The Integration of a Load Limiter to an Orbiter Over-Center Mechanism
This paper summarizes the design process used to relieve the predicted high loads on a Space Shuttle Orbiter mechanism prior to the STS-112 flight. The overloading of the mechanism was due to a dynamic response between the orbiter and payload that was specific to this payload s mass and attachment scheme. A solution was devised by adding a component that prevented overload of the mechanism. In addition, the introduction of the new component neither interfered with the normal operation nor required extra-vehicular activity from a crewmember. By utilizing rapid prototyping technology, engineers were able to verify clearances and feasibility while preparing to build the flight hardware. This design solution was successfully flown on STS-112 and STS-113.