Search NASA⌕ Search

SEARCH · Search NASA

Results for “Risk assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

CO 2 Pipeline risk assessment and comparison for the midcontinent United States

For this work, a comprehensive quantitative risk assessment for the construction and operation of CO 2 transportation networks considered for the Midcontinent United States was conducted. The results showed risks associated with CO 2 pipelines were significantly less than those of other pipeline types. The assessment used four conceptual pipelines of different lengths to discuss risks operators may see. The assessment evaluated the risk associated with construction and operation using data from the US Occupational Safety Health Administration to determine the risk of injury or death for pipeline workers and data from the US Pipeline and Hazardous Materials Safety Administration for CO 2 , natural gas distribution, natural gas transmission/gathering, and non-CO 2 hazardous liquid pipelines to develop quantitative likelihood and severity values leading to risk values. The data for the assessment covered incidents from 2010 to 2017 for CO 2 pipelines. The average risk for construction and 30 years of operation for four CO 2 pipeline configurations ranging between 79 and 1,546 miles in length was found. The construction and operational risk averaged between $\$1,400,521$ (approximately $\$0.02$/tonne of CO 2 ) for the shorter pipeline (79 miles) and $\$27,481,939$ (approximately $\$0.10$/tonne of CO 2 ) for a longer pipeline (1,546 miles). The largest risks of fatality for CO 2 pipelines comes from vehicle transport. The largest operational risk to the pipeline was due to leakage. Public pipeline opposition is also a significant risk; it was not quantified but is addressed.

03 NATURAL GAS↗

Quantitative Risk Assessment (Topical Report)

Carbon capture, utilization, and storage (CCUS) in geological formations plays a key role in mitigating anthropogenic CO 2 emissions and achieving the aggressive goal of net-zero greenhouse gas emissions. Quantitative risk assessment is crucial for ensuring the safety and reliability of geologic carbon storage (GCS) by evaluating CO 2 migration in subsurface, forecasting potential leakage and induced seismicity risks, and optimizing operational and monitoring plans. We present the use, progress, and research trends of risk assessment from the Southwest Regional Partnership on Carbon Sequestration (SWP) as an example of large-scale CCUS projects in North America. The information provided in this report can help readers understand the significance of risk and uncertainty assessment and apply them effectively in large-scale CCUS projects.

42 ENGINEERING↗

Probabilistic Risk Assessment of a Light Water Reactor Coupled with a High-Temperature Electrolysis Hydrogen Production Plant

This paper presents recent updates on the Level 1 Probabilistic Risk Assessment (PRA) of Light Water Reactors (LWRs) coupled with a hydrogen production plant. It provides the overview of past results on the PRA for Pressurized Water Reactors (PWRs) and Boiling Water Reactors (BWRs) coupled to a 1150 MW High Temperature Electrolysis Facility (HTEF), as well as the latest research results for a smaller 100 MW HTEF facility. Differences between the two HTEF designs are listed. Key differences include the amount and quality of diverted LWR steam, complexity of the Heat Extraction System (HES), and the electrical power source for the HTEF plant. A Failure Mode and Effect Analysis (FMEA) was conducted for the new HTEF design, and the LWR PRA models were modified in the SAPHIRE risk assessment tool to account for the newly identified risk contributors. These include the steam loss event at the HES system, the electrical overcurrent event at the HTEF facility and at the transmission line from the LWR plant, and the hydrogen detonation event at the HTEF facility. The coupling of LWRs with a 100 MW HTEF increases the frequency of several initiating events. For the reference PWR, the largest frequency increase is for the steam line break event at 5.5%. While for the reference BWR, the largest frequency increase is for the switchyard-related Loss of Offsite Power (LOOP) event at 0.11%. The overall plant risk increases by 6.56% and 0.03% for PWR and BWR reference plants respectively. It is found that these risk metrics satisfy the safety criteria of both 10 CFR 50.59 and Regulatory Guide 1.174 licensing pathways.

08 HYDROGEN↗

Use of Flooding Probabilistic Risk Assessment

General slide information on using flooding Probabilistic Risk Assessment (PRA) taken from published INL reports or public Nuclear Regulatory Commission (NRC) information. Topics covered are: SDP related to flooding in US Door integrity tests at Idaho State University Smoothed Particle Hydrodynamics for external flooding NRC-INL Flood Barrier project

99 GENERAL AND MISCELLANEOUS↗

Biota Modeling in EPA’s Preliminary Remediation Goal and Dose Compliance Concentration Calculators for Use in EPA Superfund Risk Assessment: Explanation of Intake Rate Derivation, Transfer Factor Compilation, and Mass Loading Factor Sources

The Preliminary Remediation Goal (PRG) and Dose Compliance Concentration (DCC) calculators are screening level risk assessment tools that set forth the Environmental Protection Agency’s (EPA) recommended approaches and currently available risk assessment guidance for response actions at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites, commonly known as Superfund. The environmental screening levels derived by the PRG and DCC calculators are used to identify isotopes contributing the highest risk and dose as well as establish preliminary remediation goals. Each calculator has residential gardening and subsistence farmer exposure scenarios that model transfer of contaminants from soil and water into various types of biota (crops and animal products). New publications of human intake rates of biota; farm animal intakes of water, soil, and fodder; and soil to plant interactions require updates be implemented into the PRG and DCC calculators. Recent improvements in the biota modeling for these calculators include newly derived biota intake rates, enhanced soil mass loading factors (MLFs), and more comprehensive soil to plant transfer factors (BV’s) and soil to tissue transfer factors (TFs) for animals. New biota have been added in both the produce and animal products categories that greatly improve the accuracy and utility of the PRG and DCC calculators and encompass greater geographic diversity on a national and international scale.

54 ENVIRONMENTAL SCIENCES↗

Dynamic Probabilistic Risk Assessment Based Response Surface Approach for FLEX and Accident Tolerant Fuels for Medium Break LOCA Spectrum

After the Fukushima Daiichi Accident, the safety features such as accident tolerant fuel (ATF) and diverse and flexible coping strategies (FLEX) for existing nuclear fleets are being investigated by the US Department of Energy under the Light Water Reactor Sustainability Program. This research is being conducted to quantify the risk-benefit of these safety features. Dynamic probabilistic risk assessment (DPRA)-based response-surface approach has been presented to quantify the FLEX and ATF benefits by estimating the risk associated with each option. ATFs with multilayered silicon carbide (SiC), iron-chromium-aluminum, and chromium-coated zirconium cladding were considered in this study. While these ATF candidates perform better than the current zirconium cladding (Zr), they may introduce additional failure modes in some operating conditions. The fuel failure analysis modules (FAMs) were developed to investigate ATF performance. The dynamic risk assessments were performed using RAVEN, a DPRA tool, coupled with RELAP5 and FAMs. A cumulative distribution function-based index provided a mean of comparing the benefits of safety enhancements. For medium break loss of coolant accidents, FLEX operational timing window for each fuel type was estimated. Among these ATF candidates, SiC-type ATF was the most beneficial candidate for an increased safety margin than Zr-based fuel and was found to complement FLEX strategies in terms of risk and coping time.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Probabilistic Groundwater Modeling of the RDX Plume at Los Alamos National Laboratory to Support Risk Assessment - 20359

A plume of the contaminant hexahydro-1,3,5-trinitro-1,3,5-triazine (RDX) with concentrations greater than the New Mexico tap water drinking standard (9.66 ppb) is present in the regional aquifer near the southwestern boundary of Los Alamos National Laboratory (LANL). A risk assessment is performed for exposure to regional aquifer groundwater, with long-term predictions of RDX concentrations provided by a calibrated, probabilistic, numerical fate and transport model. The structure of the model is hierarchical, with the RDX Regional Aquifer (RA) groundwater model acting as the primary tool for analysis of downgradient RDX concentrations. The RA model is deeply informed by the conceptual site model (CSM) and is calibrated using site RDX concentration data and hydraulic head measurements, along with other analyses. The model is calibrated using data through December 2019. Where data are scarce other lines of evidence are used to inform inputs, including the multiphase RDX Vadose Zone (VZ) model and Pipe and Disk analytical screening tool. Model inputs are described with informative prior distributions using a robust approach to development that incorporates all available lines of evidence for every parameter used as an input to the RA model. Calibration is performed using a classical nonlinear optimization routine, which is then used to initialize a Bayesian calibration. The Bayesian calibration constrains the uncertainty in the classical calibration, ultimately providing posterior distributions for all model parameters. The challenges of the calibration include high-dimensional parameter space, including spatially heterogeneous hydraulic conductivities, comparatively sparse data, and low RDX concentrations. Posterior parameter distributions developed in the calibration process are then used for stochastic predictive model runs into the future. The result of the forward runs is spatially and temporally explicit estimates of head and concentration with uncertainty at all points in space and time. The probabilistic modeling approach presented here includes innovative computational and statistical methods that leverage high-performance computing (HPC) resources. It makes use of prior modeling work performed at the chromium plume site in the central LANL area, with extensive updates. The risk assessment will ultimately be used to support decision-making at the site, using multiple appropriately weighted sources of information, as well as uncertainty, sensitivity, and value-of-information analyses. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modeling FLEX Human Actions Using the EMRALD Dynamic Risk Assessment Tool

Most current efforts have modified and applied existing human reliability analysis (HRA) methods to treat human actions related to beyond-design-basis external events in which diverse and flexible coping strategies (FLEX) equipment would be deployed. However, many questions remain regarding the suitability of legacy HRA methods to address FLEX human actions, sparking the need for a new method of reasonably evaluating them. In this context, Idaho National Laboratory (INL) researched a relatively new approach to treating FLEX human actions via Event Modeling Risk Assessment Using Linked Diagrams (EMRALD) software. EMRALD was developed to support the increasing need for dynamic probabilistic risk assessment (PRA) models that can respond to evolving plant conditions during simulations. A couple benefits were identified when analyzing FLEX human actions through this software. In general, it is especially useful for evaluating a strategy’s feasibility, including FLEX human actions that require a relatively long time to perform. In this paper, we suggest how FLEX human actions can be modeled using the EMRALD software. Two different HRA modeling approaches using EMRALD are introduced: (1) procedure-based modeling and (2) PRA/HRA-based modeling. The former approach was introduced in the authors’ previous paper, whereas this paper mainly discusses how the latter approach works for an extended loss of AC power (ELAP) scenario with relevant procedures and PRA models. A hybrid method combining the two modeling approaches is introduced at the paper’s conclusion.

99 GENERAL AND MISCELLANEOUS↗

Crowd-based spatial risk assessment of urban flooding: Results from a municipal flood hotline in Detroit, MI

Climate change is increasing the frequency and intensity of extreme precipitation events, raising the risk of urban flood disasters. This study uses a crowd-sourced municipal call database to characterize the spatial distribution of flood risk in Detroit, MI. Call data including dates and addresses were obtained from the City of Detroit Department of Public Works for 2021. Calls were mapped and aggregated to census tract counts and merged with neighborhood-level data. Associations of predictors with flood calls were tested using spatial regression models. Flooding calls were located throughout the city but were concentrated in specific areas. Multivariate models of census tract level call counts indicated that increased poverty and Black, immigrant, and older residents were positively associated with flood calls, while increased elevation was associated with protective effects. Longer distances from waste water interceptors were associated with higher risk for calls. Crowd-sourced flood hotline call data can be used for effective spatial flood risk assessment. Though flooding occurs throughout the city of Detroit, infrastructural, neighborhood, and household factors influence flooding extent. Limitations included the self-reported nature of calls. Future modeling efforts might include input from local stakeholders to improve spatial risk assessment.

54 ENVIRONMENTAL SCIENCES↗

An Approach to Automate tools for the Risk Assessment of Digital Instrumentation and Control Systems

Reliable digital instrumentation and control systems (DI&C) are integral for sustaining the continued operation of nuclear power plants. These systems ensure that nuclear reactors operate safely, efficiently, and within regulatory requirements. Yet, the cost of designing and licensing new nuclear DI&C can be prohibitively expensive. Under the U.S. Department of Energy Light Water Reactor Sustainability Program, Idaho National Laboratory has developed a framework for supporting the risk-informed design of DI&C systems by offering methods to support the identification, quantification, and evaluation of risks for various DI&C design architectures. The framework indicates potential software failure modes and provides pathways for quantifying the potential for these software failures, including common cause failures. Using the framework’s systematic approach, challenges for assessing risks within new and existing nuclear DI&C systems can be reduced. Nevertheless, the current framework can be further improved using the convenience of automation. This paper introduces the development of Software for the Hazard Identification and Evaluation of Digital Systems (SHIELDS). SHIELDS is an engineering software package that enables the identification, elimination, and mitigation of potential risks and reduces the burden of deploying reliable DI&C systems. This work introduces plans and techniques to digitize and improve the manual risk assessment modules of the framework. These improvements will save time and increase the repeatability and usability of the framework, making it more accessible to a wider range of users. Ultimately, this introduces SHIELDS and how its modules support efficient development of safe and reliable DI&C systems.

46 - INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AN↗

INTEGRATED RISK ASSESSMENT OF DIGITAL I&C SAFETY SYSTEMS FOR NUCLEAR POWER PLANTS

Upgrading the existing analog instrumentation and control (I&C) systems to state-of-the-art digital I&C (DI&C) systems provides the foremost means to improve performance and reduce costs for existing light-water reactors (LWRs). However, qualification of digital technologies remains a challenge?especially the issue of software common cause failure (CCF), which has been difficult to address. Existing analyses of CCFs in I&C systems mainly focus on hardware failures. With the application and upgrading of new DI&C systems, software CCFs due to design flaws might become a potential threat to plant safety, considering that most redundancy designs use similar digital platforms or software in their operating and application systems. With complex multi-layer redundancy designs to meet the single failure criterion, these I&C safety systems are of particular concern in U.S. Nuclear Regulatory Commission (NRC) licensing procedures. In 2019, the Risk-Informed Systems Analysis (RISA) Pathway of the U.S. Department of Energy?s (DOE?s) Light Water Reactor Sustainability (LWRS) Program initiated a project to develop a risk assessment strategy for delivering a strong technical basis to support effective, licensable, secure DI&C technologies for digital upgrades/designs. An integrated risk assessment for the DI&C (RADIC) process was proposed for this strategy to identify potential key digital-induced failures, implement reliability analyses of related digital safety I&C systems, and evaluate the unanalyzed sequences introduced by these failures (particularly software CCFs) at the plant level. This paper summarizes these RISA efforts in the risk analysis of safety-related DI& systems at Idaho National Laboratory.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

An Integrated Risk Assessment Process of Safety-Related Digital I&C Systems in Nuclear Power Plants

Upgrading the existing analog instrumentation and control (I&C) systems to state-of-the-art digital I&C (DI&C) systems will greatly benefit existing light water reactors. However, the issue of software common cause failure (CCF) remains an obstacle in terms of qualification for digital technologies. Existing analyses of CCFs in I&C systems mainly focus on hardware failures. With the application and upgrading of new DI&C systems, design flaws could cause software CCFs to become a potential threat to plant safety, considering that most redundancy designs use similar digital platforms or software in their operating and application systems. With complex multilayer redundancy designs to meet the single failure criterion, these I&C safety systems are of particular concern in U.S. Nuclear Regulatory Commission licensing procedures. In Fiscal Year 2019, the Risk-Informed Systems Analysis (RISA) Pathway of the U.S. Department of Energy’s Light Water Reactor Sustainability Program initiated a project to develop a risk assessment strategy for delivering a strong technical basis to support effective, licensable, and secure DI&C technologies for digital upgrades and designs. An integrated risk assessment for the DI&C process was proposed for this strategy to identify potential key digital-induced failures, implement reliability analyses of related digital safety I&C systems, and evaluate the unanalyzed sequences introduced by these failures (particularly software CCFs) at the plant level. Here this paper summarizes these RISA efforts in the risk analysis of safety-related DI&C systems at Idaho National Laboratory.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Risk Assessment Framework for Cyber-Physical Security in Distribution Grids with Grid-Edge DERs

Integration of inverter-based distributed energy resources (DERs) is reshaping the landscape of distribution grids to fulfill the socioeconomic, environmental, and sustainability goals. Addressing the technological challenges of DER grid integration requires an adaptive communication layer for efficient DER management and control. This transition has given rise to a cyberphysical system (CPS) architecture within the distribution system, causing new vulnerabilities for cyberphysical attacks. To better address potential threats, this paper presents a comprehensive risk assessment framework for cyberphysical security in distribution grids with grid-edge DERs. The framework incorporates a detailed CPS model accounting for dynamic DER characteristics within the distribution grid. It identifies vulnerabilities in DER communication systems, models attack scenarios, and addresses communication latency crucial for inverter control timescales. Subsequently, the quantification of attack impacts employs an attack probability model including both the vulnerability and criticality of cyber components. The proposed risk assessment framework was validated through testing on the modified IEEE 13-node and 123-node test feeders.

cyberattack↗

Application of quantitative risk assessment to address stakeholder questions in geologic carbon storage

Ambitious international greenhouse gas emissions reduction targets demand a rapid transformation to a low-carbon economy. This transformation includes the accelerated adoption of carbon dioxide (CO2) capture and storage (CCS) technology. However, as with any large-scale engineering enterprise, the widespread commercial-scale deployment of geologic carbon storage (GCS) raises important questions about technology and cost-effectiveness, safety, environmental risk, and long-term liability. Effectively assessing and managing risks and liability associated with GCS projects is a key technical need throughout the project life cycle-from site selection and permitting to monitoring design, operational risk management, and post-operational site closure. This presentation highlights recent advancements in tools for quantitative risk assessment, being developed by the National Risk Assessment Partnership (NRAP). NRAP is a multi-year, multinational laboratory research collaboration sponsored by the U.S. Department of Energy's Office of Fossil Energy and Carbon Management. Our focus will be on these tools' applications in addressing critical stakeholder questions related to supporting permitting to ensure secure and environmentally protective storage; designing effective and efficient monitoring plans; evaluating the effectiveness of remedial actions and risk management alternatives; and informing liability assessment and investment decisions. This paper will detail the key functionality of NRAP’s Open-Source Integrated Assessment Model (NRAP-Open-IAM), a computational framework for assessing leakage risk and containment assurance. This model features streamlined workflows for calculating leakage risk profiles, delineating risk-based area of review, and assessing contingency plans and post-injection site care requirements. ORION is an open-source, observation-based ensemble forecasting toolkit to help operators assess the seismic hazard at a carbon storage site. The State of Stress Analysis Tool (SOSAT), designed to assess subsurface stress conditions and evaluate geomechanical risk resulting from CO2 injection in an area of interest will also be presented. We will also introduce a prototype model to evaluate storage project costs and liability associated with risk management. The Technoeconomic and Liability Evaluation for Storage (TALES) model uses results from forecasts of leakage and induced seismicity risk to estimate the lifecycle cost of managing risk. Finally, a preliminary example of how the NRAP Risk-based Adaptive Monitoring Plan (RAMP) tool can be used to design efficient and effective site monitoring plans and estimate the detectability of fluid leakage will be provided. The relevance of these tools for addressing key stakeholder questions amidst uncertainty will be emphasized.

decision support↗

Plan for the Development and Application of a Risk Assessment Approach for Transportation Package Approval of a Transportable Nuclear Power Plant for Maritime Shipment (Rev. 1)

This plan proposes a strategy for licensing a transportable nuclear power plant, containing its unirradiated and irradiated fuel, as a transportation package for maritime transport using a probabilistic risk assessment framework in order to meet the regulatory requirements of 10 CFR Part 71. It is anticipated that initially, the deterministic transportation package licensing approach will be challenging due to the functional requirements of the transportable nuclear power plant. As such, a partial exemption request from the U.S. Nuclear Regulatory Commission coupled with applied compensatory measures are anticipated in support of providing equivalent safety to the public, worker, and environment. A plan is outlined as to how this would be demonstrated and a pathway is primarily outlined using the accompanying low accident rates which in turn support very low probabilities of release for a maritime application. Wherever possible, the proposed plan is supported by actual accident (casualty) data. Additional supporting information regarding a highway transportation probabilistic risk assessment in support of the Project Pele demonstration reactor that is currently under development is also referenced and discussed.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

On alert for Ebola: public health risk assessment of travellers from Uganda to the USA during the 2022 outbreak

Abstract Background On 20 September 2022, the Ugandan Ministry of Health declared an outbreak of Ebola disease caused by Sudan ebolavirus. Methods From 6 October 2022 to 10 January 2023, Centers for Disease Control and Prevention (CDC) staff conducted public health assessments at five US ports of entry for travellers identified as having been in Uganda in the past 21 days. CDC also recommended that state, local and territorial health departments (‘health departments’) conduct post-arrival monitoring of these travellers. CDC provided traveller contact information, daily to 58 health departments, and collected health department data regarding monitoring outcomes. Results Among 11 583 travellers screened, 132 (1%) required additional assessment due to potential exposures or symptoms of concern. Fifty-three (91%) health departments reported receiving traveller data from CDC for 10 114 (87%) travellers, of whom 8499 (84%) were contacted for monitoring, 1547 (15%) could not be contacted and 68 (1%) had no reported outcomes. No travellers with high-risk exposures or Ebola disease were identified. Conclusion Entry risk assessment and post-arrival monitoring of travellers are resource-intensive activities that had low demonstrated yield during this and previous outbreaks. The efficiency of future responses could be improved by incorporating an assessment of risk of importation of disease, accounting for individual travellers’ potential for exposure, and expanded use of methods that reduce burden to federal agencies, health departments, and travellers.

General & Internal Medicine↗