Search NASA⌕ Search

SEARCH · Search NASA

Results for “Requirements Verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Design of Digital Acquisition for Beam Current Monitor

As a part of the Proton Improvement Plan II (PIP-II) at Fermilab, instrumentation systems are being modernized to take advantage of the higher speeds and ease of use offered by standardized embedded systems like MicroTCA. A rear-transition module (RTM) is being designed to interface with said embedded systems. In each of the four identical channels on the RTM, the differential signal from an alternating-current current transformer (ACCT) transimpedance amplifier will again be amplified by a differential operation-amplifier, then filtered by a low-pass topology. The conditioned signal is then digitized at a maximum of 10MS/s by an analog to digital converter (ADC) integrated circuit. After digitization, the ADC passes the data to an off the shelf AdvancedMC (AMC) Xilinx FPGA module using low voltage differential signals. This paper will describe the simulation of analog circuitry for signal conditioning, simulation of digital signal integrity based on physical design as well as verification of design characteristics critical to signal integrity. This work aims to create a methodology that can be applied to future RTMs requiring application of high-speed digital design principles.

White, Turner [Fermilab] (ORCID:0009000348159256)↗

Verification of the ENDF/B-VII.1 Based MC 2 -3 Library Rev.1

The MC 2 -3 code, developed by Argonne National Laboratory under the DOE-NE NEAMS program, is a multigroup cross section generation code for fast reactor applications. Last year, the ENDF/B-VII.0 (E70) MC 2 -3 library, which has been extensively used, verified, and validated over a long period, was intensively reverified and updated to support the commercial grade dedication (CGD) requirement of the TerraPower Natrium project. This year, the ENDF/B-VII.1 (E71) MC 2 -3 library, the preliminary version of which was generated several years ago, was regenerated and rigorously verified to support the Natrium project as well as the completion of verification of the E71 library. The E71 library was verified using the process developed during the verification of the E70 library, including comparisons of cross sections with the NJOY-generated cross sections, comparisons of the resolved resonance cross sections with those using the PEDNF library, and comparison of total cross sections with the sum of partial cross sections. Additional verifications were conducted to ensure that the benchmark problem solutions with the E71 library are reasonable compared to the corresponding Monte Carlo solutions. Furthermore, the E71 gamma library was generated, which includes data for prompt gamma, delayed gamma, and delayed beta as well as neutron and gamma heating. The gamma library was verified at the level of individual isotopes. The EBR-II core solutions from MC 2 -3/ DIF3D and MCNP were compared, demonstrating that those solutions in terms of k-effective and assembly powers were in good agreement.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

BlueCRAB Domain Overlapping Coupling: Theory & Verification

Coupling low- and high-fidelity codes is a useful way to model complex engineering systems. Thanks to the high-fidelity code, complex phenomena can be resolved in areas of the system where this is required, yet the efficiency of the lower-fidelity code is still retained in modeling the rest of the system. This document details the theory and implementation of coupling two different thermal-hydraulic codes: the system thermal-hydraulics (STH) code System Analysis Module (SAM) and the coarse-mesh computational fluid dynamics (CFD) code Pronghorn. Both applications are included in the Comprehensive Reactor Analysis Bundle (BlueCRAB) code suite and are based on the Multiphysics Object-Oriented Simulation Environment (MOOSE) framework. The domain overlapping (DO) coupling approach was adopted, as it offers proven advantages over more conventional domain decomposition methods. In the DO coupling, SAM provides Pronghorn with boundary conditions that depend on the system-level simulation of the entire plant. In return, the overlapping coupled SAM components–termed “surrogate components”–receive friction factors and source terms computed online based on the Pronghorn simulation. The framework is designed to be generic and enable coupling regardless of geometry and the number of inlet/outlet boundaries in the DO coupled domain. The developed method leads to consistent pressure drops, enthalpies, and scalar concentrations when comparing the coupled SAM and Pronghorn simulations. This document presents the DO coupling approach, along with two verification and two demonstration cases. The proposed problems explore different physical aspects relevant to nuclear reactor analysis, including buoyancy-driven flows, complex flow patterns, and multiple inlets and outlets. Periodically, new versions of this “BlueCRAB Domain Overlapping Coupling: Theory & Verification” report will be issued to reflect future developments and verification tests.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

In-orbit performance of the soft X-ray imaging telescope Xtend aboard XRISM

Here, we present a summary of the in-orbit performance of the soft X-ray imaging telescope Xtend onboard the X-Ray Imaging and Spectroscopy Mission (XRISM), based on in-flight observation data, including first-light celestial objects, calibration sources, and results from the cross-calibration campaign with other currently operating X-ray observatories. XRISM/Xtend has a large field of view of ${38{^{\prime }_{.}}5}$ $\times$ ${38{^{\prime }_{.}}5}$, covering an energy range of 0.4–13 keV, as demonstrated by the first-light observation of the galaxy cluster Abell 2319. It also features an energy resolution of 170–180 eV at 6 keV, which meets the mission requirement and enables us to resolve He-like and H-like Fe K$\alpha$ lines. Throughout the observation during the performance verification phase, we confirm that two issues identified in the Soft X-ray Imager (SXI) onboard the previous Hitomi mission—light leakage and crosstalk events—are addressed and suppressed in the case of Xtend. A joint cross-calibration observation of the bright quasar 3C 273 results in an effective area measured to be $\sim$420 cm$^{2}$ at1.5 keV and $\sim$310 cm$^{2}$ at 6.0 keV, which matches values obtained in ground tests. We also continuously monitor the health of Xtend by analyzing overclocking data, calibration source spectra, and day-Earth observations; the readout noise is stable and low, and contamination is negligible even one year after launch. A low background level compared with other major X-ray instruments onboard satellites, combined with the largest grasp ($\Omega _{\rm eff}\sim 60$ cm$^2$ deg$^2$) of Xtend, will not only support Resolve analysis, but also enable significant scientific results on its own. This includes near-future follow-up observations and transient searches in the context of time-domain and multi-messenger astrophysics.

instrumentation: detectors: Xtend↗

In situ quantum verification of polarization-stabilized optical channels

The active stabilization of polarization channels is a task of growing importance as quantum networks move to deployed demonstrations over existing fiber infrastructure. However, the uniquely strict requirements for high-fidelity qubit transmission complicate the extent to which classical solutions may apply to future quantum networks, particularly in terms of recognizing noise sources present in low-flux, nonunitary channels. Here we introduce an in situ benchmarking approach that augments a classical polarization tracking system, limited to unitary correction, with simultaneously transmitted quantum light for ancilla-assisted process tomography of the full quantum map. Implemented in a quantum local-area network, our method uses the reconstructed map both to validate the classical compensation and to expose noise sources it fails to capture. A sliding measurement window that continuously updates the estimated quantum process further increases sensitivity to rapid channel fluctuations. Our results should unlock new opportunities for in situ channel characterization in quantum-classical coexistence networks.

Stevens, Matthew L [Arizona State University]↗

Southwest Regional Partnership on Carbon Sequestration: Phase III (Final Scientific/Technical Report)

The Southwest Regional Partnership on Carbon Sequestration (SWP) is one of 7 regional partnerships formed in 2003 under the U.S. Department of Energy’s (DOE) Regional Carbon Sequestration Partnerships (RCSPs) initiative. The overall purpose of the initiative was to help determine and implement the technology, infrastructure, and regulations most appropriate to promote carbon storage in different regions of the country. Covering Arizona, Colorado, New Mexico, Oklahoma, Utah, and parts of Texas, Wyoming, and Kansas, the SWP evaluated regional carbon storage and utilization potential and focused on technologies and sites that could complement the region’s strong position in energy production. The project progressed through three phases: • Phase I (2003–2005): Characterized regional geologic formations and CO 2 sources, assessed sequestration potential, and identified pilot test sites. • Phase II (2005–2013): Conducted small-scale field tests to validate sequestration methods, including geologic and terrestrial projects. • Phase III (2008–2022): Demonstrated large-scale CO 2 injection at a commercial oil field to test monitoring, verification, and long-term storage strategies. This report covers Phase III. The final project site, the Farnsworth Unit (FWU) in Texas, provided real-world testing of reservoir characterization, monitoring, and risk evaluation tools and processes that could be used in any commercial scale carbon capture, utilization, and storage (CCUS) project. Extensive data collection and analysis helped refine best practices for reservoir characterization, injection monitoring, and storage verification. The SWP contributed to national databases, DOE best practice manuals, and regional geological assessments to support future sequestration efforts. Key lessons learned include the importance of robust data management, strategic site selection, regulatory navigation, and effective industry collaboration. The project’s findings will inform ongoing and future carbon storage initiatives. Task 1 (Regional Characterization) • The SWP continued to participate in national outreach efforts and NATCARB. • The SWP evaluated multiple potential sites before selecting the FWU as the primary field test location. Task 2 (Public Outreach and Education) • The SWP contributed to national databases, DOE best practice manuals, and regional geological assessments to support future sequestration efforts. Task 3 (Permitting and Regulatory Compliance) • The SWP ensured compliance with federal and state regulations, including National Environmental Policy Act (NEPA) requirements. • The SWP obtained all necessary permits for drilling, injection, and monitoring activities. Task 4 (Site Characterization and Planning) • The SWP developed work plans for four key activities: characterization, simulation, monitoring and verification, and risk evaluation. • The SWP collected and synthesized legacy data from multiple sources to build initial static geological models and dynamic reservoir models demonstrating project feasibility. • The SWP conducted an initial risk evaluation and developed mitigation plans. Task 5 (Field Operations and Data Collection) • The SWP drilled, logged, and cored three characterization wells to gather critical subsurface data. • The SWP conducted multiple geophysical surveys, including 3D seismic, crosswell seismic, and vertical seismic profiling, to improve reservoir characterization. Task 6 (Monitoring and Verification) • The SWP performed extensive geological characterization using data from characterization wells and seismic surveys. • The SWP established a surface monitoring network to track CO 2 flux in soil gas, groundwater chemistry, and near-surface atmospheric CO 2 levels. • The SWP built and refined reservoir models to study the effects of relative permeability on simulation behavior and improve calibration with experimental data. Task 7 (Risk Assessment and Model Refinement) • The SWP conducted multiple studies to evaluate reservoir integrity, predict CO 2 plume behavior and improve predictive modeling capabilities. • The SWP refined geological models and used them to enhance the accuracy of simulation models. • The SWP continued quantitative risk assessment of top-ranked risks and strengthened the link between qualitative and quantitative risk methodologies.

02 PETROLEUM↗

Hardware Fuzzing with An Emulator

Bugs in digital logic have led to some significant security vulnerabilities. Hardware bugs are particularly troublesome since they cannot be easily patched. Additionally, if the bug is in the root of trust, all trust built upon it can be vulnerable. Traditional testing either require a deep knowledge of the system, creative attack vectors and lots of human interaction. This is not scalable as there are very few engineers that can wear the hat of a designer, a verification engineer, and a cybersecurity expert. Hardware fuzzing is a relatively new research area in dynamic hardware testing. It has proven to be an effective method for discovering bugs, unexpected behaviors, and security vulnerabilities in software. While hardware fuzzing is new to the hardware domain, it has a strong track record in software testing. Fuzzing is a testing technique that randomly mutates the input data to uncover bugs or vulnerabilities in the design. It is especially good at finding corner cases that test engineers can not envision. Another advantage over other dynamic testing techniques is that, if done well, deep knowledge of the design is not required. Additionally, fuzzing scales well. If the system is set up correctly, it can run unsupervised for weeks if necessary. In this work, we propose using hardware fuzzing to improve the input vector generation for an information flow tracking tool. To get reasonable throughput of test vectors, an emulator is targeted as the execution platform. Efficient emulator execution has some specific requirements.

42 ENGINEERING↗

An Evaluation and Qualification of U.S.-Based Research Reactors for Irradiation Capabilities Supporting Advanced Nuclear Systems

Irradiation experiments are a prerequisite for evaluating nuclear reactor system designs, analyzing the performance of these systems, and obtaining licenses. Likewise, irradiation facilities are necessary for producing the radioisotopes used in industrial and medical applications. Recent developments in modeling and simulation capabilities and advancements in computational resources have further enabled the design of irradiation experiments for evaluating radiation-induced phenomena and determining nuclear fuel, material, and system design and safety criteria pertaining to both normal and accident scenarios. These computational tools and models require comprehensive experimental datasets acquired under prototypic radiation conditions—for exploring material and system performance under the uniquely harsh environments found in nuclear reactors—to enable verification and validation for qualification and licensing purposes. However, qualification of irradiation experimental facilities, primarily research and test reactors (RTRs), necessitates that their performance be evaluated based on the irradiation environment (e.g. flux, power, testing capabilities) using an appropriate scoring matrix. Although many university campus RTRs are available for research and development (R&D) activities and initiatives, this study focuses on evaluating and qualifying the irradiation facilities (mostly RTRs) within the United States that are suitable for advanced nuclear fuel, material, and system irradiation experiments aimed at establishing operational-performance limits and informing component and fuel designs so as to improve operational efficiencies and mitigate proliferation vulnerabilities, as well as for radioisotope production aimed at multipurpose applications. As a result, the findings of the present study support the acceleration of nuclear fuel and material qualifications, thus hastening new and advanced nuclear energy system demonstrations and radioisotope production efforts by using extended R&D.

irradiation experiment↗

The Science, Engineering, and Validation of Marine Carbon Dioxide Removal and Storage

Scenarios to stabilize global climate and meet international climate agreements require rapid reductions in human carbon dioxide (CO 2 ) emissions, often augmented by substantial carbon dioxide removal (CDR) from the atmosphere. While some ocean-based removal techniques show potential promise as part of a broader CDR and decarbonization portfolio, no marine approach is ready yet for deployment at scale because of gaps in both scientific and engineering knowledge. Marine CDR spans a wide range of biotic and abiotic methods, with both common and technique-specific limitations. Further targeted research is needed on CDR efficacy, permanence, and additionality as well as on robust validation methods—measurement, monitoring, reporting, and verification—that are essential to demonstrate the safe removal and long-term storage of CO 2 . Engineering studies are needed on constraints including scalability, costs, resource inputs, energy demands, and technical readiness. Research on possible co-benefits, ocean acidification effects, environmental and social impacts, and governance is also required.

climate mitigation↗

Requirements Description of VARPOW

This report presents the modeling and simulation capabilities of Argonne National Laboratory’s VARPOW code that is used in present reactor analysis activities. These capabilities will then be used to establish the set of VARPOW verification tasks necessary to verify VARPOW for usage on commercial projects. A similar approach was taken for the PERSENT, REBUS and DIF3D software packages.

Ramey, Kyle [Argonne National Laboratory (ANL), Ar↗

A Full-Induction Magnetohydrodynamics Solver for Liquid Metal Fusion Blankets in Vertex-CFD

Multiphysics modeling of liquid metal fusion blankets, which produce tritium and convert energy of neutrons created via fusion reactions into heat, is crucial for predicting performance, ensuring structural integrity, and optimizing energy production. While traditional blanket modeling of liquid metal flows during normal steady operating conditions commonly employs the inductionless approximation of the magnetohydrodynamics (MHD) equations, transient scenarios, when the plasma-confining magnetic field varies on millisecond time scales, require a full-induction MHD approach that dynamically evolves the magnetic field via the time-dependent induction equation. This paper presents the formulation, implementation, and initial verification of a full-induction MHD solver integrated within the open-source Vertex-CFD framework, which aims to achieve tight multiphysics coupling, a flexible software design enabling easy extension and addition of physics models, and performance portability across computing platforms. The solver utilizes finite element spatial discretization, implicit Runge–Kutta time integration, and an inexact Newton method to solve the resulting discrete nonlinear system, leveraging Trilinos packages for efficient computation. Verification against selected benchmark problems demonstrates accuracy and robustness of the solver. Furthermore, when the solver is applied to an idealized blanket model in 2.5D and full 3D, results obtained with Vertex-CFD are in good agreement with recently published quasi-2D simulations. These findings establish a computational foundation for future simulations of transient MHD phenomena in liquid metal blankets with Vertex-CFD, and open avenues for future extensions and performance optimizations.

Endeve, Eirik [ORNL] (ORCID:0000000312519507)↗

Adaptive Protection and Validated Models to Enable Deployment of High Penetrations of Solar PV (PV-MOD)

The availability and validation of various PV models in commercial tools differ, with some models not yet thoroughly validated for advanced inverter functionalities and reliable performance under weak system conditions. Many existing models do not fully incorporate new inverter control functions, which can affect system stability. The increasing deployment of solar PV and other inverter-based resources (IBRs), including distributed energy resources (DERs), is influencing the reliable operation of protection schemes in distribution systems and microgrids. Emerging adaptive protection schemes (APS) offer new opportunities for protecting these systems during varying configurations and DER operating conditions, though their demonstration and validation remain limited. Adaptive protection schemes face similar challenges, as they are typically designed for specific configurations. There is a growing need for tools and methodologies to streamline the deployment of adaptive protection for safe and reliable DER integration. The project main objective was to develop and validate high-fidelity generic models of solar PV facilities for stability, protection, EMT, and QSTS analyses. This objective was achieved, and these models can now be integrated into commercial software tools, enabling utilities, vendors, and developers to study high-penetration PV systems more confidently. The project also demonstrated advanced applications of these models, including the design and deployment of adaptive protection schemes in high-penetration field applications and microgrids, supporting grid safety and reliability. Several milestones were reached by the end of the project. A sophisticated inverter test plan was developed, and inverters representative of the North American marketplace were selected. EPRI and NREL tested various inverters, conforming to IEEE standards. Improvements were made to existing generic models of IBR units, IBR plants, and aggregated feeders for various analyses. The first generic electromagnetic transient (EMT) model for a solar PV plant was developed, conforming to IEEE Std 2800™-2022 and validated against laboratory measurements of a 2.2 MVA large-scale battery energy storage system (BESS) inverter. That model was then used to produce reference responses illustrating examples of validated and verified IBR plant models that pass or fail tests for technical minimum capability and performance as specified in the IEEE standard. The developed, tested, and validated generic models can be used for transmission planning, stability assessments, expansion planning, and evaluating potential future IBR interconnection requirements. They can also support interconnection screens and conformity assessments of IBR plants, including solar PV. The project significantly contributed to the ongoing standardization and model-based representation and verification of IBR responses. The project further addressed challenges of common distribution protection schemes with increasing deployment of DER by developing, validating, and demonstrating adaptive protection schemes (APS) that can improve the reliable and safe integration of DER into distribution systems. New APS were designed using improved DER models for three common distribution systems: a radial feeder, a meshed network, and a microgrid. Modeling and hardware-in-the-loop (HIL) testing of the APS were conducted, successfully showing their effectiveness and selectivity. Proof-of-concept field demonstration was achieved for two APS, i.e., one on a radial feeder and another one in a microgrid. Field demonstration could not be achieved for the APS on a meshed network, primarily due apprehension of one utility partner and also due to limited access to the protective algorithms in the network protectors. Guidelines developed from the lessons learned in the project lay out the general process followed in the design, installation, and commissioning of APS for various distribution systems. Distribution utility partners’ apprehension about field demonstration of the new APS were addressed—with varying success—by taking a stepped risk-management approach of modeling of a wide range of sensitivities first, performing in-depth proof-of-concept testing in the laboratory including HIL next, and finally deliberately implementing and commissioning the actual protection equipment and algorithms into parts of—or in parallel operation to—the three real distribution systems. Future work should include pilot projects that further show the acceptable performance of the developed APS before these schemes be rolled out more widely. Inclusion of both utility and original equipment manufacturers (OEMs) in future projects could increase chances of successful field demonstration. Despite challenges in achieving the field demonstration goal of the project for all three APS, the research significantly contributed to the innovation of adaptive protection solutions for scalable and reliable DER integration into distribution systems. This project significantly enhances the understanding of the impact of using appropriate inverter models on distribution and transmission (T&D) systems. By addressing the limitations of existing generic models, the project introduces high-fidelity models for stability, protection, electromagnetic transient (EMT), and quasi-static time series (QSTS) analyses. These models, integrated into commercial software tools, enable utilities, vendors, and developers to confidently study high-penetration PV systems. The project also demonstrates advanced applications, including adaptive protection schemes (APS) for distribution systems and microgrids, ensuring grid safety and reliability. The technical effectiveness and economic feasibility of the methods are evident through the development and validation of sophisticated inverter test plans and the selection of representative inverters. Testing by EPRI and NREL on retail, commercial, and utility-scale inverters, conforming to IEEE standards, underscores the robustness of the models. Improvements to existing generic models for various analyses further enhance their validity and applicability. The project also identifies gaps in common distribution protection schemes and designed new APS using improved DER models, demonstrating their effectiveness through modeling and hardware-in-the-loop (HIL) testing. The project’s benefits to the public are manifold. By advancing the standardization and model-based representation of IBR response, it supports transmission planning, stability assessments, and future IBR interconnection requirements. The generic models can facilitate better communication between transmission planners and developers, supporting expected IBR plant capability and performance. Additionally, the development of APS for radial feeders, meshed networks, and microgrids supports the integration of distributed energy resources (DERs) into distribution systems, enhancing grid reliability and safety. The project’s emphasis on thorough testing and simplicity in design ensures practical and scalable solutions for DER integration.

14 SOLAR ENERGY↗

MCNPs Easy Sources for (α,n) (MESA):Verification with Sources4c

MESA is intended to be a direct re-implementation of the algorithms documented in the Sources manual in C++. However, some fundamental changes to the computational structure and logic were made to avoid the use of goto, require consistency in input definition, and reduce computational approximations in later steps of three-layer problems. In addition, MESA uses α-decay information from ISC libraries (based on ENDF). In most cases, differences between Sources4c and MESA are dominated by differences in decay energy spectra and intensities. To verify this we have reproduced 6 problems that are documented examples or samples in Sources4c. These problems cover the three types of problems MESA currently supports: homogeneous, interface, and three-layer.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Magnetic mesh generation and field line reconstruction for scrape-off layer and divertor modeling in stellarators

The design of divertor targets and baffles for optimal heat and particle exhaust from magnetically confined fusion plasmas requires a combination of fast, low-fidelity models (such as EMC3-Lite (Feng 2022 Plasma Phys. Control. Fusion 64 125012)) for scoping studies and high-fidelity ones (such as EMC3-EIRENE (Feng et al 2014 Contrib. Plasma Phys. 54 426–31)) for verification. Both of those approaches benefit from a magnetic flux tube mesh for fast interpolation and mapping of field line segments (Feng et al 2005 Phys. Plasmas 12 052505). A new automated mesh generator for unstructured quadrilateral flux tubes with adaptive refinement is presented and integrated into FLARE (Frerichs 2024 Nucl. Fusion 64 106034). For HSX with an extended first wall, it is found that several layers of flux tubes can span the entire half field period before splitting is required. This is an advantage over the traditional setup of the EMC3-EIRENE mesh where careful construction of several sub- domains is required already for the much tighter present first wall. In particular, there is no longer the need to manually construct a suitable outer boundary for the mesh. The divide and conquer paradigm with unstructured mesh layout offers a powerful alternative for fast head load approximation that is suitable for integration into optimization workflows. Further examples for W7-X and CTH demonstrate the versatile application range.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

NORTH DAKOTA CARBONSAFE PHASE III: SITE CHARACTERIZATION AND PERMITTING OF GEOLOGIC STORAGE OF CARBON DIOXIDE

The Energy & Environmental Research Center (EERC), in partnership with Minnkota Power Cooperative Inc. (Minnkota), SLB, and Computer Modelling Group Ltd. (CMG), supported wide-scale deployment of carbon capture and storage (CCS) as part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative Phase III. This phase included the acquisition, analysis, and development of information to fully characterize two storage complexes to demonstrate viable storage resources for commercial volumes of CO2 (defined by DOE as a minimum of 50 million tonnes [MMt] of CO2 within a 30-year period) (National Energy Technology Laboratory, 2024). Phase III also involved the preparation, submission, and approval of North Dakota underground injection control (UIC) Class VI storage facility permits (SFPs)—required precursors to applications for Class VI injection well permits. The presumed viability of commercial-scale CCS, situated adjacent to Minnkota’s Milton R. Young Station (MRYS), is validated by Minnkota’s continued pursuit of Project Tundra—an initiative to build the world’s largest lignite-based CCS project in central North Dakota (www.projecttundrand.com). Project Tundra comprises two scopes of work, Tundra Capture (installation of postcombustion CO2 capture at MRYS) and Tundra SGS (secure geologic storage). The efforts of North Dakota CarbonSAFE Phase III, Site Characterization and Permitting, supported Tundra SGS. Extensive site-specific characterization activities included a successful multimeasurement geophysical approach and drilling a stratigraphic test well (J-ROC 1, subsequently renamed Liberty-1) adjacent to MRYS. Core collection and analyses, downhole testing and fluid sampling, and geophysical logging were performed on J-ROC 1 and on a nearby stratigraphic test well (known as J-LOC 1), which was drilled, cored, and tested under a complementary project funded by the North Dakota Lignite Research Program. The injection tests performed on J-LOC 1 positively impacted the CarbonSAFE project, resulting in fewer proposed injection wells and significant construction, operations, and monitoring cost savings. The characterization data collected and analyses performed were integrated into geologic models, and successive numerical simulations were run to determine CO2 plume extent and subsurface pressure buildup associated with the planned CO2 injection rate of nearly 4 MMt per year. The latter doubles the CarbonSAFE Initiative goal with an estimated 100 MMt of CO2 stored in 20 years. Application of the U.S. Environmental Protection Agency’s (EPA’s) method for estimating the Class VI Rule area of review (AOR) to the overpressurized Broom Creek Formation inspired an alternative method of calculation, called risk-based AOR delineation. This peer-reviewed method was applied for the first time during the storage facility-permitting process. The two SFP applications submitted in 2021 successfully resulted in North Dakota Industrial Commission (NDIC) orders in 2022 authorizing the creation of the storage facility areas and amalgamation of pore space as well as establishing financial responsibility requirements. After approval of the SFPs, Minnkota filed in 2022 applications for permits to reenter the J-ROC 1 well and to drill two new wells—all with the intended purpose to become Class VI injection wells. To establish eligibility under the Internal Revenue Code for Section 45Q tax incentives, a monitoring, reporting, and verification (MRV) plan was prepared and submitted by Minnkota to EPA in 2022, resulting in the first such plan approved in North Dakota. Also in 2022, under the National Environmental Policy Act (NEPA), Minnkota prepared and submitted an environmental information volume (EIV) describing the proposed CCS project and associated potential environmental impacts. Based on the EIV, DOE determined that the proposed construction project required an environmental assessment, and Minnkota submitted the first draft in 2023 and a revised draft in 2024. Both submissions were followed by a public comment period. Subsequently, DOE issued a finding of no significant impact (FONSI) on September 13, 2024. A successful outreach program, strongly based in the production, presentation, and dissemination of informational material, fostered an environment to aid stakeholders in making informed decisions regarding the planned project. Opportunities for public input were provided at various steps along the way, including at county planning and zoning meetings, before and during the SFP administrative hearing, and during environmental assessment public comment periods. In addition, land/pore space owners and mineral owners had various points of contact, including granting access rights, securing pore space leasing, and mineral owner notifications. Based upon the successful storage facility permitting issued by NDIC, approval of the MRV plan by EPA, and receipt of a FONSI under the NEPA, Minnkota is continuing its pursuit of Project Tundra. In December 2023, the Office of Clean Energy Demonstrations under its Carbon Capture Demonstrations Projects Program announced funding for the capture system (Office of Clean Energy Demonstrations, 2023) and a proposal for CarbonSAFE Phase IV: Construction funding was submitted in March 2024 for the storage project. A go/no-go decision to proceed with construction and operations in the Broom Creek Formation is anticipated in 2024. References National Energy Technology Laboratory, CarbonSafe Initiative, https://netl.doe.gov/carbon-management/carbon-storage/carbonsafe (accessed August 2024). Office of Clean Energy Demonstrations, 2023, OCED selects three projects in CA, ND, and TX to reduce harmful carbon pollution, create new economic opportunities, and advance carbon reducing technologies, December, www.energy.gov/oced/articles/oced-selects-three-projects-ca-nd-and-tx-reduce-harmful-carbon-pollution-create-new (accessed August 2024).

Peck, Wesley↗

An In Situ Feed Monitoring System for Molten Salt Reactors with Fast Neutron Energy Spectrum Molten Salt Reactor Applications

Molten salt reactors (MSRs) are one of the six promising advanced reactor technologies selected for further research and development by the Generation IV International Forum. More than twenty MSR designs are actively being developed around the world. Several of these designs are liquid-fueled and intended for operation within the fast neutron energy spectrum.1 National regulations will require liquid-fueled MSRs to control and account for nuclear material within licensed facilities. Additionally, states with comprehensive safeguards agreements with the International Atomic Energy Agency (IAEA) are obligated to declare nuclear material quantities within facilities. In return, the IAEA Department of Safeguards independently verifies these quantities and provides assurance that the nuclear material and facility are being used only for peaceful purposes. One key distinction of liquid-fueled MSRs compared with other types of reactors is that in portions of the facility, the nuclear material is in bulk form rather than discrete items. Traditional nuclear material accounting techniques such as physical item counting and verification of serial numbers on fresh fuel assemblies do not translate directly to all process streams within liquid-fueled reactors. Liquid-fueled MSRs are typically designed with low excess reactivity. This feature provides safety benefits but also means that most MSRs require the addition of makeup fuel salt while a reactor is operational. The nuclear material in the initial fuel salt and in any makeup fuel salt must be quantified. Additionally, distinct nuclear material diversion and reactor misuse scenarios form the basis of the detection methods and monitoring systems developed for liquid-fueled MSRs. For example, the IAEA provides assurance that fuel salt containing nuclear material is not being diverted from the system, that the feed salt matches the reported actinide concentrations and uranium enrichment, and that no additional fertile material is being introduced into the system. Measurement systems currently used for nuclear material control and accounting are not directly applicable to achieving MSR safeguards goals. This paper concerns a system being designed to account for the nuclear material added to liquid-fueled MSRs and monitor for diversion and misuse scenarios related to MSR feed systems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Verification of an energy-conserving semi-implicit electrostatic particle-in-cell scheme for modeling high-density plasma at scale

A verification study of a semi-implicit energy-conserving electrostatic particle-in-cell algorithm is presented. The algorithm relaxes the time-step and mesh-size constraints that require resolution of the plasma period and Debye length associated with traditional explicit momentum-conserving particle-in-cell algorithms. Physical implications and applicability of using the semi-implicit scheme for modeling high-density plasmas are discussed. Where possible, numerical results are compared against analytical solutions. The simulation results indicate that the algorithm is stable at time steps larger than twice the inverse plasma frequency and cell sizes larger than the Debye length. It is found that the algorithm gives adequate results, provided that the distribution function and the spatiotemporal scales dictating the physics of the problem are resolved. As such, the algorithm may provide a robust method for kinetic modeling of high-density plasmas at scale.

Cyclotron resonance↗

2023 Annual Explosives Inventory Completion

The 2023 Lawrence Livermore National Laboratory (LLNL) annual explosives inventory was executed from May 18, 2023 to September 27, 2023 and was verified for accuracy effective September 28, 2023 following the LLNL Explosive Materials Inventory Plan. This year’s annual inventory includes changes incorporated based on the Department of Energy (DOE) Office of Inspector General (OIG) Audit Report DOE-OIG-20-50, The Department of Energy’s Storage and Disposition of Explosives Material at Selected Sites, dated July of 2020. Based on the associated recommendations, explosives at DOE and National Nuclear Safety Administration (NNSA) sites are considered "sensitive personal property" and applicable inventories must comply with 41 CFR 109, Personal Property Management. This regulation adds additional stipulations which require the annual inventory to include accountability of the total site inventory. In addition, the inventory must be performed by personnel other than the property owner, or alternatively must include independent verification. The development of the inventory plan was agreed to by the LLNL Explosives Safety Committee in conjunction with the LLNL Property and Business Division Leader. The LLNL Explosive Materials Inventory Plan was reviewed and approved by the DOE Explosives Safety Committee Chair on May 17, 2023 and by the NNSA Property Management Office on May 25, 2023.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗