Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Sustaining the Z Facility (FY24 Progress Report)

Based on planning and reviews conducted in 2020, it is clear today that the Z Facility must be sustained through 2040 or longer. This requires a well-developed and executed maintenance and sustainment effort. Z’s Sustainment Plan outlines the approach that Sandia’s Pulsed Power Sciences Center will pursue to assure that the Z Facility maintains its world class research and development program supporting the NNSA’s Science Based Stockpile Stewardship efforts. In FY24, the Pulsed Power Center at SNL planned and executed many substantial sustainment projects as well as maintenance-driven-sustainment aligned to the Sustainment Plan. These projects are listed in this section with brief descriptions of the work executed.

42 ENGINEERING↗

Hydrogen Sustainable Infrastructure Guidelines (H2SIG)

Infrastructure interacts with major global challenges inclusive of climate change, resilience, equity and social justice, environmental protection and biodiversity, public health, and economic recovery. This effort directly addresses how to apply sustainability assessments to the unique aspects of hydrogen (H2) infrastructure projects using the Envision® sustainability framework developed by the Institute for Sustainable Infrastructure (ISI). Envision is a flexible system of criteria and performance objectives to aid decision makers and help project teams identify sustainable approaches during planning, design and construction of infrastructure projects that will continue throughout the project’s operations, maintenance, and end-of-life phases. The goal of this work is to support those interested in conducting sustainability assessments for hydrogen infrastructure projects. Through this work the team has developed hydrogen-specific guidelines and best practices to assist project developers, investors and regulators in straightforward application of the Envision framework to systematically enhance clarity and increase objectivity across hydrogen projects. Subject matter experts from 20 different organizations (industry, non-profits, municipalities, emissions regulators, national labs) were engaged through 7 focus groups to discuss the H2-prioritized Envision requirements and elements to be included in the guidelines. In addition to these guidelines, the team conducted case studies as a way of demonstrating and informing the guidelines and providing examples or ideas for implementing sustainability in future projects. Through this study, the authors found that hydrogen infrastructure projects can incorporate many sustainable practices including reducing GHG emissions affecting climate change, reducing air pollutant emissions affecting the health of communities, synergistically handling waste byproducts, integrating into existing infrastructure, incorporating renewable energy, and addressing equity and environmental justice. Additionally, hydrogen infrastructure projects could benefit from 2-way communication engagement and collaborative planning with stakeholders, educational awareness of hydrogen technology, tracking and reporting on water use and water quality, and including monetized environmental and social benefits in life-cycle cost estimates. This document is the final technical report for the Hydrogen Sustainability Assessment Methods for Project Development project. While the main focus of the report is to provide guidelines for applying sustainability to hydrogen infrastructure, there are sections within the appendix providing completed project tasks and methodology.

08 HYDROGEN↗

American Samoa: Unlocking Renewable Energy Potential

Located approximately between Hawaii and New Zealand, American Samoa is the only U.S. territory in the southern hemisphere. American Samoa faces similar climate and energy resilience challenges as other Pacific islands: geographic remoteness, dependence on imported fossil fuels, and increased vulnerability to natural hazards like earthquakes, cyclones, and tsunamis. In 2022, the average electricity price for residential customers in American Samoa was approximately 45 cents/kilowatt-hour (kWh) - almost three times the U.S. average of 15 cents/kWh. Renewable energy represents a small but growing power system contribution, although American Samoa relies almost entirely on imported fossil fuels. The territory possesses substantial solar resources and wind and biomass resource potential. Planned renewable power projects include utility-scale solar photovoltaic (PV) and wind generation with battery storage systems.

American Samoa↗

Enabling the Next Generation Of Facilities for Particle Physics

The report of the decadal US Particle Physics Community Planning Exercise known as “Snowmass” was released earlier this year. The Snowmass report serves as input for the second phase of planning, the Particle Physics Project Prioritization Panel (P5). P5 will develop a strategic plan for U.S. particle physics that will guide the field for the next decade and set R&D priorities beyond that. A broad range of proposals for future facilities were put forward during the Snowmass process, many requiring beyond state-of-the-art superconducting materials and magnets. This talk will give an overview of some of the collider options and outline elements of an R&D plan for the material and magnet development needed to meet the challenging requirements.

Gourlay, Steve↗

Kotzebue Strategic Energy Plan

The Kotzebue Strategic Energy Plan outlines a community-driven roadmap to reduce reliance on imported diesel, lower energy costs, and build a resilient energy future for Kotzebue, Alaska. Developed in 2024-2025 through the U.S. Department of Energy’s Energy Technology Innovation Partnership Project (ETIPP), the plan was led by the Native Village of Kotzebue in collaboration with Kotzebue Electric Association, the City of Kotzebue, the Northwest Arctic Borough, NANA Regional Corporation, and regional partners.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Collaborative energy and land use planning

Energy models make projections for infrastructure, yet struggle to map deployment pathways at the ground level, where risks and benefits to human and natural systems materialize. Furthermore, a study now shows how blending in geospatial science can help to preserve natural capital while allowing for new infrastructure to be built.

Energy and society↗

Electrifying Subsea Infrastructure Through Ocean-Powered Systems

This paper explores the potential for electrifying subsea oil and gas infrastructure using wave-powered ocean energy systems. It details how a type of system, an Autonomous Offshore Power System (AOPS), can provide a potential solution and outlines the work and findings to data of joint industry project that integrates and co-demonstrates an AOPS with an electrified subsea asset. In this Project (Project), an AOPS will provide power and data communications to an electrified subsea asset at the PacWave South test site off the U.S. Oregon coast. Here, this paper provides a description and analysis of the system configuration, subsea asset integration process, and pre-deployment testing plans, along with projected benefits for the industry.

16 TIDAL AND WAVE POWER↗

Latest Development to the Mass Tracking System (MTG)

This poster informs about the ongoing development project of the Mass Tracking System (MTG) taking place in Fuels Conditioning Complex at MFC. The information is about the MTG utilization, the possible complications in the future with the system and the solution for those complication. Furthermore, the poster reports about the progress and the future plans of the project after brief insight on how the MTG operates in the facility. Essentially, the project is separated in three different phases starting with the back-end development focusing on conversion and migration phases and finalizing with the front-end development of the website phase to provide FCF with versatile and efficient system.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Toward Drilling the Perfect Geothermal Well: An International Research Coordination Network for Geothermal Drilling Optimization Supported by Deep Machine Learning and Cloud Based Data Aggregation

The EDGE project, supported by the U.S. Department of Energy Geothermal Technologies Office under award DE-EE0008793, established a data-driven framework for improving the efficiency, cost-effectiveness, and reliability of geothermal well drilling. The project focused on developing scalable data infrastructure, advanced machine learning and probabilistic models, and integrated analytics tools to support continuous drilling optimization. A central objective was to reduce geothermal drilling costs by up to seventy percent while minimizing the risk of well failure through predictive diagnostics and adaptive planning. Over the project period, a comprehensive data repository was designed and deployed, incorporating records from over one hundred geothermal wells across varied geological settings. This repository supported both structured and unstructured data and adhered to FAIR data principles, enabling provenance tracking, quality control, and standardized metadata. The project introduced automated ingestion pipelines and a cloud-hosted platform that facilitated access to raw, processed, and derived datasets. This infrastructure served as the foundation for model development and analysis. Machine learning workflows were developed to predict key drilling metrics including rate of penetration, non-productive time, and total drilling costs. Self-organizing maps and dimensionality reduction methods were used to uncover operational patterns and outliers, while supervised learning algorithms such as random forests and deep neural networks were applied to forecast performance outcomes. The models were validated on heterogeneous datasets from both U.S. and Icelandic fields, demonstrating variable but significant predictive accuracy. The results indicated that finer temporal resolution, inclusion of lithological data, and consistency in operational annotations could substantially improve model performance. The project also implemented process mining techniques to reconstruct state-transition models from drilling event logs. These models enabled the identification of deviations from optimal workflows and provided insights into recurring failure modes. Analysis of non-productive time highlighted the impact of equipment failures, geological challenges, and human factors, offering opportunities for targeted mitigation strategies. The EDGE Dashboard was developed as a web-based expert system integrating data visualization, model outputs, and user-driven queries. It provided an accessible interface for operators to explore historical data, evaluate predicted outcomes, and compare drilling scenarios. Initial feedback from project partners suggested that the dashboard could serve as a foundation for more advanced advisory and optimization tools. Overall, the EDGE project demonstrated the feasibility and value of applying modern data science techniques to geothermal drilling. It delivered a set of interoperable tools and models that can support more efficient, lower-risk well development. The findings point toward a viable path for transitioning from advisory analytics to semi-autonomous drilling systems, contingent on continued collaboration, expanded datasets, and field validation. The project results have immediate relevance for drilling operations, data management practices, and future geothermal R&D efforts aimed at achieving reliable, cost-competitive geothermal energy at scale.

15 GEOTHERMAL ENERGY↗

A Play-Based Exploration of CO 2 Storage in the Illinois Basin: Community Baseline Assessment for Carbon Storage Engagement Planning in the Illinois Basin

This report presents a stakeholder mapping analysis conducted as part of the Play-Based Exploration of CO 2 Storage in the Illinois Basin project (DOE Cooperative Agreement DE-FE0032366). The analysis was undertaken to systematically identify, categorize, and characterize stakeholder groups and community conditions relevant to the planning and deployment of carbon capture and storage (CCS) infrastructure across the Illinois Basin. Its purpose is to establish a contextual baseline that informs targeted engagement strategies, supports equitable project planning, and strengthens the social dimensions of CCS site screening.

01 COAL, LIGNITE, AND PEAT↗

Wave energy in season: a comparative approach to feasibility of seasonal deployments for remote coastal communities

Remote coastal communities, which could be early adopters of wave energy projects, have concerns over costs, conflicts, and potential risks of development. Designers and developers are challenged to address these community concerns as they continue to develop wave energy technologies. One potential means of reducing costs, conflicts, and risks, especially for demonstration and pilot-scale projects, could be planning a deployment that operates for only a portion of the year—a seasonal deployment. Here, in this paper, we examine the impacts of a seasonal deployment in terms of cost, electricity production, operations and maintenance, environmental impacts, and community benefits. We take a holistic, comparative approach to feasibility that can be replicated for other comparative studies. We estimate electricity production using a point absorber WEC modeled near Sitka, AK, USA and optimized for the given sea conditions. We determine that, for remote community sized projects, seasonal deployments could result in small cost savings (less than 10 %), but larger decreases in annual energy production (around 30 % for our case study area). Seasonal deployments could be preferable in places with seasonal energy needs, if failures and device access become a major hindrance to wave energy technology development, or as a cautionary approach to introducing new technology to the oceans. We also determine that a highly seasonal wave resource is not necessarily a requirement for seasonal deployments to be considered. Seasonal deployments are an alternative to year-round deployments that can be considered in places where marine spatial conflict is a seasonal concern.

WEC optimizations↗

Grid connection barriers to renewable energy deployment in the United States

Bulk-power grid connection is an emerging bottleneck to the entry of wind, solar, and storage but has been understudied due to a lack of data. We create and analyze two novel interconnection datasets with more than 38,000 project-level observations that provide new information documenting interconnection challenges in the United States. Active grid connection requests are more than double the total installed capacity of the US power plant fleet (2,600 vs. 1,280 GW). The time required to secure a connection has increased by 70% over the last decade, and withdrawal rates remain high at 80%, suggesting a constrained transmission system that jeopardizes energy transition targets. Wide distributions of interconnection costs indicate the inherent uncertainty of the interconnection process. Interconnection requests that identify large transmission upgrades tend to withdraw from the process. These findings suggest the need for interconnection reforms, tighter links between long-term transmission planning and project-level interconnection processes, and more interconnection outcome transparency.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Advances in the PIP-II Project and the Indian Institutions & Fermilab Collaboration

The Proton Improvement Plan – II (PIP-II) project at Fermi National Accelerator Laboratory (Fermilab) is the first particle accelerator project in the USA to receive significant in-kind contributions from international partners. Partnering countries include the USA, India, Italy, the United Kingdom, France, and Poland. When completed, PIP-II will accelerate protons to 800 MeV, and power the world’s most intense neutrino beam for the Deep Underground Neutrino Experiment (DUNE). Technological advancements for PIP-II across the entire collaboration have significantly matured, with the project currently in the construction phase. The Indian Institutions & Fermilab Collaboration (IIFC) for PIP-II has a 14+ years history. The IIFC R&D phase concluded with the validation of various prototypes and defined the beginning of the construction phase. This presentation highlights the advances of the synergistic PIP-II collaboration. Work supported, in part, by the U.S. Department of Energy, Office of Science, Office of High Energy Physics, under U.S. DOE Contract No. 89243024CSC000002.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Multi-GeV FFA beam transport test at CEBAF

Jefferson National Lab plans an upgrade project to reach 22 GeV high polarization electron beam by using Fixed Field Alternating-gradient (FFA) magnets. The utilization of the FFA magnets for 10-22 GeV beam energy range is unexampled, therefore those magnets need an experimental validation before their full installation to form an arc in the Continuous Electron Beam Accelerator Facility (CEBAF). For this reason, JLAB is also considering the design of an FFA magnet test bench, i.e. a half or full FFA cell, that would be deployed in the current CEBAF in order to serve as the highest energy demonstration for the FFA field uniformity, permanent magnet resiliency with the beam as well as enabling beam optics measurements with the 5-11 GeV range highly polarized beams which closely resembles the full energy range of the 22 GeV upgrade. In this report, we present the status of the planned beamline for the FFA beam transport test at CEBAF.

Accelerator Physics↗

Ammonium Looping with Membrane Absorber and Distributed Stripper for Enhanced Algae Growth

The objective of this project is to conduct a comprehensive investigation to develop and demonstrate a practical, reliable, and cost-effective integrated carbon dioxide (CO 2 ) capture and biofixation process for algae production. This process utilizes a chemical hindered ammonium solution (NH 4 OH) as both a capture reagent and an algae nutrient. The membrane absorber employed in the system ensured minimal ammonia (NH 3 ) emissions in the treated flue gas. Additionally, distributed solar-energy powered strippers located near the bioreactor modules facilitate solvent regeneration and enable just-in-time delivery of CO 2 and NH 3 to the algae, thereby minimizing the pH swing for enhanced productivity. The proposed membrane CO 2 absorber and solar-powered stripper is designed and seamlessly integrated with the existing 0.1 MWth bench-scale CO 2 capture system (CCS) and open raceway ponds (ORPs) at the University of Kentucky Center for Applied Energy (UK CAER) campus. The entire integrated process has undergone construction, operation, testing, and analysis. Furthermore, technology has been evaluated with a techno-economic analysis (TEA), technology gap analysis (TGA), life-cycle analysis (LCA), and a technology maturation plan (TMP). This project was performed within two budget periods, 54 months in duration. There are fourteen Project Tasks, twelve Milestones and four Success Criteria.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Wai'anae Moku Resilience Hub Network ETIPP Deep-Dive Technical Assistance

In 2024, organizations representing communities in the Wai'anae moku, with support from the National Laboratory of the Rockies (NLR) and Hawai'i State Energy Office (HSEO) through an ETIPP Strategic Energy Planning engagement, developed the Wai'anae Moku Community Energy Plan, along with a companion report from NLR. The plan identified five priority focus areas and associated projects to support an energy vision of Wai'anae moku community representatives. The 2026 ETIPP Deep Dive Technical Assistance focuses explicitly on the project identified as highest priority in the plan: support for resilience hub network design and analysis. This fact sheet outlines the scope of technical assistance, benefits of participation the project, and roles and contact information for partners in the project.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Planning Amidst Uncertainty: Identifying Core CCS Infrastructure Robust to Storage Uncertainty

Carbon Capture and Storage (CCS) is a critical technology for reducing anthropogenic CO2 emissions, but its large-scale deployment is complicated by uncertainties in geological storage performance. These uncertainties pose significant financial and operational risks, as underperforming storage sites can lead to costly infrastructure modifications, inefficient pipeline routing, and economic shortfalls. To address this challenge, we propose a novel optimization workflow that is based on mixed-integer linear programming and explicitly integrates probabilistic modeling of storage uncertainty into CCS infrastructure design. This workflow generates multiple infrastructure scenarios by sampling storage capacity distributions, optimally solving each scenario using a mixed-integer linear programming model, and aggregating results into a heatmap to identify core infrastructure components that have a low likelihood of underperforming. A risk index parameter is introduced to balance trade-offs between cost, CO2 processing capacity, and risk of underperformance, allowing stakeholders to quantify and mitigate uncertainty in CCS planning. Applying this workflow to a CCS dataset from the US Department of Energy’s Carbon Utilization and Storage Partnership project reveals key insights into infrastructure resilience. Reducing the risk index from 15% to 0% is observed to lead to an 83.7% reduction in CO2 processing capacity and a 77.1% decrease in project profit, quantifying the trade-off between risk tolerance and project performance. Furthermore, our results highlight critical breakpoints, where small adjustments in the risk index produce disproportionate shifts in infrastructure performance, providing actionable guidance for decision-makers. Unlike prior approaches that aimed to cheaply repair underperforming infrastructure, our workflow constructs robust CCS networks from the ground up, ensuring cost-effective infrastructure under storage uncertainty. These findings demonstrate the practical relevance of incorporating uncertainty-aware optimization into CCS planning, equipping decision-makers with a tool to make informed project planning decisions.

Olson, Daniel↗

Project "Right Way" Next Generation Melt Project: Phase 1 Performance Report Narrative (PRN)

In November 2024, AMERICAN entered into a Cooperative Agreement with the Office of Clean Energy Demonstrations (OCED) regarding the Industrial Decarbonization and Emissions Reduction Demonstration-To-Deployment Funding Opportunity for the “Right Way” Next Generation Melt Project (“Project”). This report encompasses initial planning and analysis activities to ensure that the project is viable.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗