GPS Spoofing Mitigation and Timing Risk Analysis in Networked Phasor Measurement Units via Stochastic Reachability

To address phasor measurement unit (PMU) vulnerability to spoofing, we propose the use of a set-valued state estimation technique known as stochastic reachability (SR)-based distributed Kalman filter (DKF) that computes secure global positioning system (GPS) timing across a network of receivers. Utilizing SR, we estimate not only GPS time but also its stochastic reachable set, which is parameterized by probabilistic zonotope (p-Zonotope). While requiring known measurement error bounds in only non-spoofed conditions, we designed a two-tiered approach. We first performed measurement-level spoofing mitigation via deviation of a measurement innovation from its expected p-Zonotope. We then performed state-level timing risk analysis via a determination of the intersection probability of the estimated p-Zonotope with an unsafe set that violates IEEE C37.118.1a-2014 standards. Finally, we validated our SR-DKF algorithm by subjecting it to a simulated receiver network to coordinate signal-level spoofing. We demonstrate improved timing accuracy and successful spoofing mitigation via the use of our SR-DKF algorithm. We also validated the robustness of the estimated timing risk as the number of receivers were varied.

47 OTHER INSTRUMENTATION↗

Regulatory Treatment of Low Frequency External Events under a Risk-Informed Performance-Based Licensing Pathway

Significant efforts are underway to develop and implement a risk-informed performance-based licensing framework for advanced reactors built on the establishment of an affirmative safety case. Such approaches offer the benefits of increased flexibility regarding key design and licensing decisions based on a detailed assessment and understanding of plant risk. These methods include the comprehensive analysis of scenarios that have historically been addressed through conservative and deterministic licensing analysis approaches, such as the evaluation of event sequences at frequencies of occurrence beyond the design basis. While the detailed analysis of low frequency events provides insights that can help justify alternative treatments to past conservatism, the findings are dependent on the quality and confidence associated with the analyses. The assessment of external hazards presents a unique challenge, as their potential frequency of occurrence, especially of large magnitude events, is inherently uncertain given the long return periods in question. The current project seeks to further explore the regulatory treatment of low frequency external events as part of a risk-informed performance-based framework. The goals are to identify the benefits and challenges of such approaches for advanced reactor vendors and to aid in the development of consistent and appropriate methodologies. As part of this effort, the current report summarizes initial project findings, with a focus on the evaluation of the seismic hazard. This includes an exploration of the implementation of a risk-informed performance-based approach through an example analysis. Based on the identified challenges associated with the probabilistic treatment of low frequency event sequences, additional performance-based methods were explored as complementary tools for demonstrating regulatory compliance. The report highlights key challenges and opportunities associated with the methods and outlines recommendations and future activities to assist with their implementation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Integrated Fire Probabilistic Risk Assessment (PRA) Modeling in Support of Operational Efficiency (Final Report)

To improve the realism of Fire PRA associated with fire progression and damage modeling or manual suppression, previous research by the Socio-Technical Risk Analysis (SoTeRiA) Research Laboratory at the University of Illinois at Urbana-Champaign focused on the development of an Integrated PRA (I-PRA) methodological framework for fire risk analysis in NPPs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Modeling FLEX Human Actions Using the EMRALD Dynamic Risk Assessment Tool

Most current efforts have modified and applied existing human reliability analysis (HRA) methods to treat human actions related to beyond-design-basis external events in which diverse and flexible coping strategies (FLEX) equipment would be deployed. However, many questions remain regarding the suitability of legacy HRA methods to address FLEX human actions, sparking the need for a new method of reasonably evaluating them. In this context, Idaho National Laboratory (INL) researched a relatively new approach to treating FLEX human actions via Event Modeling Risk Assessment Using Linked Diagrams (EMRALD) software. EMRALD was developed to support the increasing need for dynamic probabilistic risk assessment (PRA) models that can respond to evolving plant conditions during simulations. A couple benefits were identified when analyzing FLEX human actions through this software. In general, it is especially useful for evaluating a strategy’s feasibility, including FLEX human actions that require a relatively long time to perform. In this paper, we suggest how FLEX human actions can be modeled using the EMRALD software. Two different HRA modeling approaches using EMRALD are introduced: (1) procedure-based modeling and (2) PRA/HRA-based modeling. The former approach was introduced in the authors’ previous paper, whereas this paper mainly discusses how the latter approach works for an extended loss of AC power (ELAP) scenario with relevant procedures and PRA models. A hybrid method combining the two modeling approaches is introduced at the paper’s conclusion.

99 GENERAL AND MISCELLANEOUS↗

A Preliminary Radiological Risk Assessment Model for Disposition of Remote-Handled Transuranic Wastes at Los Alamos National Laboratory Area G - 20116

The U.S. Department of Energy (DOE) operates a low-level radioactive waste (LLW) disposal site at Material Disposal Area G, in Los Alamos, New Mexico, USA. Area G has been the primary LLW disposal site for Los Alamos National Laboratory (LANL) since the 1960's. In addition to LLW, Area G is host to a variety of other wastes, the disposition of which must be determined before closure of the site. A probabilistic Radiological Risk Assessment (RRA) for Area G is used in order to support decision making regarding some wastes that are not addressed in the extant Area G Performance Assessment (PA) and Composite Analysis (CA). Between 1979 and 1987, 33 special shafts were augered into the Bandelier Tuff at Area G. This volcanic tuff is present across Pajarito Plateau on the eastern slopes of the Jemez Mountains, and varies widely in its consistency, from weakly indurated non-welded layers to welded layers that uphold the mesa cliffs of the Plateau. These mesas are home to LANL, Area G, and the townsites of Los Alamos and White Rock, with residences about 1400 m from Area G. The 33 Shafts were lined with steel casing, and contain remote-handled (RH) transuranic wastes (TRU) resulting from experiments and analysis performed in special glove boxes at the Chemistry and Metallurgy Research (CMR) facility at LANL. Some of these wastes originated as used nuclear fuel. The purpose of the Area G RRA is to evaluate the potential future risk to humans and the environment from the RH TRU in the 33 Shafts in the context of the risk associated with the surrounding wastes at Area G. The analysis is responsive to expectations outlined in DOE Order 458.1, Radiation Protection of the Public and the Environment, and is informed by the Manual and Guidance accompanying DOE O 435.1, Radioactive Waste Management. Because the waste meets the definition of TRU, the regulatory context necessarily takes into consideration the regulation governing the disposal of TRU from the U.S. Environmental Protection Agency (EPA): 40 CFR 191, Environmental Radiation Protection Standards for Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes. Given the broader regulatory context for the RRA, the analysis is subject to different assumptions from those made in the existing DOE O 435.1 PA and CA, such as allowing for future occupation of the site. The analysis begins with a comprehensive evaluation of features, events, processes, and exposure scenarios (FEPS) for Area G and the wastes it contains. These FEPSs are screened to eliminate from further consideration those of extremely low probability and/or consequence, and a conceptual site model (CSM) is subsequently developed. The scope and structure of the Area G RRA Model is informed by this CSM, and the Area G RRA Model is developed using the GoldSim systems analysis modeling platform. This paper presents the initial version of a defensible, transparent, and reasonably realistic model, which is based on the state of knowledge of the wastes, the site, and the FEPSs that govern contaminant transport from wastes into the environment and subsequent exposures to humans and other biota. Probabilistic model input distributions represent uncertainties inherent in the real and modeled systems. The results of the Area G RRA Model inform decisions regarding the disposition of the RH TRU in the 33 Shafts. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A framework to implement human reliability analysis during early design stages of advanced reactors

Nuclear power plants require human actions throughout their lifecycle from design, construction, operation, and decommissioning. However, for advanced reactors (e.g., Generation IV), the reliance on human intervention in safety-related actions is expected to be reduced or completely replaced by automated actions. The Probabilistic Risk Assessment (PRA) Standard for Advanced Non-LWR Nuclear Power Plants requires that the impacts of all operator actions are captured and incorporated in the risk of the modeled plant. Moreover, the Modernization of Technical Requirements for Licensing Advanced Reactors requires human reliability analysis (HRA) to be included throughout all design and PRA development stages. However, due to the lack of details during the early design stages, HRA is often postponed until the design is mature enough. Conducting HRA in later design stages, though it may be adequate in capturing pre-, at-, and post-initiators comes short of informing the design itself in the iterative design lifecycle. Hence, this paper presents a framework to include HRA during the design's early stages, pre-conceptual or conceptual. The proposed framework provides a process for the removal of operator actions that do not contribute to the risk and the identification of all key operator actions that are critical to the safety of the design. The results of this framework are then used to inform the design of those safety-related operator actions to update the design further. Then, using information from the updated design, this framework can be reapplied to investigate the impact of the design update on human reliability. The PRA model of the X-energy's pre-conceptual Xe-100 high-temperature gas-cooled pebble-bed reactor (HTGR-PB) design is used to demonstrate the approach. In the pre-conceptual Xe-100 PRA model, also called Phase 0 PRA model, human actions were considered an integral part of analyzing the plant response to different initiating events. Hence, in this paper, all possible human actions in the Xe-100 PRA model are identified, analyzed, and removed to emulate a design relying only on the available automated control systems. The preliminary results of this assessment show how safe the Xe-100 design is even without crediting any human actions. The results also list necessary sequences in which operator actions are critical to the risk profile of the design.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Beyond Expected Values Evolving Metrics for Resource Adequacy Assessment

Resource adequacy analysis quantifies the likelihood of capacity shortfall on a power system in a probabilistic manner. Using a combination of statistical techniques and power system fundamentals, the analysis typically evaluates hundreds or thousands of stochastic random samples (replications) of varying load, generator outages, variable renewable energy availability, and other aspects of power system uncertainty. In this range of uncertainty, there are - at times - periods where the power system's available resources are insufficient to meet system demand, referred to as a shortfall event. Today's power systems' rapidly evolving generation mix is changing the types of data needed by system planners and regulators, which can often render traditional resource adequacy metrics insufficient for ensuring resource adequacy for tomorrow's grid. In this paper we provide a critical assessment of traditional measures of shortfall risk in power systems, discussing their shortcomings and how they compare to metrics used in other domains. From this analysis we propose four steps forward for improving power system resource adequacy risk metrics in the future.

ENERGY PLANNING, POLICY, AND ECONOMY↗

Industry Level Integrated Fire Modeling Using Fire Risk Investigation in 3D (FRI3D)

The software Fire Risk Investigation in 3D (FRI3D) has been developed over the last 2 years to integrate 3D spatial modeling with existing fire probabilistic risk assessment (PRA) models and fire simulation codes. The goal of this research and development is to automate many of the fire analysis manual tasks to reduce industry efforts in the initial fire modeling and operational costs for the model maintenance and evaluations required during normal plant operations. The tasks for Fiscal Year (FY) 2021 include first testing the FRI3D modeling capabilities by importing an industry fire model into FRI3D and making a 3D model of a complex/high-risk significant area. (For this work, the switchgear room was chosen.) Then, the second task of FY 2021 is to develop a dynamic fire PRA process that can help optimize traditional fire PRA models. The switchgear room model will be used for the dynamic fire PRA work. This report describes the work and insights learned when using FRI3D software to model both a Nuclear Regulatory Report (NUREG) example models and a full industry switchgear room.

97 MATHEMATICS AND COMPUTING↗

Operating Experience Data Analysis for Digital Instrumentation and Control System Reliability and Risk Assessment in Nuclear Power Plants

The implementation of advanced digital instrumentation and control (DI&C) systems in U.S. nuclear power plants (NPPs) can bring significant advancements in reliability, monitoring, and control capabilities. However, these systems also introduce new challenges, particularly in assessing risks such as common-cause failures (CCFs) and establishing robust reliability estimates for DI&C components. Addressing these challenges is critical for ensuring the safe and efficient operation of NPPs. Recently, Idaho National Laboratory was tasked by the U.S. Nuclear Regulatory Commission (NRC) to conduct a DI&C reliability study using operating experience data from the nuclear industry. The two operating experience data sources for the study are the Institute of Nuclear Power Operations’ Industry Reporting and Information System (IRIS) and the NRC’s Licensee Event Report database which is hosted at Idaho National Laboratory at https://lersearch.inl.gov/LERSearchCriteria.aspx. This report provides a comprehensive examination of DI&C systems, including their architecture, operational advantages, and associated challenges. It reviews existing industry DI&C studies and failure mode taxonomies, along with reliability data from various industries. Through a detailed analysis of these databases, the study provides insights into DI&C system performance. Considerations should be given to incorporate DI&C failure data into the NRC's Integrated Data Collection and Coding System and updating the Reliability and Availability Data System to support ongoing DI&C reliability studies. Recommendations are also provided for modeling DI&C reliability and CCF in probabilistic risk assessment, thereby supporting risk-informed decision-making and enhancing the reliability and safety of NPPs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Bayesian and HRA-Aided Method for the Novel Reliability Analysis of Software

Technological advancements and nuclear power plant modernization has inspired considerable research in the areas of safety and reliability, yet there remains a lack of consensus for the reliability assessment of digital instrumentation and control (I&C) systems. Motivated by the lack of consensus for reliability analysis methods, this work employs a novel framework that incorporates Bayesian, human reliability, and common-cause failure (CCF) modeling techniques. The novel framework allows the use of state-of-the-art or classical modeling techniques when accounting for human and CCF effects on system reliability. The Bayesian and HRA-Aided Method for the Reliability Analysis of Software (BAHAMAS) is demonstrated by a case study for the quantification of software hazards found in a previous analysis of a digital reactor trip system. The results demonstrate the ability of BAHAMAS to account for human activities during the software development life cycle and their influence on software reliability. BAHAMAS is a flexible tool for extending the coverage of conventional probabilistic risk assessments to include modernized digital I&C systems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Light Water Reactor Sustainability Program: Use of Time Distributions to Predict Operator Procedure Performance in Dynamic Human Reliability Analysis

The Human Unimodel for Nuclear Technology to Enhance Reliability (HUNTER) framework affords software capable of conducting human reliability analysis (HRA) using a dynamic approach built around operating procedures (OPs) from nuclear power plants (NPPs). Previous HUNTER reports document the development of this software tool, the coupling of HUNTER to the simulator code, the collection of operator performance data by using simulators to calibrate HUNTER models, and linking HUNTER to probabilistic risk assessment (PRA) software. The present report largely addresses two topics. The first is a new function in HUNTER called the HUNTER Procedure Performance Predictor (P3). HUNTER P3 uses HUNTER’s built in Monte Carlo tools featuring human performance variability to identify potential error traps in procedures. The second topic is time distribution analysis to generate time inputs for dynamic HRA. The current analysis was performed to investigate time distributions for task primitives, which are the minimum task unit of analysis used in dynamic HRA modeling. Using the time distribution data, the elapsed time for human actions in an extended loss of AC power (ELAP) scenario is then investigated. Time data and prediction are essential for modeling procedure performance.

99 GENERAL AND MISCELLANEOUS↗

De-risking fault leakage risk and containment integrity for subsurface storage applications

The subsurface is pivotal in the energy transition, for the sequestration of CO 2 and energy storage. It is crucial to understand to what extent geological faults may form leakage pathways that threaten the containment integrity of these projects. Fault flow behavior has been studied in the context of hydrocarbon development, supported by observations from wells drilled through faults, but such observations are rare in geoenergy projects. Focusing on mechanical behavior as early indicator of potential leakage risks, a probabilistic Coulomb Failure Stress workflow is developed and demonstrated using data from the Decatur CO 2 sequestration project to rank faults based on their containment risk. The analysis emphasizes the importance of fault throw relative to reservoir thickness and pore pressure change in assessing reactivation risks. Integrating this mechanical assessment with geological and dynamic fault analyses contributes to derisking fault containment for geoenergy applications, providing valuable insights for the successful development of subsurface storage projects.

58 GEOSCIENCES↗

Modular High Temperature Gas-Cooled Reactor: Accident Analysis

Licensing Modernization Project (LMP) Risk Informed Approach Selection of Licensing Basis Events (LBEs) Frequency-Consequence Target LBE Cumulative Risk Targets Structures, Systems, and Components (SSC) Safety Categories Classification Evaluation of Defense in Depth (DID) Use of Probabilistic Risk Assessment (PRA) in LMP Process PRA Policy Statement American Nuclear Society (ANS) Non-Light-Water Reactor (non-LWR) PRA Standard

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Induced seismicity potential based on probabilistic geomechanics for the San Juan Basin CarbonSAFE project

Although geologic carbon sequestration projects have yet to induce — or may never induce — a damaging earthquake, experiences from other deep injection industries such as hydraulic fracturing, enhanced geothermal systems, and saltwater disposal suggest that effective quantitative seismic risk assessment is necessary for deep saline carbon capture and sequestration (CCS) projects. One such imminent CCS project is the San Juan Basin CarbonSAFE Phase III program. We use Monte Carlo probabilistic geomechanical analyses combined with observations of the geologic and operational parameters of the San Juan Basin site and suggest that this project is of low-induced seismic risk. The primary analysis is split into four sections. First, we assess the literature for faults and past seismicity, and at least five faulting scenarios are directly relevant. Second, we develop and calibrate an integrated earth model for the project site. Third, we perform Monte Carlo simulations that consider reasonable uncertainties of the geomechanical parameters. Of five tested faulting scenarios, only one presents high Coulomb failure functions, but fourth, we determine the risk to be low based on the combined lack of historical seismicity, the geologic framework of the faulting scenario, and the presence of saltwater injection at the same depth as the proposed supercritical carbon dioxide injection. The most sensitive parameters in the geomechanical calculations are the fault dip and the coefficient of friction. The least sensitive are the fault strike and the orientation of the maximum horizontal principal stress.

58 GEOSCIENCES↗

2020 Summer Resource Adequacy in the ERCOT Region

The study looks at the evolution of the Electric Reliability Council of Texas (ERCOT) market across the last decade to provide an understanding of how the market arrived at its current condition. In addition, the study examines four scenarios and utilizes probabilistic dispatch analysis to assess the potential for resource adequacy and reliability concerns under those scenarios. The study finds that under three of the four scenarios, the region will see an increased risk for Energy Emergency Alerts and need for emergency operator actions to ensure the reliable delivery of electricity to the more than 25 million people who ERCOT serves.

2020↗

Distribution Development for Residual Inventory at the New York West Valley Site - 20400

The New York State Energy Research and Development Authority (NYSERDA) is the owner of the Western New York Nuclear Service Center (WNYNSC), a 1,351 ha site located approximately 48 km south of Buffalo, New York. In 1962, Nuclear Fuel Services, Inc. (NFS) entered into Agreements with the Atomic Energy Commission and New York State to construct the first commercial reprocessing plant of nuclear fuel in the United States. NFS, a private company, built and operated the spent fuel reprocessing plant and waste disposal facilities, processing 640 Mg of spent nuclear fuel from 1966 to 1972 under an Atomic Energy Commission license. Nuclear fuel reprocessing operations ended in 1972 and never reopened, leaving behind radioactive and chemical wastes. Operations led to contamination in a number of facilities and locations. Some of that contamination has migrated from waste disposal zones to other layers, formations, and features on and off the WNYNSC. Phase I decommissioning activities are ongoing and involve the removal of a number of areas and structures that have been associated with contamination. The purpose of this work is to outline the approach for characterizing contamination not associated with disposed wastes, contaminated structures, or specific releases. In this work, the term, residual radiological activity, is used to describe environmental contamination that exists subsequent to the completion of Phase I decommissioning activities, that is not associated with disposed wastes, contaminated structures, or specific releases. Contamination from the Site was quantified relative to data that characterize the concentrations of radionuclides that exist in background. Background concentrations are those present in the area but having no influence from Site related activities. The existence of residual radiological activity that is elevated relative to background has the potential to contribute to future risks to human health and the environment. As a consequence, the residual inventory information is used to inform the West Valley Probabilistic Performance Assessment (PPA) model to characterize potential future risks to human health and the environment. The centralized West Valley Data Management System (DMS) was the source of information for the data assembled in this analysis. The DMS is a fairly large compilation consisting of thousands of records from investigation studies, with sample dates ranging from 1990 to present. Samples from monitoring wells, boreholes, geoprobe studies, surface water, surface soils, storm water outfalls, ventilation stack filters, plant and animal tissues, and more are included in the DMS. Results are typically reported in units of activity per unit volume. For the purpose of the analyses presented here, all results were converted into consistent units of pCi per unit volume. Since 1990, data have been collected from various locations across the WNYNSC at different times with varying frequency over the course of several decades. As a consequence, a number of potential issues can arise with respect to the assembly of a dataset that is deemed adequate for the characterization of residual radiological activity. These issues were assessed and resolved to the extent possible through careful consideration of the properties of the distributions. The intent was to use data which characterize the current state of the Site. Radionuclides can be designated to one of several groups depending on their origin. In this work the groups considered were 1) Naturally Occurring Radioactive Material (NORM), 2) fallout, and 3) Other (including power plant, medical research, etc). This grouping is a useful construct with respect to the interpretation of fixed laboratory results. For example, NORM radionuclides that exist within a decay chain should have approximately equivalent distributions of concentrations if they are representative of background conditions. Insights such as these can be used as a check to identify sample results that need to be further investigated or omitted due to issues associated with reported results from fixed laboratory analyses. This type of analysis provided a foundation for the assessment of the adequacy of sample results for use in subsequent components of an assessment. The general process for the assessment of residual radiological contamination at the Site consists of a sequence of several steps. First, for each analyte, several statistical tests were performed to assess the weight of evidence against the null hypothesis that the mean of the distribution of concentrations was equal to zero. If the mean of the distribution of concentrations for a given radionuclide was not found to be greater than zero, then it was removed from consideration as a component of the residual radiological contamination. If there was significant evidence to reject the hypothesis of the mean being equal to zero, the second step was to compare the distribution of the data from the Site to that of the corresponding background. A suite of tests was used to compare the distributions of the site and background data. The results of these tests were collectively used to determine if site data are elevated relative to background. The third step was to develop distributions using a Bayesian framework to characterize the distribution of mean of the increment present above background for each of the radionuclides. The Bayesian model implemented allowed for the comparison of site-specific records to background concentrations to better approximate contamination attributed to the Site. A final screening step was employed for radionuclides that exceed background. This screening step compared 95% upper confidence limits (UCLs) from the increment distribution developed in the previous step to the risk screening levels. This approach yields a list of analytes that were determined to be elevated relative to background.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hierarchical Estimation For Planetary Protection

The software uses Bayes' theorem to describe the probability of an event based on prior knowledge of conditions that might be related to the event. The purpose of Bayesian analysis is to determine posterior probabilities based on prior probabilities where new information can be used in the decision-making process as additional data is gathered. The software will be used in Probabilistic Risk Assessments (PRAs) related to the Europa Clipper mission, which is one of NASA’s top priorities. Ultimately, the mission entails sending the Europa Clipper spacecraft to Jupiter’s Europa moon to orbit the planet and collect data for research and development. Europa is the smallest of the four Galilean moons orbiting Jupiter and is believed by researchers to be the most promising place to look for present-day environments suitable for life. Europa is thought to have an iron core, a rocky mantle, and a salt-water ocean covered by an ice-layered surface.

Gribok, Andrei [Idaho National Laboratory (INL), I↗

The Publication and Endorsement of the ASME/ANS Probabilistic Risk Assessment Standard for Advanced Non-Light Water Reactor Nuclear Power Plants

Due to growing interest in non-light water reactor (NLWR) concepts, the predecessor to the American Nuclear Society (ANS)/American Society of Mechanical Engineers (ASME) Joint Committee on Nuclear Risk Management (JCNRM) initiated development of a NLWR probabilistic risk assessment (PRA) standard in 2006. The developed standard, released for trial use in 2013, was the first integral PRA standard created by the JCNRM, containing requirements ranging from the development of initiating events to the analysis of offsite radiological consequence. Based on feedback from pilot applications of the trial standard, a revised version of the standard was developed and balloted in 2020, with unanimous passage by the JCNRM and formal publication as an American National Standards Institute (ANSI) standard in 2021. The paper provides an overview of the standard and its development process. In addition, the paper reviews the latest status of U.S. Nuclear Regulatory Commission endorsement efforts through Regulatory Guide 1.247.

Fleming, K.↗