Search NASA⌕ Search

SEARCH · Search NASA

Results for “Risk-informed Systems Analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

86 records · Page 5

Evaluating Supply Prioritization Strategies for Risk-Informed Decision Making in an Arbitrary Gas Network

Supply disruptions and infrastructure failures in natural gas networks present critical challenges to energy reliability and risk-informed planning. This study evaluates two supply prioritization strategies, Maximum Delivery Prioritization (MDP) and Demand-Based Prioritization (DBP), within an arbitrary natural gas network under conditions of supply shortage. Model performance under both strategies is assessed in response to node and edge failure using demand satisfaction metrics, system-wide and localized dependency scores, and geographic information system (GIS)-based spatial analysis. Results show that DBP better preserves supply for high-demand nodes, while MDP offers broader coverage. The underlying network topology plays a critical role in shaping prioritization outcomes. Integrated GIS visualization enhances the interpretability of vulnerability assessments, revealing structurally critical components and localized vulnerabilities. The proposed framework supports scalable, data-driven decision-making for infrastructure planners and engineers, enabling improved disruption recovery and efficiency in constrained natural gas networks. These insights contribute to the development of more robust energy systems capable of withstanding stress and disruptions.

Peterson, Steven [ORNL] (ORCID:0000000287672998)↗

Application of Point Precipitation Frequency Estimates to Watersheds

This report documents work sponsored by the U.S. Nuclear Regulatory Commission (NRC) at the Oak Ridge National Laboratory (ORNL) as part of the RES project, “Application of Point Precipitation Frequency Estimates to Watersheds.” This project was implemented as part of the Probabilistic Flood Hazard Assessment (PFHA) Research Program. The objective of the PFHA Research Program is to develop tools and guidance on the use of PFHA methods to risk-inform NRC’s licensing of new facilities as well as licensing and oversight of currently operating facilities as they relate to flooding hazards. Many nuclear power plants (NPPs) are located on or near rivers so riverine flooding hazards need to be considered in their design and operation. Probabilistic riverine flood models are important tools for realistic assessment of flooding risks. However, these models require areal estimates of the depth, duration, and frequency of rainfall distributed over the watershed, which are not often available. Point precipitation frequency estimates are more widely available. For example, the National Oceanic and Atmospheric Administration (NOAA) has published NOAA Atlas 14, which provides point precipitation frequency estimates for 5-minute through 60-day durations at average recurrence intervals of 1-year through 1,000-year. The research documented in this report addresses areal reduction factors (ARFs), which can be used to convert the widely available point precipitation frequency estimates, to estimates of areal precipitation frequency over a watershed. The most widely used ARF source is Technical Paper 29 (TP-29) published by the then U.S. Weather Bureau in 1958. However, both the methods and the underlying precipitation data used to produce TP-29 are seriously out of date. For example, due to the small gauge network available at the time of TP-29’s compilation, ARF estimates developed are only for watersheds smaller than about 400 square miles. Due to the relatively short record lengths of precipitation data available, frequency considerations could not be accurately determined. Other factors such as regional climate and seasonality were not addressed. Several newer methods have been published since TP-29 was developed and both the type and quantity of precipitation data have increased significantly, along with computational resources and analytical tools such as geographic information systems. This report reviewed and assessed the available precipitation products and methods for conducting ARF analysis. The work applied up-to-date precipitation data products and analysis methods with a novel watershed-based approach to investigate how ARF estimates vary across different methods, data sources, geographical locations, return periods, and seasons. The overall findings reported here regarding basic ARF trends are in line with other recent studies showing that ARFs decrease with increasing area, increase with increasing duration, and decrease with increasing return period. This study found significant differences among the available ARF methods. This work also found a strong geographical variability across different US hydrologic regions, suggesting that the ARF are specific to regional climate patterns and geographical characteristics and should not be applied arbitrarily to other locations. The results also reveal the importance of data record length, especially for high return level ARFs. The work reported in NUREG/CR-7271 will assist NRC staff in assessing different classes of ARF methods in conjunction with available rainfall data sets. It will also support the development of guidance for application of point precipitation data in PFHAs. It should be noted that the ARF values presented in this report for any location or region were developed for the purposes of comparing methods and investigating the factors that influence ARFs. They should not be considered official and should not be used in leu of a site-specific analysis.

54 ENVIRONMENTAL SCIENCES↗

Systematic Enterprise Risk Management by Integrating the RISMC Toolkit and Cost-Benefit Analysis (Final Report)

The goal of this research is to theorize and quantify the relationships between safety and the financial performance of nuclear power plants (NPPs). The Socio-Technical Risk Analysis (SoTeRiA) theoretical framework, which connects the social aspects (e.g., safety culture) and structural features (e.g., safety practices) of an organization with organizational safety and financial risks, is used to theorize the direct and indirect relationships between safety and the financial performance of NPPs. An Integrated Enterprise Risk Management (I-ERM) methodological framework is developed to operationalize SoTeRiA to quantify NPP safety and financial performance in a unified platform where their underlying physical degradation mechanisms, coupled with maintenance performance (considering human and organizational factors), are explicitly incorporated to depict the interconnections and dependencies between safety and financial performance. In this study, NPP safety refers to both occupational safety and system safety (estimated from Probabilistic Risk Assessment, PRA), and financial performance refers to the monetary values associated with NPP operation and maintenance (O&M) strategies. This report covers a case study demonstrating the feasibility of the I-ERM methodological framework. More detailed development of one of the I-ERM modules, i.e., Probabilistic Physics-of-Failure (PPoF) analysis, and its connection with other I-ERM modules is demonstrated in a second case study. The outcome of this research will help NPP decision-makers create cost-saving maintenance strategies while maintaining safety by providing cost- and risk-informed recommendations regarding maintenance work processes and operational strategies.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Approach and Model Used to Represent a Timeline Analysis for Security Design Enhancements

Next-generation reactors will be able to use risk to inform and performance base the licensing of many aspects of the reactor, facility, and site design, including attributes of physical security. There are several factors related to security, including site topography, reactor design, and physical protection system components, to consider when designing the physical protection system into the overall facility design and plan of operation. With the versatility of advanced reactors, especially micro reactors, methods are needed to simplify and quickly evaluate potential timelines for designing a site configuration. This report describes an approach to generate qualitative and quantitative insights using a risk-informed simulation. The modeling process is described in detail, focusing on three aspects: (1) the facility mission time (the time required to control the plant until safe), (2) the attacker timeline (the time to potential sabotage), and (3) the response timeline (the time to counter the facility attack). The modeling capabilities also are extended to include facility physical phenomena such as thermal-hydraulics and heat transfer to capture realistic representation of dynamic changes to a facility. While the plant models and examples are hypothetical and do not represent a real facility, these modeling approaches could be used for future security-by-design engineering in advanced reactors. The outputs and insights from the modeling approach may be used to modify and optimize the security posture of a facility by efficiently making modifications to the model and seeing the overall impact from the modification. Lastly, use of the approach described in this report can also provide the technical basis for a physical protection program, describing how the facility and security strategy will cope with off-normal events.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Summary of Technical Peer Review on the Risk Assessment Framework proposed in Report INL/RPT-22-68656 for Digital Instrumentation and Control Systems

This report summarizes the peer review activities initiated by Idaho National Laboratory (INL) during fiscal year (FY) 2023 for the evaluation and improvement of the methodology developed under the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) risk assessment project. In FY 2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a technical basis to support effective and secure DI&C technologies for digital upgrades/designs. A framework was proposed for this strategy, which aims to (1) provide a best-estimate, risk-informed capability to quantitatively and accurately estimate the risk impact of plant modernization, considering the introduction of high safety-significant safety-related (HSSSR) DI&C systems, (2) support and supplement existing risk-informed DI&C design guides by providing quantitative risk information and evidence, (3) offer a capability of design architecture evaluation of various DI&C systems, (4) assure the long-term safety and reliability of HSSSR DI&C systems, and (5) reduce uncertainty in costs and support integration of DI&C systems in the plant. The R&D efforts of this project from FY 2019 through FY 2022 were focused on methodology improvement and demonstration of the proposed framework for the risk assessment and design optimization of safety-critical DI&C systems. Collaborations with the nuclear industry have been initiated to support the reliability and risk assessment of their DI&C systems by using the proposed framework. In FY 2023, the framework has reached to a point for a technical peer review and obtain stakeholder feedback. This peer review activity includes coordination of the reviews performed by a group of industry stakeholders, documentation of the peer review suggestions, providing resolutions and responses to the peer review comments. The objective of this technical peer review is to obtain representative feedback on the proposed framework to improve the technical qualities of its methodology and readiness for deployment to the industry. Feedback may identify potential areas for improvement and further development. The Subject Matter experts were invited to review the latest project report documenting the methodology developed in the project and provide evaluations of the technical qualities of the proposed framework and relevant methods. The reviewed project report is “An Integrated Framework for Risk Assessment of High Safety-significant Safety-related Digital Instrumentation and Control Systems in Nuclear Power Plants: Methodology and Demonstration” INL/RPT-22-68656 (short as “INL/RPT-22-68656” in this report). This peer review report documents the technical questions provided for technical peer review and introduces the technical peer reviewers from the stakeholders including nuclear utilities, regulators, and universities. Comments from technical peer reviewers and the resolutions and responses to these comments are outlined. Insights and lessons learned from the technical peer review are summarized in conclusions and future work. The primary audience of this report are DI&C designers, engineers, and probabilistic risk assessment (PRA) practitioners. This includes stakeholders, such as the nuclear utilities and regulators who consider the deployment and upgrade of DI&C systems, DI&C software developers and reviewers, and cybersecurity specialists.

99 GENERAL AND MISCELLANEOUS↗

Status Report on Regulatory Criteria Applicable to the Use of Artificial Intelligence (AI) and Machine Learning (ML)

Although the interest in the use of artificial intelligence (AI) and machine learning (ML) in nuclear energy is increasing rapidly, at present their implementation is limited. This rapid increase in interest is not surprising considering that implementing AI and ML technology would allow for continuous monitoring, facilitate the implementation of predictive maintenance with optimized staffing plans, enable automation and autonomy opportunities that could drastically reduce fixed operation and maintenance costs, and provide training for operations and maintenance. Other industries are using AI for construction, and in the nuclear arena AI could provide great benefit in decommissioning activities. The ability of AI and ML to operate in real time vastly increases their potential impact. Before AI can be used in design, operations, or as a regulatory tool, the specifics on the regulations applicable to the use of AI for nuclear power applications need to be established. The difficulty is that the specific use cases will dictate the applicability of regulations. For example, even within the application domain associated with operations, the regulations might vary if the AI is used to create a virtual reference for plant operations or is used for training, optimization of maintenance intervals, prioritization of maintenance activities, etc. Different still is if the AI is to be used for design or setting technical specifications, which will introduce additional requirements. US Nuclear Regulatory Commission (NRC) licensing reviews are based on an applicant’s design meeting its performance assessment based on (1) safety goals and objectives, (2) deterministic and/or probabilistic analysis of accident scenarios, and (3) quantitative assessment of design alternatives against the safety goals and objectives using accepted engineering tools, methodologies, and performance criteria. The current regulatory framework does not explicitly address AI or autonomous control. However, as implementing AI technology will require the use of a digital platform, it must meet the requirements of an instrumentation and control (I&C) system. The regulatory requirements for AI, which will be incorporated into the I&C system, will be very dependent on how it is used (i.e., its functionality, safety classification, etc.). The licensing process is primarily risk-based with the identification of components and systems as nonsafety, important to safety, or safety related. A risk-informed approach allows further gradation of components and systems based on risk metrics such as core damage frequency or large early release fractions. Thus, the use cases and the risk categorization of impacted systems and components will determine the regulatory requirements. Regardless of how AI is used it presents new opportunities for risk-informing operating, maintenance, and regulatory decisions. Trustworthiness, transparency, and the ability to validate and verify the results will be paramount in showing that the systems and plant still meet their performance requirements. This report describes the results of research to identify regulatory implications of AI technologies and their uses. Specifically, this report reviews current regulatory guidance relevant to the application of AI for design (including design changes or new designs including advanced reactors), construction, operations, training, maintenance, research, testing, and as a regulatory tool. AI can be automated at different levels from purely informative purposes to autonomous controls. The focus of this review included determination of constraints on the application of AI technology, identification of any regulatory gaps or uncertainties, and clarification of anticipated technical basis information likely to be important for regulatory acceptance of these technologies. Currently, any use of AI at nuclear power plants is focused on nonsafety-related applications. The NRC and other regulatory bodies are evaluating providing guidance to address gaps rather than create new regulations to address the use of AI and ML. This approach seems to be the best to encourage AI development without adding regulatory uncertainty.

97 MATHEMATICS AND COMPUTING↗

Idaho National Laboratory Integrated Multisite SSHAC Level 3: Probabilistic Volcanic Hazards Assessment

The Idaho National Laboratory (INL) resides on the eastern Snake River Plain (ESRP), part of the Snake River Plain (SRP) with a complex origin and geologic history of volcanism. Much of the Quaternary (last 2.58 million years) volcanism within 400 km of INL is genetically associated with a major thermal anomaly referred to as the Yellowstone hotspot, which is currently located more than 180 km northeast of INL. Near INL, local volcanic sources include silicic domes near its southern border, and numerous dike-fed basaltic vents of the ESRP, some of which are near or within the INL boundaries. Quantitative probabilistic assessments of screened-in volcanic hazardous phenomena for nine different facility complexes at the INL are presented for a Senior Seismic Hazard Analysis Committee (SSHAC) Level 3 (SL3) study. The comprehensive, integrated multisite SSHAC study consists of a single regional Probabilistic Volcanic Hazards Assessment (PVHA) that pertains to all nine INL facility complexes, with site-specific information developed at each respective area of interest (AOI), referred to as the "INL facility AOI" (Figure ES-1). Hazard products are generated for specified INL facility AOIs for use by multiple stakeholders from different agencies in risk-informed decision-making regarding site selection, operations, and design of nuclear facilities at INL, consistent with U.S. Department of Energy (DOE) and U.S. Nuclear Regulatory Commission (NRC) regulatory guidance. The study also serves as the basis for future periodic safety assessments required for existing DOE facilities, such as 10-year evaluations of natural-phenomena hazards. Elements of the INL PVHA including initial characterization, screening, quantitative assessments of eruption and hazard potential, and consideration of facility needs are conducted using the three phases of the SSHAC process: evaluation, integration, and documentation. As per regulatory guidance, the SSHAC framework provided the necessary processes and procedures for the PVHA Technical Integration (TI) team, at three workshops, five formal working meetings and many TI team remote meetings, to conduct initial characterization, screen the volcanic hazards, create PVHA model inputs, exercise those models in the PVHA, consider facility-specific volcanic hazard needs, and perform final hazard calculations. The Participatory Peer Review Panel (PPRP) provided independent oversight and performed process and technical reviews of the PVHA throughout its duration. The study included an extensive New Data Collection and Analyses (NDCA) program developed by the PVHA TI team to reduce uncertainties in hazard-significant elements in the PVHA model. NDCA activities generated 20 reports providing important contributory datasets and results to the project database for characterizing the ESRP. For example, a report compiling the dimensions of ESRP shield volcanoes and lava fields was used to construct volcanic footprints (areas of impact), was compared with data from INL subsurface cores, and was used to validate the results of lava-flow inundation modeling on the contemporary terrain. Another example is the acquisition of aeromagnetic data over INL and its surrounding area, with maps of buried magmatic features (e.g., subsurface volcanoes and swarms of feeder dikes) that informed the PVHA conceptual model of volcanism. The SSHAC evaluation process was used to conduct all elements of the PVHA including initial characterization and screening. Existing data and NDCA activities provided the foundation to develop the tectonomagmatic conceptual model of volcanism for the region of geographical interest in the SRP and Yellowstone hotspot volcanic system, and for considering volcanoes in the western US. Considering Quaternary volcanic sources active during this period, the screening approach identified and evaluated magma compositions, types of eruptive and intrusive phenomena, types of hazardous phenomena, and proximity of sources to INL. The PVHA TI team evaluated 18 types of magmatic sources in terms of 20 potentially hazardous phenomena, resulting in 360 screening decisions. The screening process resulted in 140 screened-in hazardous volcanic phenomena for Quaternary volcanic sources 1) proximal to INL facility complexes in the ESRP (64 basaltic and 54 silicic), 2) regional sources associated with the Yellowstone caldera system and Blackfoot Reservoir volcanic field (7), and 3) more distal sources from thirteen Cascade volcanoes and two volcanoes at Long Valley caldera (CA).

58 GEOSCIENCES↗

Operating Experience Data Analysis for Digital Instrumentation and Control System Reliability and Risk Assessment in Nuclear Power Plants

The implementation of advanced digital instrumentation and control (DI&C) systems in U.S. nuclear power plants (NPPs) can bring significant advancements in reliability, monitoring, and control capabilities. However, these systems also introduce new challenges, particularly in assessing risks such as common-cause failures (CCFs) and establishing robust reliability estimates for DI&C components. Addressing these challenges is critical for ensuring the safe and efficient operation of NPPs. Recently, Idaho National Laboratory was tasked by the U.S. Nuclear Regulatory Commission (NRC) to conduct a DI&C reliability study using operating experience data from the nuclear industry. The two operating experience data sources for the study are the Institute of Nuclear Power Operations’ Industry Reporting and Information System (IRIS) and the NRC’s Licensee Event Report database which is hosted at Idaho National Laboratory at https://lersearch.inl.gov/LERSearchCriteria.aspx. This report provides a comprehensive examination of DI&C systems, including their architecture, operational advantages, and associated challenges. It reviews existing industry DI&C studies and failure mode taxonomies, along with reliability data from various industries. Through a detailed analysis of these databases, the study provides insights into DI&C system performance. Considerations should be given to incorporate DI&C failure data into the NRC's Integrated Data Collection and Coding System and updating the Reliability and Availability Data System to support ongoing DI&C reliability studies. Recommendations are also provided for modeling DI&C reliability and CCF in probabilistic risk assessment, thereby supporting risk-informed decision-making and enhancing the reliability and safety of NPPs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Hydrogen Component Leak Rate Quantification for System Risk and Reliability Assessment through QRA and PHM Frameworks: Preprint

The National Renewable Energy Laboratory's (NREL) Hydrogen Safety Research and Development (HSR&D) program in collaboration with the University of Maryland's Systems Risk and Reliability Analysis Laboratory (SyRRA) are working to improve reliability and reduce risk in hydrogen systems. This approach strives to use quantitative data on component leaks and failures, together with Prognosis and Health Management (PHM), and Quantitative Risk Assessment (QRA) to identify at-risk components, reduce component failures and downtime, and predict when components require maintenance. Hydrogen component failures increase facility maintenance cost, facility downtime, and reduce public acceptance of hydrogen technologies, ultimately increasing facility size and cost because of potentially overly conservative requirements. Leaks are a predominant failure mode for hydrogen components. However, uncertainties in the amount of hydrogen emitted from leaking components and the frequency of those failure events limit the understanding of the risks that they present under real-world operational conditions. NREL has deployed a test fixture, the Leak Rate Quantification Apparatus (LRQA), to quantify the mass flow rate of leaking gases from medium and high-pressure components that have failed while in service. Quantitative hydrogen leak rate data from this system could ultimately be used to better inform risk assessment and Regulation Codes and Standards (RCS). Parallel activity explores the use of PHM and QRA techniques to assess and reduce risk, thereby improving safety and reliability of hydrogen systems. The results of QRAs could further provide a systematic and science-based foundation for the design and implementation of RCS, as in the latest versions of the NFPA 2 code for gaseous hydrogen stations. Alternatively, data-driven techniques of PHM could provide new damage diagnosis and health-state prognosis tools. This research will help end users, station owners and operators, and regulatory bodies move towards risk-informed preventative maintenance versus emergency corrective maintenance, reducing cost and improving reliability. Predictive modelling of failures could improve safety and affect RCS requirements such as setback distances at liquid refuelling sites. The combination of leak rate quantification research, PHM, and QRA can lead to better informed models enabling data-based decision to be made for hydrogen system safety improvements.

codes and standards↗

Risk-Informed Condition Evaluation of Solar-centered Energy Generation and Distribution Networks through Bayesian Learning and Inference

We develop a methodology based on Bayesian inference over Probabilistic Graphical Models (PGMs) to understand and quantify risk in solar-centered grids using targeted measurements and learned system behavior. Being non-prescriptive but, rather, able to infer system behavior and, ultimately, address risk queries from data, our machine learning-type paradigm is tailored for diverse topologies and threat scenarios often associated with distributed energy generation and photovoltaic distributed energy resources (PV-DERs) in particular. We describe algorithmic processes for: (i) learning the structure of PGMs that result from attack-prone PV-DER-proliferated distribution systems, (ii) quantifying cause-effect relationships, and (iii) evaluating risk queries based on diverse evidence. The contributions are illustrated on a residential grid subject to output impairment attacks on its PV-DER infrastructure.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Choosing the Best Modeling Platform for Radiological Risk Assessment Models - 20468

Radiological risk assessments, in the form of performance or safety assessments, are often required under regulations or guidance for remediation of contaminated land, decommissioning of contaminated buildings or structures, and radioactive waste disposal. These risk assessments are usually supported by fate and transport models that address decay and ingrowth of radionuclides, as well as their movement through engineered systems and the natural environment. These models are often projected thousands, or more, years into the future, largely because the radioactive species change through decay and ingrowth, and hence the magnitude of the radioactive effect changes with time. There are many computer codes that are available to address this type of modeling. They range from addressing specific pathways or processes such as infiltration of water, groundwater, surface water, air, biota, diffusion and advection of water and gases, to those that try to couple all processes together to evaluate the impact of fate and transport through the entire system to places in space and time to which access is assumed. These different types of codes are sometimes separated with the monikers process-level and systems-level codes, although it is often not clear that this separation does justice to the capabilities of the many codes that are available to evaluate fate and transport of radionuclides. The focus of this paper is the latter group of modeling codes. Several systems level modeling codes exist and are used. There are differences between these codes in terms of utility, flexibility, complexity and cost. The purpose of this paper is to compare a few of these codes in the context of work currently being performed by the International Atomic Energy Agency (IAEA) Modeling and Data for Radiological Impact Assessments (MODARIA) II Working Group 1 (WG1). The MODARIA II WG1's main focus is how stakeholder engaged decision analysis can, or should, be applied to radiological contamination problems so that better, longstanding, sustainable, solutions are reached. However, the WG1 also recognizes the potential impact of the modeling tools that are chosen to address radiological risk, which is often a primary objective of decision making for radiological problems. Other objectives might also be important, such as constraining costs, obtaining financing, minimizing impact on ecosystems, saving cultural resources, saving jobs, farmland, environmental justice, etc., in a full decision analysis for a given radiological contamination problem, but none of these other objectives have the same types of complex modeling needs as minimize radiological dose. Consequently, a further focus of WG1 is to evaluate the potential impacts on decision making of the choice of fate and transport, and risk assessment, modeling codes that are used to support decision making. The WG1 will produce a report at the end of 2020 that will focus on an approach to effective decision making and stakeholder engagement. The report will also consider the role that performance assessment modeling should play in the decision-making process, including the impact of the choice of modeling tools or computer codes on risk-informed decision making. Several sites around the World have been made available by Member States for these model comparisons, and several modeling tools have been considered. However, the focus of this paper is on two of the sites, one in Belgium and one in Ukraine, and on three of the tools: NORMALYSA (NORM And Legacy Site Assessment); GoldSim{sup C}, and AMBER{sup C}. The final report from this working group will also cover other modeling tools, including RESRAD, and PC-Cream{sup R}. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Evaluation of The Dynamic Physical Security Risk Assessment Methodology for Fleet-Wide Applications

The requirements for U.S. nuclear power plants to maintain a large onsite physical security force contribute to their high operational costs. The cost of maintaining the current physical security posture is approximately 10% of the overall operation and maintenance budget for commercial nuclear power plants. The goal of the Light Water Reactor Sustainability (LWRS) program’s physical security pathway is to develop tools, methods, and technologies and provide the technical basis for an optimized physical security posture. The conservatisms built into current security postures may be analyzed and minimized to reduce security costs while still ensuring adequate security and operational safety. The research performed at Idaho National Laboratory within LWRS program’s physical security pathway has successfully developed a dynamic force-on-force modeling framework using various computer simulation tools and integrating them with the dynamic assessment Event Modeling Risk Assessment using Linked Diagrams (EMRALD) tool. This integrated process for physical security analysis is named Modeling and Analysis for Safety Security using Dynamic EMRALD Framework (MASS-DEF). This document provides an update on the progress in applying the MASS-DEF process to an operating commercial nuclear power plant as well as additional industry feedback regarding use of the tool for other physical security risk-informed topics. This report is only a summary of the progress and does not contain specific modeling results as those contain sensitive security information. Previous reports described how a user could integrate their plant-specific force-on-force models with the dynamic simulation tool EMRALD, model operator actions, and integrate with probabilistic risk assessment tools, such as CAFTA (Computer Aided Fault Tree Analysis System) or SAPHIRE (Systems Analysis Programs for Hands-on Integrated Reliability Evaluations), and with thermal-hydraulic tools, such as RELAP-5 or MAAP. Previous reports applied various combinations of available simulations codes with EMRALD using generic plant models to demonstrate how to perform the analysis. This report is an update the progress of applying the dynamic computational framework to an actual nuclear facility using their security scenarios and timelines. This report also provides an update to the procedural guidance for the MASS-DEF process and an overview of the generic models available for use by utilities. This report does not contain any plant’s sensitive information and/or safeguards information. This study’s purpose was to verify that the results achieved using generic models are similar to actual plant results and refine our guidance on the use of the framework. This assessment enables further analysis, such as what-if scenarios and staff-reduction evaluation, thereby optimizing physical security at plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Important Human Actions for Advanced Reactors: Implications for Human Factors

As advanced reactor platforms continue to develop and gain traction in the energy sector there is a need for risk-informed, scalable regulations that match that progress. This is a core component of the U.S. Nuclear Regulatory Commission’s proposed Part 53 Rule Making; the Accelerating Deployment of Versatile, Advanced Nuclear for Clean Energy (ADVANCE) Act; and other efforts that seek to update nuclear power regulations. This paper covers one key aspect of that regulatory evolution: Important Human Actions (IHA). In this paper, we discuss how the understanding and definitions of IHAs have changed and what that means for human factors engagement through the process of developing these technologies. Instead of a narrow focus on control actions that led to an increase in core damage risk, the new focus is on IHAs is “wherever they occur.” What this means is that having a highly automated or passive safety system does not eliminate IHAs. Rather, it shifts the focus point to all the actions that enable these systems. Everything from maintenance, to design, to training can be considered an IHA and that dramatically shifts the efforts and level of engagement necessary for human factors to enable these technologies. We discuss the notions of risk-informed human factors that underpin these efforts, give several examples, and briefly describe the risk assessment methodologies that will be needed. In the past, IHAs were identified and then became a focus point of human factors engineering (HFE) activities to ensure a robust evaluation of the task was completed. The future is less clear. HFE for nuclear energy will need to evolve and become more integrated in technology development than ever before.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

INTEGRATION OF DATA ANALYTICS WITH SYSTEM HEALTH PROGRAMS

Industry equipment reliability and asset management programs are essential elements that help ensure the safe and economical operation of nuclear power plants. The effectiveness of these programs is addressed in several industry developed and regulatory programs. However, these programs have proven to be labor intensive and expensive. There is an opportunity to significantly enhance the collection, analysis, and use of this information to provide more cost-effective plant operation. Additionally, there is an acute industry need to leverage advanced technology to reduce costs and improve operational effectiveness. The goal of this paper is to provide effective and efficient analytical methods and tools to support risk-informed decisions for the equipment reliability and asset management programs at nuclear power plants. This is accomplished by creating a direct bridge between component health/lifecycle data and decision making (e.g., maintenance scheduling and project prioritization). Here we are supporting typical system engineer decisions regarding maintenance activity scheduling and component ageing management. This is performed in a risk-informed context where herein the term “risk” is broadly constructed to include both plant reliability and economics. This framework combines data analytics tools to analyze equipment reliability data with risk-informed methods designed to support system engineer decisions (e.g., maintenance and replacement schedules, optimal maintenance posture) in a customizable workflow. A challenge is that the structure of this workflow strongly depends on the decision that needs to be made, the type of data available, and the constraints that need to be considered. Current methods are designed to provide specific answers to specific problems; however, these methods might prove to be inadequate even when problem settings slightly change (e.g., different types of requirements, additional dependencies between system reliability and economics). We tackled this challenge by designing framework in a flexible and modular fashion such that the user can assemble and customize his/her own workflow that integrates SSC economic lifecycle models (e.g., maintenance and replacement costs), system reliability models, and optimization methods.

97 - MATHEMATICS AND COMPUTING↗