Search NASA⌕ Search

SEARCH · Search NASA

Results for “REACTOR MAINTENANCE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

The power of simplification: Operator interface with the AP1000{sup R} during design-basis and beyond design-basis events

The AP1000{sup R} plant is an 1100-MWe pressurized water reactor with passive safety features and extensive plant simplifications that enhance construction, operation, maintenance, safety and cost. The passive safety features are designed to function without safety-grade support systems such as component cooling water, service water, compressed air or HVAC. The AP1000 passive safety features achieve and maintain safe shutdown in case of a design-basis accident for 72 hours without need for operator action, meeting the expectations provided in the European Utility Requirements and the Utility Requirement Document for passive plants. Limited operator actions may be required to maintain safe conditions in the spent fuel pool (SFP) via passive means. This safety approach therefore minimizes the reliance on operator action for accident mitigation, and this paper examines the operator interaction with the Human-System Interface (HSI) as the severity of an accident increases from an anticipated transient to a design basis accident and finally, to a beyond-design-basis event. The AP1000 Control Room design provides an extremely effective environment for addressing the first 72 hours of design-basis events and transients, providing ease of information dissemination and minimal reliance upon operator actions. Symptom-based procedures including Emergency Operating Procedures (EOPs), Abnormal Operating Procedures (AOPs) and Alarm Response Procedures (ARPs) are used to mitigate design basis transients and accidents. Use of the Computerized Procedure System (CPS) aids the operators during mitigation of the event. The CPS provides cues and direction to the operators as the event progresses. If the event becomes progressively worse or lasts longer than 72 hours, and depending upon the nature of failures that may have occurred, minimal operator actions may be required outside of the control room in areas that have been designed to be accessible using components that have been designed to be reliable in these conditions. The primary goal of any such actions is to maintain or refill the passive inventory available to cool the core, containment and spent fuel pool in the safety-related and seismically qualified Passive Containment Cooling Water Storage Tank (PCCWST). The seismically-qualified, ground-mounted Passive Containment Cooling Ancillary Water Storage Tank (PCCAWST) is also available for this function as appropriate. The primary effect of these actions would be to increase the coping time for the AP1000 during design basis events, as well as events such as those described above, from 72 hours without operator intervention to 7 days with minimal operator actions. These Operator actions necessary to protect the health and safety of the public are addressed in the Post-72 Hour procedures, as well as some EOPs, AOPs, ARPs and the Severe Accident Management Guidelines (SAMGs). Should the event continue to become more severe and plant conditions degrade further with indications of inadequate core cooling, the SAMGs provide guidance for strategies to address these hypothetical severe accident conditions. The AP1000 SAMG diagnoses and actions are prioritized to first utilize the AP1000 features that are expected to retain a damaged core inside the reactor vessel. Only one strategy is undertaken at any time. This strategy will be followed and its effectiveness evaluated before other strategies are undertaken. This is a key feature of both the symptom-oriented AP1000 EOPs and the AP1000 SAMGs which maximizes the probability of retaining a damaged core inside the reactor vessel and containment while minimizing the chances for confusion and human errors during implementation. The AP1000 SAMGs are simple and straight-forward and have been developed with considerable input from human factors and plant operations experts. Most importantly, and different from severe accident management strategies for other plants, the AP1000 SAMGs do not require diagnosis of the location of the core (i.e., whether reactor vessel failure has occurred). This is a fundamental consequence of the AP1000 In-Vessel Retention approach, which allows severe accident management to be based on fundamental principles (e.g. provide coolant as close as possible to the core) that do not change during a specific event. This eliminates the need for one of the more difficult diagnostic requirements, since reactor vessel failure does not directly relate to any measurable plant parameter, and differs from other designs in that an engineered failure of the pressure vessel' (e.g. core catcher) is never required. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

AP1000{sup R} nuclear power plant safety overview for spent fuel cooling

The AP1000{sup R} plant is an 1100-MWe class pressurized water reactor with passive safety features and extensive plant simplifications that enhance construction, operation, maintenance, safety and costs. The AP1000 design uses passive features to mitigate design basis accidents. The passive safety systems are designed to function without safety-grade support systems such as AC power, component cooling water, service water or HVAC. Furthermore, these passive features 'fail safe' during a non-LOCA event such that DC power and instrumentation are not required. The AP1000 also has simple, active, defense-in-depth systems to support normal plant operations. These active systems provide the first level of defense against more probable events and they provide investment protection, reduce the demands on the passive features and support the probabilistic risk assessment. The AP1000 passive safety approach allows the plant to achieve and maintain safe shutdown in case of an accident for 72 hours without operator action, meeting the expectations provided in the U.S. Utility Requirement Document and the European Utility Requirements for passive plants. Limited operator actions are required to maintain safe conditions in the spent fuel pool via passive means. In line with the AP1000 approach to safety described above, the AP1000 plant design features multiple, diverse lines of defense to ensure spent fuel cooling can be maintained for design-basis events and beyond design-basis accidents. During normal and abnormal conditions, defense-in-depth and other systems provide highly reliable spent fuel pool cooling. They rely on off-site AC power or the on-site standby diesel generators. For unlikely design basis events with an extended loss of AC power (i.e., station blackout) or loss of heat sink or both, spent fuel cooling can still be provided indefinitely: - Passive systems, requiring minimal or no operator actions, are sufficient for at least 72 hours under all possible pool heat load conditions. - After 3 days, several different means are provided to continue spent fuel cooling using installed plant equipment as well as off-site equipment with built-in connections. Even for beyond design basis accidents with postulated pool damage and multiple failures in the passive safety-related systems and in the defense-in-depth active systems, the AP1000 multiple spent fuel pool spray and fill systems provide additional lines of defense to prevent spent fuel damage. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The Need for Cyber-Informed Engineering Expertise for Nuclear Research Reactors

Engineering disciplines may not currently understand or fully embrace cyber security aspects as they apply towards analysis, design, operation, and maintenance of nuclear research reactors. Research reactors include a wide range of diverse co-located facilities and designs necessary to meet specific operational research objectives. Because of the nature of research reactors (reduced thermal energy and fission product inventory), hazards and risks may not have received the same scrutiny as normally associated with power reactors. Similarly, security may not have been emphasized either. However, the lack of sound cybersecurity defenses may lead to both safety and security impacts. Risk management methodologies may not contain the foundational assumptions required to address the intelligent adversary’s capabilities in malevolent cyber attacks. Although most research reactors are old and may not have the same digital footprint as newer facilities, any digital instrument and control function must be considered as a potential attack platform that can lead to sabotage or theft of nuclear material, especially for some research reactors that store highly enriched uranium. This paper will provide a discussion about the need for cyber-informed engineering practices that include the entire engineering lifecycle. Cyber-informed engineering as referenced in this paper is the inclusion of cybersecurity aspects into the engineering process. A discussion will consider several attributes of this process evaluating the long-term goal of developing additional cyber safety basis analysis and trust principles. With a culture of free information sharing exchanges, and potentially a lack of security expertise, new risk analysis and design methodologies need to be developed to address this rapidly evolving (cyber) threatscape.

CCE↗

F Reactor Inspection

Workers from Mission Support Alliance, LLC., removed the welds around the steel door of the F Reactor before stepping inside the reactor to complete its periodic inspection. This is the first time the Department of Energy (DOE) has had the reactor open since 2008. The F Reactor is one of nine reactors along the Columbia River at the Department's Hanford Site in southeastern Washington State, where environmental cleanup has been ongoing since 1989. As part of the Tri-Party Agreement, the Department completes surveillance and maintenance activities of cocooned reactors periodically to evaluate the structural integrity of the safe storage enclosure and to ensure confinement of any remaining hazardous materials. "This entry marks a transition of sorts because the Hanford Long-Term Stewardship Program, for the first time, was responsible for conducting the entry and surveillance and maintenance activities," said Keith Grindstaff, Energy Department Long-Term Stewardship Program Manager. "As the River Corridor cleanup work is completed and transitioned to long-term stewardship, our program will manage any on-going requirements."

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

R and D program for core instrumentation improvements devoted for French sodium fast reactors

Under the framework of French R and D studies for Generation IV reactors and more specifically for sodium-cooled fast reactors (SFR); the CEA, EDF and AREVA have launched a joint coordinated research programme. This paper deals with the R and D sets out to achieve better inspection, maintenance, availability and decommissioning. In particular the instrumentation requirements for core monitoring and detection in the case of accidental events. Requirements mainly involve diversifying the means of protection and improving instrumentation performance in terms of responsiveness and sensitivity. Operation feedback from the Phenix and Superphenix prototype reactors and studies, carried out within the scope of the EFR projects, has been used to define the needs for instrumentation enhancement. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

General description of HTR-PM emergency power system - 18415

The paper will describe the design concept of the emergency power system utilized in the high temperature gas cooled reactor project (HTR-PM) which is currently under construction in Shandong, China. As a class 1E system which is related to the safety feature of the reactor, emergency power system is responsible for providing multiple reliable power sources for nuclear safety class loads. Therefore, the structure, power source deployment, operation, maintenance and alignment of the system should meet several standards and regulations. The paper will give a detailed description about the designing process of the system which include structure design, determination of primary device parameters, and some calculation results of device capacity such as emergency diesel engine, UPS et al. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

INL transient reactor restart progress

The United States Department of Energy (DOE) has authorized resumption of transient testing and the restart of the Transient Reactor Test (TREAT) facility. The TREAT reactor was used from 1959 to 1994 to conduct more than 2800 nuclear fuel transient tests prior to being placed in standby in 1994. The plant was extensively upgraded shortly before it was placed in standby. Present day assessments revealed that a sound infrastructure remains at the plant. The assessments included extensive walk-downs and subsequent functional testing. The testing was broad in scope, but ensured that any plant operability issues, including age related degradation were discovered and resolved. The primary age related degradation found was capacitors in Reactor Trip System and Automatic Reactor Control System power supplies. The majority of low voltage power supplies required replacement. Although minimal degradation was evident, in some cases elastomers such as hydraulic hoses were preemptively replaced to take advantage of the existing maintenance window and ensure future reliable operation. Configuration management has been extensively reviewed and the plant components re-labeled using modern standards. The re-labeling required extensive work including updates to plant drawings and procedures. The plant organization has been established to restart the reactor and will subsequently seamlessly transition to reactor operations. For the restart effort, the operating organization is being supplemented by subcontractors including some personnel who were involved in TREAT historical operations. During 2015 and the first half of 2016 substantial progress has been made to renew reactor systems and infrastructure, update procedures and configuration management documents, and put in place a qualified operating organization. Reactor startup is anticipated no later than 2018. (author)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Analysis of the SL-1 Accident Using RELAPS5-3D

On January 3, 1961, at the National Reactor Testing Station, in Idaho Falls, Idaho, the Stationary Low Power Reactor No. 1 (SL-1) experienced a major nuclear excursion, killing three people, and destroying the reactor core. The SL-1 reactor, a 3 MW{sub t} boiling water reactor, was shut down and undergoing routine maintenance work at the time. This paper presents an analysis of the SL-1 reactor excursion using the RELAP5-3D thermal-hydraulic and nuclear analysis code, with the intent of simulating the accident from the point of reactivity insertion to destruction and vaporization of the fuel. Results are presented, along with a discussion of sensitivity to some reactor and transient parameters (many of the details are only known with a high level of uncertainty).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Summary and experience feedback on the restart and power operation after a long term shutdown of HTR-10 - 18460

After a long term shutdown, 10 MW high temperature gas-cooled reactor (HTR-10) has been restarted in 2014. The main content of this process has been summarized and presented. The preparation in the reactor shutdown stage, the characteristic tests after the restart, and the engineering practice and experience during the power operation of HTR-10, have been introduced in details. The experience feedback on the restart process and power operation stage of HTR-10 have been proposed, including the equipment maintenance, technical transformation, routine test and inspection, modification of operational limits and conditions, and personnel training, etc. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Need for development of higher strength cryogenic structural materials for fusion magnet

A prototype fusion reactor is targeted as a beyond ITER project which is so called DEMO. Several conceptual designs have been carried out. Recently, in order to recognize practical aspects on maintenance of the prototype reactor, the replacement procedure of in-vessel components was focused and “sector process” was proposed. The process is that the reactor consists of sectors and all sectors will be drowned and replaced in a short time. The slim coil which generated higher magnetic field is required to realize the sector process. From the point of coil design, the occupancy of the structural material on the cross section of the coil increases with an increase of magnetic field. To realize the slim coil, the cryogenic structural material with higher yield strength and the proper toughness is desired.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Integration and assessment of component health prognostics in supervisory control systems - 291

Enhanced risk monitors (ERMs) for active components in advanced reactor concepts use predictive estimates of component failure to update, in real time, predictive safety and economic risk metrics. These metrics have been shown to be capable of use in optimizing maintenance scheduling and managing plant maintenance costs. Integrating this information with plant supervisory control systems increases the potential for making control decisions that utilize realtime information on component conditions. Such decision making would limit the possibility of plant operations that increase the likelihood of degrading the functionality of one or more components while maintaining the overall functionality of the plant. ERM uses sensor data for providing real-time information about equipment condition for deriving risk monitors. This information is used to estimate the remaining useful life and probability of failure of these components. By combining this information with plant probabilistic risk assessment models, predictive estimates of risk posed by continued plant operation in the presence of detected degradation may be estimated. In this paper, we describe this methodology in greater detail, and discuss its integration with a prototypic software-based plant supervisory control platform. In order to integrate these two technologies and evaluate the integrated system, software to simulate the sensor data was developed, prognostic models for feedwater valves were developed, and several use cases defined. The full paper will describe these use cases, and the results of the initial evaluation. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

An Innovative Hybrid Loop-Pool Design for Sodium Cooled Fast Reactor

The existing sodium cooled fast reactors (SFR) have two types of designs – loop type and pool type. In the loop type design, such as JOYO (Japan) [1] and MONJU (Japan), the primary coolant is circulated through intermediate heat exchangers (IHX) external to the reactor tank. The major advantages of loop design include compactness and easy maintenance. The disadvantage is higher possibility of sodium leakage. In the pool type design such as EBR-II (USA), BN-600M(Russia), Superphénix (France) and European Fast Reactor [2], the reactor core, primary pumps, IHXs and direct reactor auxiliary cooling system (DRACS) heat exchangers (DHX) all are immersed in a pool of sodium coolant within the reactor vessel, making a loss of primary coolant extremely unlikely. However, the pool type design makes primary system large. In the latest ANL’s Advanced Burner Test Reactor (ABTR) design [3], the primary system is configured in a pool-type arrangement. The hot sodium at core outlet temperature in hot pool is separated from the cold sodium at core inlet temperature in cold pool by a single integrated structure called Redan. Redan provides the exchange of the hot sodium from hot pool to cold pool through IHXs. The IHXs were chosen as the traditional tube-shell design. This type of IHXs is large in size and hence large reactor vessel is needed.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Under-sodium viewing technology for improvement of fast-reactor safeguards

The current safeguards approach for fast reactors relies exclusively on maintenance of continuity of knowledge to track the movement of fuel assemblies through these facilities. The remote handling of fuel assemblies, the visual opacity of the liquid metal coolant. and the chemical reactivity of sodium all combine and result in significant limitations on the available options to verify fuel assembly identification numbers or the integrity of these assemblies. These limitations also serve to frustrate attempts to restore the continuity-of-knowledge in instances where the information is under a variety of scenarios. The technology of ultrasonic under-sodium viewing offers new options to the safeguards community for recovering continuity-of-knowledge and applying more traditional item accountancy to fast reactor facilities. We have performed a literature review to investigate the development of under-sodium viewing technologies. In this paper we will summarize our findings and report the state of development of this technology and we will present possible applications to the fast reactor system to improve the existing safeguards approach at these reactors and in future fast reactors.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

D and D of the Callisto PWR Loop as part of the Refurbishment of the BR2 Research Reactor - 16168

Research reactor BR2 is undergoing a thorough maintenance and modernisation operation until mid-2016. In order to be able to use the reactor safely and efficiently in the coming period of 10 years, a preventive replacement of the beryllium matrix was required as a major step in the refurbishment. At the same time, a number of preventive maintenance and modernisation activities have been defined, including the dismantling of the CALLISTO (Capability for Light Water Irradiation in Steady State and Transient Operation) PWR experimental facility for in-pile studies installed into BR2 for more than 20 years. The CALLISTO end of life decommissioning strategy aims for waste, cost and dose uptake minimisation and includes: - the unloading and removal of the in-pile sections; - a closed-loop full system decontamination for dose reduction; - the complete dismantling of the loop; - the further sorting and segmentation in a dedicated workshop; - a hard chemical batch-wise decontamination for unconditional clearance. The operation is planned in the period of mid-2015 until mid-2016. The paper will describe in detail these subsequent steps, with a focus on decontamination and dismantling. Lessons learned and potential benefits towards the D and D of commercial PWR will be highlighted. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Potential applications of industrial wireless technologies in the future HTR - 18505

High Temperature Reactor (HTR) is a kind of promising nuclear reactor for supplying electricity and heat with inherent safety. The High Temperature Reactor-Pebble bed Modular reactor (HTR-PM) in China is equipped with the Distributed Control System (DCS) where wired network is applied mainly based on fiber. Considering the difficulty and cost of implementation, the flexibility of network configuration and maintenance, the industrial wireless network might be potential for some cases in the network of the next generation of HTR. Nowadays, there are several technologies available for choice, such as wireless HART, WIA-PA and ZigBee. Characteristics of these technologies are introduced. The most important factors for choice of the technology of network are the required reliability and latency tolerance of communication. Analysis and classification of the communications needed in the network of the HTR are carried out, and a comparison of popular industrial wireless technologies, including the reliability, the latency, the communication distance, and the difficulty and cost of implementation is made. Generally speaking, considering the low latency, high reliability and the compatibility with HART devices, wireless HART is promising. WIA-PA could be applied if redundant gateway is required. ZigBee might show its advantages in power consumption and cost. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Assessment of neutron radiation damage and shielding for operational good practice of the video systems at Jet - 25426

High neutron and gamma ray yields in fusion reactors like JET can be detrimental to the applied diagnostic equipment such as video imaging systems. For instance, defects induced in semiconductors by neutrons via displacement damage effects degrade the performance of CCD image sensors. Actions to minimize and/or mitigate these effects need to be considered during operation and maintenance of the video system at JET. A preliminary study on the setting up of a neutron/gamma shield around the cameras has been pursued. (authors)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Improvement of Algorithms for Pressure Maintenance Systems in Drum-Separators of RBMK-1000 Reactors

The main tasks and challenges for pressure regulation in the drum-separators of RBMK-1000 reactors are described. New approaches to constructing algorithms for pressure control in drum-separators by electro-hydraulic turbine control systems are discussed. Results are provided from tests of the operation of modernized pressure regulators during fast transients with reductions in reactor power.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗