Search NASA⌕ Search

SEARCH · Search NASA

Results for “RADIOACTIVE WASTE FACILITIES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Annual Summary Report for the Remote-Handled Low-Level Waste Disposal Facility—FY 2025

The U.S. Department of Energy (DOE) requires the performance assessment (PA) (Department of Energy Idaho Operations Office [DOE-ID] 2018a), composite analysis (CA) (DOE-ID 2012), and CA addendum (DOE-ID 2018b) for the Remote-Handled Low-Level Waste (RHLLW) Disposal Facility at the Idaho National Laboratory (INL) Site shall be maintained to evaluate changes that could affect the performance, design, and operating basis for the facility (DOE Manual 435.1-1 Change 3, “Radioactive Waste Management Manual,” Section IV.P. [4]). The RHLLW Disposal Facility became operational in September 2018 after the completion of operational readiness activities required by DOE Order 425.1D, “Verification of Readiness to Start Up or Restart Nuclear Facilities,” and the issuance of the startup authorization by the Startup Approval Authority (Boston 2018). The first waste disposals at the RHLLW Disposal Facility began in Fiscal Year (FY) 2019. In Fiscal Year (FY) 2025, no significant operational changes or other activities occurred that would cause deviation from the assumptions in the PA and CA pertaining to disposal geometry, verification of waste characteristics, tracking disposal inventories against total limits, facility closure design, or institutional controls. This FY 2025 annual summary report (ASR) documents the continued adequacy of the PA, CA, operating disposal authorization statement (ODAS) (ODAS 2018), ODAS technical-basis documents, and the radioactive waste management basis (RWMB) (INL 2024a) to meet DOE Order 435.1, “Radioactive Waste Management,” performance objectives for the RHLLW Disposal Facility. Annual review of the adequacy of the PA and CA at the RHLLW Disposal Facility ensures that conclusions of the analyses remain valid in accordance with requirements of DOE Order 435.1.

12 - MGMT OF RADIOACTIVE AND NON-RADIOACTIVE WASTE↗

Calculating Potential Radiological Emissions for Waste Management Activities at INL - 20068

At Idaho National Laboratory (INL), work involving radionuclides is evaluated for potential emissions from a project in order to comply with the National Emission Standards for Hazardous Air Pollutants (NESHAP) regulations, 40 CFR 61 Subpart H. Emission calculations are documented in an Air Permitting Applicability Determination (APAD) to analyze unmitigated and mitigated emissions and determine if an Application to Construct (ATC) or continuous monitoring is required. To calculate the unmitigated and mitigated emissions, a spreadsheet was developed to provide ease in determining potential emissions by providing the maximum operating temperature and the material being used. The spreadsheet aids in determining the potential emissions for research projects and waste management activities at Materials and Fuels Complex (MFC) and other locations across the INL site. Furthermore, it can also be used for periodic confirmatory measurements (PCM) to justify low emissions. Elements that factor into the unmitigated and mitigated calculations include the amount of each radionuclide used (in curies or grams), specific activity (if amount is given in grams), the temperature the material is heated to in Celsius, the dose conversion factor which is derived from Clean Air Act Assessment Package - 1988 (CAP-88) modeling, and the number of HEPA filters used for mitigated measures. The main drivers for calculating the unmitigated emissions for a project are the amount used per radionuclide, the maximum operating temperature, and the location of the work. The maximum operating temperature determines the airborne release factor which is dependent on the physical state of the radionuclide. Prior to October 2017, if the radionuclide was heated to greater than 100 deg. C, the radionuclide was assumed to be a gas, which has the highest airborne release factor. This assumption would be overly conservative for radionuclides with high melting and boiling points, which provided a challenge to demonstrate low emissions. In October 2017, the Environmental Protection Agency (EPA) approved an alternative method for INL. This method allows the airborne release factor to be determined by using the melting point and 90% of the boiling point of the radionuclide. This methodology was included in the spreadsheet to allow unmitigated emission calculations for APADs to be completed more efficiently and effectively. Results show a reduction in time completing air emission calculations as well as lower total emissions across all facilities at INL. MFC annual emissions were reduced by 62% from the previous year and Research and Education Campus (REC) facilities were reduced by 38% due to implementation of the approved alternative method. Time spent on APADs, PCMs, and documentation for the annual NESHAP report was also reduced significantly. The spreadsheet provided in Table I provides the potential emission calculations for the 'Advanced Retrieval and Disposition Techniques for Remote Handled Mixed Low Level Waste (RH MLLW) at the Radioactive Scrap and Waste Facility (RSWF)' project. Calculations show the Potential Effective Dose Equivalent (PEDE) at RSWF to be 7.27 E-04 mrem/yr (7.27 E-09 Sv/yr) which is well below the 0.1 mrem/yr threshold. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Summary Report for the Remote-Handled Low-Level Waste Disposal Facility—FY2021

This Fiscal Year (FY) 2021 annual summary report (ASR) documents the continued adequacy of the performance assessment (PA), the composite analysis (CA) and associated operating disposal-authorization statement (ODAS) technical basis documents for the Remote Handled (RH) Low-Level Waste (LLW) Disposal Facility at Idaho National Laboratory. Annual review of the adequacy of the PA and CA for the RHLLW Disposal Facility ensures that conclusions of the analyses remain valid in accordance with requirements of Department of Energy (DOE) Order 435.1, “Radioactive Waste Management.” In FY 2021, no significant operational changes or other activities occurred that would cause deviation from the assumptions in the PA and CA pertaining to disposal geometry, verification of waste characteristics, tracking disposal inventories against total limits, facility closure design, or institutional controls. Sixteen total waste-canister shipments were received at the RHLLW Disposal Facility, and 16 total waste canisters were emplaced.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Summary Report for the Remote-Handled Low-Level Waste Disposal Facility—FY 2022

This Fiscal Year (FY) 2022 annual summary report (ASR) documents the continued adequacy of the performance assessment (PA), the composite analysis (CA) and associated operating disposal-authorization statement (ODAS) technical-basis documents for the Remote-Handled (RH) Low-Level Waste (LLW) Disposal Facility at Idaho National Laboratory. Annual review of the adequacy of the PA and CA for the RHLLW Disposal Facility ensures that conclusions of the analyses remain valid in accordance with requirements of Department of Energy (DOE) Order 435.1, “Radioactive Waste Management.” In FY 2022, no significant operational changes or other activities occurred that would cause deviation from the assumptions in the PA and CA pertaining to disposal geometry, verification of waste characteristics, tracking disposal inventories against total limits, facility-closure design, or institutional controls. Fifteen waste canister shipments were received at the RHLLW Disposal Facility, and 15 waste canisters were emplaced in disposal vaults.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Infrastructure and DFLAW Support at Hanford - 20443

Manhattan Project era infrastructure systems are degrading at an accelerated pace across the Department of Energy's (DOE) Environmental Management complex. Revitalizing, rejuvenating and right-sizing these systems to ensure reliability for ongoing cleanup missions is a major focus at the 580-square- mile Hanford Site in southeast Washington State. The push to complete construction, commissioning, startup, and operation of facilities and systems in the Direct-Feed Low-Activity Waste (DFLAW) program at Hanford by 2023 requires considerable coordination among site contractors and a significant investment in infrastructure. The passage of time also poses a challenge. It has been about 75 years since facilities were first operated at the site, and approximately 40 years of plutonium production created a legacy of unidentified active and abandoned underground obstacles and waste sites that must be avoided when building and upgrading the infrastructure. Converting infrastructure systems originally built to support plutonium production from the 1940's to the 1980's and upgrading those systems to optimize technology is an ever-changing balance of funding profiles, available resources and execution strategies. The DOE Richland Operations Office (RL) has long recognized the need for increased investment in Hanford Site infrastructure to support the future processing of approximately 56 million gallons of waste currently stored in large underground tanks. When DFLAW is fully operational, safe and reliable infrastructure systems will be needed to ensure continuity of operations around the clock, 365 days a year. These include roadways, water, power, sewer, information technology systems and facilities. To ensure the readiness of Hanford's infrastructure to support treating tank waste in the next three years, 15 projects were identified with a combined value of $133.8 million. Through calendar year 2019, 7 infrastructure projects have been substantially completed and the remaining 8 projects, with a remaining value of $103.8 million, are scheduled to be completed by December 2023. RL and its site services/infrastructure contractor, Mission Support Alliance (MSA), regularly evaluate the needs of the DFLAW program and other Hanford Site missions to ensure the highest priority systems are addressed. In addition to a fast-approaching deadline for round-the-clock treatment operations, RL and MSA face another significant infrastructure challenge. As cleanup is being completed in a 220-square-mile area called the River Corridor, most of the cleanup operations going forward will occur in a 20-square-mile area in the center of the Hanford Site, known as the Central Plateau. Infrastructure systems are becoming more congested in an already overcrowded area. This paper/presentation will outline some of the challenges Hanford faces while executing infrastructure reliability projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Summary Report for the Remote-Handled Low-Level Waste Disposal Facility—FY 2023

This Fiscal Year (FY) 2023 annual summary report (ASR) documents the continued adequacy of the performance assessment (PA), the composite analysis (CA) and associated operating disposal-authorization statement (ODAS) technical-basis documents for the Remote-Handled (RH) Low-Level Waste (LLW) Disposal Facility at Idaho National Laboratory. Annual review of the adequacy of the PA and CA for the RHLLW Disposal Facility ensures that conclusions of the analyses remain valid in accordance with requirements of Department of Energy (DOE) Order 435.1, “Radioactive Waste Management.” In FY 2023, no significant operational changes or other activities occurred that would cause deviation from the assumptions in the PA and CA pertaining to disposal geometry, verification of waste characteristics, tracking disposal inventories against total limits, facility-closure design, or institutional controls. Eleven waste canister shipments were received at the RHLLW Disposal Facility, and ten waste canisters were emplaced in disposal vaults.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Session 097B - Panel: Pathway to End State at the East Tennessee Technology Park in Oak Ridge, TN (2/4) (R1.16b)

This panel was to focus on the 'Pathway to End State at the East Tennessee Technology Park (ETTP)'. It was to discuss the DoE's long-term vision for the ETTP site and the process for converting the site into a multi-use industrial park, historic preservation and national park, and conservation area. The Panelists were to discuss the challenges in executing a cleanup project of this magnitude, the waste management, and the monitoring efforts that supported the achievement of the Oak Ridge Office of Environmental Management (OREM) Vision 2020. This session integrated with panel sessions 97A, 97C, and 97D. Panelists with presentations: Beginning with the End in Mind (Kevin Ironside); Project Execution (Daniel Macias); Waste Management (John Wrapp); Environmental Remediation (Samantha Pack); Waste Management (Josh Pemberton); DOE's Long-Range Vision (Laura Wilkerson)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

USACE FUSRAP Records Management Challenges in the Digital Age - 20242

In late 2016, the U.S. Army Corps of Engineers (USACE) implemented a Headquarters-supported nationwide records management initiative managed by the USACE-New England District to address the digitization and organization of Formerly Utilized Sites Remedial Action Program (FUSRAP) project files. This initiative will prepare USACE FUSRAP for moving toward a fully electronic system of records management. Additionally, the records management initiative streamlines the process and prepares the Administrative Record (AR) and Permanent Record (PR) file for transfer from USACE to the U.S. Department of Energy (DOE)-Office of Legacy Management (LM) following project closeout. Over the past couple of years, USACE and DOE-LM have been working to finalize a joint guidance document to assist in the FUSRAP records transition process. However, there remain key records management topics that require further discussion and development. Specifically, these topics include the implementation, process, and procedure for the capture of social media records and compliance with Section 508 of the Rehabilitation Act of 1973 (29 USC 794d), as amended. Due to advances in technology and the ease of communication it provides, USACE is using social media more often to interface with the public than 5, 10 or 15 years ago. The identification and capture of these records are challenging because it requires each USACE district or producer of a record to track what has been released through social media so that it can be captured as part of the AR or PR. USACE is currently evaluating processes and procedures for social media records capture. This paper explores how social media is being used by USACE across FUSRAP projects and best practices for the capture of social media records. Public accessibility to the project AR is required under the Comprehensive Environmental Response, Compensation, and Liability Act, which USACE FUSRAP must follow. As USACE FUSRAP ARs are converted to a digital format, greater accessibility to the files can be provided through web sites or other electronic media. However, Section 508 of the Rehabilitation Act must be considered when releasing electronic files to the public. Under Section 508, government agencies must ensure that information is made available to the public in a format that provides equal access to persons with disabilities. This paper discusses the electronic records requirements under Section 508 and addresses broad implementation of compliance across large digital records sets. Records management challenges are presented in the context of the FUSRAP records management program; however, these records management considerations and best practices are applicable across all Federal agency records management programs. Examples presented will further aid in understanding electronic records requirements that may be included on new USACE FUSRAP contracts as well as upcoming National Archives Records Administration requirements that will move us toward an electronic government. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 56: Enhanced Performance Through Joint Assurance Review

This panel focused on the benefits of recent DOE-EM efforts to conduct joint oversight reviews. These reviews enhance partnering and alignment and represent an efficient and cost-effective way to identify and prioritize needed project performance improvements. Panelists with presentations: Enhanced Performance Through Joint Assurance Reviews (Jan Preston)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Presentation on the INL Remote-Handled Low-Level Waste Disposal Facility FY-2024 Annual Summary Report

The abstract below is from the report INL/RPT-24-82600. The powerpoint presentation contains information taken from the report. This Fiscal Year (FY) 2024 annual summary report (ASR) documents the continued adequacy of the performance assessment (PA), the composite analysis (CA), and associated operating disposal authorization statement (ODAS) technical basis documents for the Remote Handled Low Level Waste (RHLLW) Disposal Facility at Idaho National Laboratory (INL). Annual review of the adequacy of the PA and CA for RHLLW Disposal Facility ensures that conclusions of the analyses remain valid in accordance with requirements of the U.S. Department of Energy (DOE) Order 435.1, “Radioactive Waste Management.” In FY 2024, no significant operational changes or other activities occurred that would cause deviation from the assumptions in the PA and CA pertaining to disposal geometry, verification of waste characteristics, tracking disposal inventories against total limits, facility closure design, or institutional controls. Nineteen waste canister shipments were received at the RHLLW Disposal Facility, and all nineteen waste canisters were emplaced in disposal vaults.

12 - MGMT OF RADIOACTIVE AND NON-RADIOACTIVE WASTE↗

CSA, the French LILW Disposal Facility: Taking Stock of the 30 years' Operating Experience - 20009

French Andra's currently operational LILW repository, Aube disposal facility, is almost 30 years old. From the beginning, the repository has benefited from the lessons learned from the first disposal facility, the CSM. It has nevertheless continued to evolve, to improve and to adapt, seeking to gain in efficiency, safety and cost optimization. This is a look at what has changed at the CSA since 1992 - and the effect these changes had on its operating practices, construction principles and the entire management organization. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impact to Groundwater All-Pathways Dose Estimates for the Remote-Handled Low-Level Waste Disposal Facility Performance Assessment Using Updated Dose Coefficients from DOE-STD-1196-2022

The Performance Assessment (PA) for the Remote-Handled Low-Level Waste (RHLLW) Disposal Facility at Idaho National Laboratory (INL) was completed in 2018 (DOE-ID 2018) using dose coefficients from U.S. Department of Energy (DOE) Standard DOE-STD-1196-2011 (DOE 2011). Internal and external dosimetry was updated in 2021 and a new technical standard was published in 2022 (DOE-STD-1196-2022) (DOE 2022). This technical memorandum provides a comparison of the ingestion dose coefficients between those published in DOE (2011) and those published in DOE (2022). The dose coefficients in DOE (2022) were then used to calculate the all-pathways dose for the groundwater pathway and the results between the doses published in the 2018 PA and those calculated using the updated dose coefficients in DOE (2022) were compared. Several other issues in the 2018 RHLLW Disposal Facility PA were also addressed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing Hanford's Direct Feed Low Activity Waste Program - 20002

The Office of River Protection (ORP) is responsible for the management and completion of the River Protection Project (RPP) mission, which comprises both the Hanford Site tank farms operations and the completion and operation of the Waste Treatment and Immobilization Plant Project. The RPP mission is to safely retrieve, treat, and immobilize Hanford's high-level and low-activity tank waste and close the tank farms to protect the Columbia River. The Direct-Feed Low-Activity Waste (DFLAW) Program is a major subset of the overall RPP mission, providing disposition of low-activity waste. The scope is to retrieve, treat, and immobilize the low-activity waste at the Low-Activity Waste Facility. DFLAW will begin operations no later than December 2023. The DFLAW Program overarches a suite of individual projects, activities, and infrastructure upgrades. The major projects and activities include multiple contractors under both ORP and the Richland Operations Office, underscoring the need for effective integration, coordination, and collaboration. The objectives of the DFLAW Program leadership team are to: - Effectively coordinate and integrate the projects that comprise the DFLAW Program - Manage the interfaces between the projects so that the integrated DFLAW Program is completed successfully - Ensure the DFLAW portfolio of projects operate as required without gaps or conflicts at the interfaces. DOE is accomplishing these objectives through a newly established leadership model that integrates the DOE and contractor work streams and promotes a teamwork model to enable collaborative success. Long considered one of the most formidable cleanup challenges at Hanford, the Department of Energy and its contractors are on the verge of achieving a cleanup commitment that has been decades in the making. DOE is preparing to vitrify (turn to glass) Hanford's chemical and radioactive tank waste using the DFLAW process. The Modified Consent Decree milestone for completing hot commissioning of the Hanford Site's Low- Activity Waste Facility is Dec. 31, 2023. While this milestone may seem distant under normal project management circumstances, it is a relatively short period of time for the operational and cultural transformation necessary to successfully begin treating tank waste at Hanford. Direct feed means separating the waste at a tank farm to remove the more radioactive portion (i.e., solids and cesium) so that the resulting low-activity (less radioactive) waste can be fed directly to the Waste Treatment and Immobilization Plant's Low-Activity Waste Facility. Starting DFLAW will require a singular, intensive leadership focus, along with a sustained, collective commitment to excellence and teamwork by the Department and its contractors. Major upgrades to Hanford's infrastructure will occur prior to startup. Supporting DFLAW operations requires significant integration between the DFLAW facilities - the Waste Treatment Plant, Hanford's tank farms, effluent treatment facilities, disposal facilities - and between all of the site contractors to achieve success. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Operations and Recent Upgrades to a Tritium Recycling Facility - 20375

Nuclear Sources and Services Inc. (NSSI) is a waste handling treatment company that has been operating since 1971. In 2000, NSSI began building a 1,000 m{sup 2} (∼10,000 sqft) tritium recycling facility on the Houston, Texas premises to address a growing need in the waste disposal market. Over the years, the capability of the facility grew to address many different waste streams with the goal of recycling > 99.9% of all tritium activity back into the fusion community. This is achieved by maintaining an effluent stack release well below the 150 GBq/year (C Ci/year) operating limit and maintaining all liquid and solid waste disposal below the low-level radioactive release limit of 0.C MBq/kg (10 μCi/kg). The unique processing systems in the facility attracts many challenging contracts. Within the past two years, NSSI has engaged with customers to treat; organic mixed wastes that simultaneously contain tritium and carbon-14, safely extract tritium from large quantities of exit sign lights, and remove tritium from uncharacterised legacy depleted uranium beds from a superfund site. This paper will outline the initial testing, the system upgrades to treat these varied streams, and the progress in processing the feedstocks provided by these projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

On Temperature Limits for the Outer Surface of a Container in a Disposal Facility - 20313

The temperature in a disposal facility for high-level radioactive waste (HLRW) is an issue for safety. When the recommencement of the search for and selection of a site for a disposal facility for HLRW in Germany was stipulated by the Site Selection Act (StandAG 2017) in 2017, a precautionary temperature limit of 100 deg. C on the outer surface of the containers with high-level radioactive waste in the disposal facility section was set. This precautionary temperature limit shall be applied in preliminary safety analyses provided that the 'maximum physically possible temperatures' in the respective host rocks have not yet been determined due to pending research. Therefore, this issue is addressed and discussed in this paper, contributing to 'pending research' by a review of the literature. This paper briefly discusses a few examples of thermohydraulic, mechanical, chemical and biological processes in a disposal facility, because temperature limits are derived based on safety impacts regarding THMCB-processes. The temperature-dependent processes have been extracted from databases for features, events and processes (FEP-databases). Furthermore, it is discussed if the feasibility to retrieve and recover HLRW is hampered at high temperatures. A design temperature concerning single components of a disposal facility for the preservation of their features can be derived when a safety concept is established. However, the interactions of all relevant processes in a disposal concept must be considered to determine a specific temperature limit for the outer surface of the containers. Therefore, applicable temperature limits may vary for particular safety and disposal concepts in the following host rocks: rock salt, clay stone and crystalline rock. Technical solutions for retrieval and design options for recovery seem to be viable up to temperatures of 200 deg. C with different, sometimes severe, downsides according to expert judgement. Temperature limits regarding the outer surface of the containers can be derived specifically for each safety concept and design of the disposal facility in a host rock. General temperature limits without reference to specific safety concepts or the particular design of the disposal facility may narrow down the possibilities for optimisation of the disposal facility and could adversely affect the site selection process in finding the best suitable site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MH-1A Sturgis Decommissioning and Dismantlement - 20281

The U.S. Army Corps of Engineers (USACE) with its prime contractor, Aptim Federal Services, LLC (APTIM), recycled 5,260 metric tons (11.6 million pounds) of material from Sturgis Barge (Sturgis) during the Decommissioning and Dismantlement of the MH-1A nuclear power reactor. The overall objective of the project was to reduce residual radioactivity associated with MH-1A to levels that permitted release of Sturgis for dismantlement and termination of the Army Reactor Office permit. By effectively applying waste hierarchy's three Rs - reduce, reuse and recycle - the Sturgis project not only minimized the amount of waste that required disposal at landfills, but also reduced the potential for long-term environmental liability emanating from these landfills. The project team completed the physical decommissioning efforts in June 2018 in Galveston, TX. In September 2018, radiological surveys were completed to demonstrate the vessel could be released for shipbreaking. Sturgis was towed from Galveston, TX to Brownsville, TX in late September 2018. Shipbreaking, dismantlement and recycling efforts began in early October 2018 and were completed on 15 March 2019. As part of the decommissioning effort in Galveston, the team shipped 69 shipments (860 metric tons) of low-level radioactive waste and radioactive components to the Waste Control Specialist (WCS) facility in Andrews TX for disposal. Certain radioactive components had to be transferred to the Department of Energy prior to placing the materials into the Federal Waste Facility located within WCS. However, most of the radioactive waste was characterized, profiled, approved and managed under the WCS permitted radioactive waste exemption process authorized and implemented by the Texas Commission on Environmental Quality (TCEQ) and the Radioactive Materials Division. This allows LLRW and LLMW to be shipped as regulated waste and then upon receipt at WCS through satisfying the relevant waste acceptance criteria the waste is exempted and placed into the WCS RCRA permitted cell. An additional 35 shipments (544 metric ton) of contaminated hazardous waste water were transported to U.S. Ecology in Robstown, TX for treatment/disposal. An additional 36 shipments (500 metric tons) of non-hazardous wastewater was sent to Republic Waste Services' facility in Fresno, TX. The disposal of these materials required close coordination with State of Texas regulators. During decommissioning, the project team recycled approximately 270 metric tons (600,000 pounds) of lead and steel. As part of the dismantlement in Brownsville, TX the team recycled approximately 5,000 metric tons (11 million pounds) of ferrous and non-ferrous material, limiting our disposal requirements to about 180 metric tons (400,000 pounds) of material (<4% from entire shipbreaking activity). Although the primary hazard being mitigated by this project was radiological, recycling was always a priority for the project. The team strived to achieve sustainability goals as we implemented this one of a kind project. Scrap metal recycling has a large positive impact on the environment and can also favorably impact project disposal costs. Steel is among the most recycled material in the world. Nearly 40% of the world's steel production is made from scrap. Recycling steel also requires 75% less energy than producing it from raw materials. By using recycled steel rather than virgin materials, 2.33 kg of carbon emissions are eliminated per kg of steel [1]. The project recycled more than 4,500 metric tons (10 million pounds) of steel, which eliminated about 10,400 metric tons (23 million pounds) of CO{sub 2}. By implementing a recycling initiative for the Sturgis project, the team was able to realize cost avoidance for disposal of scrap, cost savings from the metals recycled, plus the project provided benefits to the environment through our recycling efforts. Once the dismantlement was complete, the team prepared a detailed decommissioning closure report, which allowed for the termination of the Army Reactor Decommissioning Permit. While it not only reduced any potential long-term environmental liability, this project to decommission and dismantle a floating nuclear power plant is truly unprecedented - it is a prime example of the USACE mission which is: 'Engineering solutions for the Nation's toughest challenges'. This unique, one of a kind, historical power plant was never designed to be taken apart, and the available information about its construction was lacking in many details. The hazards that required mitigation dictated a painstaking and deliberate process in order to avoid any release to the environment and the community, and to protect the health and safety of the workers involved while keeping the waste hierarchy's three R's - reduce, reuse and recycle at the forefront. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗