Potential Research and Development Opportunities for Light Water Reactor Spent Nuclear Fuel at INL
This report documents the commercial spent nuclear fuel currently in storage at Idaho National Laboratory with a specific focus on the potential research and development (R&D) opportunities for this material. Commercial spent nuclear fuel is stored in dry casks on the INL site at the Idaho Nuclear Technology and Engineering Center (INTEC, formerly the Idaho Chemical Processing Plant or ICPP). This spent fuel was part of the DOE-industry cooperative dry cask demonstration project that began in 1983 and from historical fuel testing and treatment activities that had been performed at the Test Area North (TAN)-607 facility. Most of the fuel is “low burnup,” but given that it was removed from the respective reactors between 1970 and 1985, it was representative for its time. The majority of the fuel is of the 15×15 Westinghouse PWR variety, though additional fuel types (e.g., TN-BRP) and configurations are also stored. Potential R&D opportunities identified are (1) the REA-2023 cask, (2) the TN-BRP cask, and (3) the Castor V/21 cask. Fuel from the TN-24P may be an alternative to the intact assemblies in the Castor V/21. Specifically, the REA-2023 cask contains 9 rods that have been exposed to air since 2005. These rods have a detailed pre-loading characterization and thus any changes in corrosion or geometry can most likely be attributed to the storage environment. In addition, similar rods to the nine in REA-2023 reside in the Castor V/21 cask whose environment has been maintained with inert nitrogen. The Castor V/21 cask also contains intact PWR assemblies that could be used to perform limited confirmation of the pyroprocessing approach. An alternative to the use of the Castor assemblies for pyroprocessing is the consolidated fuel that is stored in the TN-24P, which would not require removal from the assembly grid since it has already been packaged in accessible two-piece shell strongback containers. The TN-BRP cask contains a number of Gd-doped, low burnup assemblies that could be of use to validate code packages used to justify burnup-up credit for boiling water reactors (BWRs). The INL dry casks are stored on the CPP-2707 pad at INTEC, adjacent to the CPP-603 Irradiated Fuel Storage Facility, which incorporates a dry hot cell that has the potential to receive a full scale commercial cask of the types identified. Several evaluations have been made regarding this task, including full scale mockup testing of the physical clearances required to remove and handle fuel assemblies and components. A proposed schedule of 14 months and cost of $5.3 million was the outcome of analysis performed by Fluor Idaho and is included as Appendix A & B. In addition to the spent fuel at INL, there is also a full-scale mockup assembly that was fabricated for the Protypical Consolidation Demonstration Project to validate fuel rod consolidation approaches. The assembly was fabricated by Westinghouse as a 15 x 15 PWR, using Zircaloy-4 tubing and steel end fittings in accordance with product specifications. The only departure from specification is the use of copper metal in lieu of uranium oxide pellets to achieve a weight that is within 10% of the standard.