Search NASA⌕ Search

SEARCH · Search NASA

Results for “REMEDIAL ACTION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

84 records · Page 5

[School-Based UV-B Monitoring Project in Support of EOS-CHEM]

This grant is an extension of Grant NAG5-8929 (Drexel Project Number 230026), resulting from extensions necessary to meet changing science objectives as described in the final report for NAG5-8929, a copy of which is attached. The instrument configuration resulting from NAG54929 has remained basically intact. Cosine response measurements conducted by James Slusser s group at Fort Collins, Colorado, in support of the proposal for Aura ground validation mentioned in the final report for NAG5-8929, indicated that there was significant light leakage to the detector through the sides of the nylon housing. This was easily remedied by machining a removable opaque collar (made from the dark same grey rigid plastic plumbing tubing as the collimating tube) that fits around the detector collar. Also during this grant period, data logging procedures were established for the UV-A instrument, to record irradiance before, during, and after an Aura overflight. This is required in order to compare spatial and temporal variability as required for ground validation of data products derived from the Ozone Monitoring Instrument (OMI). Standalone 12-bit loggers from Onset Computer Corporation (the U12 series), which were not available at the start of these projects, makes possible relatively inexpensive logging for these instruments at a usable resolution. configuration and disposition of these instruments, including the final version of a GLOBE protocol for using the instruments, currently depend on action taken on the Aura ground validation proposal submitted in 2004. A copy of that proposal is attached.

Brooks, David R.↗

Coronado National Memorial Disasters: Investigating Geohazards & Slope Failure Susceptibility Utilizing NASA Earth Observations

The Coronado National Memorial (CORO), located in Hereford, Arizona, is situated along the United States' southern border, featuring recently established but still incomplete border barrier roads. This landscape is inherently prone to geohazards, and debris flow due to the steep mountainous topography, complex terrain, monsoonal rains, and freeze/thaw action - and the new infrastructure has exhibited these processes in the form of rockfall, embankment failure, and debris flow. NASA DEVELOP partnered with CORO to conduct a feasibility assessment of Earth observations for identification of geohazards and slope failure susceptibility. Leveraging Earth observations (United States Geological Survey 3D Elevation Program Digital Elevation Model and a locally obtained Light Detection And Ranging-derived Digital Elevation Model) from 2019 to 2023, and geospatial datasets starting from 2008, the study was able to provide tools to determine the focus for damage mitigation, identify areas most susceptible to slope failures, and prioritize at risk assets through three products: change detection maps, slope failure susceptibility maps, and a slope failure prioritization model. With an emphasis on monitoring high-risk areas and prioritizing mitigation efforts, the project addresses a critical gap in remediation strategies and aims to enhance preservation and safety of the region. Results of this study found that (i) the most identifiable areas of change were the road cuts and debris directly adjacent to the roads created for border construction, (ii) areas of highest slope failure susceptibility are located in mountainous areas with erosive geology, and (iii) roads resulting from border construction have approximately twice the risk of slope failure as roads created by the national park service.

Geohazard↗

Ecological Impacts of the Space Shuttle Program at John F. Kennedy Space Center, Florida

The Space Shuttle Program was one of NASAs first major undertakings to fall under the environmental impact analysis and documentation requirements of the National Environmental Policy Act of 1969 (NEPA). Space Shuttle Program activities at John F. Kennedy Space Center (KSC) and the associated Merritt Island National Wildlife Refuge (MINWR) contributed directly and indirectly to both negative and positive ecological trends in the region through the long-term, stable expenditure of resources over the 40 year program life cycle. These expenditures provided support to regional growth and development in conjunction with other sources that altered land use patterns, eliminated and modified habitats, and contributed to cultural eutrophication of the Indian River Lagoon. At KSC, most Space Shuttle Program related actions were conducted in previously developed facilities and industrial areas with the exception of the construction of the shuttle landing facility (SLF) and the space station processing facility (SSPF). Launch and operations impacts were minimal as a result of the low annual launch rate. The majority of concerns identified during the NEPA process such as potential weather modification, acid rain off site, and local climate change did not occur. Launch impacts from deposition of HCl and particulates were assimilated as a result of the high buffering capacity of the system and low launch and loading rates. Metals deposition from exhaust deposition did not display acute impacts. Sub-lethal effects are being investigated as part of the Resource Conservation and Recovery Act (RCRA) regulatory process. Major positive Space Shuttle Program effects were derived from the adequate resources available at the Center to implement the numerous environmental laws and regulations designed to enhance the quality of the environment and minimize impacts from human activities. This included reduced discharges of domestic and industrial wastewater, creation of stormwater management systems, remediation of past contamination sites, implementation of hazardous waste management systems, and creation of a culture of sustainability. Working with partners such as the USFWS and the St Johns River Water Management District (SJRWMD), wetlands and scrub restoration and management initiatives were implemented to enhance fish and wildlife populations at the Center. KSC remains the single largest preserve on the east coast of Florida in part due to NASAs commitment to stewardship. Ongoing Ecological Program projects are directed at development of information and knowledge to address future KSC management questions including the transition to a joint government and commercial launch facility, enhanced habitat management requirements for wetlands and scrub, potential impacts of emerging contaminants, and adaptation to climate change including projected sea level rise over the next 50-75 years.

Space Shuttle Program↗

CARA Devolution ESMO Pilot Program

Information regarding the current effort ongoing with CARA to determine the steps needed to have a mission move away from being supported by CARA, otherwise referred to as Devolving/Devolution. Information regarding the working group established to undertake this effort, documents agreed that needed to be written and plans for a parallel operations period. The communication between ESMO and CARA during the Parallel Operations period will be as the following: – A daily email will be sent from ESMO to CARA describing each HIE that is being actively planned and worked, and the action that ESMO is planning on taking – A weekly email will be sent from ESMO to CARA listing the progress toward achieving the parallel operations success criteria – The CARA team will remain on distribution for ESMO HIE communications and CAM invitations associated with DAMs/RMMs during the parallel operations period – At a minimum, 2 members of the CARA team will be in attendance at all ESMO planning and review discussions – A monthly email will be sent from ESMO to CARA with the HIE metrics • During parallel operations, ESMO will contact NASA Headquarters to report any redDevolution Working Group laid out and completed all steps needed to begin parallel operations • Parallel Ops for ESMO began on 11/26 (CARA in shadow mode only) • Any lessons learned from parallel ops will be folded back into documents/templates • Hope to achieve all success criteria < 6 months • Decision for permanent devolution will be based on completion of parallel ops and other future documentation creation (CARA Standard and Handbook, etc) and reviews (ORR) event which is less than 2 days from TCA, including the proposed remediation, on an as-needed daily basis flow using SpaceTrack to send and receive data

ESMO pilot devolution program↗

Hypergol Maintenance Facility North, SWMU 090, Year 3 Air Sparge System Performance Monitoring Report, Kennedy Space Center, Florida

This Performance Monitoring Report (PMR) presents Year 3 Air Sparge (AS) System operation, maintenance, and monitoring (OM&M) activities and performance monitoring results for the AS Interim Measure (IM) at the Hypergol Maintenance Facility North (HMFN) at Kennedy Space Center (KSC), Florida. HMFN has been designated Solid Waste Management Unit (SWMU) 090 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities included in this report extends from September 2022 to August 2023. The HMFN AS IM was implemented in 2019-2020 to treat a chlorinated solvent groundwater plume that resulted from historical operations supporting the National Aeronautics and Space Administration (NASA) Space Program. The system includes 213 AS wells, with screen depths ranging from 25 feet to 45 feet below land surface (bls) and treats approximately 1.62 acres of contaminated groundwater. The objective of the AS IM is to actively reduce groundwater concentrations exceeding Florida Department of Environmental Protection Natural Attenuation Default Concentrations (NADCs) (identified as the High Concentration Plume [HCP]) to levels that facilitate transition into a Long-Term Monitoring program. The AS IM targets all of the HCP, except for a source zone area within the HCP where trichloroethene (TCE) concentrations exceed 11,000 micrograms per liter (μg/L) at depths greater than 45 feet bls. This is because site lithology was found to not be conducive to the AS treatment technology at these deeper depths. NASA will re-visit plans for potentially utilizing another remedial technology for residual deeper contamination following completion of the AS IM. OM&M activities and results from Year 3 indicate that the AS system at HMFN is operating as designed and is meeting performance criteria. Groundwater performance monitoring results indicate that following the third year of AS system operation, TCE concentrations in wells across all treated depth intervals have been reduced by an average of more than 99 percent. Overall, the areal extent of the plume showed a reduction following Year 3 of AS operations; however, continued operation of the AS system is required to meet the IM objective.

VOCs↗

Wilson Corners Solid Waste Management Unit (SWMU) 001: 2021 Annual Long-Term Monitoring Report, Kennedy Space Center, Florida

This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2021 at Wilson Corners, Solid Waste Management Unit (SWMU) 001, at Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Adaptive site management is being utilized through ongoing assessment, design, and interim measures (IM). Annual LTM of the groundwater is also being conducted at the site. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code (F.A.C.). The goal of LTM at this site is threefold: to determine groundwater flow characteristics, monitor the downgradient concentration trends, and monitor select locations internal to the groundwater plume. Every 5 years, upgradient and side-gradient monitoring wells are sampled to verify delineation. The last time this was performed was in 2015. The sampling of these wells in 2020 was replaced with the direct push technology (DPT) investigations completed in October 2020 and April 2021. This DPT groundwater data was presented in an Advance Data Package (ADP) in September 2021 and discussed in the Implementation Work Plan (IWP) dated November 2021 for installation of an air sparge (AS) system. Based on results from groundwater sampling activities performed during the previous reporting period, including the 2020 and 2021 DPT groundwater sampling, it was determined that the LTM sampling plan was no longer meeting the goal of LTM because delineation was not verified. The 2021 LTM sampling plan was modified to include the sampling of monitoring wells located around the perimeter of the low concentration plume (LCP); the area with concentrations of contaminants of concern [COCs] greater than Groundwater Cleanup Target Levels [GCTLs]), and sampling of 10 monitoring wells proposed for installation (April 2021 KSC Remediation Team (KSCRT) Meeting, Decision 2104-D32). The modified LTM plan received team consensus at the September 2021 KSCRT Meeting (Decision Number 2109-D03), and sampling of the existing monitoring wells was completed in December 2021. The proposed monitoring wells are planned for installation in late 2022, concurrent with ongoing IM construction activities. December 2021 LTM data was presented at the May 2022 KSCRT Meeting, and activities are summarized in this report. The activities presented in this report include the December 2021 groundwater gauging of 42 monitoring wells and sampling of 44 monitoring wells. During the December 2021 event, the low flow sampling method was used, and samples were analyzed for a select list of volatile organic compounds (VOCs), including 1,1,2-trichloro-1,2,2-trifluoroethane (Freon 113). The following conclusions can be made based on the 2021 LTM results: - In December 2021, groundwater flow for the site was generally to the west at all intervals. This is generally consistent with historical observations at the site, with the exception of a southwest and southeast flow component observed at 34 to 48 feet below land surface (bls). - The vertical extent of VOCs was historically delineated by monitoring wells screened greater than 48 feet bls. The results from the two vertical extent monitoring wells, WILC-MW0078 (screened 65 to 70 feet bls) and WILC-MW0130 (screened 56 to 66 feet bls) that were sampled during the 2021 LTM indicate that groundwater vinyl chloride (VC) concentrations in both wells were greater than the GCTL. The Remediation Team has previously agreed to delay deeper DPT investigations in this area to prevent the creation of additional pathways for vertical migration. - The LCP continues to extend both horizontally, predominantly to the west, and vertically beyond the current monitoring well network, with some retraction observed to the southeast. Evaluation of this data combined with data from the 2020 and 2021 DPT sampling event indicate that the LCP encompasses an estimated 20.7 acres based on an expanded sampling area, as compared to the 2020 LCP footprint of 17.0 acres. - Freon 113 was not detected above GCTLs during the 2021 LTM event. Based on groundwater sampling activities performed in 2021, including April 2021 DPT groundwater sampling, the following recommendations are provided: - Perform the next LTM sampling event, targeted to occur in 2023, concurrently with the IM baseline sampling prior to AS system installation; - Include sampling from nine monitoring wells that are planned to be installed in late 2022, concurrent with upcoming IM construction activities. Installation of one deep vertical well, screened 70 to 80 feet bls, will be delayed to prevent the creation of an additional pathway for vertical migration; - Continue to sample under the modified annual LTM plan as presented in Table 4-1 concurrently with IM baseline sampling; and - Once the AS system install and start-up is complete, select monitoring wells from the LTM program will transition into the performance monitoring plan, and LTM will be temporarily discontinued. Performance monitoring will be performed quarterly, and the monitoring well network will be evaluated following the first performance monitoring sampling event.

long-term monitoring (LTM)↗

Improving Satellite Compatible Microdevices to Study Biology in Space

The technology for biology in space lags far behind the gold standard for biological experiments on Earth. To remedy this disparity, the Rothschild lab works on proof of concept, prototyping, and developing of new sensors and devices to further the capabilities of biology research on satellites. One such device is the PowerCell Payload System. One goal for synthetic biology in aiding space travel and colonization is to genetically engineer living cells to produce biochemicals in space. However, such farming in space presupposes bacteria retain their functionality post-launch, bombarded by radiation, and without the 1G of Earth. Our questions is, does a co-culture of cyanobacteria and protein-synthesizing bacteria produce Earth-like yields of target proteins? Is the yield sensitive to variable gravitational forces? To answer these questions, a PowerCell Payload System will spend 1 year aboard the German Aerospace Center's Euglena and Combined Regenerative Organic-food Production In Space (Eu:CROPIS) mission satellite. The PowerCell system is a pair of two 48-well microfluidic cards, each well seeded with bacteria. The system integrates fluidic, thermal, optical, electronic, and control systems to germinate bacteria spores, then measure the protein synthesized for comparison to parallel experiments conducted on the Earth. In developing the PowerCell Payload, we gained insight into the shortcomings of biology experiments on satellites. To address these issues, we have started three new prototyping projects: 1) The development of an extremely stable and radiation resistant cell-free system, allowing for the construction of proteins utilizing only cell components instead of living cells. This can be lyophilized on a substrate, like paper. (2) Using paper as a microfluidic platform that is flexible, stable, cheap, and wicking. The capillary action eliminates the need for pumps, reducing volume, mass, and potential failing points. Electrodes can be printed on the paper to sense for biochemicals. (3) Developing a modular, semi-autonomous microfluidic device that can be easily adapted for a variety of common biological experiments. This versatility will allow for quicker and cheaper experimentation. These improvements to satellite experiment platforms have the potential to radically increase the return from NASA's biological and field studies with reduced development time, mass, and cost with increased robustness data and interpretation.

biology in spac↗

General Services Administration Reclamation Yard Solid Waste Management Unit 010: 2022 Groundwater Monitoring Report Kennedy Space Center, Florida

This report presents a summary of the groundwater monitoring activities that occurred in September and October 2022 at General Services Administration Reclamation Yard, Solid Waste Management Unit 010, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code. For the purposes of this report, two separate plumes, known as the Polychlorinated Biphenyl (PCB)/Volatile Organic Aromatic (VOA) Plume and the Chlorinated Volatile Organic Compound (VOC) Plume, were identified for this site. The contaminants of concern (COCs) for the PCB/VOA Plume consist of PCBs, 1,2,4-trichlorobenzene, and breakdown products of 1,2,4-trichlorobenzene. The COCs for the Chlorinated VOC Plume were tetrachloroethene, trichloroethene, cis-1,2-dichloroethene, and vinyl chloride. Groundwater monitoring for VOCs in the Chlorinated VOC Plume area was discontinued following the December 2021 annual monitoring event. Annual groundwater monitoring for underground injection control (UIC) parameters continues for both the PCB/VOA Plume and the Chlorinated VOC Plume areas. The activities presented in this report include one field event: September and October 2022, which includes sitewide semi-annual water level measurements of 55 monitoring wells, redevelopment of all monitoring wells listed in the sampling plan, and groundwater sampling of 28 monitoring wells. The sampling and analysis demonstrated that the PCB/VOA plume is not expanding and is significantly reduced compared to before a 2018 source removal interim measure. Recommendations are made for the 2023 groundwater monitoring program.

groundwater↗

Components Refurbishment and Chemical Analysis Facility, Hot Spot 1 SWMU #041 Year 3 Annual Performance Monitoring Report Kennedy Space Center, Florida

This Year 3 Annual Performance Monitoring Report (PMR) presents the operations, maintenance, and monitoring activities for the Hydraulic Containment System (HCS) Interim Measure (IM) at the Components Refurbishment and Chemical Analysis (CRCA) facility located at John F. Kennedy Space Center (KSC), Florida. The primary objective of the HCS is to attain hydraulic control of the dissolved-phase chlorinated volatile organic compound (CVOC) plume, with the secondary objective to reduce concentrations of CVOCs in the high-concentration plume to support transition to monitored natural attenuation (MNA). CRCA has been designated Solid Waste Management Unit 041 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities documented in this Year 3 PMR extends from September 2021 through October 2022. Baseline sampling activities were completed in June 2019, and full-scale startup of the HCS IM was completed in July-August 2019. The operational runtime of the HCS for the Year 3 reporting period was approximately 91%, with the majority of downtime attributed to system maintenance and repair. This is generally consistent with Year 1 and Year 2 runtimes of 85% and 92%, respectively. To help reduce downtime, an anti-scaling amendment, Redux 390, has been used to reduce scaling and help maintain system design parameters. Over nine million gallons of groundwater were treated during Year 3 of HCS operations, and concentrations of the site’s contaminants of concern (trans-1,2-dichloroethene and vinyl chloride) have been reduced by over 97%. This PMR describes the activities that were performed during Year 3 to operate and monitor the HCS IM, which includes three extraction wells, seven injection wells, and conveyance piping to a modular structure containing the control panel and an air stripper. Influent and effluent sampling results from the air stripper show that the system is operating as designed and is reducing concentrations of contaminants of concern to below detection limits. In addition to HCS operation, this PMR also discusses performance monitoring that has been implemented to assess progress of the HCS IM and overall plume conditions through scheduled groundwater (quarterly and semi-annual) and sub-slab soil gas (quarterly) sampling and analysis. Two ambient air samples were also collected on a quarterly basis in the vicinity of the modular structure and the paved driveway east of the Solvent Reclamation Area during routine operation and maintenance (O&M) activities to ensure safe breathing zone air quality for on-site personnel. All sub-slab soil gas and ambient air sampling conducted during the Year 3 operational period showed results below applicable regulatory air screening limits. Predictions made during the Year 2 groundwater model updates were in close correlation to post Year 3 plume conditions. Therefore, it can be assumed that the projected path remains valid for transition to MNA in one to two years of continuous HCS operation. The contents of this Year 3 PMR were presented during the February 2023 KSC Remediation Team meeting, where Team consensus was reached on several items including continued O&M of the HCS, and continued monitoring of groundwater, ambient air, and sub-slab soil gas. Replacement of MW0019 and VMP04 was also recommended, as well as additional direct-push technology sampling to further delineate the downgradient plume and confirm overall site-wide low-concentration plume boundaries. Sampling for per- and polyfluoroalkyl substances at CRCA is ongoing and will be submitted under separate cover.

K. Alex Murphy↗

Components Refurbishment and Chemical Analysis Facility, Hot Spot 1 Solid Waste Management Unit #041 Year 4 Annual Performance Monitoring Report Kennedy Space Center, Florida

This Year 4 Annual Performance Monitoring Report (PMR) presents the operations, maintenance, and monitoring activities for the Hydraulic Containment System (HCS) Interim Measure (IM) at the Components Refurbishment and Chemical Analysis (CRCA) facility located at John F. Kennedy Space Center (KSC), Florida. The primary objective of the HCS is to attain hydraulic control of the dissolved-phase chlorinated volatile organic compound (CVOC) plume, with the secondary objective to reduce concentrations of CVOCs in the high-concentration plume to support transition to monitored natural attenuation (MNA). CRCA has been designated Solid Waste Management Unit 041 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities documented in this Year 4 PMR extends from November 2022 through September 2023. Baseline sampling activities were completed in June 2019, and full-scale startup of the HCS IM was completed in July-August 2019. The operational runtime of the HCS for the Year 4 reporting period was approximately 94%, with the majority of downtime attributed to associated groundwater sampling events, maintenance, and Hurricane Nicole. Almost five million gallons of groundwater were treated during Year 4 of HCS operations, and concentrations of the site’s contaminants of concern (trans-1,2-dichloroethene and vinyl chloride) have been reduced by over 99%. This PMR describes the activities that were performed during Year 4 to operate and monitor the HCS IM, which includes three extraction wells, seven injection wells, and conveyance piping to a modular structure containing the control panel and an air stripper. Influent and effluent sampling results from the air stripper show that the system is operating as designed and is reducing concentrations of contaminants of concern to below detection limits. In addition to HCS operation, this PMR also discusses performance monitoring that has been implemented to assess progress of the HCS IM and overall plume conditions through scheduled groundwater (quarterly and semi-annual) and sub-slab soil gas (quarterly) sampling and analysis. Two ambient air samples were also collected on a quarterly basis in the vicinity of the modular structure and the paved driveway east of the Solvent Reclamation Area during routine operation and maintenance (O&M) activities to ensure safe breathing zone air quality for on-site personnel. All sub-slab soil gas and ambient air sampling conducted during the Year 4 operational period showed results below applicable regulatory air screening limits. Predictions made during the Year 2 groundwater model updates were in close correlation to post Year 4 plume conditions. A supplemental DPT study conducted in 2022 and 2023. This study indicated that low-concentration plume conditions, where concentrations exceed State of Florida Groundwater Cleanup Target Levels, expanded westward to Kennedy Parkway North and northward to the vicinity of the railroad tracks. Based on these results, recommendations were made to install 14 wells to monitor the downgradient and boundary conditions of the expanded LCP. The contents of this Year 4 PMR were presented during the November 2023 KSC Remediation Team meeting, where Team consensus was reached on several items including continued O&M of the HCS, and continued monitoring of groundwater, ambient air, and sub-slab soil gas. Sampling for per- and polyfluoroalkyl substances at CRCA is ongoing and will be submitted under separate cover.

K. Alex Murphy↗

Launch Complex 34, SWMU CCO542022 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot (HS) 6 Air Sparge (AS) System presents the results of Year 13 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, results of the biennial site-wide LTM event, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. This site has been designated Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) Corrective Action Program. For the site-wide biennial LTM event, a total of 55 monitoring wells were sampled for volatile organic compounds (VOCs) in February 2023 and one well was sampled for polychlorinated biphenyls (PCBs) in December 2022. One well planned for VOC sampling was found to be destroyed and could not be sampled (CW0002). The LTM wells are screened in two lithologic zones: Layer 1 (0 to 25 feet below land surface [bls]) and Layer 2 (25 to 30 ft bls), and are located in the outlying areas of LC34 to monitor groundwater conditions within the Low-Concentration Plume (LCP), defined as concentrations exceeding Groundwater Cleanup Target Levels (GCTLs), and the High-Concentration Plume (HCP), defined as concentrations exceeding Natural Attenuation Default Concentrations (NADCs). Results from the biennial sampling event indicated overall plume stability and delineation for the plume, which extends over 300 acres. The operational period for Year 13 of the HCS was from April 1, 2022 to March 31, 2023. Operational runtime for the system was 90 percent during Year 13, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2023, a total of 313,673,241 cumulative gallons of groundwater containing 88,337 pounds of VOCs have been removed by the HCS. Influent concentrations of trichloroethene (TCE) have decreased since startup from approximately 280,000 μg/L (January 2010) to 12,000 μg/L (March 2023). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2022 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2021. Full vertical profile sampling was completed at each DPT from 8 to 98 feet bls, at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 μg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 8 to 98 feet bls. In addition to DPT sampling, groundwater samples were collected from deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2022 to verify vertical delineation. Layer 7/8 monitoring well results were non-detect in December 2022, with exception of three wells (IW0162, IW043D2, and IW044D2), where TCE, cis-1,2-dichloroethene (cDCE), and/or vinyl chloride (VC) were detected above GCTLs. These wells are screened 105 to 115 feet bls, which is below the existing recovery well capture zone. TCE was first detected in IW0162 in December 2021 and has since been sampled at least monthly to monitor TCE concentrations. The maximum TCE concentration during this operational period was 15,000 μg/L at IW0162 in March 2023. Because of the increased TCE concentrations in this well, a new recovery well (RW21D), screened 86 to 106 feet bls, was installed in January 2023 and incorporated into existing HCS operations. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual in 2020. The HS 6 AS system remained operational during the reporting period covered under this report. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2022 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. A Phase Two Expansion of the HS 6 AS IM was recently completed. As of the date of this report, the expansion became operational in August 2023 and the first quarter of monitoring was conducted in November 2023. Details of the construction, start-up, and performance monitoring will be included in a future Annual PMR. Overall, the tasks associated with Year 13 operation of the HC IM, operation of the HS 6 AS IM, and biennial site-wide sampling were performed in accordance with recommendations included in the previous 2021 LC34 (Year 12) annual report. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives. Results from the site-wide biennial LTM program also show that the overall network of monitoring wells is adequate to continue monitoring plume-wide conditions.

Complex 34↗

Launch Complex 34, SWMU CC054 2023 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring and Phase Two Expansion Construction Completion Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 14 operations and performance monitoring of the hydraulic containment (HC) Interim Measure (IM), details associated with construction and implementation of the HS 6 AS system expansion (Phase Two), and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. The timeframe for activities documented in this PMR extends from April 1, 2023 to March 31, 2024. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the shallow and deep DSZ and surrounding dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to recharacterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS and install additional recovery wells in Layer 7 to more adequately capture residual contaminant mass. The operational period for Year 14 of the HCS was from April 1, 2023 to March 31, 2024. Operational runtime for the system was 94 percent during Year 14, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2024, a total of 344,849,634 cumulative gallons of groundwater containing 94,656 pounds of chlorinated volatile organic compounds (CVOCs) have been removed by the HCS. During the reporting period covered under this report, the HCS recovered 31,176,393 gallons and approximately 6,319 pounds of CVOC mass. Total combined influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 25,000 µg/L (March 2024). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in January 2024 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2022. Full vertical profile sampling was completed at each DPT from 8 to 98 feet below land surface (bls), at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 28 to 98 feet bls. An overall decreasing trend of TCE concentrations was observed in DPT samples during this reporting period, which is a reduction from the previous event (December 2022) and the peak event in December 2021, where TCE percentages appeared to increase in all depth zones because several recovery wells were turned off during the AS pilot study in the DSZ. The maximum TCE concentration in January 2024 was 1,600,000 µg/L in the 53 feet bls depth interval at DPT594 (previous maximum result in 2022 was 1,800,000 µg/L in the 48 feet bls depth interval at DPT599). This maximum concentration in the 53 feet bls depth interval is in the deep capture zone. During the January 2024 DPT event, the largest portion of TCE mass was observed in the 48 feet bls interval above/within Layer 4. This trend remains consistent with previous years and appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, annual groundwater samples were collected from 11 deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2023 to verify vertical and horizontal delineation. Three of the wells were also sampled biweekly to evaluate operations of recovery well RW21D (screened 86 to 106 feet bls), which was installed in January 2023. Of the Layer 7/8 monitoring sampled only annually, results were non-detect or less than groundwater cleanup target levels GCTLs in December 2023, with the exception of one well, IW45D2, which had a cis-1,2-dichloroethene (cDCE), detection greater than the GCTL. Of the three wells sampled biweekly during the operational period, the well located closest to Layer 7 recovery well RW21D (IW44D2, screened 105 to 115 feet bls) had concentrations of TCE, cDCE and vinyl chloride (VC) greater than GCTLs throughout the operational period, but displayed a decreasing trend since the peak concentrations in September 2023. The maximum TCE concentration during this operational period was 190,000 µg/L at IW44D2 in September 2023, but reduced to 700 µg/L in March 2024, indicating the HCS is still effectively removing mass from the source area. Expansion of the HCS and addition of new recovery wells is ongoing and will continue to be evaluated as the groundwater recovery scheme is optimized. Details of the expansion and optimization will be provided in a future PMR. The HS 6 AS IM was initiated in 2018 with 160 AS wells and expanded in 2019 with another 140 AS wells. An additional expansion of the HS 6 AS IM was completed during the reporting period covered under this report and details of the construction implementation and startup of the expansion are detailed in Section III of this report. The new expansion, referred to as Phase Two, was implemented between August 17, 2022 and August 28, 2023, and included the installation of 190 air sparge wells to treat an additional 11.2 acres. The original configuration (referred to as Phase One) operated until Phase Two came online, then all but 52 AS wells were turned off so the components could be moved and utilized in the Phase Two area. The 52 AS wells that remain on are in a barrier configuration preventing contaminated groundwater from impacting the treated area. The HS 6 AS system (both Phase One and Two) operated normally during the reporting period covered under this report. Semi-annual performance monitoring of the Phase One configuration was conducted in April and November 2023, consistent with previous years. For the Phase Two configuration, 21 new monitoring wells were installed and sampled quarterly, with a baseline event in July 2023, and quarterly events in November 2023 and February 2024 summarized in this report. Semi-annual monitoring results collected in April and October 2023 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and VC) have decreased to less than GCTLs in nearly all wells and not impacting the surface water drainage canal, indicating the HS 6 IM continues to meet objectives. The baseline and quarterly sampling for the Phase Two configuration indicate generally decreasing concentrations in wells within and around the perimeter of the treatment area. At least two more quarters of monitoring will be conducted and once those results are evaluated a reduced the sampling frequency may be considered. Overall, the tasks associated with Year 14 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with recommendations included in the previous 2022 LC34 (Year 13) PMR. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

groundwater remediation↗