Search NASA⌕ Search

SEARCH · Search NASA

Results for “Space Station Remote Manipulator System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Multiple manipulator control from orbiter for Space Station assembly

This paper discusses the assembly process of the Space Station Freedom. It is shown that the assembly of the Space Station will require 29 flights of the Space Shuttle Orbiter: six shuttle flights during the initial assembly stage when the Space Station will not have sufficient life-support capability; seven more flights before the Station will support human occupation independent of the presence of the Space Shuttle; and 16 more flights for achieving full operational capability. The shuttle systems to be used in the Space Station assembly are described together with the results of simulation and analyses. Special attention is given to the Space Shuttle Remote Manipulator System which will be available on all Shuttle flights to support the Space Station assembly.

Price, Charles R.↗

The NASA-LaRC Controls-Structures Interaction (CSI) technology program

One of the main difficulties encountered in the design and implementation of control systems for spacecraft is the interaction between the control system and the flexibility of the vehicle. This difficulty has resulted in problems for a multitude of spacecraft including the earliest U.S. spacecraft, Explorer I; the Orbiting Geophysical Observatory III; Mariner 10; Galileo; and the Hubble Telescope. Recognizing the importance of the issue, NASA has an ongoing Controls-Structures Interaction (CSI) technology program to develop the methodology to design optimally and simultaneously both the control system and the structure. The CSI program is a multicenter program involving research teams from NASA's Langley Research Center (LaRC), Jet Propulsion Laboratory (JPL), and Marshall Space Flight Center (MSFC). JPL's area of interest is in optics-class vehicles and MSFC's in astrophysics vehicles. The aim of this paper is to explain the ongoing activities at LaRC, which are of a theoretical, ground test, and flight test nature, with focus on applications to spacecraft with multiple experiment-pointing mounts, large space radiometers, Space Station Freedom (SSF), and the Space Shuttle Remote Manipulator System (RMS).

Anderson, Willard W.↗

Development of Japanese experiment module remote manipulator system

National Space Development Agency of Japan (NASDA) is developing the Japanese Experiment Module (JEM), as its contribution to the International Space Station. The JEM consists of the pressurized module (PM), the exposed facility (EF), the experiment logistics module pressurized section (ELM-PS), the experiment logistics module exposed section (ELM-ES) and the Remote Manipulator System (RMS). The JEMRMS services for the JEM EF, which is a space experiment platform, consists of the Main Arm (MA), the Small Fine Arm (SFA) and the RMS console. The MA handles the JEM EF payloads, the SFA and the JEM element, such as ELM-ES.

Matsueda, Tatsuo↗

A perspective on space robotics in Japan

This report summarizes the research and development status and perspective on space robotics in Japan. The R & D status emphasizes the current on-going projects at NASDA including the JEM Remote Manipulator System (JEMRMS) to be used on Space Station Freedom and the robotics experiments on Engineering Satellite 7 (ETS-7). As a future perspective, not only NASDA, but also ISAS and other government institutes have been promoting their own research in space robotics in order to support wide spread space activities in the future. Included in this future research is an autonomous satellite retrieval experiment, a dexterous robot experiment, an on-orbit servicing platform, an IVA robot, and several moon/planetary rovers proposed by NASDA or ISAS and other organizations.

Ohkami, Yoshiaki↗

Guidelines for the use of programmable display pushbuttons on the Space Station's telerobot control panel

Simulations of a Remote Manipulator System task on microcomputer prototypes were performed to establish guidelines for using programmable display pushbuttons (PDP) on a telerobot control panel. Simulations of control panels with and without PDP were conducted. It is shown that there is a statistically significant increase in the number of commands issued in the non-PDP control panel. Guidelines for using PDP panels are listed.

Stuart, Mark A.↗

Real Time Data System (RTDS)

Information is given in viewgraph form on the Real Time Data System (RTDS). Topics covered include applications to the Space Station Freedom, the Space Shuttle flight controllers, the Mission Control Center workstations, and the Remote Manipulator Systems (RMS). Also covered are the technology gap, pacing factors, and lessons learned during research.

Heindel, Troy A.↗

STS-108 Flight Day 2 Highlights

On this second day of the STS-108, Endeavour continues to approach the International Space Station. A camera on the end of the Remote Manipulator System robotic arm scans the side of Endeavour and shows the Rafaello Multipurpose Logistics Module.

Source record↗

Mobile remote manipulator vehicle system

A mobile remote manipulator system is disclosed for assembly, repair and logistics transport on, around and about a space station square bay truss structure. The vehicle is supported by a square track arrangement supported by guide pins integral with the space station truss structure and located at each truss node. Propulsion is provided by a central push-pull drive mechanism that extends out from the vehicle one full structural bay over the truss and locks drive rods into the guide pins. The draw bar is now retracted and the mobile remote manipulator system is pulled onto the next adjacent structural bay. Thus, translation of the vehicle is inchworm style. The drive bar can be locked onto two guide pins while the extendable draw bar is within the vehicle and then push the vehicle away one bay providing bidirectional push-pull drive. The track switches allow the vehicle to travel in two orthogonal directions over the truss structure which coupled with the bidirectional drive, allow movement in four directions on one plane. The top layer of this trilayered vehicle is a logistics platform. This platform is capable of 369 degees of rotation and will have two astronaut foot restraint platforms and a space crane integral.

Bush, Harold G.↗

Conceptual design of a mobile remote manipulator system

A mobile remote manipulator system has been identified as a necessary device for space station. A conceptual design for an MRMS is presented which features (1) tracks on the MRMS and guide pins only on the truss structure, (2) a push/pull drive mechanism which rotates to permit movement in four directions, and (3) spacecrane and mobile foot restraint manipulators (or arms). Operational and design features of the MRMS elements are described and illustrated. Concepts are also presented which permit rotating the operational plane of the MRMS through 90 deg. Such a system has been found to have great utility for initial space station construction, maintenance and repair, and to provide a construction capability for future station growth or large spacecraft assembly and/or servicing.

Bush, H. G.↗

Space Station Freedom automation and robotics: An assessment of the potential for increased productivity

This report presents the results of a study performed in support of the Space Station Freedom Advanced Development Program, under the sponsorship of the Space Station Engineering (Code MT), Office of Space Flight. The study consisted of the collection, compilation, and analysis of lessons learned, crew time requirements, and other factors influencing the application of advanced automation and robotics, with emphasis on potential improvements in productivity. The lessons learned data collected were based primarily on Skylab, Spacelab, and other Space Shuttle experiences, consisting principally of interviews with current and former crew members and other NASA personnel with relevant experience. The objectives of this report are to present a summary of this data and its analysis, and to present conclusions regarding promising areas for the application of advanced automation and robotics technology to the Space Station Freedom and the potential benefits in terms of increased productivity. In this study, primary emphasis was placed on advanced automation technology because of its fairly extensive utilization within private industry including the aerospace sector. In contrast, other than the Remote Manipulator System (RMS), there has been relatively limited experience with advanced robotics technology applicable to the Space Station. This report should be used as a guide and is not intended to be used as a substitute for official Astronaut Office crew positions on specific issues.

Weeks, David J.↗

Space Shuttle orbiter modifications to support Space Station Freedom

The modifications to the Space Shuttle orbiter required to support Space Station Freedom (SSF) assembly and operations are described. Attention is given to berthing modifications, Shuttle Remote Manipulator System upgrades, docking modifications, and Spacelab mission modifications. For SSF assembly missions, the Space Shuttle orbiter will transport elements of the SSF to a 28.5 deg inclination, 220 nm altitude (nominal) orbit.

Segert, Randall↗

Evolutionary space station fluids management strategies

Results are summarized for an 11-month study to define fluid storage and handling strategies and requirements for various specific mission case studies and their associated design impacts on the Space Station. There are a variety of fluid users which require a variety of fluids and use rates. Also, the cryogenic propellants required for NASA's STV, Planetary, and Code Z missions are enormous. The storage methods must accommodate fluids ranging from a high pressure gas or supercritical state fluid to a sub-cooled liquid (and superfluid helium). These requirements begin in the year 1994, reach a maximum of nearly 1800 metric tons in the year 2004, and trail off to the year 2018, as currently planned. It is conceivable that the cryogenic propellant needs for the STV and/or Lunar mission models will be met by LTCSF LH2/LO2 tanksets attached to the SS truss structure. Concepts and corresponding transfer and delivery operations have been presented for STV propellant provisioning from the SS. A growth orbit maneuvering vehicle (OMV) and associated servicing capability will be required to move tanksets from delivery launch vehicles to the SS or co-orbiting platforms. Also, appropriate changes to the software used for OMV operation are necessary to allow for the combined operation of the growth OMV. To support fluid management activities at the Space Station for the experimental payloads and propellant provisioning, there must be truss structure space allocated for fluid carriers and propellant tanksets, and substantial beam strengthening may be required. The Station must have two Mobile Remote Manipulator Systems (MRMS) and the growth OMV propellant handling operations for the STV at the SS. Propellant needs for the Planetary Initiatives and Code Z mission models will most likely be provided by co-orbiting propellant platform(s). Space Station impacts for Code Z mission fluid management activities will be minimal.

Source record↗

Space robotic experiment in JEM flight demonstration

Japan is collaborating on the multinational space station program. The JEM, Japanese Experiment Module, has both a pressurized module and an Exposed Facility (EF). JEM Remote Manipulator System (JEMRMS) will play a dominant role in handling/servicing payloads and the maintenance of the EF, and consists of two robotic arms, a main arm and a small fine arm. JEM Flight Demonstration (JFD) is a space robotics experiment using the prototype small fine arm to demonstrate its capability, prior to the Space Station operation. The small fine arm will be installed in the Space Shuttle cargo bay and operated by a crew from a dedicated workstation in the Aft Flight Deck of the orbiter.

Nagatomo, Masanori↗

Magnetic docking aid for orbiter to ISS docking

The present docking system for the Orbiter uses mechanical capture latches that are actuated by contact forces. The forces are generated when the two approaching masses collide at the docking mechanism. There is always a trade-off between having high enough momentum to effect capture and low enough momentum to avoid structural overload or unacceptable angular displacements. The use of the present docking system includes a contact thrusting maneuver that causes high docking loads to be included into Space Station. A magnetic docking aid has been developed to reduce the load s during docking. The magnetic docking aid is comprised of two extendible booms that are attached adjacent to the docking structure with electromagnets attached on the end of the boom. On the mating vehicle, two steel plates are attached. As the Orbiter approaches Space Station, the booms are extended, and the magnets attach to the actuated (without thrusting), by slowly driving the extendible booms to the stowed position, thus reacting the load into the booms. This results in a docking event that has lower loads induced into Space Station structure. This method also greatly simplifies the Station berthing tasks, since the Shuttle Remote Manipulation System (SRMS) arm need only place the element to be berthed on the magnets (no load required), rather than firing the Reaction Control System (RCS) jets to provide the required force for capture latch actuation. The Magnetic Docking Aid was development testing on a six degree-of-freedom (6 DOF) system at JSC.

Schneider, William C.↗

Proceedings of the 2nd Annual Conference on NASA/University Advanced Space Design Program

Topics discussed include: lunar transportation system, Mars rover, lunar fiberglass production, geosynchronous space stations, regenerative system for growing plants, lunar mining devices, lunar oxygen transporation system, mobile remote manipulator system, Mars exploration, launch/landing facility for a lunar base, and multi-megawatt nuclear power system.

Source record↗

Design, construction, and utilization of a space station assembled from 5-meter erectable struts

The primary characteristics of the 5-meter erectable truss is presented, which was baselined for the Space Station. The relatively large 5-meter truss dimension was chosen to provide a deep beam for high bending stiffness yet provide convenient mounting locations for space shuttle cargo bay size payloads which are approx. 14.5 ft (4.4 m) in diameter. Truss nodes and quick attachment erectable joints are described which provide for evolutionary three dimensional growth and for simple maintenance and repair. A mobile remote manipulator system is described which is provided to assist in station construction and maintenance. A discussion is also presented of the construction of the Space Station and the associated extravehicular active (EVA) time.

Mikulas, Martin M., Jr.↗

Orbiter Repair Maneuver Contingency Separation Methods and Analysis

Repairing damaged thermal protection system tile requires the Space Shuttle to be oriented such that repair platform access from the International Space Station (ISS) is possible. To do this, the Space Shuttle uses the Orbiter Repair Maneuver (ORM), which utilizes the Shuttle Remote Manipulator System (SRMS) to rotate the Space Shuttle in relation to the ISS, for extended periods of time. These positions cause difficulties and challenges to performing a safe separation (no collision or thruster plume damage to sensitive ISS structures) should an inadvertent release occur or a contingency procedure require it. To help protect for an SRMS failure or other failures, a method for separating without collision and the ability to redock to ISS from the ORM configuration was needed. The contingency ORM separation solution elegantly takes advantage of orbital mechanics between ISS and the separating Space Shuttle. By pitching the ISS down approximately 45 degrees, in a majority of the ORM repair positions, the altitude difference between the ISS and Space Shuttle center of gravity is maximized. This altitude difference results in different orbital energies (orbital periods) causing objects to separate from each other without requiring translational firings. Using this method, a safe contingency ORM separation is made possible in many odd positions even though some separation positions point high powered thrusters directly at fragile ISS and Soyuz solar arrays. Documented in this paper are the development simulations and procedures of the contingency ORM separation and the challenges encountered with large constraints to work around. Lastly, a method of returning to redock with the ISS to pick up the stranded crew members (or transfer the final crew members) is explained as well as the thruster and ISS loads analysis.

Machula, Michael↗