Results for “Project Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Learning the ABCs (of Project Management)

To lead a project effectively, one has to establish and maintain the flexibility to take appropriate actions when needed. Overconstrained situations should be avoided. To get on top of matters and stay there, a manager needs to anticipate what it will take to successfully complete the job. Physical and financial resources, personnel, and management structure are all important considerations. Carving out the necessary turf up front can make a world of difference to the project's outcome. After the "what," "where," and "when" of a project are nailed down, the next question is "how" to do the job. When I first interviewed for the job of Science Payload Manager on the Advanced Composition (ACE) Explorer mission, Dr. Edward Stone (ACE Principal Investigator) asked, "Al, give me an idea of your management style." It was a question I had not considered before. I thought about it for a few seconds and then answered, "Well, the first descriptive term that comes to mind is the word "tranquility". That seemed to startle him. So I added, "I guess what I mean is, that if the situation is tranquil and the project is running smoothly, then I've anticipated all the problems and taken necessary actions to head them off." He then asked: "Have you ever reached this state?" "No," I admitted, "but I strive for it." That seemed to satisfy him because I got the job.

Frandsen, Allan

Agent-Based Simulations for Project Management

Currently, the most common approach used in project planning tools is the Critical Path Method (CPM). While this method was a great improvement over the basic Gantt chart technique being used at the time, it now suffers from three primary flaws: (1) task duration is an input, (2) productivity impacts are not considered , and (3) management corrective actions are not included. Today, computers have exceptional computational power to handle complex simulations of task e)(eculion and project management activities (e.g ., dynamically changing the number of resources assigned to a task when it is behind schedule). Through research under a Department of Defense contract, the author and the ViaSim team have developed a project simulation tool that enables more realistic cost and schedule estimates by using a resource-based model that literally turns the current duration-based CPM approach "on its head." The approach represents a fundamental paradigm shift in estimating projects, managing schedules, and reducing risk through innovative predictive techniques.

White, J. Chris

Issues in NASA program and project management

This volume is the sixth in an ongoing series on aerospace project management at NASA. Articles in this volume cover evolution of NASA cost estimating; SAM 2; National Space Science Program: strategies to maximize science return; and human needs, motivation, and results of the NASA culture surveys. A section on resources for NASA managers rounds out the publication.

Hoban, Francis T.

Issues in NASA program and project management

This volume is the ninth in an ongoing series on aerospace project management at NASA. Articles in this volume cover evolution of NASA cost estimating; SAM 2; National Space Science Program: strategies to maximize science return; and human needs, motivation, and results of the NASA culture surveys. A section on resources for NASA managers rounds out the publication.

Hoban, Francis T.

Issues in NASA program and project management

This new collection of papers on aerospace management issues contains a history of NASA program and project management, some lessons learned in the areas of management and budget from the Space Shuttle Program, an analysis of tools needed to keep large multilayer programs organized and on track, and an update of resources for NASA managers. A wide variety of opinions and techniques are presented.

Hoban, Francis T.

Improving Project Management Using Formal Models and Architectures

This talk discusses the advantages formal modeling and architecture brings to project management. These emerging technologies have both great potential and challenges for improving information available for decision-making. The presentation covers standards, tools and cultural issues needing consideration, and includes lessons learned from projects the presenters have worked on.

Kahn, Theodore

International Project Management Committee: Overview and Activities

This slide presentation discusses the purpose and composition of the International Project Management Committee (IMPC). The IMPC was established by members of 15 space agencies, companies and professional organizations. The goal of the committee is to establish a means to share experiences and best practices with space project/program management practitioners at the global level. The space agencies that are involved are: AEB, DLR, ESA, ISRO, JAXA, KARI, and NASA. The industrial and professional organizational members are Comau, COSPAR, PMI, and Thales Alenia Space.

Hoffman, Edward

MSFC Propulsion Systems Department Knowledge Management Project

This slide presentation reviews the Knowledge Management (KM) project of the Propulsion Systems Department at Marshall Space Flight Center. KM is needed to support knowledge capture, preservation and to support an information sharing culture. The presentation includes the strategic plan for the KM initiative, the system requirements, the technology description, the User Interface and custom features, and a search demonstration.

Caraccioli, Paul A.

A critical review of the life sciences project management at Ames Research Center for the Spacelab Mission development test 3

A management study was initiated by ARC (Ames Research Center) to specify Spacelab Mission Development Test 3 activities and problems. This report documents the problems encountered and provides conclusions and recommendations to project management for current and future ARC life sciences projects. An executive summary of the conclusions and recommendations is provided. The report also addresses broader issues relevant to the conduct of future scientific missions under the constraints imposed by the space environment.

Helmreich, R. L.

Virtual Project Management Challenge

Technical knowledge is essential to the work done by NASA practitioners. So it may be surprising to learn that the most ingenious and elegant solutions to project challenges often arise not from a specific technical discipline perspective, but from a systems-focused mindset. While technical discipline expertise is a critical component of project success, sometimes the simplest resolution to a problem involves a systems-wide solution. Because of this, encouraging a systems mentality among project team members can be a powerful tool in mitigating risk and eliminating threats. Join us for an exploration of the critical ways in which a systems engineering and integration perspective can enhance project management efforts. Presenter Bo Bejmuk is the former Space Shuttle Orbiter Program Director and manager of Sea Launch Program operations and development for Boeing. He recently served as Chairman of the Standing Review Board for the NASA Constellation Program. Moderator Ramien Pierre is from NASA's Academy for Program/Project and Engineering Leadership (APPEL).

Bo Bejmuk

Project Management: The Television Show

There are parallels between what goes on in the emergency room, with its host of accident and gunshot wound victims, and what goes on in successful project management.

Little, Terry

Automated Procurement System (APS) revised project management plan (DS-03)

The Project Plan is the governing document for the implementation of the Automated Procurement System (APS). It includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

Murphy, Diane R.

Application of Agile for Systems Engineering, Project Management and Modeling and Lessons Learned

The Systems Engineering team within the Human Research Program (HRP) Exploration Medical Capability (ExMC) Element has been transforming its development processes to be more efficient, robust,and responsive to change and to its stakeholders. To these ends, the Systems Engineering team trialed the integration of agile development techniques into existing and new processes. Agile development methods are well understood within the software development community. Outside ofsoftware development, however, how non-software project management (PM) and systems engineering (SE) teams implement agile development techniques is less well understood. In its transformation efforts, the ExMC SE team focused on three main areas: Improving the project communications among subsystem teams and stakeholders by adopting a scrum-like process, Changing the status and reporting mechanisms to improve schedule coordination between the subsystem team, SE leadership, and ExMC Element leadership, and Unifying the model-based SE workflow to improve understanding of Concepts of Operations across projects.This presentation highlights several of these transformations and what the SE team learned while undergoing the transformation.

S Lumpkins

The Dust Management Project: Final Report

A return to the Moon to extend human presence, pursue scientific activities, use the Moon to prepare for future human missions to Mars, and expand Earth s economic sphere, will require investment in developing new technologies and capabilities to achieve affordable and sustainable human exploration. From the operational experience gained and lessons learned during the Apollo missions, conducting longterm operations in the lunar environment will be a particular challenge, given the difficulties presented by the unique physical properties and other characteristics of lunar regolith, including dust. The Apollo missions and other lunar explorations have identified significant lunar dust-related problems that will challenge future mission success. Comprised of regolith particles ranging in size from tens of nanometers to microns, lunar dust is a manifestation of the complex interaction of the lunar soil with multiple mechanical, electrical, and gravitational effects. The environmental and anthropogenic factors effecting the perturbation, transport, and deposition of lunar dust must be studied in order to mitigate it s potentially harmful effects on exploration systems and human explorers. The Dust Management Project (DMP) is tasked with the evaluation of lunar dust effects, assessment of the resulting risks, and development of mitigation and management strategies and technologies related to Exploration Systems architectures. To this end, the DMP supports the overall goal of the Exploration Technology Development Program (ETDP) of addressing the relevant high priority technology needs of multiple elements within the Constellation Program (CxP) and sister ETDP projects. Project scope, approach, accomplishments, summary of deliverables, and lessons learned are presented.

Hyatt, Mark J.