Search NASA⌕ Search

SEARCH · Search NASA

Results for “REAP”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

87 records · Page 5

IV&V Assurance Case Design for Artemis II

As human-rated missions like those in NASA’s Artemis program continue to grow in both size and complexity, and the role of software in achieving mission objectives expands dramatically, NASA’s Independent Verification and Validation (IV&V) Teams face evolving challenges in assuring the safety and performance of the safety- and mission-critical embedded software that is essential to landing astronauts on the surface of the Moon by 2024. Key among these challenges is IV&V’s desire to present a cohesive, integrated assurance statement to its stakeholders that encapsulates and summarizes our assurance positions across the integrated Artemis systems and their combined role in support of a safe and successful flight. In order to meet this challenge, the IV&V Teams have begun a transition to using formal assurance case concepts and documentation in the Goal Structuring Notation (GSN) to build an argument in support of software assurance. IV&V recognizes significant benefits to the logical argumentation structure provided by assurance cases and GSN over our current practices for documenting and managing assurance claims. In order to reap these benefits, IV&V is integrating the use of assurance case concepts with our paradigm of follow-the-risk capability based assurance. Because of this, assurance cases created and used by IV&V are distinct from the sort of assurance case created by a development project or embedded software assurance organization. IV&V’s assurance cases depend much less upon standards and regulations, and more on evidence captured by IV&V regarding the environment, requirements, design, and implementation. IV&V constructs an independent network of claims based on an independent decomposition of arguments. Based upon the risk posture of these claims and their associated software and software artifacts, IV&V then develops and executes engineering analyses and testing, which provide evidence to either support or refute the claim. This emerging risk-informed assurance case methodology is being put into practice as IV&V plans for support of the Artemis II mission, the first flight of the Orion capsule and Space Launch System with astronauts on board.

Gerek Whitman↗

IV&V Assurance Case Design for Artemis II

As human-rated missions like those in NASA's Artemis program continue to grow in both size and complexity, and the role of software in achieving mission objectives expands dramatically, NASA's Independent Verification and Validation (IV&V) Teams face evolving challenges in assuring the safety and performance of the safety- and mission-critical embedded software that is essential to landing astronauts on the surface of the Moon by 2024. Key among these challenges is IV&V's desire to present a cohesive, integrated assurance statement to its stakeholders that encapsulates and summarizes our assurance positions across the integrated Artemis systems and their combined role in support of a safe and successful flight. In order to meet this challenge, the IV&V Teams have begun a transition to using formal assurance case concepts and documentation in the Goal Structuring Notation (GSN) to build an argument in support of software assurance. IV&V recognizes significant benefits to the logical argumentation structure provided by assurance cases and GSN over our current practices for documenting and managing assurance claims. In order to reap these benefits, IV&V is integrating the use of assurance case concepts with our paradigm of follow-the-risk capability based assurance. Because of this, assurance cases created and used by IV&V are distinct from the sort of assurance case created by a development project or embedded software assurance organization. IV&V's assurance cases depend much less upon standards and regulations, and more on evidence captured by IV&V regarding the environment, requirements, design, and implementation. IV&V constructs an independent network of claims based on an independent decomposition of arguments. Based upon the risk posture of these claims and their associated software and software artifacts, IV&V then develops and executes engineering analyses and testing, which provide evidence to either support or refute the claim. This emerging risk-informed assurance case methodology is being put into practice as IV&V plans for support of the Artemis II mission, the first flight of the Orion capsule and Space Launch System with astronauts on board.

Whitman, Gerek↗

Securing the legacy of TESS through the care and maintenance of TESS planet ephemerides

Much of the science from the exoplanets detected by the TESS mission relies on precisely predicted transit times that are needed for many follow-up characterization studies. We investigate the severity of ephemeris deterioration for simulated TESS planets and find that the ephemerides of 81% of those will have expired (i.e. mid-transit time uncertainties greater than 30 minutes, impeding the efficient scheduling of follow-up observations) one year after their TESS observations. This rapid deterioration is driven primarily by the relatively short time baseline of TESS observations. In particular, of the simulated planets that would be recommended as potential James Webb Space Telescope targets by Kempton et al. (2018), 80% will have 1 mid-transit time uncertainties greater than 30 minutes by the earliest time JWST would observe them. The recently-approved extension to the TESS mission means that the ephemerides of most (though not all) primary mission planets will eventually be rescued, but the benefits of these new observations can only be reaped two years after the primary mission observations. Moreover, even with the advent of the TESS mission extension, the ephemerides of most primary mission TESS planets (as well as those newly discovered during the extended mission) will again have expired by the time future facilities such as the ELTs, Ariel and the possible LUVOIR/OST missions come online. We identify categories of TESS planets for which the ephemeris deterioration is most severe, and provide strategies for maintaining their ephemerides fresh through additional follow- up transit observations. We find that the longer the baseline between the TESS and the follow-up observations, the longer the ephemerides stay fresh, and that 51% of simulated primary mission TESS planets will require space-based observations to refresh their ephemerides.

Surveys↗

Securing the Legacy of TESS through the Care and Maintenance of TESS Planet Ephemerides

Much of the science from the exoplanets detected by the Transiting Exoplanet Survey Satellite (TESS) mission relies on precisely predicted transit times that are needed for many follow-up characterization studies. We investigate ephemeris deterioration for simulated TESS planets and find that the ephemerides of 81% of those will have expired (i.e., 1σ mid-transit time uncertainties greater than 30 minutes) 1 yr after their TESS observations. We verify these results using a sample of TESS planet candidates as well. In particular, of the simulated planets that would be recommended as James Webb Space Telescope (JWST) targets by Kempton et al., ∼80% will have midtransit time uncertainties >30 minutes by the earliest time JWST would observe them. This rapid deterioration is driven primarily by the relatively short time baseline of TESS observations. We describe strategies for maintaining TESS ephemerides fresh through follow-up transit observations. We find that the longer the baseline between the TESS and the follow-up observations, the longer the ephemerides stay fresh, and that 51% of simulated primary mission TESS planets will require space-based observations. The recently approved extension to the TESS mission will rescue the ephemerides of most (though not all) primary mission planets, but the benefits of these new observations can only be reaped 2 yr after the primary mission observations. Moreover, the ephemerides of most primary mission TESS planets (as well as those newly discovered during the extended mission) will again have expired by the time future facilities such as the ELTs, Ariel, and the possible LUVOIR/Origins Space Telescope missions come online, unless maintenance follow-up observations are obtained.

Diana Dragomir↗

Space Launch System Payload Stage Capability for Ultra-High Characteristic Energy Missions

The Space Launch System (SLS) vehicle is NASA’s cornerstone capability for a new era of human and robotic exploration of deep space. The unrivalled performance of SLS provides the capability to launch the first woman and next man to walk on the lunar surface and to support development of a sustained human presence in cislunar space, and ultimately human missions to Mars. As an evolvable capability with unique launch performance, the opportunities enabled by SLS also include game-changing benefits for science missions, including probes to the outer solar system and beyond. For the last two years, the SLS Program has worked with the Interstellar Probe team at the Johns Hopkins University Applied Physics Laboratory(APL) to provide data that describe how SLS could support a mission that would break through the boundary of the heliosphere and into pristine interstellar space only a decade after launch, enabling earlier science return and greatly increasing spacecraft life in the interstellar medium. In record-breaking time, the ISP as launched on SLS may answer questions raised by the extended mission of NASA’s Voyager spacecraft. While SLS and its efficient Exploration Upper Stage (EUS) offer benefits for exploration of the outer planets, adding one or more additional stages to this architecture makes it even more capable for missions beyond our solar system, offering more realistically appealing flight times that would allow the mission scientists to reap the rewards of exploration. During the time the SLS Program has been working with the Interstellar Probe team, it has identified an expedited path to the Block 2 capability planned for the Interstellar Probe mission, and further matured performance numbers for diverse multi-stage configurations using a combination of commercially available liquid hydrogen (LH2)/liquid oxygen (LOX) upper stages and solid motor kick stages. That work has demonstrated the SLS payload stage capability provides significant benefits and opens trade space for multiple missions in consideration during planning for the next Planetary Science and Astrobiology Decadal Survey. This presentation details the significant benefits SLS can provides for very high characteristic (C3) energy missions by coupling the capabilities of SLS to current commercial rocket propulsion stage systems. These capabilities are explored specifically in the context of an Interstellar Probe architecture in which a small, capable science probe, coupled with carefully tailored mission design trajectories, could be used to explore the outer solar system and the interstellar medium. The presentation will also address the operational logistics of integrating such a mission, explaining the options available for “non-standard” SLS payloads, including processing those with radioisotope power generators or additional propulsion stages. An SLS system overview and capabilities will be presented, along with vehicle configuration and orbit performance capability studies, explaining how SLS is enabling for a variety of high-energy science mission profiles, including launching an exploratory probe bound for interstellar space only a decade after launch.

Rob Stough↗

(abstract) The Alpha-Proton-X-ray Spectrometer Deployment Mechanism -- An Anthropomorphic Approach to Sensor Placement on Martian Rocks and Soil

The Mars Pathfinder mission promises to reap a harvest of geological information about Mars. One of the nearly half dozen instruments making this science data possible is the alpha proton X ray spectrometer (APXS). Using a curium source and backscattering techniques, the APXS will determine the elemental composition of rocks and the soil around the landing site. To ensure information of high fidelity, the APXS sensor face must be aligned to within 20° to the surface of each rock and soil sampling location and be held there for up to 10 hours. This is accomplished through the anthropomorphic deployment mechanism (ADM). The ADM mounts on the back of the Mars rover. Working with the rover, the ADM both actively and passively positions the APXS sensor head against a chosen target. The ADM is an amalgamation of unique solutions to some very challenging design problems. The resulting design is light, flexible, and nearly autonomous. Its straightforward operation rivals that of the human arm in simplicity and elegance.

Mars↗

Satellite Conjunction Assessment, Risk Analysis and Collision Avoidance Best Practices: The History, Evolution and Opportunities

Since Explorer 1 was launched on January 31, 1958, the United States (U.S.) has reaped the benefits of space exploration. New markets and new technologies have spurred the economy and changed lives in many ways across the national security, civil, and commercial sectors. Space technologies and space-based capabilities now provide global communications, navigation and timing, weather forecasting, and more. Space exploration also presents challenges that impact not only the U.S. but also its allies and other partners. A significant increase in the volume and diversity of activity in space means that it is becoming increasingly congested. Emerging commercial ventures such as satellite servicing, in-space manufacturing, and tourism as well as new technologies enabling small satellites and large constellations of satellites present serious challenges for safely and responsibly using space in a stable, sustainable manner. To meet these challenges, the U.S. seeks to improve global awareness of activity in space by publicly sharing flight safety-related information and by coordinating its own on-orbit activity in a safer, more responsible manner. It seeks to bolster stability and reduce current and future operational on-orbit risks so that space is sustained for future generations. To this end, new and better Space Situational Awareness (SSA) capabilities are needed to keep pace with the increased congestion, and the U.S. seeks to create a dynamic environment that encourages and rewards commercial providers who improve these capabilities. The National Aeronautics and Space Administration (NASA) Spacecraft Conjunction Assessment and Collision Avoidance Best Practices Handbook reflects how NASA currently operates, which has evolved over time. Consideration is given to important topics such as spacecraft and constellation design; spacecraft “trackability;” pre-launch preparation and early launch activities; on-orbit collision avoidance; and automated trajectory guidance and maneuvering. This talk aims to present examples of responsible practices for spacecraft Owners/Operators (O/O) to consider for lowering collision risks and operating safely in space (from LEO and beyond) in a stable and sustainable manner. As technology and innovation continues to improve upon existing capabilities, what kind of new challenges are presented in the SSA community? Can space exploration and commercial ventures thrive while keeping paramount the safety and protection of the space environment? What are the challenges and opportunities that need to be addressed and considered for space situational awareness in Cis-Lunar Space? It may prove useful for entities offering, or intending to offer, SSA or Conjunction Assessment (CA) services to consider such examples of responsible practices to protect the space environment for future use by all.

Collision Avoidance↗

Development of Large-Scale Thrust Chambers using Laser Powder Directed Energy Deposition

Historical manufacturing methods for liquid propulsion combustion chambers have relied on series of tube-walls or slotted channel walls (subsequently brazed or plated) for regenerative cooling paths. Large-scale additive manufacturing techniques offer strong potential to minimize manufacturing lead times and cost for developing liquid propulsion chambers, while maintaining performance metrics of traditionally manufactured hardware. The benefits expand beyond traditional combustion chambers to lesser considered nuclear thermal propulsion chambers where radiation energizes the singular incoming propellant stream instead of an exothermic chemical reaction. While each subset of liquid propulsion chambers reaps similar benefit, the geometric challenges in each design can vary substantially. This manuscript discusses the challenges of large contraction ratio propulsion chambers, bimetallic liners and closeout jackets, and material selection when considering laser powder directed energy deposition. LP-DED presently offers build volumes unattainable by L-PBF systems, required for large diameter thrust chambers. LP-DED typically has faster deposition time and is capable of overhang angles without support material (due to the ability to tilt the build plate and minimize the actual build angle). These benefits come at the cost of feature resolution. Designers and manufacturers should consider the effects of thick-wall features printed parallel to the primary surface versus perpendicular due to distortion. Thick-wall and thin-wall features printed in the same plane can substantially increase build time. Where large-scale L-PBF overlaps in size, there may be limited benefit in the quantity of powder required for the build due to the low capture rate of LP-DED and a case-by-case examination is required.

LP-DED↗

Alvin Tollestrup (1924-2020): A Life in Science

Alvin Tollestrup was a physicist and engineer of uncommon insight, intuition, and ingenuity who was revered in life for his essential leadership in the development of superconducting magnets for high-energy accelerators. He exhibited a matchless mastery of what he called freshman physics — though his mastery hardly ended there — and an uncanny gift for joining careful measurements with transparent calculations to reveal the essence of a subject. To watch Alvin at work was to learn how a true scientist formulates and solves a problem. He had other gifts: a nose for significant problems in both science and technology, the ability to draw talented people to an important cause, and a mentor's instinct for spotting gifted junior colleagues and helping them to mature as engineers and scientists. He was also good company! Alvin brought his keen vision about what constitutes important science, along with powerful ambition for the institution and for fundamental science, to considerat ions about Fermilab's future. His questions were uniformly probing, his opinions unfailingly interesting, and his appetite for work consistently inspiring. Among Alvin's many contributions to experimental particle physics — in a career that spanned seven decades — the rich achievements of the Collider Detector at Fermilab Collaboration, of which he was a founder and an enduring leader, stand out. The discovery of the top quark in 1995 earned worldwide acclaim. He reaped individual accolades as well, including election to the National Academy of Sciences. The National Medal of Technology, conferred in 1989, recognized Alvin’s leading role in developing superconducting magnets for Fermilab's Tevatron. Universities Research Association created the Tollestrup Award for Postdoctoral Research, commemorating Alvin's avuncular support for young scientists. This volume celebrates Alvin Tollestrup’s career and the rich, fulfilling life he led beyond the laboratory. Contributions from colleagues and family illuminate many facets of this remarka! ble figure. May old friends savor the memory of the Alvin they knew, while discovering less-familiar parts of his history; and may readers who did not have the opportunity to know Alvin firsthand find inspiration in his exemplary life in science.

Palmer, Mark↗

Snowmass2021: Opportunities from Cross-survey Analyses of Static Probes

Cosmological data in the next decade will be characterized by high-precision, multi-wavelength measurements of thousands of square degrees of the same patches of sky. By performing multi-survey analyses that harness the correlated nature of these datasets, we will gain access to new science, and increase the precision and robustness of science being pursued by each individual survey. However, effective application of such analyses requires a qualitatively new level of investment in cross-survey infrastructure, including simulations, associated modeling, coordination of data sharing, and survey strategy. The scientific gains from this new level of investment are multiplicative, as the benefits can be reaped by even present-day instruments, and can be applied to new instruments as they come online.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

On-PIC Light Source Integration & Micro-dispensing of Solder Paste for Flip Chip Application

To reach the next level benefits of photonic integrated circuits (PICs), the Integrated Photonic Systems Roadmap-International describes the necessity of either heterogeneous or hybrid integration of light sources [1]. A new approach for hybrid integration is Photonic Wire Bonding where 3D nanolithography is used to pattern a polymer waveguide that connects light sources to PIC waveguides. The waveguides resemble electrical wire bonds and essentially do the same as their electrical counterpart for packaging photonic chips together. In order to reap the full benefits of a photonic wire bonds, the light source must be carefully packaged. In this work I seek to expand RIT’s photonic packaging capability by establishing a packaging process to integrate light sources, specifically an Indium Phosphide distributed feedback lasers and a reflective semiconductor optical amplifiers, directly onto a photonic integrated circuits. Another necessary requirement for PIC packaging is densely integrated electrical connectivity. In this thesis I developed a fine pitch flip chip interconnect technique demonstrated using gold stud bumps in conjunction with micro-dispensed solder paste. This work opens the door to high density photonic flip chip applications. The micro-dispensed solder paste dots having diameters 50-125 µm are currently being tested at a pitch of 150 µm . The gold stud bumps are formed with 1mil gold wire creating bumps with a diameter of 40-60 µm depending on specific parameter values. These capabilities will allow RIT to assemble and test novel photonic integrated devices, cutting down on the time and cost associated with third party assembly and tests facilities. Thereby keeping RIT at the forefront of photonic research.

Wongk, Nicole↗

A Novel LDPP-MADDPG Approach for Distributed Power Allocation in mmWave Cellular Networks

This paper considers the problem of distributed beam scheduling and power allocation problem in millimeter- Wave (mmWave) cellular networks, in which multiple Base Stations (BSs) operate as individual operators over a shared spectrum. We propose a novel learning-aided approach that integrates the Lyapunov Drift-Plus-Penalty (LDPP) framework and Multi-agent Deep Deterministic Policy Gradient (MADDPG) reinforcement learning algorithms. This offers a powerful approach to learning stable and constraint-aware policies, reaping the joint benefit of both LDPP and MADDPG, in complex multiagent environments. The major challenge for this approach is to integrate these two approaches in a meaningful and effective manner. The key idea to solve this problem is to introduce a novel feature of local observation that incorporates potential negative value of the reward function due to the stochastic constraints introduced by the LDPP framework. Empirical results demonstrate that our proposed scheme outperforms the baseline methods under various conditions.

99 - GENERAL AND MISCELLANEOUS↗

ECP SOLLVE: Validation and Verification Testsuite Status Update and Compiler Insight for OpenMP

The OpenMP language continues to evolve with every new specification release, as does the need to validate and verify the new features that have been implemented by the different vendors. With the release of OpenMP 5.0 and OpenMP 5.1, new target offload and host-based features have been introduced to the programming model. While OpenMP continues to grow in maturity, there is an observable growth in the number of compiler and hardware vendors that support OpenMP. In this manuscript, the main focus is on evaluating the conformity and OpenMP implementation progress of various compiler vendors such as Cray, IBM, GNU, Clang/LLVM, NVIDIA, and Intel. More specifically, the 4.5, 5.0, and 5.1 versions of the OpenMP specification are analyzed. For our experimental setup, the Crusher and Summit computing systems hosted by Oak Ridge National Lab’s Computing Facilities are utilized. The effort of vendor agnostic analysis of these implementations is especially valuable for application developers who are using new OpenMP features to accelerate their scientific codes. Insights are presented into the current implementation status of various vendors, the progression of specific compiler’s support for OpenMP overtime, the subset of OpenMP 4.5, 5.0, and 5.1 that is supported by all compilers, and examples of how our test suite has influenced discussion regarding the correct interpretation of the OpenMP specification. By evaluating OpenMP conformity of pre-Exascale computing systems, the aim is to detail progress and status of AMD + Cray ecosystem before the system and their OpenMP implementation is used for mission critical applications when the first Exascale Computer Frontier is made available to applications.

Huber, Thomas↗