GIF-VHTR Materials (Graphite) Project Plan: Progress since September 2021

¦1: Data, Design Methodology and Construction 1.1: Graphite Selection and Acquisition Strategy (Original tasks completed) 1.2: Graphite Properties (Virgin Materials) 1.3: Graphite Fracture Behaviour(Original tasks completed) 1.4: Graphite Oxidation Behaviour(Original tasks completed) 1.5: Graphite Component Testing 1.6: Graphite Irradiation Effects 1.7: Graphite Irradiation Induced Creep 1.8: Graphite Codes and Standards Development (ASME & ASTM) 1.9: Graphite BehaviourModels Development 1.10: Links to Existing Graphite Irradiation BehaviourDatabases 1.11: Materials Database ¦2: Operation and Inspection 2.1: Methodologies for determining requirements for inspection of graphite cores 2.2: Methodologies for ISI of graphite cores ¦3: Decommissioning and Disposal (New task added 2021) 3.1: Technical data for decommissioning and disposal issues

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Cameco Corporation's Approach to Legacy and Ongoing Waste Management Within the Fuel Services Division - 19124

Since 2011, a Fuel Services Division (FSD) employee has been dedicated to oversee divisional waste management with the goal of accelerating the recycle/disposal of accumulated legacy radioactive wastes stored at its Ontario operations in Blind River and Port Hope. The Blind River Refinery (BRR) and Port Hope Conversion Facility (PHCF) were previously owned by the federal Crown Corporation, Eldorado Nuclear, becoming part of Cameco in 1988 and Cameco Fuel Manufacturing (CFM), previously known as Zircatec Precision Industries, becoming part of Cameco in 2006. Accumulated legacy radioactive waste is stored at each of the facilities. This radioactive waste has accumulated from operations beginning in the 1930's in Port Hope and the 1980's in Blind River. Due to minimal commercially available outlets for the disposal and/or treatment of these wastes, the waste was managed onsite by storage in underutilized space in buildings, trailers and/or in the secured yard. This relatively low-cost practice meant that over decades, the inventory increased at an unsustainable rate until available space became a limiting factor. During this time, the labelling, inventory records, characterization details and other history of many of the waste materials was not maintained adequately. Due to the volume of waste that had accumulated, campaigns to address these deficiencies in information were not considered feasible, sustaining the issue of accumulation of low-level radioactive waste. Since 2011, FSD has completed annual campaigns to address the accumulated legacy waste, which has included processing of material for decontamination to meet the unrestricted release criteria under the Canadian Nuclear Substance and Radiation Devices Regulations (NSRDR), disposal of marginally contaminated wastes (<500 ppm uranium) at a permitted landfill in the United States, processing of contaminated materials to reduce the volume of low-level radioactive waste and disposal at a designated facility in Port Hope. In addition FSD has undertaken significant changes to radioactive waste management practices at each of the facilities. Multiple characterization techniques, including visual observation, review of process and other historical records, laboratory analysis and radiation scanning have been utilized in campaign planning to identify the scope and appropriate waste management technique(s) to reduce the inventory of stored material. This divisional waste management program has resulted in a significant change to how radioactive waste is generated, inventoried, characterized and managed within FSD and has increased the visibility within the leadership team of the opportunities and challenges of waste management, such as alignment with decommissioning planning, project planning and budgeting. The heightened awareness has led to better financial and physical resource planning to execute waste projects with a current projected elimination of the legacy waste within FSD by 2025. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Project X Accelerator R&D Plan

Project X is a high intensity proton facility conceived to support a world-leading program in neutrino and flavor physics over the next two decades at Fermilab. Project X is an integral part of the Fermilab Roadmap as described in the Fermilab Steering Group Report. Project X is based on an 8 GeV superconducting H-linac, paired with the existing (but modified) Main Injector and Recycler Ring, to provide in excess of 2 MW of beam power throughout the energy range 60-120 GeV, simultaneous with at least 100 kW of beam power at 8 GeV. The linac utilizes technology in common with the ILC over the energy range 0.6-8.0 GeV. Beam current parameters can be made identical to ILC resulting in identical rf generation and distribution systems. This alignment of ILC and Project X technologies allows for a shared development effort. The initial 0.6 GeV of the linac draws heavily on technology developed by Argonne National Laboratory for a facility for rare isotope beams. It is anticipated that the exact configuration and operating parameters of the linac will be defined through the R&D program and will retain alignment with the ILC plan as it evolves over this period. Utilization of the Recycler Ring as an H{sup -} stripper and accumulator ring is the key element that provides the flexibility to operate the linac with the same beam parameters as the ILC. The linac operates at 5 Hz with a total of 5.6 x 10{sup 13} H{sup -} ions delivered per pulse. H{sup -} are stripped at injection into the Recycler in a manner that 'paints' the beam both transversely and longitudinally to reduce space charge forces. Following the 1 ms injection, the orbit moves off the stripping foil and circulates for 200 msec, awaiting the next injection. Following three such injections a total of 1.7 x 10{sup 14} protons are transferred in a single turn to the Main Injector. These protons are then accelerated to 120 GeV and fast extracted to a neutrino target. The Main Injector cycle takes 1.4 seconds, producing approximately 2.3 MW of beam power at 120 GeV. At lower proton energies Main Injector cycle times can be shorter, allowing a beam power above 2 MW in the range of proton energy between 60 GeV and 120 GeV. In parallel, because the loading of the Recycler only requires 0.6 seconds, up to four linac cycles are available for accumulation and distribution of 8 GeV protons from the Recycler. Total available 8 GeV beam power lies in the range of 100-200 kW, depending on the energy in the Main Injector. Primary modifications to the existing accelerator complex to support Project X include integration of an H{sup -} injection system, a new RF system, a new extraction system, and measures to mitigate electron cloud effects, in the Recycler Ring. The Main Injector would need a new RF system, measures to preserve beam stability through transition, and measures to mitigate electron cloud effects. Finally, substantial modifications to the existing NuMI target station will be required to support >2 MW operations. It is anticipated that Project X configured as described above would initially support high intensity neutrino beams to the NOvA experiment, in parallel with at least one new 8 GeV based flavor/rare decay experiment. Depending upon future directions flexibility is retained for delivering neutrinos toward the DUSEL site and/or protons into the Tevatron. The purpose of this document is to describe an R&D plan that would position the U.S. to initiate construction of Project X in the 2012 time frame, assuming a go ahead decision in roughly 2010. The organization of this document is as follows: (1) Goals - Describes goals of the R&D and preliminary design period (2008-2011). Included are design, technical development, project documentation, and organizational goals. These are described in the context of an overall set of performance goals for Project X. (2) R&D Plan Elements - Describes the essential technical elements of the plan, including major subsystem performance requirements, associated accelerator and technology issues, and the plans for addressing these issues. (3) R&D Plan - Describes how the plan elements are assembled into a time-ordered plan, defines the associated resources required to support this plan, and describes the alignment of activities undertaken within the Project X, SRF/ILC, and HINS programs. Also describes how the R&D plan will be organized and executed by the prospective participating institutions.

43 PARTICLE ACCELERATORS↗

Preliminary Project Execution Plan for the TREAT LEU Fuel Conversion Project

This project execution plan for the Transient Reactor Test (TREAT) facility Low Enriched Uranium (LEU) Fuel Conversion Project informs the reader of a high-level path forward for conversion of TREAT facilities at Idaho National Laboratory and provides guidance for INL personnel regarding the TREAT LEU Fuel Conversion Project. This project is part of the National Nuclear Security Administration’s Global Threat Reduction Initiative Reactor Conversion Program.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Oak Ridge D and D Plan 3515 Project - Technology Review (2007) and GammaCam Technology Demonstration for Characterizing Building 3515 at Oak Ridge (2007)

This paper presents the results from the Characterization, Decontamination and Decommissioning (CD and D) Study performed by MSE Technology Application, Inc. (MSE) to assist the U.S. Department of Energy (DOE) and Oak Ridge National Laboratory (ORNL) in the preparation of a Project Execution Plan and Remediation Plan for Building 3515 at ORNL. Primary objectives of this study were to identify innovative CD and D technologies and methodologies and recommend alternatives applicable to the CD and D of Building 3515. Building 3515 is a small heavily shielded concrete and cement block structure centrally located in the Bethel Valley portion of the ORNL. The building's interior is extensively contaminated with Cesium 137 (Cs-137), the primary contaminant of concern. A previous attempt to characterize the building was limited to general interior area radiation exposure level measurements and a few surface smears gathered by inserting monitoring equipment into the building on long poles. Consequently, the spatial distribution of the gamma radiation source inside the building was not determined. A subsequent plan for D and D of the building presented a high risk of worker radiation dose in excess of as low as reasonably achievable (ALARA) because the source of the interior gamma radiation field is not completely understood and conventional practices required workers to be in close proximity of the building. As part of an initial literature search, MSE reviewed new generation gamma source characterization technologies and identified the GammaCam{sup TM} portable gamma ray imaging system as an innovative technology applicable to locating the dominant gamma ray sources within the building. The GammaCam{sup TM} gamma-ray imaging system is a commercially available technology marketed by the EDO Corporation. This system consists of a sensor head with a co-aligned camera and a portable computer. The system is designed to provide two-dimensional spatial mappings of gamma ray emitting nuclides in real time. The gamma radiation sensor and camera can be set up within or outside of the radiation field while the system operator and PC can be located 30 to 60 m (100 to 200 ft) from the sensor head. The system has been used successfully at numerous DOE and commercial nuclear facilities to precisely locate gamma radiation sources. However, literature attesting to the ability of this technology to detect radiation sources within heavily shielded structures was not available. Consequently, MSE was not certain if this technology would be capable of locating gamma ray sources within the heavily shielded Building 3515. To overcome this uncertainty, MSE sent two individuals to the EDO Corporation for training. At completion of the training, MSE leased the GammaCam{sup TM} portable system and brought it to ORNL to evaluate the capability of the system. An overview from this evaluation is summarized in this paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

National Security Technology Incubation Project Continuation Plan

This document contains a project continuation plan for the National Security Technology Incubator (NSTI). The plan was developed as part of the National Security Preparedness Project (NSPP) funded by a Department of Energy (DOE)/National Nuclear Security Administration (NNSA) grant. This continuation plan describes the current status of NSTI (staffing and clients), long-term goals, strategies, and long-term financial solvency goals.The Arrowhead Center of New Mexico State University (NMSU) is the operator and manager of the NSTI. To realize the NSTI, Arrowhead Center must meet several performance objectives related to planning, development, execution, evaluation, and sustainability. This continuation plan is critical to the success of NSTI in its mission of incubating businesses with security technology products and services.

99 GENERAL AND MISCELLANEOUS↗

Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

River Protection Project System Plan, Rev. 8 - 18661

The River Protection Project System Plan comprises a set of scenarios that evaluate options for safely treating the high-level radioactive waste stored in underground tanks at the DOE Hanford Site. It establishes a baseline case, used for communicating the DOE's strategy to various stakeholders, as well as ten alternative scenarios that evaluate initiatives to potentially accelerate cleanup and/or address risks. The scenarios were modeled using TOPSim, a custom flowsheet simulator that includes chemistry and mass transfer elements used to estimate operating durations and completion dates, quantities of waste treated through various processes, as well as the time required to complete treatment. The TOPSim results are aligned to a resource-loaded Oracle{sup R} Primavera P6 schedule to estimate the life cycle cost of the cleanup mission. This paper will outline the results of the System Plan, Rev. 8 modeling effort. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TCCSP Project Implementation Plan

The TCCSP CarbonSAFE Phase II efforts focused on developing the technical, community, and economic foundation for a commercial-scale regional geologic storage complex for CO 2 captured. TCCSP has conducted a thorough evaluation of the regional, local, and site-specific geology, legacy well infrastructure, injection site design, and project planning as part of the CarbonSAFE Phase II TCCSP. Specially, the work performed under the CarbonSAFE Phase II has significantly furthered the advancement towards the commerciality of the TCCSP storage complex by delivering on the following objectives: Objective 1: Acquire site-specific characterization data to validate carbon dioxide (CO 2 ) storage estimates of reservoir units and the competency of confining layers in the region to prevent CO 2 leakage to develop a commercial-scale CO 2 project. Objective 2: Assess technical, economic, regulatory, and stakeholder aspects of the TCCSP.

54 ENVIRONMENTAL SCIENCES↗