fault trees to historical frequencies, with a goal of under 15% difference. The research aims to deliver a reliable PRA model to assess the safety of MHTGRs for use within high-temperature industrial applications.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Probabilistic Assessment of Damage from Same Shock Response Spectra due to Variations in Damping

Interpretation of field data from shock tests and subsequent assessment of product safety margins via laboratory testing are based on the shock response spectra (SRS). The SRS capture how a single degree of freedom (SDOF) structure responds to the shock at differing frequencies and, therefore, no longer contain the duration or other temporal parameters pertaining to the shock. A single duration can often be included in the technical specification or in the recreation of acceleration vs. time history from the specified SRS; however, there is little basis for that beyond technical judgment. The loss of such temporal information can result in the recreated SRS being the same while its effect on a system or component can be different. This paper attempts to quantify this deficiency as well as propose a simple method of capturing damping from shock waves that can allow the original waveform to be more accurately reconstructed from the SRS. In this study the decay rate associated with various frequencies that comprise the overall shock was varied. This variation in the decay rate leads to a variation in the acceleration vs. time history, which can be correlated to a “Damage Index” that captures the fatigue damage imparted to the object under shock. Several waveforms that have the same SRS but varying rates of decay for either high- or low-frequency components of the shock were investigated. The resulting variation in stress cycles and Damage Index is discussed in the context of the lognormal distribution of fatigue failure data. It is proposed that, along with the SRS, the decay rate is also captured to minimize the discrepancy between field data and representative laboratory tests.

36 MATERIALS SCIENCE↗

Assessment of doses in contaminated urban areas: modelling exercise based on Fukushima data

State-of-the-art dose assessment models were applied to estimate doses to the population in urban areas contaminated by the Fukushima Daiichi Nuclear Power Plant accident. Assessment results were compared among five models, and comparisons of model predictions with actual measurements were also made. Assessments were performed using both probabilistic and deterministic approaches. Predicted dose distributions for indoor and outdoor workers from a probabilistic approach were in good agreement with the actual measurements. In addition, when the models were applied to assess the doses to the representative person, based on a concept recommended by the International Commission on Radiological Protection and in the International Atomic Energy Agency Safety Standards, it was evident that doses to the representative person obtained with a deterministic approach were always higher than those obtained with a probabilistic approach using the same model.

dose assessment↗

Multi-Mechanism Flood Hazard Assessment: Critical Review of Current Practice and Approaches

This report documents the initial findings from the Nuclear Regulatory commission (NRC)-sponsored research project Methods for Estimating Joint Probabilities of Coincident and Correlated Flooding Mechanisms for Nuclear Power Plant Flood Hazard Assessments.1 This research project is a part of NRC’s Probabilistic Flood Hazard Assessment (PFHA) Research Program and will aid the development of guidance on the use of PFHA methods to evaluate infrastructure safety for existing and proposed US nuclear power plants (NPPs). More specifically, this project intends to provide technical background for the development of flood hazard curves for multi-mechanism floods (MMFs). MMFs are flood events caused by more than one flooding mechanism (e.g., flood events due to the simultaneous occurrence of precipitation-induced river flooding and storm surge). Project activities include three main tasks: Task 1—Survey of current concepts and methods in assessing MMF hazards; Task 2—Critical assessment of selected methods and approaches for quantifying probabilistic MMF hazard risk; Task 3—Development of example case studies to illustrate best practices for quantifying probabilistic MMF hazard risk The initial findings from Tasks 1 and 2 are documented in this report. Task 1 comprised a survey of approaches and methods that have been applied to understand and assess flood hazards due to MMFs. Task 2 involved a critical review of the selected approaches and methods. To that end, the scope of this report includes documentation of (1) a reconnaissance-level survey of the current state of concepts and practice for MMF hazard assessment; (2) a generalized MMF assessment framework to address the distinctions among various types of flood-forcing phenomena, flood mechanisms (grouped into three mechanism types), and flood severity metrics; (3) a wide-ranging survey of approaches and methods that have been applied to various flooding phenomena and settings; and (4) a critical assessment of MMF hazard assessment methods. Studies were identified involving MMFs related to coastal flooding mechanisms, fluvial (rivers/streams) flooding mechanisms, and associated combinations of coastal and fluvial flooding mechanisms. Studies were also identified that address MMFs involving coastal and fluvial flooding mechanisms as well as coastal flooding mechanisms along with extreme precipitation (without specific attribution to fluvial or pluvial mechanisms). The studies identified for review in this report included assessments at varying spatial scales (from local to global) with differing geographic regions of focus using both observed and synthetic data. The majority of studies identified and reviewed were site-specific assessments focusing on relatively short return periods. Studies considered a range of flood severity metrics, made differing assumptions regarding the occurrence of extrema, and used multiple statistical techniques; the use of copulas for the development of joint distributions was a particularly popular analysis technique. The literature review highlighted the differences among existing studies relative to terminology used, means of presenting results, framework and techniques employed, and level of sophistication regarding the number and types of variables considered. Despite the significant diversity in existing studies, the review identified several promising techniques that will be considered in future work under this project, including the development of joint distributions for MMFs using copula and Bayesian-motivated approaches.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Dynamic PRA Methods to Evaluate the Impact on Accident Progression of Accident Tolerant Fuels

Accident tolerant fuels (ATFs) are new nuclear fuels developed in response to the accident at the Fukushima power station in March 2011. The goal of ATFs is to withstand accident scenarios through better performance compared to currently employed fuels (e.g., small-scale hydrogen generation). This paper targets a method for evaluating and comparing ATF performance from a probabilistic risk assessment (PRA) perspective by employing a newly developed combination of event trees and dynamic PRA methods. Compared to classical PRA methods based on event trees and fault trees, dynamic PRA can evaluate with higher resolution the safety impacts of physics dynamics and the timing/sequencing of events on the accident progression without the need to introduce overly conservative modeling assumptions and success criteria. In this paper, we analyze the impact on the accident progression of three different cladding configurations for two initiating events [a large break loss-of-coolant accident (LB-LOCA) and a station blackout (SBO)] by employing dynamic PRA methods. The goal is to compare the safety performance of ATFs (FeCrAl and Cr-coated cladding) and the currently employed Zr-based clad fuel. We employ two different strategies. The first focuses on the identification of success criteria discrepancies between the accident sequences generated by the classical PRA model and the set of simulation runs generated by dynamic PRA using ATF. The second one, on the other hand, directly uses dynamic PRA to evaluate the impact of timing of events (e.g., recovery actions) on accident progression. In conclusion, by applying these methods to the LB-LOCA and SBO initiating events, we show how dynamic PRA methods can provide analysts with detailed and quantitative information on the safety impact of ATFs.

97 - MATHEMATICS AND COMPUTING↗

UNDERSTANDING THE SEMI-PROBABILISTIC APPROACHES IN STRUCTURAL RELIABILITY USED TO SET DESIGN RELIABILITY TARGETS FOR GRAPHITE COMPONENTS USING ASME BPVC METHODS

Graphite is a quasi-brittle material, resulting in random variability in tensile strength distributions. To account for the random variability in strength, HHA-3000 of the ASME BPVC provides two semi-probabilistic methods for qualifying nuclear graphite components in the design stage, the simplified and full assessments. The full and simplified assessments apply statistical methods to engineering-based design problems. This is often referred to as reliability-based design. Reliability-based design (RBD) is a method to develop reliable designs by accounting for uncertainties and result in small chances of failure when also considering safety factors. RBDs provide reliability targets using semi-probabilistic approaches. RBD is implemented in ASME BPVC HHA-3000 for nuclear graphite components, but is not specific to that application. There has been much confusion around the methods implemented in ASME BPVC HHA-3000 for qualifying nuclear graphite components. To address the confusion, this paper takes a hierarchical approach. First, the general RBD framework is presented. Then, the semi-probabilistic methods and the underlying assumptions implemented in the assessments are presented. The semi-probabilistic methods are separated from the engineering modifications that have been made to the assessments. After building the framework and underlying assumptions, the specific methods in the full and simplified assessments are explained in three steps: inputs, methods, outputs. The methods are applied to an H-451 reflector block. Tensile strength properties for other graphite grades are provided.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Multi-Mechanism Flood Hazard Assessment: Critical Review of Current Practice and Approaches

This report documents the initial findings from the Nuclear Regulatory commission (NRC)-sponsored research project Methods for Estimating Joint Probabilities of Coincident and Correlated Flooding Mechanisms for Nuclear Power Plant Flood Hazard Assessments.¹ This research project is a part of NRC’s Probabilistic Flood Hazard Assessment (PFHA) Research Program and will aid the development of guidance on the use of PFHA methods to evaluate infrastructure safety for existing and proposed US nuclear power plants (NPPs). More specifically, this project intends to provide technical background for the development of flood hazard curves for multi-mechanism floods (MMFs). MMFs are flood events caused by more than one flooding mechanism (e.g., flood events due to the simultaneous occurrence of precipitation-induced river flooding and storm surge).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Probabilistic Multi-Hazard Performance Assessment of Concrete Structures in Nuclear Installations

Concrete structures in nuclear installations are subject to time-dependent degradation mechanisms that can deteriorate their physical and mechanical properties, potentially exacerbating the risk of structural failure under external forces such as a seismic event. Previous research has extensively investigated the seismic response of nuclear concrete structures and the associated risk, as well as their effect on structural components safety margins. However, substantial work is still necessary to incorporate concrete aging effects into such evaluations. In fact, most models in the literature assume pristine concrete conditions and do not account for the impact of aging on the structural components’ fragility curves. This work identifies relevant time-dependent degradation mechanisms and provides simplified models to predict the the evolution of key material properties based on data from the literature. Namely, this work focuses on the aging effects of corrosion, alkali–silica reaction (ASR), and irradiation on reinforced concrete within US Department of Energy (DOE) nuclear facilities and nuclear power plants (NPP) structures. Furthermore, degradation models based on literature data are presented that define the relationship between probabilistic material properties and the concrete’s age. In this work, sampled material properties served as input for a simplified finite element model (FEM) of a critical nuclear structural system, with the output of the FEM being the seismic response for a given ground motion. The results of the FEM were then used within a probabilistic performance assessment with a statistically significant number of samples. The research presented herein addresses the detrimental effects of hazards caused by natural phenomena on deteriorated concrete elements of nuclear installations. This work directly benefits the safety analysis performed on US DOE/ National Nuclear Security Administration (NNSA) nuclear facilities located in areas prone to seismic activity. The results presented herein could aid in the improvement of DOE-STD-1020, the DOE Standard that addresses seismic risk analysis and capacity evaluation in DOE facilities. DOE-STD-1020 refers to the requirements in American Society of Civil Engineers (ASCE) 4-98, now superseded by ASCE 4-16, that shall be met in performing dynamic response analyses and generating in-structure response spectra, provided that such requirements are consistent with the requirements of ASCE/Structural Engineering Institute (SEI) 43-05. Moreover, the results presented herein could also aid in the updating of section C3.1.1. of ASCE 4-16 to account for the effects of aging on the stiffness of reinforced elements and American Concrete Institute (ACI) 349.3R-18, “Report on Evaluation and Repair of Existing Nuclear Safety-Related Concrete Structures.” Ultimately, this work can assist the risk assessment of potential lifetime extension of the existing US commercial nuclear fleet (light water reactors) and the safety analysis of the emerging advanced nuclear reactors. The proposed proof-of-concept methodology employs open-source DOE computational tools and is transferable to commercial software commonly used by engineering firms.

42 ENGINEERING↗

Optimization of Mitigating System Performance Index to Improve Nuclear Power Plant Safety and Efficiency

MSPI (Mitigation System Performance Index) is one of the risk-informed, plant-specific performance indicators of NRC’s Reactor Oversight Process. MSPI is used by the regulator and nuclear industry to monitor and assess the performance of plant mitigating systems. In this project, a calculation tool has been developed by incorporating the plant operation data, Probabilistic Risk Assessment (PRA) data, and industry baseline values to automate the calculation process of MSPI and the generation of the report. This is the first stage in an effort to optimize the MSPI through advanced artificial intelligence (AI) and machine learning (ML) techniques to improve nuclear power plant safety and efficiency.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Evaluation of Physical Security Risk for Potential Implementation of FLEX using Dynamic Simulation Methods

The requirements for United States nuclear power plants to maintain a large onsite physical security force contribute to their large operational costs. The cost of maintaining the current physical security posture is approximately 10% of the overall operation and maintenance budget for commercial nuclear power plants. The goal of the Light Water Reactor Sustainability Program Physical Security Pathway is to develop tools, methods, and technologies and provide the technical basis for an optimized physical security posture. This pathway will analyze and minimize the conservatisms built into current security postures in order to reduce security costs while still ensuring adequate security and operational safety. The research performed at Idaho National Laboratory within this pathway has successfully developed a dynamic force-on-force (FOF) modeling framework using various computer simulation tools and integrated them with the dynamic assessment Event Modeling Risk Assessment using Linked Diagrams (EMRALD) tool. This document provides an overview of lessons learned in applying a dynamic computational framework that links results from a commercially available FOF simulation tool, a commercially available thermal-hydraulic tool, and EMRALD to an operating commercial nuclear power plant. This process of including plant procedures and multiple analysis results is being called Modeling and Analysis for Safety Security using Dynamic EMRALD Framework. Previous reports described how a user could integrate their plant-specific FOF models with the dynamic simulation tool EMRALD, model operator actions, integrate with probabilistic risk assessment tools, such as Computer Aided Fault Tree Analysis System or Systems Analysis Programs for Hands-on Integrated Reliability Evaluations, and with thermal-hydraulic tools, such as RELAP-5. Previous reports applied various combinations of available simulations codes with EMRALD using generic plant models to demonstrate how to perform the analysis. This report documents the results of applying the dynamic computational framework to an actual nuclear facility using their security scenarios and timelines. The purpose of this study was to verify that results achieved using generic models are similar to actual plant results and to refine our guidance of the use of the framework. Such an assessment enables further analysis, such as what-if scenarios and staff-reduction evaluation, thereby optimizing physical security at plants. NOTE: The work performed in this report is based on a generic EMRALD model with actual plant data used for the analysis. However, only the generic model and general results of the analysis are in the report. No plant’s sensitive information is discussed in this report. The discussion shows examples of insights that can be obtained from the MASS-DEF methodology.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Sensitivity of fatigue reliability in wind turbines: effects of design turbulence and the Wöhler exponent

Fatigue assessment of wind turbines involves three main sources of uncertainty: material resistance, load, and the damage accumulation model. Many studies focus on increasing the accuracy of fatigue load assessment to improve the fatigue reliability. Probabilistic modeling of the wind's turbulence standard deviation is an example of an approach used for this purpose. Editions 3 and 4 of the IEC standard for the design of wind energy generation systems (IEC 61400-1) suggest different probability distributions as alternatives for the representative turbulence in the normal turbulence model (NTM) of edition 1. There are debates on whether the suggested distributions provide conservative reliability levels, as the established design safety factors are calibrated based on the representative turbulence approach. The current study addresses the debate by comparing annual reliability based on different scenarios of NTM using a probabilistic approach. More importantly, it elaborates on the relative importance of load assessment accuracy in defining the fatigue reliability. Using the DTU 10 MW reference wind turbine and the first-order reliability method (FORM), we study the changes in the annual reliability level and its sensitivity to the three main random inputs. We perform the study considering the blade root flapwise and the tower base fore–aft moments, assuming different fatigue exponents in each load channel. The results show that integration over distributions of turbulence in each mean wind speed results in less conservative annual reliability levels than representative turbulence. The difference in the reliability levels varies according to turbulence distribution and the fatigue exponent. In the case of the tower base, the difference in the annual reliability index after 20 years can be up to 50 %. However, the model and material uncertainty have much higher effects on the reliability levels compared to load uncertainty. Knowledge about such differences in the reliability levels due to the choice of turbulence distribution is especially important, as it impacts the extent of lifetime extension through reliability reassessments.

17 WIND ENERGY↗

Regulatory Treatment of Low Frequency External Events under a Risk-Informed Performance-Based Licensing Pathway: Safety Criteria Evaluation

There has been recent progress in the development of risk-informed performance-based (RIPB) design and licensing approaches, which leverage the insights gained from detailed risk assessments and utilize performance-based metrics to permit flexibility and innovation. The RIPB approaches have included the probabilistic treatment of external hazards, including low frequency events that are beyond the design basis. A preceding study conducted in FY21 noted that there are certain challenges to the probabilistic treatment of low frequency external events, which are primarily the result of uncertainty in the hazard curve and the associated plant response to rare, severe events. The current work expands on the previous study by examining the regulatory safety criteria contained within draft 10 CFR Part 53 and associated draft RIPB seismic design guidance. The evaluation identified potential challenges in demonstrating satisfaction of the safety criteria for low frequency external events, with specific difficulties associated with demonstrating compliance with cumulative safety criteria metrics, such as the quantitative health objectives (QHOs). Non-LWRs are expected to utilize the direct calculation of offsite consequence, rather than use surrogates, for comparison to the QHOs, which can be particularly challenging as the previously identified uncertainties are compounded by uncertainties in the response of the neighboring population. The current work details this evaluation and key findings. The central recommendation from this effort is that it is necessary to develop an approach for demonstrating compliance with the safety criteria in draft Part 53 that addresses the key challenges while providing flexibility to applicants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗