Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling Service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Distributed Energy Resource Optimization Using a Software as Service (SaaS) Approach at the University of California, Davis Campus

Together with OSIsoft LLC as its private sector partner and matching sponsor, the Lawrence Berkeley National Laboratory (Berkeley Lab) won an FY09 Technology Commercialization Fund (TCF) grant from the U.S. Department of Energy. The goal of the project is to commercialize Berkeley Lab's optimizing program, the Distributed Energy Resources Customer Adoption Model (DER-CAM) using a software as a service (SaaS) model with OSIsoft as its first non-scientific user. OSIsoft could in turn provide optimization capability to its software clients. In this way, energy efficiency and/or carbon minimizing strategies could be made readily available to commercial and industrial facilities. Specialized versions of DER-CAM dedicated to solving OSIsoft's customer problems have been set up on a server at Berkeley Lab. The objective of DER-CAM is to minimize the cost of technology adoption and operation or carbon emissions, or combinations thereof. DER-CAM determines which technologies should be installed and operated based on specific site load, price information, and performance data for available equipment options. An established user of OSIsoft's PI software suite, the University of California, Davis (UCD), was selected as a demonstration site for this project. UCD's participation in the project is driven by its motivation to reduce its carbon emissions. The campus currently buys electricity economically through the Western Area Power Administration (WAPA). The campus does not therefore face compelling cost incentives to improve the efficiency of its operations, but is nonetheless motivated to lower the carbon footprint of its buildings. Berkeley Lab attempted to demonstrate a scenario wherein UCD is forced to purchase electricity on a standard time-of-use tariff from Pacific Gas and Electric (PG&E), which is a concern to Facilities staff. Additionally, DER-CAM has been set up to consider the variability of carbon emissions throughout the day and seasons. Two distinct analyses of value to UCD are possible using this approach. First, optimal investment choices for buildings under the two alternative objectives can be derived. Second, a week-ahead building operations forecaster has been written that executes DER-CAM to find an optimal operating schedule for buildings given their expected building energy services requirements, electricity prices, and local weather. As part of its matching contribution, OSIsoft provided a full implementation of PI and a server to install it on at Berkeley Lab. Using the PItoPI protocol, this gives Berkeley Lab researchers direct access to UCD's PI data base. However, this arrangement is in itself inadequate for performing optimizations. Additional data not included in UCD's PI database would be needed and the campus was not able to provide this information. This report details the process, results, and lessons learned of this commercialization project.

25 ENERGY STORAGE↗

An Exact Algorithm for the Linear Tape Scheduling Problem

Magnetic tapes are often considered as an outdated storage technology, yet they are still used to store huge amounts of data. Their main interests are a large capacity and a low price per gigabyte, which come at the cost of a much larger file access time than on disks. With tapes, finding the right ordering of multiple file accesses is thus key to performance. Moving the reading head back and forth along a kilometer long tape has a non-negligible cost and unnecessary movements thus have to be avoided. However, the optimization of tape request ordering has rarely been studied in the scheduling literature, much less than I/O scheduling on disks. For instance, minimizing the average service time for several read requests on a linear tape remains an open question. Therefore, in this paper, we aim at improving the quality of service experienced by users of tape storage systems, and not only the peak performance of such systems. To this end, we propose a reasonable polynomial-time exact algorithm while this problem and simpler variants have been conjectured NP-hard. We also refine the proposed model by considering U-turn penalty costs accounting for inherent mechanical accelerations. Then, we propose a low-cost variant of our optimal algorithm by restricting the solution space, yet still yielding an accurate suboptimal solution. Finally, we compare our algorithms to existing solutions from the literature on logs of the mass storage management system of a major datacenter. This allows us to assess the quality of previous solutions and the improvement achieved by our low-cost algorithm. Aiming for reproducibility, we make available the complete implementation of the algorithms used in our evaluation, alongside the dataset of tape requests that is, to the best of our knowledge, the first of its kind to be publicly released.

Honoré, Valentin↗

BigData Express: Toward Predictable, Schedulable, and High-Performance Data Transfer [Slides]

BigData Express: a schedulable, predictable, and high-performance data transfer service. A peer-to-peer, scalable, and extensible data transfer model; A visually appealing, easy-to-use web portal; A high-performance data transfer engine; On-demand provisioning of end-to-end network paths with guaranteed QoS; Robust and flexible error handling; CILogon-based security (certificate version); A rich set of REST APIs to support scientific workflows

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Battery Degradation Modeling in Hybrid Power Plants: An Island System Unit Commitment Study: Preprint

As hybrid power plants (HPPs), such as photovoltaic (PV) and battery combinations, become increasingly important in power systems with high renewable energy penetration to address PV variability and ensure grid stability. This paper focuses on the urgent need to model the coordination between PV and battery systems in HPPs while accounting for battery degradation. We present a generation scheduling model that explicitly incorporates PV-battery hybridization in the unit commitment problem. Moreover, the cost function of the HPP scheduling problem endogenously considers battery degradation with adjustable weights to strike a balance between minimizing production costs and prolonging battery life, particularly when providing energy arbitrage and ancillary services. Using a realistic island system simulation, we demonstrate that accounting for battery degradation in the scheduling problem can significantly extend battery life with only minor additional production costs.

battery degradation↗

Assessment of Cold Spraying Mild-Steel Powder onto Mild-Steel Substrate for Development of Waste Tank Repair System - 20515

Infrastructure for nuclear waste storage and processing (e.g., waste tanks, transfer pipelines, evaporators) at the U.S. Department of Energy (DOE) Hanford Site has been in service well beyond its original design life. Past corrosion control methods at Hanford for waste tanks have not been fully successful, as evidenced by leaks forming in tank AY-102, the first double-shell tank (DST) constructed, and significant degradation detected in the primary tanks of AP-102 and AY-101. Failure of infrastructure components can pose a significant risk to the environment, worker safety, and project schedules. Therefore, remotely deployable methods for repairing and extending the service life of the existing tank waste infrastructure are needed. Cold spray has been identified as a potential technique for performing in situ repairs and material buildup for life extension of waste storage and processing infrastructure. Cold-spray repair methods and technology are well-established and are used extensively by industry and the military for making repairs using dissimilar materials. Pacific Northwest National Laboratory is evaluating the process of making repairs using mild-steel powder applied to a mild-steel substrate to minimize the galvanic corrosion potential. This paper presents the initial results for a feasibility ('go/no-go') assessment as to whether low-density deposits with sound metallurgic bonds, to build-back steel plate material, can be achieved using existing commercial cold-spray equipment. An assessment of steel-on-steel deposit is necessary to determine if cold spray is a viable candidate for DST carbon steel plate restoration/repair and thus DST service life extension. Powder properties and preparation requirements have been investigated and operating conditions and parameters for depositing a cold-spray buildup of mild steel on a mild-steel substrate have been determined. Soundness of metallurgic bonding as a function of the operating parameters exercised and results from applying cold spray to lay a deposit over simulated small-diameter flaws in 1/2-inch mild-steel plate are presented. Application of in situ cold-spray repair to the DOE complex has the potential to reduce cost and schedule impacts associated with component failures and the need to procure and construct replacement infrastructure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Multi-Timescale Integrated Dynamic and Scheduling Model (MIDAS-Solar)

Solar photovoltaic (PV) installations have experienced unprecedented growth in the United States. PV will become not only an energy producer but also a necessary provider of ancillary services at multiple timescales. Conventional methods to simulate power system operations - such as long-term production simulation (which typically considers schedules from hours to minutes by using an optimization framework) and short-term transient studies (which simulate dynamics from seconds to sub-seconds using state variables and differential equations) are not sufficient for studying the multiple-timescale variation of solar generation and its impact on system reliability. Long-term system economics and short-term system dynamics are highly coupled, particularly when the penetration level of renewable generation is extremely high, because the uncertainty and variability of solar generation will impact both power systems steady-state and dynamic performance. This project helps meet and exceed the Solar Energy Technologies Office goal of systems integration by directly addressing this stability and reliability challenge for electric grid planning and operation. This will be accomplished by developing temporally comprehensive, closed-loop simulation models that seamlessly simulate power systems operations from economic scheduling (day-ahead to hours) to dynamic response analysis (seconds to sub-seconds). Both a multi-timescale grid model and an integrated PV model will be developed in this project to accurately study the impacts of PV variability and uncertainty on system reliability at multiple timescales. Using quasi-dynamic simulation methods and data-driven security assessment (DSA) criteria will allow the dynamic characteristics of PV to be fed forward into longer-timescale scheduling models for a complete understanding of the effect of short-term PV dynamics on bulk systems operations (e.g., reserve scheduling and deployment). Upon completion of the proposed model, this project will help operators accurately assess system reliability by deploying energy and reserve scheduling under critical contingency conditions and studying interactions among all types of essential reliability services provided by modern PV power plants.

14 SOLAR ENERGY↗

Effect of Heat and Electricity Storage and Reliability on Microgrid Viability:A Study of Commercial Buildings in California and New York States

In past work, Berkeley Lab has developed the Distributed Energy Resources Customer Adoption Model (DER-CAM). Given end-use energy details for a facility, a description of its economic environment and a menu of available equipment, DER-CAM finds the optimal investment portfolio and its operating schedule which together minimize the cost of meeting site service, e.g., cooling, heating, requirements. Past studies have considered combined heat and power (CHP) technologies. Methods and software have been developed to solve this problem, finding optimal solutions which take simultaneity into account. This project aims to extend on those prior capabilities in two key dimensions. In this research storage technologies have been added as well as power quality and reliability (PQR) features that provide the ability to value the additional indirect reliability benefit derived from Consortium for Electricity Reliability Technology Solutions (CERTS) Microgrid capability. This project is intended to determine how attractive on-site generation becomes to a medium-sized commercial site if economical storage (both electrical and thermal), CHP opportunities, and PQR benefits are provided in addition to avoiding electricity purchases. On-site electrical storage, generators, and the ability to seamlessly connect and disconnect from utility service would provide the facility with ride-through capability for minor grid disturbances. Three building types in both California and New York are assumed to have a share of their sensitive electrical load separable. Providing enhanced service to this load fraction has an unknown value to the facility, which is estimated analytically. In summary, this project began with 3 major goals: (1) to conduct detailed analysis to find the optimal equipment combination for microgrids at a few promising commercial building hosts in the two favorable markets of California and New York; (2) to extend the analysis capability of DER-CAM to include both heat and electricity storage; and (3) to make an initial effort towards adding consideration of PQR into the capabilities of DER-CAM.

25 ENERGY STORAGE↗

Potential Advantages to Employing an Onsite Laboratory at FUSRAP Sites Contaminated with Radionuclides and Metals - 20353

Various factors that support an evaluation of the relative costs, advantages and disadvantages of utilizing an onsite laboratory or an offsite laboratory for remediation of Formerly Utilized Sites Remedial Action Program (FUSRAP) sites contaminated with radionuclides and metals are presented. In terms of how much more quickly an onsite laboratory provides results versus an offsite laboratory, the results of this study provide tools for calculating the amount of cost savings per day for excavation of contaminated soils for various scenarios including: - State, municipal or local property remediation where the remediation schedule becomes time-critical due to the extra cost and inconvenience to the town or municipality caused by the need for increased security and safety personnel, possible road closures and detours, and the inconvenience to the public due to modified or decreased services of State or municipal facilities; - Residential property where the remediation schedule becomes time-critical due to the inconvenience to the homeowner as well as the importance of maintaining good community relations; - Commercial property where the remediation schedule becomes time-critical due to the hardship and potential loss of revenue endured by the property owner; - Open area where treatment of excavation water is required, and - Open area where treatment of excavation water is not required. For every scenario, the number of matrices, radionuclide and metal contaminants of concern and the project duration are important factors. The costs for the onsite laboratory included the capital costs associated with setting up the lab such as trailer(s) or building(s), power and water hookup, analytical testing equipment, balances, computers, desks and bookcases; support equipment such as hot plates, filtration assemblies, safety equipment, ovens, etc.; and supplies such as glassware, pipettes, filters, etc. and ongoing costs such as labor, chemicals and reagents, standards, cost of the laboratory obtaining certification and maintenance. Offsite laboratory sample testing costs are generally very competitive and typically substantially lower than onsite laboratory costs if only the sample testing costs are considered. The great disadvantage of using an offsite laboratory is that they often cannot guarantee rapid turnaround times for results which creates project delays associated with the remediation process including delays determining the completeness of the characterization and remediation processes, delays in backfilling a property and additional costs for treating wastewater (excavation water, stormwater or both). These costs will vary greatly depending upon the area of the country in which the project is located due to the wide range of labor costs for the onsite laboratory and field workers, as well as the contaminants of interest, matrices and most importantly the size of the impacted area and the number of properties located in that area. This paper provides guidelines for calculating the cost savings that may be realized if an onsite laboratory can generate results more quickly than an offsite laboratory by estimating the costs associated with the remediation process for the various scenarios noted above such as work crew labor costs, excavator and dump truck equipment rentals, wastewater treatment costs (if applicable) and the additional costs incurred by homeowners, commercial property owners and towns/municipalities that are reimbursed by the potentially responsible parties. Key assumptions involve the typical quickest turnaround time provided by the onsite and offsite laboratories. Costs for the operation of a wastewater treatment system and the remediation of a site area or property were provided by personnel who have been involved in the operation of a large FUSRAP site in New Jersey for many years. This study provides valuable information for determining the most cost-effective approach for analysis of project samples and therefore may be used on upcoming FUSRAP projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improving logistic efficiency of WEEE collection through dynamic scheduling using simulation modeling

Highlights: • Latest EU regulation on WEEE require more flexible logistics models. • The implementation of dynamic scheduling is evaluated for WEEE collection. • A hybrid simulation model compares dynamic (pure and “mixed”) and static collection schemes. • Results confirm the higher flexibility and efficiency of dynamic systems. • Dynamic scheduling “mixed” solutions result more efficient than pure ones. - Abstract: The complexity of collection systems for Waste from Electric and Electronic Equipment (WEEE) in the EU is increasing, due to the latest directive that sets new collection targets and modes. The high variability and the uncertainty of reverse flows require innovative logistic approaches. One recent option for increasing efficiency and responsiveness in waste collection services, boosted by new technological solutions for waste level monitoring, is to adopt a dynamic collection scheme, where the collection frequency is not established a priori (based on a fixed plan), but it is based on the actual filling levels of waste bins. This option can allow the service provider to plan the collection service following the actual demand, resulting in a more responsive service, while improving the logistic efficiency. This paper evaluates the implementation of dynamic scheduling schemes for the collection of WEEE. A hybrid simulation model has been developed in order to support researchers and practitioners in assessing quantitative impacts of adopting dynamic scheduling in WEEE collection. Three logistic alternatives (a fixed collection schedule scheme, a pure dynamic scheme and a mixed one) have been compared in a test case based on data of an Italian municipality; collection services for different types of WEEE (i.e. large appliances and small items) have been analyzed. Results show a promising performance of dynamic schedules compared to the fixed one, revealing, for the specific test case, how a mixed solution can combine the advantages of dynamic and fixed scheduling, gaining flexibility towards customer demand while improving truck resource utilization.

42 ENGINEERING↗

In-service inspection of radioactive waste tanks at the Savannah River Site - 15410

Liquid radioactive wastes from the Savannah River Site (SRS) separation process are stored in large underground carbon steel tanks. The high level wastes are processed in several of the tanks and then transferred by piping to other site facilities for further processing before they are stabilized in a vitrified or grout waste form. Based on waste removal and processing schedules, many of the tanks, will be required to be in service for times exceeding the initial intended life. Until the waste is removed from storage, transferred, and processed, the materials and structures of the tanks must maintain a confinement function by providing a barrier to the environment and by maintaining acceptable structural stability during design basis events, which include loadings from both normal service and abnormal (e.g., earthquake) conditions. A structural integrity program is in place to maintain the structural and leak integrity functions of these waste tanks throughout their intended service life. In-service inspection (ISI) is an essential element of a comprehensive structural integrity program for the waste tanks at the Savannah River Site (SRS). The ISI program was developed to determine the degree of degradation the waste tanks have experienced due to service conditions. As a result of the inspections, an assessment can be made of the effectiveness of corrosion controls for the waste chemistry, which precludes accelerated localized and general corrosion of the waste tanks. Ultrasonic inspections (UT) are performed to detect and quantify the degree of general wall thinning, pitting and cracking as a measure of tank degradation. The results from these inspections through 2013, for the 27 Type III/IIIA tanks, indicate no reportable in-service corrosion degradation in the primary tank (i.e., general, pitting, or cracking). The average wall thickness for all tanks remains above the manufactured nominal thickness minus 0.25 millimeter and the largest pit identified is approximately 1.70 millimeter deep (i.e., less than 10% through-wall). Improvements to the inspection program were recently instituted to provide additional confidence in the degradation rates. Thickness measurements from a single vertical strip along the accessible height of the primary tank have been used as a baseline to compare historical measurements. Changes in wall thickness and pit depths along this vertical strip are utilized to estimate the rate of corrosion degradation. An independent review of the ISI program methodology, results, and path forward was held in August 2009. The review recommended statistical sampling of the tanks to improve the confidence of the single strip inspection program. The statistical sampling plan required that SRS increase the amount of area scanned per tank. Therefore, in addition to the baseline vertical strip that is obtained for historical comparisons, four additional randomly selected vertical strips are inspected. To date, a total of 104 independent vertical strips along the height of the primary tank have been completed. A statistical analysis of the data indicates that at this coverage level there is a 99.5% confidence level that one of the worst 5% of all the vertical strips was inspected. That is, there is a relatively high likelihood that the SRS inspection program has covered one of the most corroded areas of any of the Type III/IIIA waste tanks. These data further support the conclusion that there are no significant indications of wall thinning or pitting. Random sampling will continue to increase the confidence that one of the worst 5% has been inspected. In order to obtain the additional vertical strips, and minimize budget and schedule impacts, data collection speed for the UT system was optimized. Prior to 2009, the system collected data at a rate of 32 square centimeters per minute. The scan rate was increased to 129 - 160 square centimeters per minute by increasing the scanner step and pixel sizes in the data acquisition set-up. Laboratory testing was utilized to optimize the scan index/pixel size such that the requirements for wall thinning and pit detection were still maintained. SRS continues to evaluate improvements to ultrasonic equipment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In-service Inspection of Radioactive Waste Tanks at the Savannah River Site – 15410

Liquid radioactive wastes from the Savannah River Site (SRS) separation process are stored in large underground carbon steel tanks. The high level wastes are processed in several of the tanks and then transferred by piping to other site facilities for further processing before they are stabilized in a vitrified or grout waste form. Based on waste removal and processing schedules, many of the tanks will be required to be in service for times exceeding the initial intended life. Until the waste is removed from storage, transferred, and processed, the materials and structures of the tanks must maintain a confinement function by providing a barrier to the environment and by maintaining acceptable structural stability during design basis events, which include loadings from both normal service and abnormal (e.g., earthquake) conditions. A structural integrity program is in place to maintain the structural and leak integrity functions of these waste tanks throughout their intended service life. In-service inspection (ISI) is an essential element of a comprehensive structural integrity program for the waste tanks at the Savannah River Site (SRS). The ISI program was developed to determine the degree of degradation the waste tanks have experienced due to service conditions. As a result of the inspections, an assessment can be made of the effectiveness of corrosion controls for the waste chemistry, which precludes accelerated localized and general corrosion of the waste tanks. Ultrasonic inspections (UT) are performed to detect and quantify the degree of general wall thinning, pitting and cracking as a measure of tank degradation. The results from these inspections through 2013, for the 27 Type III/IIIA tanks, indicate no reportable in-service corrosion degradation in the primary tank (i.e., general, pitting, or cracking). The average wall thickness for all tanks remains above the manufactured nominal thickness minus 0.25 millimeter and the largest pit identified is approximately 1.70 millimeter deep (i.e., less than 10% through-wall). Improvements to the inspection program were recently instituted to provide additional confidence in the degradation rates. Thickness measurements from a single vertical strip along the accessible height of the primary tank have been used as a baseline to compare historical measurements. Changes in wall thickness and pit depths along this vertical strip are utilized to estimate the rate of corrosion degradation. An independent review of the ISI program methodology, results, and path forward was held in August 2009. The review recommended statistical sampling of the tanks to improve the confidence of the single strip inspection program. The statistical sampling plan required that SRS increase the amount of area scanned per tank. Therefore, in addition to the baseline vertical strip that is obtained for historical comparisons, four additional randomly selected vertical strips are inspected. To date, a total of 104 independent vertical strips along the height of the primary tank have been completed. A statistical analysis of the data indicates that at this coverage level there is a 99.5% confidence level that one of the worst 5% of all the vertical strips was inspected. That is, there is a relatively high likelihood that the SRS inspection program has covered one of the most corroded areas of any of the Type III/IIIA waste tanks. These data further support the conclusion that there are no significant indications of wall thinning or pitting. Random sampling will continue to increase the confidence that one of the worst 5% has been inspected. In order to obtain the additional vertical strips, and minimize budget and schedule impacts, data collection speed for the UT system was optimized. Prior to 2009, the system collected data at a rate of 32 square centimeters per minute. The scan rate was increased to 129 - 160 square centimeters per minute by increasing the scanner step and pixel sizes in the data acquisition set-up. Laboratory testing was utilized to optimize the scan index/pixel size such that the requirements for wall thinning and pit detection were still maintained. SRS continues to evaluate improvements to ultrasonic equipment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

H 2 -optimal transactive control of electric power regulation from fast-acting demand response in the presence of high renewables

Here, this paper presents an H 2 -optimal power regulation scheme for balancing authorities to provide regulation services using both generation and load resources in the presence of a significant amount of intermittent renewable generation. The optimal controller is designed to minimize the loss of total economic surplus due to deviations from the schedule because of generation contingencies. The results show that the optimal controller outperforms the conventional ACE control policy by (1) providing faster return to the schedule under varying demand response levels, (2) reducing the cost of using reserve units for regulation services, and (3) minimizing deviations from the global surplus-maximizing schedule.

24 POWER TRANSMISSION AND DISTRIBUTION↗

TRANSFORMING THE SRS ENVIRONMENTAL BUSINESS: COMMUNICATION AND APPLIED PROJECT MANAGEMENT PRINCIPLES

A process for communicating information relating to core business functions that also encourages improving internal communications has been established at SRS. This process continues to grow and strengthen as the multiple Contractors, Regulators and DOE-SR relationships mature. A number of management communication tools have been initiated, retooled, rebooted or continued with enhancements to ensure appropriate information is communicated to all levels with environmental responsibility at SRS. The types of information that are the focus of this improved process are feedback from the customer and from informational exchange forums (i.e., Challenge Opportunity and Resolution (COR), SRS Regulatory Integration Team (SRIT), Environmental Quality Management Division (EQMD), Senior Environmental Managers Council (SEMC), etc.). These forums, SRS environmental functions centralization, and the creation of a Regulatory Integration process allows for cross-functional decision making, problem solving and information sharing that involves the field organizations, Environmental Compliance Authorities (ECA), Subject Matter Experts (SME), DOE and the Regulators. Numerous examples of effective decision-making and problem solving will be shared. Lessons Learned involving inadequate communications and the resulting impacts on the environment, customer satisfaction, and relationships will also be discussed. Additionally, the focus on improved communications also includes maintaining awareness of business activities. The tools being utilized to facilitate the continuing improvement of internal communications include weekly staff meetings for all individuals within the organization, quarterly ECA and SME meeting, quarterly Regulatory Integration & Environmental Services (RI&ES) All-Hands meetings hosted by the Director, bi-weekly EQMD and EQMD Lite meetings with the customer, bi-annual SRIT meetings, and COR meetings on an as need basis. In addition, an existing Required Reading Program is being formally utilized in RI&ES to ensure all individuals get formal notification of new/revised business documents. In all cases, the development of environmental communication topics that occur at SRS have a cost-scope-schedule basis that can be linked to delivery of environmental services.

99 GENERAL AND MISCELLANEOUS↗

Impact of Glen Canyon Generation Loss

Colorado River Basin hydropower generation has faced challenges due to droughts and ecological and social water requirements. Specifically, Glen Canyon hydropower generation fluctuates substantially with recent extreme weather trends. Further, the western grid evolves with higher wind and solar share, and Glen Canyon hydropower's contribution to grid flexibility services is essential. The Western Area Power Administration (WAPA) markets and schedules electricity production at GCD, and the loss of this power could have significant financial consequences for the WAPA Colorado River Storage Project's (CRSP) Office because it may need to purchase relatively large amounts of energy to serve its firm electrical obligations. In addition, GCD provides grid reliability services for the WAPA Colorado-Missouri (WACM) balancing authority (BA). Both WAPA and DOE's Water & Power Technology Office (WPTO) are interested in researching how these drier hydrological conditions will impact federal electrical energy production, the Western Electricity Coordinating Council (WECC) power grid, and the value of hydropower in the face of lower production. We study multiple hydrologic and power grid scenarios to understand the grid impacts of the loss of Glen Canyon generation. The study uses a production cost model, water resources planning models, water-centric grid models, and various data analytic techniques. The study progress presentation discusses the selection of probable CRSP' hydropower scenarios and power grid scenarios to understand the impacts of Glen Canyon generation, which includes technologies that compensate the Glen Canyon energy and ancillary services contributions, transmission availability, and energy local marginal prices at interested grid locations of WAPA operation.

droughts↗

Investigation of Stochastic Unit Commitment to Enable Advanced Flexibility Measures for High Shares of Solar PV

As the share of solar photovoltaics (PV) in the power system increases, there is a growing need for flexibility from multiple, possibly interdependent sources to adjust to PV's variability, uncertainty, and diurnal dependence. This paper investigates how stochastic unit commitment leveraging probabilistic solar forecasts can support other flexibility measures under high solar shares. We consider two flexibility measures relevant to day-ahead scheduling: battery energy time-shifting and solar ancillary service provision. Unit commitment and economic dispatch simulations are conducted on a realistic test system based on Texas using day-ahead solar trajectories. The benefits of the two flexibility measures are pronounced when the instantaneous solar share is high, offering cost savings of 10%-20% in the spring. For a Texas-sized system, this translates to hundreds of millions of dollars in cost savings once the installed PV capacity enables instantaneous solar shares regularly exceeding 40%. Using probabilistic forecasts also greatly increases the reliability of upward reserve provision from solar PV, reducing unserved reserves by 50%-100%. Both day-ahead forecast resolution and errors can impact system reliability at high solar shares, but the stochastic formulation has significant value, mitigating reliability impacts on over-forecast days.

ancillary services↗

DYnamic and Asynchronous Data Streamliner

DYAD aims to help sharing data files between producer and consumer job elements, especially between co-scheduled jobs or within an ensemble. DYAD provides the service by two components: a FLUX module and a I/O wraper set. DYAD transparently synchronizes file I/O between producer and consumer, and transfers data from the producer location to the consumer location managed by the service. Users only need to use the file path that is under the directory managed by the service.

Ahn, DongH↗

Investigation of Nonflammable Electrolytes for Behind-the-Meter Storage Batteries

Behind-the-Meter Storage (BTMS) is a battery-based, stationary energy storage system that is connected to the residential or industrial customer's side of the electrical grid utility service meter. BTMS systems enable consumers to (A) economically schedule charging and usage of stored energy, (B) store and use energy from on-site generation, especially from inconstant, renewable sources like solar and wind, and (C) avoid overloading the grid during peak hours via supplementation with stored energy. BTMS battery performance requirements and general priorities differentiate from other applications, like EVs, which has prompted the development of batteries with tailored electrode and electrolyte materials. These materials prioritize low cost, avoiding critical materials; longevity, achieving 8000 cycle and 20-year shelf lives; and importantly, high safety. Nonflammable electrolytes show promise to improve safety by mitigating thermal runaway, yet often come with sacrifices to battery performance. In this presentation (1) primary categories of nonflammable electrolytes will be discussed; (2) a rational design of experiment will be presented for efficient performance evaluation of several nonflammables electrolyte in BTMS-relevant battery chemistry, Li4Ti5O12- and LiNi0.90Mn0.10O2; and (3) preliminary results will be presented.

battery↗

Audit Report on Management Controls over the Use of Service Contracts at the Office of River Protection

The Department of Energy's (Department) Office of River Protection (ORP) is responsible for the storage, treatment, and disposal of over 53 million gallons of highly radioactive waste from over 40 years of plutonium production at the Hanford Site. Because of the diversity, complexity, and large scope of its mission, coupled with its small staff, ORP told us that it has found it necessary to engage in service contracts to obtain consulting services, technical expertise, and support staff. Federal policy generally permits contractors to perform a wide range of support service activities, including, in most situations, the drafting of Government documents subject to the review and approval of Federal employees. Federal policy issued by the Office of Management and Budget, however, prohibits contractors from drafting agency responses to Congressional inquiries and reports issued by the Office of Inspector General and Government Accountability Office (GAO) because they are so closely related to the public interest and provide the appearance of private influence. To provide a majority of its needed services, ORP issued a Blanket Purchase Agreement to Project Assistance Corporation (PAC) in 2003. Through the Blanket Purchase Agreement, ORP acquired services in the areas of project management, risk assessment, program assessment, quality assurance, safety, cost and schedule estimating, budgeting and finance, and engineering. PAC has, in turn, subcontracted with various other firms to obtain some of the services needed by ORP. From 2005 to 2008, the total annual cost for the contract with PAC had grown from $4.7 million to $9.2 million. Because of the extent of the services provided and growing costs of the contract, we conducted this review to determine whether ORP appropriately administered its contract with the Project Assistance Corporation. Our review disclosed that, in some instances, ORP had not appropriately administered all work performed under the PAC contract. Specifically, ORP allowed PAC employees to perform work that was inherently governmental and created situations where a potential conflict of interest occurred. Specifically: (1) ORP assigned PAC employees responsibility for providing information and responses to Congressional inquiries and reports issued by the GAO and the Department of Energy's Office of Inspector General (OIG); and (2) PAC employees were also allowed to perform functions that created potential conflicts of interest. ORP permitted PAC employees, for example, to develop statements of work and approve funding of work to be performed under PAC's own contract. We concluded that these problems occurred, at least in part, because ORP had not established controls necessary to effectively administer the PAC contract. Federal procurement regulations recommended that agencies provide additional management controls over contractors whose work has the potential to influence the action of government officials. ORP, however, had not implemented the controls specifically recommended in Federal policy guidance for administering contracts, including: (1) Performing conflict of interest reviews; and (2) Separating contractor and Department employees either physically or organizationally. By not effectively administering its contract with PAC, ORP increased the risk that decisions based on work performed by the contractor may not have been made in the best interests of the Department. For example, ORP increased the risk that approved work would be unnecessary or too costly. As we also recently noted in our report on 'Management Challenges at the Department of Energy' (DOE/IG-0808, December 2008), contract administration issues such as those discussed in this report remain a significant vulnerability. Continued efforts to improve this area are vitally important since the risk that contractors receive payments for unallowable costs could also increase as the Department expands its contracting activities under the American Recovery and Reinvestment Act. To its credit, however, ORP has recognized that there are weaknesses in its oversight of the PAC contract and is in the process of taking certain corrective actions. ORP indicated that it had reassigned responsibility to a Federal employee for responding to Congressional requests, GAO reviews, and OIG reports, and, planned to physically separate PAC employees from their government counterparts. While positive, those actions do not sufficiently address the issues identified in our report. Accordingly, we have made several recommendations designed to strengthen internal controls over this area.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗