Search NASASearch

SEARCH · Search NASA

Results for “Project Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Automated Procurement System (APS) revised project management plan (DS-03)

The Project Plan is the governing document for the implementation of the Automated Procurement System (APS). It includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

Murphy, Diane R.

1393 Ring Bus at JPL: Description and Status

Completed Ring Bus IC V&V Phase - Ring Bus Test Plan Completed for SIM Project - Applicable to Other Projects Implemented a Avionics Bus Based upon the IEEE 1393 Standard - Excellent Starting Point for a General Purpose High-Speed Spacecraft Bus - Designed to Meet SIM Requirements for - Real-time deterministic, distributed systems. - Control system requirements - Fault detection and recovery Other JPL Projects Considering Implementation F'light Software Ring Bus Driver Module Began in 2006, Continues Participating in Standard Revision. Search for Earth-like planets orbiting nearby stars and measure the masses and orbits of the planets it finds. Survey 2000 nearby stars for planetary systems to learn whether our Solar System is unusual, or typical. Make a new catalog of star position 100 times more accurate than current measurements. Learn how our galaxy formed and will evolve by studying the dynamics of its stars. Critically test models of exactly how stars shine, including exotic objects like black holes, neutron stars and white dwarfs.

time synchronization

Europa Clipper Payload Verification and Validation: Early Architecture and Implementation

NASA’s Europa Clipper mission will investigate the Jovian icy moon Europa with a sophisticated payload consisting of a suite of nine instruments. Clipper’s observations will help provide answers to a broad range of scientific objectives related to Europa’s habitability. As the project proceeds through Phase C, we are building confidence in the system’s ability to achieve these science goals by implementing a rigorous payload verification and validation (V&V) program. This paper details the planned structure and implementation of the Europa Clipper payload V&V program as it exists leading up to the project critical design review (CDR), before the bulk of instrument- or payload- level V&V activities have begun. We first explain the context for payload V&V on Europa Clipper, including its interfaces with other parts of the project system. We then describe the taxonomy of V&V concepts and their interrelationships, followed by a discussion on how this framework allows us to codify interfaces, processes, and ideas that are key to a successful V&V program. We focus on key aspects of the planning phases of V&V, especially establishing a complete set of verification items and accurately mapping them into appropriate verification activities. The second half of the paper describes the logistics of implementing this framework onto our actual payload system, including the processes and tools we use to manage and communicate agreements, changes, and risks across the project. We conclude with a reflection on the unique drivers and challenges of the V&V program concept development so far and the work that is planned for phase D implementation.

Srivastava, Priyanka

The OSIRIS-Rex Asteroid Sample Return: Mission Operations Design

The OSIRIS-REx mission employs a methodical, phased approach to ensure success in meeting the missions science requirements. OSIRIS-REx launches in September 2016, with a backup launch period occurring one year later. Sampling occurs in 2019. The departure burn from Bennu occurs in March 2021. On September 24, 2023, the SRC lands at the Utah Test and Training Range (UTTR). Stardust heritage procedures are followed to transport the SRC to Johnson Space Center, where the samples are removed and delivered to the OSIRIS-REx curation facility. After a six-month preliminary examination period the mission will produce a catalog of the returned sample, allowing the worldwide community to request samples for detailed analysis.Traveling and returning a sample from an Asteroid that has not been explored before requires unique operations consideration. The Design Reference Mission (DRM) ties together space craft, instrument and operations scenarios. The project implemented lessons learned from other small body missions: APLNEAR, JPLDAWN and ESARosetta. The key lesson learned was expected the unexpected and implement planning tools early in the lifecycle. In preparation to PDR, the project changed the asteroid arrival date, to arrive one year earlier and provided additional time margin. STK is used for Mission Design and STKScheduler for instrument coverage analysis.

GCS plan for software aspects of certification

As part of the Guidance and Control Software (GCS) research project being sponsored by NASA to evaluate the failure processes of software, standard industry software development procedures are being employed. To ensure that these procedures are authentic, the guidelines outlined in the Radio Technical Commission for Aeronautics (RTCA/DO-178A document entitled, software considerations in airborne systems and equipment certification, were adopted. A major aspect of these guidelines is proper documentation. As such, this report, the plan for software aspects of certification, was produced in accordance with DO-178A. An overview is given of the GCS research project, including the goals of the project, project organization, and project schedules. It also specifies the plans for all aspects of the project which relate to the certification of the GCS implementations developed under a NASA contract. These plans include decisions made regarding the software specification, accuracy requirements, configuration management, implementation development and verification, and the development of the GCS simulator.

Shagnea, Anita M.

JPL space robotics: Present accomplishments and future thrusts

Complex missions require routine and unscheduled inspection for safe operation. The purpose of research in this task is to facilitate structural inspection of the planned Space Station while mitigating the need for extravehicular activity (EVA), and giving the operator supervisory control over detailed and somewhat mundane, but important tasks. The telerobotic system enables inspection relative to a given reference (e.g., the status of the facility at the time of the last inspection) and alerts the operator to potential anomalies for verification and action. There are two primary objectives of this project: (1) To develop technologies that enable well-integrated NASA ground-to-orbit telerobotics operations, and (2) to develop a prototype common architecture workstation which implements these capabilities for other NASA technology projects and planned NASA flight applications. This task develops and supports three telerobot control modes which are applicable to time delay operation: Preview teleoperation, teleprogramming, and supervised autonomy.

Weisbin, C. R.

Artificial Gravity as a Multi-System Countermeasure to Bed Rest Deconditioning: Pilot Study Overview

Efficient, effective, multi-system countermeasures will likely be required to protect the health, safety, and performance of crews aboard planned exploration-class space flight missions to Mars and beyond. To that end, NASA, DLR, and IMBP initiated a multi-center international project to begin systematically exploring the utility of artificial gravity (AG) as a multi-system countermeasure in ground based venues using test subjects deconditioned by bed rest. The goal of this project is to explore the efficacy of short-radius, intermittent AG as a countermeasure to bone, muscle, cardiovascular, and sensory-motor adaptations to hypogravity. This session reports the results from a pilot study commissioned to validate a standardized protocol to be used by all centers involved in the project. Subject selection criteria, medical monitoring requirements, medical care procedures, experiment control procedures, and standardized dependent measures were established jointly. Testing was performed on 15 rigorously screened male volunteers subjected to 21 days of 6deg HDT bed rest. (All provided written consent to volunteer after the nature of the study and its hazards were clearly explained to them.) Eight were treated with daily 1hr AG exposures (2.5g at the feet decreasing to 1.0g at the heart) aboard a short radius (3m) centrifuge, while the other seven served as controls. Multiple tests of multiple dependent measures were made in each of the primary physiological systems of interest during a 10 day acclimatization period prior to HDT bed rest and again during an 8 day recovery period after the bed rest period was complete. Analyses of these data (presented in other papers in this session) suggest the AG prescription had salutary effects on aspects of the bone, muscle, and cardiovascular systems, with no untoward effects on the vestibular system, the immune system, or cognitive function. Furthermore, treatment subjects were able to tolerate 153/160 centrifuge sessions over the 21 day deconditioning protocol, suggesting that tolerance was unaffected by deconditioning. These positive results set the stage for full implementation of the planned multi-center international AG project. Future work will be devoted to developing optimization techniques for AG prescriptions (likely supplemented by exercise) to provide maximum physiological protection across all systems subject to space flight deconditioning in both men and women with minimum time and/or side effects. While a continuous AG solution (rotating vehicle) would likely be more efficient, this study suggests that intermittent AG could be an effective multi-system countermeasure.

Paloski, William H.

International Space Station (ISS) Low Pressure Intramodule Quick Disconnect Failures

A failure of an ISS intermodule Quick Disconnect (QD) during protoflight vibration testing of ISS regenerative Environmental Control and Life Support (ECLS) hardware led to the discovery of QD design, manufacturing, and test flaws which can yield the male QD susceptible to failure of the secondary housing seal and inadequate housing assembly locking mechanisms. Discovery of this failure had large implications when considering that currently there are 399 similar units on orbit and approximately 1100 units on the ground integrated into flight hardware. Discovery of the nature of the failure required testing and analysis and implementation of a recovery plan requiring part screening and review of element level and project hazard analysis to determine if secondary seals are required. Implementation also involves coordination with the Nodes and MPLM project offices, Regenerative ECLS Project, ISS Payloads, JAXA, ESA, and ISS Logistics and Maintenance.

Lewis, John F.

Igiugig Comprehensive Energy Plan Implementation Assistance

In 2023, the National Laboratory of the Rockies (NLR) partnered with the Renewable Energy Alaska Project (REAP) to provide technical assistance to Igiugig through the US Department of Energy's Energy Transitions Initiative Partnership Project (ETIPP). The overall objective of this ETIPP project was to provide technical support to help the community achieve their energy goal of reducing diesel fuel for electricity by 50% by 2030 through the implementation of high priority strategies defined in their 2022 Community Energy Plan. Technical support focused on evaluating additional renewables and renewable heating scenarios, identifying heat recovery system design options for high penetration renewables, investigation power quality and line loss issues, and supporting integration of battery energy storage.

24 POWER TRANSMISSION AND DISTRIBUTION

Human factors aspects of air traffic control

An overview of human factors problems associated with the operation of present and future air traffic control systems is presented. A description is included of those activities and tasks performed by air traffic controllers at each operational position within the present system. Judgemental data obtained from controllers concerning psychological dimensions related to these tasks and activities are also presented. The analysis includes consideration of psychophysiological dimensions of human performance. The role of the human controller in present air traffic control systems and his predicted role in future systems is described, particularly as that role changes as the result of the system's evolution towards a more automated configuration. Special attention is directed towards problems of staffing, training, and system operation. A series of ten specific research and development projects are recommended and suggested work plans for their implementation are included.

Older, H. J.

Information Management System for the California State Water Resources Control Board (SWRCB)

A study was made to establish the requirements for an integrated state-wide information management system for water quality control and water quality rights for the State of California. The data sources and end requirements were analyzed for the data collected and used by the numerous agencies, both State and Federal, as well as the nine Regional Boards under the jurisdiction of the State Board. The report details the data interfaces and outlines the system design. A program plan and statement of work for implementation of the project is included.

Heald, T. C.

Materials Processing in Space (MPS) program description

Insight is provided into the scientific rotationale for materials processing in space (MPS), and a comprehensive and cohesive approach for implementation and integration of the many, diverse aspects of MPS is described. The programmatic and management functions apply to all projects and activities implemented under MPS. It is intended that specific project plans, providing project unique details, will be appended to this document for endeavors such as the Space Processing Applications Rocket (SPAR) Project, the Materials Experiment Assembly (MEA) Project, the MPS/Spacelab (MPS/SL) Project, and the Materials Experiment Carrier (MEC) Payloads.

Source record

Coarsening in Solid-Liquid Mixtures-2: A Materials Science Experiment for the ISS

A materials science experiment has been developed and readied for operation aboard the International Space Station (ISS). Components of this experiment are onboard ISS and area awaiting the flight of science samples. The goal of the experiment is to understand the dynamics of Ostwald ripening, also known as coarsening, a process that occurs in nearly any two-phase mixture found in nature. Attempts to obtain experimental data in ground-based laboratories are hindered due to the presence of gravity, which introduces material transport modes other than that of the coarsening phenomenon. This introduces adjustable parameters in the formulation of theory. The original Coarsening in Solid-Liquid Mixtures (CSLM) mission, which flew on the Space Shuttle in 1997, produced data from a coarsened eutectic alloy. Unfortunately, both the science matrix and the hardware, while nominally functional, did not account adequately for operations in microgravity. A significantly redesigned follow-on experiment, CSLM-2 has been developed to redress the inadequacies of the original experiment. This paper reviews the CSLM-2 project: its history, science goals, flight hardware implementation, and planned operations and analysis

Hickman, J. Mark

Approaches for Autonomous Peer to Peer Communication: For Resilient Community Microgrids

The final phase of the Islandable Communications task of the SECURE project consisted of integrating the islandable communications network into a microgrid simulation at NREL. Initially integration was planned for a microgrid implemented as a mix of simulation and physical hardware. As the project evolved, the microgrid became fully simulated. The simulation environment was structured to break out the communication paths that would pass over a communication network in a field demonstration. The Islandable Communication network was integrated into the simulation environment, allowing both a commercial cellular carrier and a Private LTE network to be evaluated. The microgrid simulation showed differences in performance and behavior when operating over the wireless networks (compared to operating over wired Ethernet in the lab). These differences point to further research opportunities to better understand how microgrid communication carried over real-world or impaired networks affects the microgrid system behavior.

24 POWER TRANSMISSION AND DISTRIBUTION

Uplink Coding

This viewgraph presentation reviews uplink coding. The purpose and goals of the briefing are (1) Show a plan for using uplink coding and describe benefits (2) Define possible solutions and their applicability to different types of uplink, including emergency uplink (3) Concur with our conclusions so we can embark on a plan to use proposed uplink system (4) Identify the need for the development of appropriate technology and infusion in the DSN (5) Gain advocacy to implement uplink coding in flight projects Action Item EMB04-1-14 -- Show a plan for using uplink coding, including showing where it is useful or not (include discussion of emergency uplink coding).

flight projects

New Millennium EO3

The New Millennium Program (NMP) is a NASA technology program that focuses on the validation of advanced spacecraft and instrumentation technologies in space. This program specifically seeks technologies that could significantly benefit future space and Earth science missions by enabling new science capabilities and reducing life cycle costs. These technologies must also require a validation in space to mitigate risks to the first science users, and provide cross-cutting benefits to both NASA's Earth and Space Science enterprises. The NASA Office of Earth Science (OES) directed the NMP to focus the third Earth Observing mission, E03, on innovative measurement concepts that would facilitate remote sensing observations from orbits beyond conventional low-Earth orbit (LEO). These orbits include geosynchronous orbits, highly elliptical orbits, mid-Earth and high-Earth orbits, and other unique vantage points such as L1 and L2. To maximize the input from the Earth science community, a NASA Research Announcement (NRA) was released to solicit innovative measurement concepts for this NMP flight. Because the NMP is a technology validation program, rather than a conventional science program, the NRA required that these measurement concepts employ revolutionary technologies and/or measurement strategies that will enable future science missions from orbits beyond LEO. Another requirement was that a validation in space was needed to reduce real or perceived risks of this concept to future science users. The proposals submitted in response to this NRA were peer reviewed by the NASA OES. The measurement concepts selected through this process will be summarized in this presentation. The E03 measurement concept NRA did not solicit complete mission concepts or flight hardware. Instead, the selected investigators will join integrated project formulation teams to define the mission for the demonstration of the measurement technique and participate in mission design trades and implementation planning. The teams will define and document the measurement approach, the required technologies, the validation plan, the scalability of the design to future science missions, and the infusion path for the completely validated instrument. During this project formulation phase, the specific technologies required to implement each measurement concept will be solicited through an open technology solicitation, and the technology providers will be added to the integrated teams. Once a complete candidate mission concept has been formulated for each measurement concept, these concepts will be subjected to a comprehensive review. The Associate Administrator of the OES will use the results of this review to select a single concept for the E03 flight opportunity. That mission concept will enter its implementation phase, which is expected to last for less than 36 months before launch. During this phase, and after launch, the implementation team will work with the NMP to document and disseminate the information gathered during the flight qualification testing and operations of the measurement concept and its component technologies. This information will be archived and published, where appropriate, to encourage the rapid infusion of these validated technologies into future space and Earth science missions. I

Li, Fuk K.

NASA Supportability Engineering Implementation Utilizing DoD Practices and Processes

The Ares I design and development program made the determination early in the System Design Review Phase to utilize DoD ILS and LSA approach for supportability engineering as an integral part of the system engineering process. This paper is to provide a review of the overall approach to design Ares-I with an emphasis on a more affordable, supportable, and sustainable launch vehicle. Discussions will include the requirements development, design influence, support concept alternatives, ILS and LSA planning, Logistics support analyses/trades performed, LSA tailoring for NASA Ares Program, support system infrastructure identification, ILS Design Review documentation, Working Group coordination, and overall ILS implementation. At the outset, the Ares I Project initiated the development of the Integrated Logistics Support Plan (ILSP) and a Logistics Support Analysis process to provide a path forward for the management of the Ares-I ILS program and supportability analysis activities. The ILSP provide the initial planning and coordination between the Ares-I Project Elements and Ground Operation Project. The LSA process provided a system engineering approach in the development of the Ares-I supportability requirements; influence the design for supportability and development of alternative support concepts that satisfies the program operability requirements. The LSA planning and analysis results are documented in the Logistics Support Analysis Report. This document was required during the Ares-I System Design Review (SDR) and Preliminary Design Review (PDR) review cycles. To help coordinate the LSA process across the Ares-I project and between programs, the LSA Report is updated and released quarterly. A System Requirement Analysis was performed to determine the supportability requirements and technical performance measurements (TPMs). Two working groups were established to provide support in the management and implement the Ares-I ILS program, the Integrated Logistics Support Working Group (ILSWG) and the Logistics Support Analysis Record Working Group (LSARWG). The Ares I ILSWG is established to assess the requirements and conduct, evaluate analyses and trade studies associated with acquisition logistic and supportability processes and to resolve Ares I integrated logistics and supportability issues. It established a strategic collaborative alliance for coordination of Logistics Support Analysis activates in support of the integrated Ares I vehicle design and development of logistics support infrastructure. A Joint Ares I - Orion LSAR Working Group was established to: 1) Guide the development of Ares-I and Orion LSAR data and serve as a model for future Constellation programs, 2) Develop rules and assumptions that will apply across the Constellation program with regards to the program's LSAR development, and 3) Maintain the Constellation LSAR Style Guide.

Smith, David A.

Determining Unabated Airborne Radionuclide Emissions Monitoring Requirements Using Inventory-Based Methods

Compliance with the airborne radionuclide emission monitoring requirements in the National Emission Standards for Hazardous Air Pollutants (NESHAP; Title 40 of the U.S. Code of Federal Regulations Part 61, Subpart H) and State requirements in Washington Administrative Code 246–247: Radiation Protection – Air Emissions and 173-480: Ambient Air Quality Standards and Emission Limits for Radionuclides were evaluated for Pacific Northwest National Laboratory (PNNL) operations. Additional guidance may be found in the U.S. Department of Energy Handbook, Environmental Radiological Effluent Monitoring and Environmental Surveillance. To meet regulatory requirements, reviews of planned or proposed projects and activities provide the basis for implementing necessary monitoring adjustments or for implementing changes to projects and activities in a timely manner. Potential unabated off-site doses were evaluated for emission locations managed by PNNL and licensed to the Department of Energy. These locations were at facilities in Richland, Washington (i.e., the Hanford Site and PNNL–Richland campus) and in Sequim, Washington, (PNNL–Sequim campus). This report describes the inventory-based methods and provides the results for the NESHAP assessment performed in January 2024 for calendar year ending 2023.

40 CFR 61 Subpart H