Search NASA⌕ Search

SEARCH · Search NASA

Results for “Reliability allocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Storage management in Ada. Three reports. Volume 1: Storage management in Ada as a risk to the development of reliable software. Volume 2: Relevant aspects of language. Volume 3: Requirements of the language versus manifestations of current implementations

The risk to the development of program reliability is derived from the use of a new language and from the potential use of new storage management techniques. With Ada and associated support software, there is a lack of established guidelines and procedures, drawn from experience and common usage, which assume reliable behavior. The risk is identified and clarified. In order to provide a framework for future consideration of dynamic storage management on Ada, a description of the relevant aspects of the language is presented in two sections: Program data sources, and declaration and allocation in Ada. Storage-management characteristics of the Ada language and storage-management characteristics of Ada implementations are differentiated. Terms that are used are defined in a narrow and precise sense. The storage-management implications of the Ada language are described. The storage-management options available to the Ada implementor and the implications of the implementor's choice for the Ada programmer are also described.

Auty, David↗

The Challenges of Integrating NASA's Human, Budget, and Data Capital within the Constellation Program's Exploration Launch Projects Office

The U.S. Vision for Space Exploration directs NASA to retire the Space Shuttle in 2010 and replace it with safe, reliable, and cost-effective space transportation systems for crew and cargo travel to the Moon, Mars, and beyond. Such emerging space transportation initiatives face massive organizational challenges, including building and nurturing an experienced, dedicated team with the right skills for the required tasks; allocating and tracking the fiscal capital invested in achieving technical progress against an integrated master schedule; and turning generated data into usehl knowledge that equips the team to design and develop superior products for customers and stakeholders. This paper discusses how NASA's Exploration Launch Projects Office, which is responsible for delivering these new launch vehicles, integrates these resources to create an engineering business environment that promotes mission success.

Kidd, Luanne↗

The Challenges of Integrating NASA's Human, Budget, and Data Capital within the Constellation Program's Exploration Launch Projects Office

The U.S. Vision for Space Exploration directs NASA to retire the Space Shuttle in 2010 and replace it with safe, reliable, and cost-effective space transportation systems for crew and cargo travel to the Moon, Mars, and beyond. Such emerging space transportation initiatives face massive organizational challenges, including building and nurturing an experienced, dedicated team with the right skills for the required tasks; allocating and tracking the fiscal capital invested in achieving technical progress against an integrated master schedule; and turning generated data into useful knowledge that equips the team to design and develop superior products for customers and stakeholders. It has been more than 30 years since the Space Shuttle was designed; therefore, the current aerospace workforce has limited experience with developing new designs for human-rated spaceflight hardware. To accomplish these activities, NASA is using a wide range of state-of-the-art information technology tools that connect its diverse, decentralized teams and provide timely, accurate information for decision makers. In addition, business professionals are assisting technical managers with planning, tracking, and forecasting resource use against an integrated master schedule that horizontally and vertically interlinks hardware elements and milestone events. Furthermore, NASA is employing a wide variety of strategies to ensure that it has the motivated and qualified staff it needs for the tasks ahead. This paper discusses how NASA's Exploration Launch Projects Office, which is responsible for delivering these new launch vehicles, integrates its resources to create an engineering business environment that promotes mission success, which is defined by replacing the Space Shuttle by 2014 and returning to the Moon by 2020.

Kidd, Luanne↗

3D-Laser-Scanning Technique Applied to Bulk Density Measurements of Apollo Lunar Samples

In order to better interpret gravimetric data from orbiters such as GRAIL and LRO to understand the subsurface composition and structure of the lunar crust, it is import to have a reliable database of the density and porosity of lunar materials. To this end, we have been surveying these physical properties in both lunar meteorites and Apollo lunar samples. To measure porosity, both grain density and bulk density are required. For bulk density, our group has historically utilized sub-mm bead immersion techniques extensively, though several factors have made this technique problematic for our work with Apollo samples. Samples allocated for measurement are often smaller than optimal for the technique, leading to large error bars. Also, for some samples we were required to use pure alumina beads instead of our usual glass beads. The alumina beads were subject to undesirable static effects, producing unreliable results. Other investigators have tested the use of 3d laser scanners on meteorites for measuring bulk volumes. Early work, though promising, was plagued with difficulties including poor response on dark or reflective surfaces, difficulty reproducing sharp edges, and large processing time for producing shape models. Due to progress in technology, however, laser scanners have improved considerably in recent years. We tested this technique on 27 lunar samples in the Apollo collection using a scanner at NASA Johnson Space Center. We found it to be reliable and more precise than beads, with the added benefit that it involves no direct contact with the sample, enabling the study of particularly friable samples for which bead immersion is not possible

Macke, R. J.↗

Situation Awareness Implications of Adaptive Automation of Air Traffic Controller Information Processing Functions

The goal of this research was to define a measure of situation awareness (SA) in an air traffic control (ATC) task and to assess the influence of adaptive automation (AA) of various information processing functions on controller perception, comprehension and projection. The measure was also to serve as a basis for defining and developing an approach to triggering dynamic control allocations, as part of AA, based on controller SA. To achieve these objectives, an enhanced version of an ATC simulation (Multitask (copyright)) was developed for use in two human factors experiments. The simulation captured the basic functions of Terminal Radar Approach Control (TRACON) and was capable of presenting to operators four different modes of control, including information acquisition, information analysis, decision making and action implementation automation, as well as a completely manual control mode. The SA measure that was developed as part of the research was based on the Situation Awareness Global Assessment Technique (SAGAT), previous goal-directed task analyses of enroute control and TRACON, and a separate cognitive task analysis on the ATC simulation. The results of the analysis on Multitask were used as a basis for formulating SA queries as part of the SAGAT-based approach to measuring controller SA, which was used in the experiments. A total of 16 subjects were recruited for both experiments. Half the subjects were used in Experiment #1, which focused on assessing the sensitivity and reliability of the SA measurement approach in the ATC simulation. Comparisons were made of manual versus automated control. The remaining subjects were used in the second experiment, which was intended to more completely describe the SA implications of AA applied to specific controller information processing functions, and to describe how the measure could ultimately serve as a trigger of dynamic function allocations in the application of AA to ATC. Comparisons were made of the sensitivity of the SA measure to automation manipulations impacting both higher-order information processing functions, such as information analysis and decision making, versus lower-order functions, including information acquisition and action implementation. All subjects were exposed to all forms of AA of the ATC task and the manual control condition. The approach to AA used in both experiments was to match operator workload, assessed using a secondary task, to dynamic control allocations in the primary task. In total, the subjects in each experiment participated in 10 trials with each lasting between 45 minutes and 1 hour. In both experiments, ATC performance was measured in terms of aircraft cleared, conflicting, and collided. Secondary task (gauge monitoring) performance was assessed in terms of a hit-to-signal ratio. As part of the SA measure, three simulation freezes were conducted during each trial to administer queries on Level 1, 2, and 3 SA.

Kaber, David B.↗

Causal simulation and sensor planning in predictive monitoring

Two issues are addressed which arise in the task of detecting anomalous behavior in complex systems with numerous sensor channels: how to adjust alarm thresholds dynamically, within the changing operating context of the system, and how to utilize sensors selectively, so that nominal operation can be verified reliably without processing a prohibitive amount of sensor data. The approach involves simulation of a causal model of the system, which provides information on expected sensor values, and on dependencies between predicted events, useful in assessing the relative importance of events so that sensor resources can be allocated effectively. The potential applicability of this work to the execution monitoring of robot task plans is briefly discussed.

Doyle, Richard J.↗

Modeling Ka-band low elevation angle propagation statistics

The statistical variability of the secondary atmospheric propagation effects on satellite communications cannot be ignored at frequencies of 20 GHz or higher, particularly if the propagation margin allocation is such that link availability falls below 99 percent. The secondary effects considered in this paper are gaseous absorption, cloud absorption, and tropospheric scintillation; rain attenuation is the primary effect. Techniques and example results are presented for estimation of the overall combined impact of the atmosphere on satellite communications reliability. Statistical methods are employed throughout and the most widely accepted models for the individual effects are used wherever possible. The degree of correlation between the effects is addressed and some bounds on the expected variability in the combined effects statistics are derived from the expected variability in correlation. Example estimates are presented of combined effects statistics in the Washington D.C. area of 20 GHz and 5 deg elevation angle. The statistics of water vapor are shown to be sufficient for estimation of the statistics of gaseous absorption at 20 GHz. A computer model based on monthly surface weather is described and tested. Significant improvement in prediction of absorption extremes is demonstrated with the use of path weather data instead of surface data.

Russell, Thomas A.↗

Assessing Spectrum Compatibility for Beyond-Line-of-Sight UAS Control and Non-Payload Communications

In order to provide for the safe integration of unmanned aircraft systems (UAS) into the National Airspace System (NAS), the control and non-payload communications (CNPC) link must be highly reliable. A specific requirement is that it must operate using aviation safety radiofrequency spectrum. Two types of links are required - line-of-sight (LOS) using terrestrial-based communications and beyond-line-of-sight (BLOS) using satellite communications. The 2012 World Radiocommunication Conference (WRC-12) provided a suitable allocation for LOS CNPC spectrum in the 5030 to 5091 MHz band which, when combined with a previously existing allocation fulfills the LOS spectrum requirement. The 5030 to 5091 MHz band is also allocated for BLOS CNPC, but since a significant portion of that band is required for LOS CNPC, additional BLOS spectrum is required. More critically, there are no satellites in operation or in development to provide such services in that band. Hence BLOS CNPC cannot be provided in protected aviation spectrum under current conditions. To fill this gap and enable integration of UAS into the NAS, it has been proposed to allow CNPC to operate over certain Fixed Satellite Service (FSS) bands in which many satellites currently provide commercial services. To enable this, changes in international regulation must be enacted. Agenda Item 1.5 of the 2015 WRC examines the possible regulatory changes needed. As part of the examination process, sharing between potential UAS using satellite communications for BLOS CNPC and other services allocated to the FSS bands being considered must be studied. This paper reviews the technical requirements and approach being undertaken for these sharing studies, with emphasis on study of interference from UAS into digital repeater links operating under the Fixed Service allocation. These studies are being conducted by NASA Glenn Research Center.

superhigh frequencies↗

Successful Completion of the JWST OGSE2 Cryogenic Test at JSC Chamber-A While Managing Numerous Challenges

The James Webb Space Telescope (JWST) Optical Telescope Element (OTE) assembly is the largest optically stable infrared-optimized telescope currently being manufactured and assembled, and scheduled for launch in 2018. The JWST OTE, including the primary mirrors, secondary mirror, and the Aft Optics Subsystems (AOS) are designed to be passively cooled and operate at near 45 degrees Kelvin. Due to the size of its large sunshield in relation to existing test facilities, JWST cannot be optically or thermally tested as a complete observatory-level system at flight temperatures. As a result, the telescope portion along with its instrument complement will be tested as a single unit very late in the program, and on the program schedule critical path. To mitigate schedule risks, a set of 'pathfinder' cryogenic tests will be performed to reduce program risks by demonstrating the optical testing capabilities of the facility, characterizing telescope thermal performance, and allowing project personnel to learn valuable testing lessons off-line. This paper describes the 'pathfinder' cryogenic test program, focusing on the recently completed second test in the series called the Optical Ground Support Equipment 2 (OGSE2) test. The JWST OGSE2 was successfully completed within the allocated project schedule while faced with numerous conflicting thermal requirements during cool-down to the final cryogenic operational temperatures, and during warm-up after the cryo-stable optical tests. The challenges include developing a pre-test cool-down and warm-up profiles without a reliable method to predict the thermal behaviors in a rarified helium environment, and managing the test article hardware safety driven by the project Limits and Constraints (L&C's). Furthermore, OGSE2 test included the time critical Aft Optics Subsystem (AOS), a part of the flight Optical Telescope Element that would need to be placed back in the overall telescope assembly integrations. The OGSE2 test requirements included the strict adherence of the project contamination controls due to the presence of the contamination sensitive flight optical elements. The test operations required close coordination of numerous personnel while they being exposed and trained for the 'final' combined OTE and instrument cryo-test in 2017. This paper will also encompass the OGSE2 thermal data look-back review.

JWST OGSE2 Cryogenic Test↗

Development and Characterization of a Small Spacecraft Electro-Optic Scanner for Free-Space Laser Communications

Emergent data-intensive missions coupled with dramatic reductions in spacecraft size plus an increasing number of space-based missions necessitates new high performance, compact and low cost communications technology. Free space optical communications offer advantages including orders of magnitude increase for data rate performance, increased security, immunity to jamming and lack of frequency allocation requirements when compared with conventional radio frequency (RF) means. The spatial coherence and low divergence associated with the optical frequencies of laser communications lends themselves to superior performance, but this increased directionality also creates one of the primary technical challenges in establishing a laser communications link by repeatedly and reliably pointing the beam onto the receive aperture. Several solutions have emerged from wide angle (slow) mechanical articulation systems, fine (fast) steering mirrors and rotating prisms, inertial compensation gyros and vibration isolation cancellation systems, but each requires moving components and imparts a measured amount of burden on the host platform. The complexity, cost and size of current mechanically scanned solutions limits their platform applicability, and restricts the feasibility of deploying optical communications payloads on very compact spacecraft employing critical systems. A high speed, wide angle, non-mechanical solution is therefore desirable. The purpose of this work is to share the development, testing, and demonstration of a breadboard prototype electro-optic (EO) scanned laser-communication link (see Figure 1). This demonstration is a step toward realizing ultra-low Size, Weight and Power (SWaP) SmallSat/MicroSat EO non-mechanical laser beam steering modules for high bandwidth ( greater than Gbps) free-space data links operating in the 1550 nm wavelength bands. The elimination of all moving parts will dramatically reduce SWaP and cost, increase component lifetime and reliability, and simplify the system design of laser communication modules. This paper describes the target mission architectures and requirements (few cubic centimeters of volume, 10's of grams of weight with milliwatts of power) and design of the beam steering module. Laboratory metrology is used to determine the component performance including horizontal and vertical resolution (20urad) as a function of control voltage (see Figure 2), transition time (0.1-1ms), pointing repeatability and optic insertion loss. A test bed system demonstration, including a full laser communications link, is conducted. The capabilities of this new EO beam steerer provide an opportunity to dramatically improve space communications through increased utilization of laser technology on smaller platforms than were previously attainable.

Laser Optical Communications↗

Meeting human needs

Manned space flight can be viewed as an interaction of three general elements: the human crewmember, spacecraft systems, and the environment. While the human crewmember is a crucial element in the system, certain physiological, psychological, environ- mental and spacecraft systems factors can compromise human performance in space. These factors include atmospheric pressure, physiology, uncertainties associated with space radiation, the potential for exposure to toxic materials in the closed environment, and spacecraft habitability. Health protection in space, for current and future missions, relies on a philosophy of risk reduction, which in the space program is achieved in four ways-through health maintenance, health care, design criteria, an selection and training. Emphasis is place upon prevention, through selection criteria and careful screening. Spacecraft health care systems must be absolutely reliable, and they will be automated and computerized to the maximum extent possible, but still designed with the human crewmember's capabilities in mind. The autonomy and technological sophistication of future missions will require a greater emphasis on high-level interaction between the human operator and automated systems, with effective allocation of tasks between humans and machines. Performance in space will include complex tasks during extravehicular activity (EVA) and on planetary surfaces, and knowledge of crewmembers' capability and limitations during such operations will be critical to mission success. Psychological support will become increasingly important on space missions, as crews spend long periods in remote and potentially hazardous environments. The success of future missions will depend on both individual psychological health and group cohesion and productivity, particularly as crew profiles become more heterogeneous. Thus, further human factors are needed in the area of small-group dynamics and performance.

Nicogossian, Arnauld E.↗

Assessing Spectrum Compatibility for Beyond-Line-of-Sight UAS Control and Non-Payload Communications

In order to provide for the safe integration of unmanned aircraft systems (UAS) into the National Airspace System (NAS), the control and non-payload communications (CNPC) link must be highly reliable. A specific requirement is that it must operate using aviation safety radiofrequency spectrum. Two types of links are required - line-of-sight (LOS) using terrestrial-based communications and beyond-line- of-sight (BLOS) using satellite communications. The 2012 World Radiocommunication Conference (WRC-12) provided a suitable allocation for LOS CNPC spectrum in the 5030-5091 MHz band which, when combined with a previously existing allocation fulfills the LOS spectrum requirement. The 5030- 5091 MHz band is also allocated for BLOS CNPC, but since a significant portion of that band is required for LOS CNPC, additional BLOS spectrum is required. More critically, there are no satellites in operation or in development to provide such services in that band. Hence BLOS CNPC cannot be provided in protected aviation spectrum under current conditions. To fill this gap and enable integration of UAS into the NAS, it has been proposed to allow CNPC to operate over certain Fixed Satellite Service (FSS) bands in which many satellites currently provide commercial services. To enable this, changes in international regulation must be enacted. Agenda Item 1.5 of the 2015 WRC examines the possible regulatory changes needed. As part of the examination process, sharing between potential UAS using satellite communications for BLOS CNPC and other services allocated to the FSS bands being considered must be studied. This paper reviews the technical requirements and approach being undertaken for these sharing studies, with emphasis on study of interference from UAS into digital repeater links operating under the Fixed Service allocation. These studies are being conducted by NASA Glenn Research Center.

compatibility↗

Reliability and performance experience with flat-plate photovoltaic modules

Statistical models developed to define the most likely sources of photovoltaic (PV) array failures and the optimum method of allowing for the defects in order to achieve a 20 yr lifetime with acceptable performance degradation are summarized. Significant parameters were the cost of energy, annual power output, initial cost, replacement cost, rate of module replacement, the discount rate, and the plant lifetime. Acceptable degradation allocations were calculated to be 0.0001 cell failures/yr, 0.005 module failures/yr, 0.05 power loss/yr, a 0.01 rate of power loss/yr, and a 25 yr module wear-out length. Circuit redundancy techniques were determined to offset cell failures using fault tolerant designs such as series/parallel and bypass diode arrangements. Screening processes have been devised to eliminate cells that will crack in operation, and multiple electrical contacts at each cell compensate for the cells which escape the screening test and then crack when installed. The 20 yr array lifetime is expected to be achieved in the near-term.

Ross, R. G., Jr.↗

O/S analysis of conceptual space vehicles

The application of recently developed computer models in determining operational capabilities and support requirements during the conceptual design of proposed space systems is discussed. The models used are the reliability and maintainability (R&M) model, the maintenance simulation model, and the operations and support (O&S) cost model. In the process of applying these models, the R&M and O&S cost models were updated. The more significant enhancements include (1) improved R&M equations for the tank subsystems, (2) the ability to allocate schedule maintenance by subsystem, (3) redefined spares calculations, (4) computing a weighted average of the working days and mission days per month, (5) the use of a position manning factor, and (6) the incorporation into the O&S model of new formulas for computing depot and organizational recurring and nonrecurring training costs and documentation costs, and depot support equipment costs. The case study used is based upon a winged, single-stage, vertical-takeoff vehicle (SSV) designed to deliver to the Space Station Freedom (SSF) a 25,000 lb payload including passengers without a crew.

Ebeling, Charles E.↗

Generalized Symbolic Execution for Model Checking and Testing

Modern software systems, which often are concurrent and manipulate complex data structures must be extremely reliable. We present a novel framework based on symbolic execution, for automated checking of such systems. We provide a two-fold generalization of traditional symbolic execution based approaches: one, we define a program instrumentation, which enables standard model checkers to perform symbolic execution; two, we give a novel symbolic execution algorithm that handles dynamically allocated structures (e.g., lists and trees), method preconditions (e.g., acyclicity of lists), data (e.g., integers and strings) and concurrency. The program instrumentation enables a model checker to automatically explore program heap configurations (using a systematic treatment of aliasing) and manipulate logical formulae on program data values (using a decision procedure). We illustrate two applications of our framework: checking correctness of multi-threaded programs that take inputs from unbounded domains with complex structure and generation of non-isomorphic test inputs that satisfy a testing criterion. Our implementation for Java uses the Java PathFinder model checker.

Khurshid, Sarfraz↗

Regenerative Life Support Systems for Exploration Habitats: Unique Capabilities and Challenges to Enable Long-Duration-Mission Habitats Beyond Low Earth Orbit

The Artemis I launch of NASA’s Space Launch System and Orion crew vehicle will mark a major milestone in the agency’s efforts to return humans to the Moon. Work is underway on the Human Landing System that will carry the next astronauts to the lunar surface, and the lunar orbiting Gateway that will host science and serve as a platform to support sustained human presence on the Moon and ultimately crewed missions to Mars. Two decades of continuous human presence on the International Space Station has provided a wealth of experience operating, upgrading, and demonstrating advanced Regenerative Environmental Control and Life Support Systems (Regen ECLSS). However, habitats that enable sustained lunar surface presence and transit to Mars will encounter many unique conditions and challenges. System characteristics including reliability, maintainability, mass, and power become significantly more critical. Operating environments associated with lower total pressure, low gravity, contingency protocols, and extensive un-crewed and dormant periods impose additional functionality requirements and alter the performance of certain critical systems. Integration and combined operations with other elements such as orbiting outposts, logistics suppliers, and mobility platforms impact capability and interface requirements. Limits on allocated water and oxygen consumable mass influence the need for higher levels of water and oxygen recovery from waste products. Impacts and challenges these unique exploration circumstances impose on the suite of Regen ECLSS systems are explored and discussed herein.

David F Howard↗

Implementation of GAMMON - An efficient load balancing strategy for a local computer system

GAMMON (Global Allocation from Maximum to Minimum in cONstant time), an efficient load-balancing algorithm, is described. GAMMON uses the available broadcast capability of multiaccess networks to implement an efficient search technique for finding hosts with maximal and minimal loads. The search technique has an average overhead which is independent of the number of participating stations. The transition from the theoretical concept to a practical, reliable, and efficient implementation is described.

Baumgartner, Katherine M.↗

Comparison Modeling of System Reliability for Future NASA Projects

A National Aeronautics and Space Administration (NASA) supported Reliability, Maintainability, and Availability (RMA) analysis team developed a unique RMA analysis methodology using cut set and importance measure analysis in order to comparison model proposed avionics computing architectures. In this paper we will present this efficient application of the RMA analysis methodology for importance measures that includes Reliability Block Diagram (RED) Analysis, Comparison modeling, Cut Set Analysis, and Importance Measure Analysis. We will also demonstrate that integrating RMA early in the system design process as a key to success by providing a fundamental decision metric supporting design selection. The RMA analysis methodology presented in this paper and applied to the avionics architectures enhances the usual way of predicting the need for redundancy based on failure rates or subject matter expert opinion. Using the REDs and the minimal cut sets, along with the Fussell-Vesely (FV) factors, importance measures are calculated for each functional element in the architectures. This paper presents an application of the FV importance measures and presents an improved methodology for using importance measures in success space (instead of failure space) to compare architectures. These importance measures are used to determine which functional element would be most likely to cause a system failure, thus, quickly identifying the path to increase the overall system reliability by either procuring more reliable functional elements or adding redundancy. This application of the RMA analysis methodology, using RBD analysis, cut set analysis, and the importance measure analysis, allows the avionics design team to better understand and compare the vulnerabilities in each of the architectures, enabling them to address the deficiencies in the design architectures more efficiently, while balancing the need to design for optimum weight and space allocations.

Gillespie, Amanda M.↗