Search NASA⌕ Search

SEARCH · Search NASA

Results for “Shutdown”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Analysis of the Hydrologic Response Associated With Shutdown and Restart of the 200-ZP-1 WMA T Tank Farm Pump-and-Treat System

This report examines possible hydrologic effects of pump-and-treat remediation actions and provides a detailed analysis of water-level measurements for selected 200-ZP-1 T Tank Farm pump-and-treat system monitor wells during a recent shutdown (May 1, 2008) and restart activity (June 4, 2008) involving extraction well 299-W11-46. Specifically, this report 1) applies to recently developed methods for removing barometric pressure fluctuations from well water-level measurements to enhance the detection of pump-and-treat system effects at selected monitor wells, 2) analyzes the barometric-corrected well water-level responses to determine large-scale hydraulic properties, and 3) assesses characteristics and conditions that influence hydrologic responses (both laterally and vertically) associated with pump-and-treat systems. The general findings presented in this report have universal application for unconfined and confined aquifer systems.

54 ENVIRONMENTAL SCIENCES↗

Plasma-surface interactions during tokamak disruptions and rapid shutdowns

Recent progress in understanding of disruptions and in developing methods to avoid disruption damage is presented. Nearly complete mitigation of conducted heat loads has been achieved with high-Z gas jet shutdown. The resulting local radiation heat flash melting in the main chamber might be a concern in ITER, especially with beryllium walls. During the current quench, significant vessel forces can occur due to halo currents I-halo; however, these are found to fall reliably below a boundary of (halo current fraction times halo current peaking factor) <0.7 both experimentally and numerically. Numerical simulations indicate that runaway electrons (REs) could cause serious damage to hard-to reach components in ITER, making their suppression a high priority. During the current quench, less than 20% of the density required for collisional suppression of REs appears to have been achieved. Collisional suppression of REs may have been achieved, however, in full-current RE beams with gas injection. (C) 2010 Elsevier B.V. All rights reserved.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Novel Hybrid Monte Carlo/Deterministic Technique for Shutdown Dose Rate Analyses of Fusion Energy Systems

The rigorous 2-step (R2S) method uses three-dimensional Monte Carlo transport simulations to calculate the shutdown dose rate (SDDR) in fusion reactors. Accurate full-scale R2S calculations are impractical in fusion reactors because they require calculating space- and energy-dependent neutron fluxes everywhere inside the reactor. The use of global Monte Carlo variance reduction techniques was suggested for accelerating the neutron transport calculation of the R2S method. The prohibitive computational costs of these approaches, which increase with the problem size and amount of shielding materials, inhibit their use in the accurate full-scale neutronics analyses of fusion reactors. This paper describes a novel hybrid Monte Carlo/deterministic technique that uses the Consistent Adjoint Driven Importance Sampling (CADIS) methodology but focuses on multi-step shielding calculations. The Multi-Step CADIS (MS-CADIS) method speeds up the Monte Carlo neutron calculation of the R2S method using an importance function that represents the importance of the neutrons to the final SDDR. Using a simplified example, preliminarily results showed that the use of MS-CADIS enhanced the efficiency of the neutron Monte Carlo simulation of an SDDR calculation by a factor of 550 compared to standard global variance reduction techniques, and that the increase over analog Monte Carlo is higher than 10,000.

hybrid Monte Carlo/deterministic↗

Benchmarking a Pronghorn Model of the Natural Convection Shutdown Heat Removal Test Facility Against STAR-CCM+ (Poster)

Summary Verification of Pronghorn’s Net Radiation Transfer via Code-to-Code comparison with STAR-CCM+. Comparison based on Natural Convection Shutdown Heat-Removal Test Facility (NSTF). Near-perfect agreement if conjugate heat transfer inside the riser channels is replaced by fixed temperature. Difference of up to 5K if conjugate heat transfer is modeled (correlation vs. full CFD).

97 MATHEMATICS AND COMPUTING↗

Validation of the integration of CFD and SAS4A/SASSYS-1: Analysis of EBR-II shutdown heat removal test 17

Recent analyses have demonstrated the need to model multidimensional phenomena, particularly thermal stratification in outlet plena, during safety analyses of loss-of-flow transients of certain liquid-metal cooled reactor designs. Therefore, Argonne's reactor systems safety code SAS4A/SASSYS-1 is being enhanced by integrating 3D computational fluid dynamics models of the plena. A validation exercise of the new tool is being performed by analyzing the protected loss-of-flow event demonstrated by the EBR-II Shutdown Heat Removal Test 17. In this analysis, the behavior of the coolant in the cold pool is modeled using the CFD code STAR-CCM+, while the remainder of the cooling system and the reactor core are modeled with SAS4A/SASSYS-1. This paper summarizes the code integration strategy and provides the predicted 3D temperature and velocity distributions inside the cold pool during SHRT-17. The results of the coupled analysis should be considered preliminary at this stage, as the exercise pointed to the need to improve the CFD model of the cold pool tank. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Initial Site-Specific Studies for Removing SNF from Six Shutdown Sites - 18042

The US Department of Energy (DOE) is exploring options for developing a large-scale transportation system for the safe transport of spent nuclear fuel (SNF) and high-level radioactive waste to future storage or disposal facilities. This complex, large-scale transportation system will involve coordinated, integrated activities. Interfaces with various transportation and non-transportation activities must be defined, and systems must be developed to ensure successful integration when the system becomes operational. To provide an understanding of the tasks and interfaces required for the complete de-inventory of particular sites where SNF is stored, DOE solicited bids from integrating contractors to develop initial site-specific de-inventory reports. The reports were developed for several nuclear power plant sites selected to represent a range of geographic locations, existing on-site SNF storage systems, and expected transportation modal options. Each report is presented in a self-contained narrative describing a potential campaign for removing all SNF and greater-than-class-C low-level radioactive waste (GTCC waste) from each specified site. Each study narrative includes site information; an analysis of the near-site transportation infrastructure; a concept of operations for the de-inventory; an estimated budget and schedule for the duration of operations; and a safety and security plan with site-specific considerations, emergency response considerations, and recommendations for the next steps DOE could take to de-inventory the site. The reports provide cost estimates for analytical purposes only; they do not attempt to specify the party or parties responsible for the costs. These reports present a first look at how an integrating contractor might recommend removing SNF from particular sites. They are written from the perspective of the contractor and do not represent DOE's plans. At this writing, six sites have been studied: - Connecticut Yankee, - Big Rock Point, - Humboldt Bay, - Maine Yankee, - Trojan, - Kewaunee. DOE may develop de-inventory reports for all reactor sites, with an initial focus on shutdown reactor sites. The order in which sites have been selected for study should not be considered an indicator of the order used by DOE to remove SNF from the sites. Since the SNF's destination is not important for the purpose of this work, DOE tasked the contractor with planning transportation of the SNF from the site to a generic railroad location in the approximate geographical center of the United States. These reports represent an initial study of the specific sites. Per the terms of the contract, the contractor was not permitted to engage in dialogue with power plant site personnel; near-site railroad personnel; or any local, state, or regional stakeholders about the studies. DOE provided site-specific data. The contractor was tasked to rely on past corporate experience, data available from DOE, and publicly available data when making site-specific recommendations for removing all SNF from each site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transition From Operation to Decommissioning with a Sudden Decision to Permanent Shutdown and with Parallel Operation On-site - 18559

In a short time the Swedish nuclear operator OKG have to shift from a operator of three nuclear power plants at one site to a company where both decommissioning and operation will take place in parallel for numerous of years as a result of a decision to permanently shut down two of the three reactors. The paper will be focusing on the challenges to change organization and mind-set from operations to decommissioning within parts of a company while still maintaining and developing the highest standard for the plant still in operation, and this in the combination with a decision of permanent shutdown earlier than expected. The paper will also address how OKG managed to create and maintain momentum in essential processes like permits, defueling and project planning before, during and short after the organization was changed and some of the employees had to leave the company. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Proven Safe and Effective Process for the Treatment of Bulk Sodium at Shutdown Reactors and Research Facilities - 18601

Elemental sodium is an alkaline metal that reacts when exposed to air or water. This reaction is exothermic in nature and presents the risk of attendant fire as well as hydrogen generation. Within the United States sodium was used in liquid metal fast breeder reactors (LMFBR) during the 1960's and 70's as a heat transfer medium for commercial, experimental and prototype reactors as well as for nuclear energy related research and development experiments due to the element's good thermal conductivity. Shutdown of these reactors and the end of these experiments present a challenge to decommissioning teams as the wastes associated with each project have different characteristics affecting treatment based on the sodium's origin as well as different volumes requiring treatment. French CEA (Commissariat a l'Energie Atomique) and FRAMATOME worked together in the 1980's to develop a treatment process called the NOAH (NaOH - sodium hydroxide) process for the disposal of large volumes of bulk sodium. This paper provides an overview of the treatment process, details past uses of the technology and discusses the process' applications within the United States Department of Energy complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

How to reduce Shutdown Dose Rates in ITER Diagnostics Equatorial Ports

The ITER vacuum vessel presents 54 access ports, arranged in three levels, where port plugs are inserted hosting different types of systems: test blanket modules, antennas, vacuum pumps, neutral beam injectors and diagnostics. At the equatorial level, nine out of the eighteen access ports present diagnostics port plugs, in which the diagnostics systems are deployed into three DSMs (Diagnostics Shield Modules). The DSMs, being a major constituent in volume of the port plugs, must help to fulfill the design target of Shutdown Dose Rates (SDDR) corresponding to 100 μSv.h{sup -1} after 10{sup 6} s of cooling time for planned in-situ maintenance operations in the port interspace. Additionally, the DSMs are largely responsible for the port plug drained weight limit of 45 T, which imposes limitations to the shielding technology. Up to now, all the proposed DSM designs combine differently stainless steel, water and/or B{sub 4}C as shielding to accommodate a maximum of 1.1 m{sup 3} of DSM bulk shield, contained into a L 1845 x W 518 x H 2011 mm stainless steel box weighting 5.8 T for each DSM. These proposals show insufficient shielding properties with respect to SDDR, while none of them satisfies currently the weight limit. However, during 2016, a new DSM concept has been developed, named 'modular DSM', with significant engineering advances and changes. The DSM length has been increased by 500 mm, up to 2345 mm. The SS box has been reduced to the minimum structure required, presenting the same weight while being larger and hosting a larger volume of bulk shielding inside. Thus, the volume of bulk shielding has been enlarged up to 1.5 m{sup 3} per DSM. The shielding technology is based on B{sub 4}C bricks deployed in SS trays that are attached to the vertical plates. This results in a bulk shielding made of 65% of B{sub 4}C, 10% SS and 25% void, with effective density of 2.4 g.cm{sup -3}. In summary, the modular DSM, without a weight increase, hosts extra 0.5 m3 of bulk shielding along an additional 500 mm of length, to be used with a light but highly neutron absorber, what allows fitting the weight limit of 45 T for the port plug once drained. From now, the non-modular DSMs will be referred as 'short DSMs'. The modular DSM's advantages with respect to the short DSM versions have shown that the DSMs design can be improved in generic approach, i.e. when the penetrations of the systems are not taken into consideration. A mention apart is required when port specific penetrations are considered. Provided that they will be an important radiation transmission path, their presence could significantly diminish the improvement. To clarify this issue, in this work we have carried out a nuclear analysis of the ITER equatorial port no. 11 integration considering the modular DSM. It is a first plasma port hosting the following 6 major diagnostics systems: Neutral Particle Analyzer (NPA), H-α monitor, Low Field Side (LFS) reflectometry, Visible - Ultraviolet divertor (VUV div), Visible - Ultraviolet core survey (VUV CS) and X-rays Crystal System (XRCS). For the baseline case, a SDDR matrix has been derived assigning responsibilities to the different EP no. 11 individual systems in terms of neutron flux transmission through them, and the related activation due to that neutron flux (activation of itself, but also of the rest of systems taken one by one). Different EP no. 11 configurations have been studied in addition to the baseline case. For example, the backfill of the port plug penetrations to protect all the empty space not required for systems sight. Another issue is the determination of the role of the Co impurity content minimization from 0.05 wt.% to 0.03 wt.% recently proposed. In this summary, only some results related to the baseline are given.

61 RADIATION PROTECTION AND DOSIMETRY↗

Analysis of Shutdown Dose Rate in Fusion Energy Systems Using Hybrid Monte Carlo/Deterministic Techniques - Paper 138

Accurate assessments of shutdown dose rate (SDDR) are critical to support operation, maintenance, and waste disposal planning and to guide possible design changes of critical components in fusion energy systems. An SDDR calculation involves three steps: 1. a neutron transport calculation to determine the space and energy neutron flux distributions, 2. an activation calculation for computing the photon source distribution, and 3. a photon transport calculation for the estimation of the final SDDR. A companion paper describes the challenges of SDDR computations in fusion energy systems and the status of the techniques that are currently being used in SDDR analysis. Of these techniques, the rigorous 2-step (R2S) computational system entails Monte Carlo (MC) neutron and photon transport calculations coupled with a comprehensive activation step using a dedicated inventory code and library. The use of global MC variance reduction techniques was suggested for accelerating the SDDR MC neutron transport calculation. These techniques, which attempt to calculate MC tallies with nearly uniform relative uncertainties in both the low-flux space-energy regions and the high-flux space-energy regions, do not preferentially focus the MC computational efforts toward space-energy regions of high importance to the final decay dose. The ability of these approaches to accurately predict SDDR is inhibited by their prohibitive computational costs, which will be on the order of thousands of processor-years for full-scale modeling of an entire fusion plant. The companion paper describes the theoretical background of the Multi-Step Consistent Adjoint Driven Importance Sampling (MS-CADIS) method, which has been proposed to speed up SDDR MC neutron calculations. The MS-CADIS method uses the CADIS method, which has been successfully used for more than a decade in shielding calculations, but focuses on multistep shielding calculations such as SDDR analyses. The companion paper also describes a new method for calculating the uncertainties in SDDR due to uncertainties in the MC neutron calculation. This new method of uncertainty propagation uses the MS-CADIS neutron adjoint source to propagate the uncertainties in the neutron fluxes to the SDDR. This paper describes the application of the MS-CADIS method for speeding up the SDDR MC calculations and for calculating the SDDR uncertainty due to the neutron flux uncertainties. A new metric for assessing the reliability of SDDR calculations was also suggested and used in this analysis. The ITER benchmark problem was used in this analysis. The problem resembles the configuration and geometrical arrangement of an upper port plug in ITER. The analysis compared the efficiency of the MS-CADIS method to the traditional approach of using global MC variance reduction techniques for speeding up SDDR MC neutron calculation. The application of the MS-CADIS method to SDDR calculations in fusion energy systems was tested using the ITER benchmark problem. Compared to the standard FW-CADIS method, the increase in the efficiency of the SDDR neutron MC calculation due to the use of the MS-CADIS method was between 18% and 69%. The MS-CADIS method also increases the fraction of non-zero-scoring mesh tally elements in the space-energy regions of high importance to the final SDDR. Implementation of the MS-CADIS method in the SCALE and the ADVANTG code systems is currently under way. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗

ECAR-7448 Rev 0 MARVEL Post-Shutdown Dose Analysis in the Upper Confinement

This report documents a bounding post-shutdown dose rates over time in the upper confinement area and above the top of the TREXc Pit Shield at the end of two years of operation of the MARVEL microreactor. The dose rates take into consideration the doses from the core fission products, the sodium-potassium coolant (NaK), the steel components, the Stirling engines, and the gallium eutectic (EGaInSn) secondary coolant. The MCNP model in this analysis is based on the 90% design of the MARVEL reactor from ECAR- 7447. Neutron fluence used as inputs to this analysis were calculated in ECAR-7447.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

The upgrade and re-validation of the Compact Muon Solenoid Electromagnetic Calorimeter Control and Safety Systems during the Second Long Shutdown of the Large Hadron Collider at CERN

The Electromagnetic Calorimeter (ECAL) is one of the subdetectors of the Compact Muon Solenoid (CMS), a general-purpose particle detector at the CERN Large Hadron Collider (LHC). The CMS ECAL Detector Control System (DCS) and the CMS ECAL Safety System (ESS) have supported the detector operations and ensured the detector’s integrity since the CMS commissioning phase, more than 10 years ago. Over this long period, several changes to both systems were necessary to correct issues, extend functionality and keep them in-line with current hardware technologies and the evolution of software platforms. Due to the constraints imposed on significant changes to a running system, major hardware and software upgrades were therefore deferred to the second LHC Long Shutdown (LS2). This paper presents the architectures of the CMS ECAL control and safety systems, discusses the ongoing and planned upgrades, details implementation processes and validation methods and highlights the expectations for the post-LS2 systems.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Estimate of pre-thermal quench non-thermal electron density profile during Ar pellet shutdowns of low-density target plasmas in DIII-D

The radial density profile of pre-thermal quench (pre-TQ) early-time runaway electrons (REs) is estimated by combining electron cyclotron emission (ECE) and soft x-ray (SXR) data during rapid shutdown of low-density (n e ≲ 10 13 cm -3 ) DIII-D target plasmas with cryogenic argon pellet injection. This technique is limited in these experiments to the pre-TQ phase and quickly loses validity during the TQ. Two different cases are studied: a high (10 keV) temperature target and a lower (4 keV) temperature target. The results indicate that early-time, low-energy (~10 keV) REs form ahead of the argon pellet as it enters the plasma, affecting the pellet ablation rate; it is hypothesized that this may be caused by rapid cross-field transport of argon ions ahead of the pellet. Fokker-Planck modeling of the two shots suggests that the RE current is quite significant during the pre-TQ phase (up to 50% of the total current). Comparison between modeled pre-TQ RE current and post-TQ RE current inferred from avalanche theory suggests that RE current increases during the high temperature target TQ but decreases during the low temperature target TQ. Here, the uncertainties in this estimate are large; but, if true, this suggests that TQ loss of REs can be larger than previously estimated in DIII-D.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Benchmark Simulation of the Natural Convection Shutdown Heat Removal Test Facility Using SAM

Natural convection systems are a promising method to passively remove heat from reactor cavities during loss of forced flow accident scenarios. In this work at Argonne National Laboratory (ANL), a highly instrumented Natural Convection Shutdown Heat Removal Test Facility (NSTF) was used to demonstrate the effectiveness of air-cooled natural convection systems. In previous work, RELAP5-3D simulations were performed on this facility with favorable comparisons to experiment for mass flow rate, pressure drop, air temperature increase, and air velocity. Both experimental and simulation efforts with this facility present a useful opportunity to perform a benchmark study with the System Analysis Module (SAM). SAM is an advanced thermal-hydraulic system code currently in development at ANL for advanced non-light water reactor safety analysis.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

ALICE upgrades during the LHC Long Shutdown 2

A Large Ion Collider Experiment (ALICE) has been conceived and constructed as a heavy-ion experiment at the LHC. During LHC Runs 1 and 2, it has produced a wide range of physics results using all collision systems available at the LHC. In order to best exploit new physics opportunities opening up with the upgraded LHC and new detector technologies, the experiment has undergone a major upgrade during the LHC Long Shutdown 2 (2019–2022). This comprises the move to continuous readout, the complete overhaul of core detectors, as well as a new online event processing farm with a redesigned online-offline software framework. These improvements will allow to record Pb-Pb collisions at rates up to 50 kHz, while ensuring sensitivity for signals without a triggerable signature.

47 OTHER INSTRUMENTATION↗

Shutdown Dose Rate Analysis Using the Multi-Step CADIS Method

The Multi-Step Consistent Adjoint Driven Importance Sampling (MS-CADIS) hybrid Monte Carlo (MC)/deterministic radiation transport method was proposed to speed up the shutdown dose rate (SDDR) neutron MC calculation using an importance function that represents the neutron importance to the final SDDR. This work applied the MS-CADIS method to the ITER SDDR benchmark problem. The MS-CADIS method was also used to calculate the SDDR uncertainty resulting from uncertainties in the MC neutron calculation and to determine the degree of undersampling in SDDR calculations because of the limited ability of the MC method to tally detailed spatial and energy distributions. The analysis that used the ITER benchmark problem compared the efficiency of the MS-CADIS method to the traditional approach of using global MC variance reduction techniques for speeding up SDDR neutron MC calculation. Compared to the standard Forward-Weighted-CADIS (FW-CADIS) method, the MS-CADIS method increased the efficiency of the SDDR neutron MC calculation by 69%. The MS-CADIS method also increased the fraction of nonzero scoring mesh tally elements in the space-energy regions of high importance to the final SDDR.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

The Multi-Step CADIS method for shutdown dose rate calculations and uncertainty propagation

Shutdown dose rate (SDDR) analysis requires (a) a neutron transport calculation to estimate neutron flux fields, (b) an activation calculation to compute radionuclide inventories and associated photon sources, and (c) a photon transport calculation to estimate final SDDR. In some applications, accurate full-scale Monte Carlo (MC) SDDR simulations are needed for very large systems with massive amounts of shielding materials. However, these simulations are impractical because calculation of space- and energy-dependent neutron fluxes throughout the structural materials is needed to estimate distribution of radioisotopes causing the SDDR. Biasing the neutron MC calculation using an importance function is not simple because it is difficult to explicitly express the response function, which depends on subsequent computational steps. Furthermore, the typical SDDR calculations do not consider how uncertainties in MC neutron calculation impact SDDR uncertainty, even though MC neutron calculation uncertainties usually dominate SDDR uncertainty.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗