Search NASA⌕ Search

SEARCH · Search NASA

Results for “SATURN V LAUNCH VEHICLE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Dynamic verification of a digital flight control system.

Development of a digital control system dynamic variation technique which accounts for the limitation of available frequency response analyzers. Digital control system theory is briefly reviewed, and generation of the necessary theoretical frequency responses is discussed. Results of the dynamic verification of a digital control system for a Saturn V launch vehicle are presented, and attention is given to the limitations of this technique along with its applicability to other types of digital control systems. A technique for performing open-loop frequency response analyses of a flight program implemented in a 'flight-type' digital computer and interface hardware with vehicle dynamics simulated on an analog computer is described.

Nabers, J. P., Jr.↗

A 10,000-gpm liquid hydrogen transfer system for the Saturn/Apollo program.

Brief description of the design and operation of the liquid hydrogen transfer system used to service the Saturn V launch vehicle. The cryogenic loading of the huge booster begins eight hours before the scheduled liftoff. The first three hours of fueling are spent in cold hydrogen gas conditioning of the fuel tank. The cold hydrogen gas is provided by vaporizing liquid hydrogen from the storage tank and routing the resultant gas through the fill system. Boil-off losses after loading are continuously replaced through control valves which are driven by a computer system. The liquid hydrogen transfer system is made up of a number of subsystems including the 850,000 gal storage tank whose boil-off losses amount to only 200 gal/day, the pressurization system, the burn pond for controlled disposal of hydrogen waste gas, the storage tank fill manifold, and the hazardous gas monitoring system. Some of the subsystems and components are redundant to provide a high degree of reliability.

Wybranowski, E., Jr.↗

Mission requirements: Skylab rescue mission SL-R

The Skylab Program includes three low earth orbit missions. These missions are designated SL-1/SL-2,SL-3 and SL-4. In addition to the three nominal Skylab missions, the program includes the Skylab Rescue Mission (SL-R). The SL-R mission is designed to provide a safe return of the Skylab crew in the event the Command Service Module (CSM) becomes disabled while docked to the Saturn Workshop (SWS). Mission requirements for the SL-R mission only are presented. SL-R mission configuration will be a CSM (modified with a field installed kit) manned by two crewmen launched on a Saturn IB Launch Vechicle. The SL-R CSM will rendezvous and dock with the SWS (or Orbital Assembly (OA), consisting of the SWS and disabled CSM, if the disabled CSM has not previously been jettisoned). The SWS configuration includes a Multiple Docking Adapter (MDA), Apollo Telescope Mount (ATM), Airlock Module (AM), and an S-IVB stage (modified as an Orbital Workshop (OWS), previously launched and inserted into orbit on a two-stage Saturn V Launch Vehicle for the SL-1/SL-2 mission.

Source record↗

Long Life Technology Work at Rockwell International Space Division

This paper presents highlights of long-life technology oriented work performed at the Space Division of Rockwell International Corporation under contract to NASA. This effort included evaluation of Saturn V launch vehicle mechanical and electromechanical components for potential extended life capabilities, endurance tests, and accelerated aging experiments. A major aspect was evaluation of the components at the subassembly level (i.e., at the interface between moving surfaces) through in-depth wear analyses and assessments. Although some of this work is still in progress, preliminary conclusions are drawn and presented, together with the rationale for each. The paper concludes with a summary of the effort still remaining.

D K Huzel↗

Time domain desensitized specific optimal system design

A digital computer algorithm for desensitized specific optimal system design for general time-invariant nonlinear systems is presented. The algorithm utilizes a technique of partitioning and uncoupling of the original specific closed-loop system state and sensitivity equations into linear, nonlinear, and control subsystems. Results of the application of the algorithm in the design of a Saturn V Launch Vehicle analog attitude control system and an LST image motion compensation digital controller are given.

Henson, T. F.↗

The initial flight anomalies of Skylab 1

At approximately 63 seconds into the flight of Skylab 1 on May 14, 1973, an anomaly occurred which resulted in the complete loss of the meteoroid shield around the orbital workshop. This was followed by the loss of one of the two solar array systems on the workshop and a failure of the inter stage adapter to separate from the S-II stage of the Saturn V launch vehicle. The investigation reported herein identified the most probable cause of this flight anomaly to be the breakup and loss of the meteoroid shield due to aerodynamic loads that were not accounted for in its design. The breakup of the meteoroid shield, in turn, broke the tie downs that secured one of the solar array systems to the workshop. Complete loss of this solar array system occurred at 593 seconds when the exhaust plume of the S-II stage retro-rockets impacted the partially deployed solar array system. Falling debris from the meteoroid shield also damaged the S-II inter stage adapter ordnance system in such a manner as to preclude separation. Of several possible failure modes of the meteoroid shield that were identified, the most probable in this particular flight was internal pressurization of its auxiliary tunnel which acted to force the forward end of the meteoroid shield away from the shell of the workshop and into the supersonic air stream. The pressurization of the auxiliary tunnel was due to the existence of several openings in the aft region of the tunnel. Another possible failure mode was the separation of the leading edge of the meteoroid shield from the shell of the workshop (particularly in the region of the folded ordnance panel) of sufficient extent to admit ram air pressures under the shield.

Source record↗

Remembering Apollo 11: The 30th Anniversary Data Archive CD-ROM

On July 20, 1969, the human race accomplished its single greatest technological achievement of all time when a human first set foot on another celestial body. Six hours after landing at 4:17 p.m. Eastern Standard Time (with less than thirty seconds of fuel remaining), Neil A. Armstrong took the "small step" into our greater future when he stepped off the Lunar Module, named Eagle, onto the surface of the Moon, from which he could look up and see Earth in the heavens as no one had done before him. He was shortly joined by Edwin "Buzz" Aldrin, and the two astronauts spent twenty-one hours on the lunar surface and returned forty-six pounds of lunar rocks. After their historic walks on the Moon, they successfully docked with Michael Collins, patiently orbiting the cold but no longer lifeless Moon alone in the Command module Columbia. This CR-ROM is intended as a collection of hard to find technical data and other interesting information about the Apollo 11 mission, as well as the apollo program in general. It includes basic overviews, such as a retrospective analysis, an annotated bibliography, and history of the lunar-orbit rendezvous concept. It also contains technical data, such as mission operations reports, press kits, and news references for all of the Apollo missions, the Apollo spacecraft, and the Saturn V launch vehicle. Rounding out this CD-ROM are extensive histories of the lunar Orbiter program (the robotic predecessor to Apollo, biographies of the Apollo astronauts and other key individuals, and interesting audio-visual materials, such as video and audio clips, photo galleries, and blueprint-like diagrams of the Apollo spacecraft.

Edgar M Cortright↗

Wernher von Braun: Reflections on His Contributions to Space Exploration

In 1950, Dr. Wernher von Braun and approximately 100 of his team members came to Huntsville, Alabama, to begin work with the Army on what would later become America's historic space program. He would later serve as the first director of the Marshall Space Flight Center and led the development of the Saturn V launch vehicle that launched seven crewed American mission to the moon, as well as America s first space station, Skylab. Von Braun is best known for his team s technical achievements. He realized his dream of exploring outer space by helping place humans on the moon. His engineering and managerial talent during the Apollo era had contributed to a technological revolution. He was by all accounts a good engineer, but he was only one among many. What set Von Braun apart were his charisma, his vision, and his leadership skills. He inspired loyalty and dedication in the people around him. He understood the importance of communicating his vision to his team, to political and business leaders and the public. Today, the Marshall Center continues his vision by pursuing engineering and scientific projects that will continue to open space to exploration. This presentation will discuss Von Braun's impact on Huntsville, the Marshall Center, the nation and the world and look at his contributions in context of where world space exploration is today.

Goldman, Arthur E.↗

Apollo 16 Press Kit

The Apollo 16 spacecraft is scheduled for launch on Apr. 16, 1972 from Complex 39A at the Kennedy Space Center, Florida by the Saturn V launch vehicle. Crewmen are mission commander John W. Young, command module pilot Thomas K. Mattingly II and lunar module pilot Charles M. Duke Jr. Objectives of the mission, to last up to 12 days, as outlined by NASA: to perform selenological inspection, survey and sampling of materials in a preselected region of Descartes using a lunar roving' vehicle; deploy and activate Apollo surface experiments; develop man's capability to work in the lunar environment; obtain photographs of candidate exploration sites; and toconduct inflight experiments and photographic tasks in lunar orbit. Following launch, the spacecraft will reach Earth Parking Orbit and remain in orbit for about two and one-half revolutions prior to Translunar Injection. Next, the Command and Service Module docks with the Lunar Module and the spacecraft "coasts" to the moon. In orbit around the moon, the Command and Service Module/Lunar Module combination will descend to within 50,000 feet of the lunar surface before undocking. The Lunar Module will continue to descend while the Command and Service Module returns to an orbit approximately 60 miles high. Stay time on the lunar surface is scheduled for approximately 73 hours. The ascent stage of the Lunar Module then lifts the astronauts back into lunar orbit where they will dock with the Command/Service Module. The Lunar Module is jettisoned and Transearth Injection follows. Just prior to reentry into the earth's atmosphere, the Service Module is jettisoned, and the astronauts in the Command Module splashdown in the Pacific Ocean. The target point for end-of-mission splashdown is at 05 degrees 0 minutes north latitude and 158 degrees 40 minutes west longitude or approximately 985 nautical miles south of Honolulu, Hawaii. Splashdown is scheduled for Apr. 28, 1972 at 10:30 a.m. Hawaiian Standard Time (2:30 p.m. CST). Recovery forces for Apollo 16, stationed in both the Atlantic and Pacific Oceans, will consist of three ships, nine aircraft and nearly 1,700 personnel. CTF-130 (Manned Spacecraft Recovery Force, Pacific) forces will be stationed south of Hawaii. Three ships, eight helicopters and three Air Force HC-130H aircraft, and nearly 1,100 personnel, will take part. Task Force 140 (Manned Spacecraft Recovery Force, Atlantic), comprising one ship, six HC-130H aircraft, three helicopters and approximately 300 personnel, will be positioned for possible launch abort operations. Two ships in the Atlantic will also be used for acoustical testing. Other forces, primarily aircraft and personnel of the Air Force Aerospace Rescue and Recovery Service will be on alert around the world for contingency recovery support.

Source record↗