Search NASA⌕ Search

SEARCH · Search NASA

Results for “Stand-alone”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

An Advanced Pretreatment/Anaerobic Digestion (APAD) Technology for Increased Conversion of Sewage Sludge to Bio-natural Gas in Small-scale Wastewater Plants of less than Five tons Sewage Sludge a Day

The problem today of energy production from sewage sludge at small-scale is that conventional Anaerobic Digestion (AD) as used today at Wastewater Treatment Facilities (WWTF) produces too little energy for warrant use of the biogas. It further leaves 50% or more of the waste behind after the treatment. To overcome this problem, we proposed a novel concept based on Advanced Wet Oxidation & Steam Explosion (AWOEx) of the recalcitrant parts of sewage sludge left behind after AD. We further suggest upgrading biogas to renewable natural gas (RNG) using gaseous fermentation of biogas with hydrogen added by a new methanogen. Overall, the DOE funded Advanced Pretreatment & Anaerobic digestion (APAD) project showed significant improvements over current practice. The project demonstrated that AWOEx followed by AD significantly enhanced the carbon conversion efficiency from 37% to 62%, an increase of 68%. This is far higher than the metric for the specific FOA of an increase of 50%. Besides, the project showed high efficiency of our biological conversion of biogas into RNG when using a new isolate of Methanothermobacter wolfeii resulting in a 100% increased production of a refined biogas with maximum 5% CO2. With both AWOEx pretreatment and biogas upgrading, the project showed a CCE of ca. 83%, far higher than any previous work on sewage sludge. Besides over 200% higher amount of energy in the form of RNG, the APAD concept will reduce disposal cost due to significant reduction in the concentration of final sludge product after APAD. The APAD technology can operate as a bolt-on to a conventional AD plant for improving conversion of the residual organics after AD as done in this DOE project. It can further be implemented as a stand-alone process with AWOEx followed by AD for WWTF’s currently operating without AD.

09 BIOMASS FUELS↗

The ORNL Moderator Test Station Science Case

Oak Ridge National Laboratory (ORNL) hosts two world-leading slow neutron sources, the Spallation Neutron Source (SNS) and the High Flux Isotope Reactor (HFIR), and is currently developing the technical design for a Second Target Station (STS) for the SNS. Upon completion of the STS project, ORNL will be uniquely positioned to optimize each of its three neutron sources, the SNS First Target Station (FTS), the STS, and HFIR, in a complementary way. Among the essential aspects of a re-imagined FTS and the current STS design are high-brightness parahydrogen moderators—moderators which are optimized for high per-unit-area neutron brightness rather than integrated-across-large-area neutron intensity. The high-brightness moderators proposed for the STS will, for the brightness metric, significantly outperform the coupled moderators currently on the FTS for appropriately optimized neutron beamlines, provided the moderating hydrogen is converted to near-equilibrium levels of parahydrogen (approximately 99.8% at 20 K). The original FTS moderators, by contrast, were conservatively designed to be relatively insensitive to the exact ortho:para ratio, with a consequent loss in performance. As a result, a redesign of the FTS moderators assuming fully converted parahydrogen could result in significant performance improvements on the FTS coupled moderators, and more consistent performance over time for all hydrogen moderators. This “parahydrogen problem” is a long-standing challenge for the effective implementation of hydrogen cold moderators at high-power neutron sources. In addition, the development of new moderator concepts, whether based on previously unused materials, structured heterogeneous arrays, or even simply on changes in overall shape and size is significantly restricted at a large-scale production facility intended to use the resulting neutron beams. Accordingly, moderators for production neutron sources are often designed in a very conservative, low-risk fashion, even though this compromises the absolute neutronic performance. Advanced moderator concepts worthy of study include features that could not be tested without redesigning and redeploying the entire existing reflector, shielding, and neutron beamline installation, making such development efforts far more expensive than building a stand-alone test facility.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Optimized V1G and V2G Electric Vehicle Fleet Management and Grid Transaction at Marine Corps Air Station Miramar in San Diego, CA

The overall technical goal of the project was to demonstrate an all-electric bi-directional non-tactical fleet at Marine Corps Air Station (MCAS) Miramar that was integrated and controlled with other distributed energy resources (DERs) (i.e., PV, stationary battery, and building loads) to provide resilience to critical electric loads in the event of grid outages, to minimize charging costs, and to provide economic energy resources to electricity markets. In this project, the specific, technical objectives were: 1. Demonstrate that bi-directional electric vehicles can provide critical complementary services to fixed storage batteries in microgrid applications while performing function as non-tactical vehicles. 2. Demonstrate participation of bi-directional (V2G) and unidirectional (V1G) PEVs for demand management and minimization of charging costs. 3. Demonstrate integration of multiple DERs for grid service participation. US Marine Corps Air Station (MCAS) Miramar in San Diego was the site of this electric vehicle-to-microgrid-utility grid test and demonstration project. Existing microgrid assets in this study included (1) a public works building; (2) a 30-kW rooftop photovoltaic (PV) system and (3) a separate 250 kW carport PV system. In this project, six bi-directional V2G vans were located at the MCAS Miramar’s showcase building-scale microgrid to develop and test technical capabilities that V2G can provide in microgrid applications (e.g., cost reduction and resiliency). These resources provided aggregated demand management and simulated participation in current retail DR programs. The vehicles used in this demonstration were selected because they provided functionality that MCAS Miramar needed, 15 passenger transport and facilities work cargo carrying capacity, and bi-directional charging capability that the research project required. All vehicles in this study were manufactured and distributed by VIA Motors, Inc. There were six vehicles total and each was VIA’s VTRUX eREV V2G model, a modified General Motors Chevrolet 2500 2WD van. Three of the vans were configured as passenger vans and the other three were configured as cargo vans. Each van had an on-board bi-direcrtional inverter/charger, Bel Power Solutions model 350INVCHGT150-120-240-8G nominally rated at +/-15 kW. The VIA van’s charging connector follows the J1772 charging protocol. The bi-directional EVSEs demonstrated in this study were manufactured by Coritech, Inc. Each VGI-80-AC charging station enabled enhanced V2G charging capability to a Clipper Creek CS-100 charging module. The enhanced capabilities included ethernet communication following the SEP2.0 protocol with a distributed energy resource function set and an operator screen displaying real-time SOC, voltage, and current. The VGI-80-AC charging stations are classified as level 2 with a maximum current output of 80 A or effectively 19 kW. The VIA van’s onboard charger limited the charging and discharging power to 15 kW in each direction. A control computer was installed in the EWOC and connected to an existing monitor. The V2G control communication network was a completely stand-alone closed system that did not have any connection to any other networks on the base. A cybersecure remote communication connection was created with a cellular modem, firewall hardware, and a virtual private network configuration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

TuFF internal WRAP for Rapid Pipeline Repair (TuFF iWRAP)

The goal of “TuFF internal WRAP for Rapid Pipeline Repair” (TuFF iWRAP) program was to develop a novel material system and placement process to fabricate structural pipe within the existing deteriorated pipelines without disruption of gas delivery. The team (University of Delaware – Center for Composite Materials (UD-CCM) and Plitzie Inc.) addressed this challenge by developing a new material feedstock and pipe in pipe (PIP) repair strategy. This allows the potential for significant cost reduction and has minimum operational impact on gas customers. The new robotic based placement design allows discontinuous placement of pipe sections creating a stand-alone structural liner within the legacy pipeline without the need for pipe shutdown. Here, the material is supplied using a tethered material feeding system and is placed and UV cured with the internal Wound Rapid Automated Placement (iWRAP) system. This provides maximum placement efficiency capable of traversing 90 angle bends in 12-inch pipe and overall design customization to meet pipe repair requirements (e.g., variable wall thickness, bridging gaps, etc.). UV-curable fiber reinforced composite material has been optimized to meet structural performance and placement/cure times. Superior strength and fatigue life has been demonstrated by improving fiber-matrix adhesion using new fiber sizing for UV resins. Rapid cure approaches using new liner and resins have been evaluated with industry. The appropriate design of the section joints has been developed and tested. We estimate coating time to be ~100 hours per mile enabling typical pipe repair within 1 week.

03 NATURAL GAS↗

Capability Building Progression of an Insider Threat Mitigation Program at International Nuclear Power Plant

With threats to nuclear facilities continuously evolving, the development and implementation of insider threat mitigation programs is increasingly important. The Office of International Nuclear Security within the U.S. Department of Energy’s National Nuclear Security Administration (DOE/NNSA’s) developed the “Insider Threat Mitigation Program: Facility Implementation Handbook” to assist organizations to be better positioned to minimize the risks posed by malicious insiders. The handbook identified eight elements that contribute to the development and implementation of insider threat mitigation programs. This report outlines the development of a capability building progression of an insider threat mitigation program at international nuclear power plants. This information can be stand-alone or be accompanied by a technical exchange with subject matter experts to support development and implementation of programs with interested international partners.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Consistent $\overline{ν}$ evaluation for minor U isotopes with $\tt{CGMF}$

Following several successful prompt $\overline{ν}$ evaluations using $\tt{CGMF}$, including consistent evaluations for minor Pu isotopes, we detail in this report our efforts to perform a consistent $\overline{ν}$ evaluation for minor U isotopes during FY25. Although we have not yet produced a finalized evaluation, we present the progress that we have made towards such an evaluation for 232,233,234,236,237,239 U prompt $\overline{ν}$. Our milestone explicitly calls out evaluations for 233 U, 234 U, and 236 U, however, to better constrain the model with reliable experimental $\overline{ν}$ data, we also include 235 U and 238 U in the evaluation procedure. Then, we additionally produce evaluations for 232 U, 237 U and 239 U $\overline{ν}$ as a byproduct. Elsewhere, we will report our efforts on a stand-alone 233 U $\overline{ν}$ evaluation. This report is organized in the following manner. In Sec. 2, we briefly outline the updates to CGMF that were needed to be able to calculate all of these minor U fission reactions. The experimental data overview is given in Sec. 3. The evaluation methodology and results are presented in Secs. 4 and 5, respectively. Finally, we conclude and outline work for FY26 in Sec. 6.

07 ISOTOPE AND RADIATION SOURCES↗

Coupled Target-Beam-Moderator Optimization for the Second Target Station

This report describes the results for a coupled target-beam-moderator optimization analysis for the Second Target Station (STS) at ORNL's Spallation Neutron Source. This study is a continuation of the optimization analysis for the moderators in the preliminary design of STS performed in 2022. In the 2022 analysis the dimensions of the moderators are parameterized, while the target and the proton beam profile are kept constant. In this analysis the target height and the proton beam profile are added as parameters. This allows to study the coupled effects of changing target, moderator and beam dimensions. Similar to the 2022 analysis, this work is performed with an automated optimization workflow that uses the optimization toolbox DAKOTA, parameterized geometries in CREO and SpaceClaim, the unstructured mesh generation in Attila4MC, and the particle transport code MCNP6.2©. This workflow enables an efficient optimization using high-fidelity geometries. The main conclusions of this analysis are the following: • Coupled beam-target-moderator optimization provides a few additional percent performance gain over stand-alone moderator optimization. • The moderator performance is not very sensitive to the target height (between ≈60 and ≈80 mm) as long as the beam profile is chosen adequately. • The moderator performance is sensitive to the choice of beam spatial standard deviations, even when the footprint is kept constant. • The optimal moderator radius is the same for a beam footprint of 30 cm 2 , 62.5 cm 2 , and 90 cm 2 . Also the slope of the super-gaussian beam profile does not significantly impact the optimal moderator radius. • The optimal parameters and sensitivities are very similar to the 2022 optimization analysis. These results only indicate a a difference in the optimal radius of the cylindrical moderator, however, this has been corrected in the final design moderator optimization. The main purpose of this report is to document the simulations, results and lessons learned. The most impactful results are summarized in. We also note that the target geometry used in this work is not the final design.

43 PARTICLE ACCELERATORS↗

Synergistic Pathways for Water Security in Emerging Sectors: Data Centers and Modern Nuclear Facilities

Stand-alone data centers, nuclear-powered data centers, and novel nuclear facilities such as fusion plant and small modular reactors (SMRs) are rapidly expanding, water-intensive sectors that present a significant challenge to the water-for-energy nexus. Their large-scale consumption of water for cooling systems not only reduces downstream water quantity but also degrades quality, demanding an integrated approach by stakeholders to understand and address these impacts through infrastructure planning and development.

42 ENGINEERING↗

ILAMBv2.7 benchmarking results comparing E3SMv2.1 land-atmosphere coupled (BGCv2LNDATM) and stand alone land (ELM) simulations with CMIP6 emission driven historical simulations

This dataset contains land model benchmarking results for the Energy Exascale Earth System Model version 2.1 (E3SMv2.1), including outputs from both coupled biogeochemistry simulations and stand-alone land model simulations. These results are compared against several emission-driven historical simulations from the Coupled Model Intercomparison Project Phase 6 (CMIP6). Benchmarking was conducted using the International Land Model Benchmarking (ILAMB) package, version 2.7 (ILAMBv2.7). CMIP6 model outputs were sourced from the Earth System Grid Federation (ESGF), while the E3SMv2.1 results were derived from raw model outputs. These outputs underwent processing steps such as time serialization, conservative regridding, and data standardization to ensure comparability. For spatial interpolation, the Earth System Modeling Framework (ESMF) tool, ESMF_RegridWeightGen, was employed to generate regridding weights, enabling the transformation of E3SM’s native cubed-sphere grid to a regular latitude-longitude grid.

Feng, Sha [PNNL]↗

Probabilistic Evaluation of Geomechanical Risks in CO2 Storage: An Exploration of Caprock Integrity Metrics Using a Multilaminate Model

The probabilistic uncertainty assessment of geomechanical risk—specifically, caprock failure—attributable to CO2 injection, as presented in a simplified hypothetical geological model, was the focus of this study. Our approach amalgamates the implementation of a multilaminate model, the creation of a response surface model in conjunction with the Box–Behnken sampling design, the execution of associated numerical modeling experiments, and the utilization of Monte Carlo simulations. Probability distributions to encapsulate the inherent variability (elastic and mechanical properties of the caprock and reservoir) and uncertainty in prediction estimates (vertical displacement, total strain, and F value) were employed. Our findings reveal that the Young modulus of the caprock is a key factor controlling equivalent total strain but is insufficient as a stand-alone indicator of caprock integrity. It is confirmed that the caprock can accommodate significant deformation without failure, if it possesses a low Young’s modulus and high mechanical strength properties, such as the friction angle and uniaxial compressive strength. Similarly, vertical displacement was found to be an unreliable indicator for caprock integrity, as caprock failure can occur across a broad spectrum of vertical displacements, particularly when both the Young modulus and mechanical strength properties have wide ranges. This study introduces the F value as the most dependable indicator for caprock failure, although it is a theoretical attribute (the shortest distance between the Mohr circle and the nearest failure envelope used to measure the sensitivity to failure) and not physically measurable in the field. Deviatoric stress levels were found to vary based on stress regimes, with the maximum levels observed under extensive and compressive stress regimes. In conjunction with the use of the response surface method, this study demonstrates the efficacy of the multilaminate framework and the Mohr–Coulomb constitutive model in providing a simplified, yet effective, probabilistic model of the mechanical behavior of caprock failure, reducing mathematical and computational complexities.

Energy & Fuels↗

Hybrid Fuel Cell Systems for Heavy-Duty Trucks: Configuration, Heat Rejection, and Performance

Low-temperature polymer electrolyte membrane fuel cell systems can achieve higher efficiency than diesel engines, but heat rejection remains a major challenge in class-8 heavy-duty fuel cell trucks. For the same rated power, the radiator heat load is greater than that in a diesel engine, while the allowable operating temperatures are lower. This work proposes and evaluates 400 kWe fuel cell–battery hybrid (FCH) platforms and operating strategies that manage heat rejection without enlarging the radiator frontal area. Three FCH platforms are identified, each varying in fuel cell system (FCS) rated power, battery energy storage system (ESS) capacity, and maximum stack coolant exit temperature (T h1 ). All three satisfy key system and vehicle requirements, including 175 kWe FCS power at top sustained speed, 400 kWe FCH power on a 6% grade climb, a target stack power density (PD) of 750 mW e /cm 2 , and heat rejection constraints. The first FCH has the smallest FCS, the largest ESS, and a T h1 of 90 °C. The second achieves the highest PD of 840 mW e /cm 2 at a T h1 of 95 °C. The third has the largest FCS, the smallest ESS, and a T h1 of 102 °C. At a Th1 of 115 °C, the platform can be configured as a stand-alone 400 kWe(net) FCS without hybridization, but the achievable PD drops to 460 mW e /cm 2 .

25 ENERGY STORAGE↗

Measurements and Prediction of Ash Deposition in a Cyclone-Fired Boiler Operating under Variable Load Conditions

Measurements of ash deposition rates were made between the secondary superheater and reheater sections of a 450 MW cyclone-fired lignite boiler as the operational load varied from 33 to 100%. Significant reductions in deposition rates with a decrease in operational load were observed. To uncover the causative mechanisms behind these observations, operational data from the power plant were used to carry out computational fluid dynamic (CFD) simulations of the boiler. After ascertaining that the gas temperatures and velocities at various sections within the boiler were being represented adequately, decoupled simulations of the ash deposition process on the deposit probe were carried out using a finely resolved boundary layer mesh. Fly ash particle size distribution (PSD) and its concentration for the decoupled calculations were determined from stand-alone cyclone barrel simulations. The ash partitioning (mass %) between the fly ash and slag was found to be ~50:50, which was in line with previous field observations, and it did not vary significantly across different cyclone loads. The predicted PSD of the deposit ash was concentrated in the size range 10–30 microns, which was in agreement with cross-sectional images of the deposit obtained from the measurements. At lower loads, sharp variations in the deposition rates were predicted in the gas temperature range 950–1150 K. The particle kinetic energy—particle viscosity-based capture methodology utilized in this study in conjunction with appropriate ash compositions, ash viscosity models and gas temperature estimates can help estimate slagging propensities at different loads reasonably well in these systems.

Krishnamoorthy, Gautham (ORCID:0000000255205092)↗

Radio Frequency Properties of a 3D Printed Klystron Circuit

The manufacturing of active RF devices like klystrons is dominated by expensive and time-consuming cycles of machining and brazing. In this article, we characterize the RF properties of X-band klystron cavities and an integrated circuit manufactured with a novel additive manufacturing process. Parts are 3D printed in 316 L stainless steel with direct metal laser sintering, electroplated in copper, and brazed in one simple braze cycle. Stand-alone test cavities and integrated circuit cavities were measured throughout the manufacturing process. The un-tuned cavity frequency varies by less than 5% of the intended frequency, and Q factors reach above 1200. A tuning study was performed, and unoptimized tuning pins achieved a tuning range of 138 MHz without compromising Q. Klystron system performance was simulated with as-built cavity parameters and realistic tuning. Together, these results show promise that this process can be used to cheaply and quickly manufacture a new generation of highly integrated high power vacuum devices.

3D printing↗

A Review on Progress, Challenges, and Prospects of Material Jetting of Copper and Tungsten

Copper (Cu) and tungsten (W) possess exceptional electrical and thermal conductivity properties, making them suitable candidates for applications such as interconnects and thermal conductivity enhancements. Solution-based additive manufacturing (SBAM) offers unique advantages, including patterning capabilities, cost-effectiveness, and scalability among the various methods for manufacturing Cu and W-based films and structures. In particular, SBAM material jetting techniques, such as inkjet printing (IJP), direct ink writing (DIW), and aerosol jet printing (AJP), present a promising approach for design freedom, low material wastes, and versatility as either stand-alone printers or integrated with powder bed-based metal additive manufacturing (MAM). Thus, this review summarizes recent advancements in solution-processed Cu and W, focusing on IJP, DIW, and AJP techniques. The discussion encompasses general aspects, current status, challenges, and recent research highlights. Furthermore, this paper addresses integrating material jetting techniques with powder bed-based MAM to fabricate functional alloys and multi-material structures. Finally, the factors influencing large-scale fabrication and potential prospects in this area are explored.

36 MATERIALS SCIENCE↗

On the predictability of turbulent fluxes from land: PLUMBER2 MIP experimental description and preliminary results

Accurate representation of the turbulent exchange of carbon, water, and heat between the land surface and the atmosphere is critical for modelling global energy, water, and carbon cycles in both future climate projections and weather forecasts. Evaluation of models' ability to do this is performed in a wide range of simulation environments, often without explicit consideration of the degree of observational constraint or uncertainty and typically without quantification of benchmark performance expectations. We describe a Model Intercomparison Project (MIP) that attempts to resolve these shortcomings, comparing the surface turbulent heat flux predictions of around 20 different land models provided with in situ meteorological forcing evaluated with measured surface fluxes using quality-controlled data from 170 eddy-covariance-based flux tower sites. Predictions from seven out-of-sample empirical models are used to quantify the information available to land models in their forcing data and so the potential for land model performance improvement. Sites with unusual behaviour, complicated processes, poor data quality, or uncommon flux magnitude are more difficult to predict for both mechanistic and empirical models, providing a means of fairer assessment of land model performance. When examining observational uncertainty, model performance does not appear to improve in low-turbulence periods or with energy-balance-corrected flux tower data, and indeed some results raise questions about whether the energy balance correction process itself is appropriate. In all cases the results are broadly consistent, with simple out-of-sample empirical models, including linear regression, comfortably outperforming mechanistic land models. In all but two cases, latent heat flux and net ecosystem exchange of CO 2 are better predicted by land models than sensible heat flux, despite it seeming to have fewer physical controlling processes. Land models that are implemented in Earth system models also appear to perform notably better than stand-alone ecosystem (including demographic) models, at least in terms of the fluxes examined here. The approach we outline enables isolation of the locations and conditions under which model developers can know that a land model can improve, allowing information pathways and discrete parameterisations in models to be identified and targeted for future model development.

54 ENVIRONMENTAL SCIENCES↗

Sabathani Community Center Solar + Battery Resilience Hub

To meet south Minneapolis, Minnesota's clean energy goals, the community exploring opportunities to transition Sabathani Community Center into a resilience hub to provide critical community services during power outages, including shelter and warmth or cooling, continued food distribution services, and more. The National Renewable Energy Laboratory, through the U.S. Department of Energy's Communities LEAP (Local Energy Action Program) pilot, worked with Sabathani to quantify the costs and benefits of installing stand-alone solar photovoltaics (PV) and PV paired with battery systems to reduce energy costs, avoid emissions, and improve resilience.

battery energy storage system↗

Minneapolis American Indian Center Solar + Battery Resilience Hub

To meet south Minneapolis, Minnesota's clean energy goals, the community exploring opportunities to transition Minneapolis American Indian Center (MAIC) into a resilience hub to provide critical community services during power outages, including shelter and warmth or cooling, continued food distribution services, and more. The National Renewable Energy Laboratory, through the U.S. Department of Energy's Communities LEAP (Local Energy Action Program) pilot, worked with MAIC to quantify the costs and benefits of installing stand-alone solar photovoltaics (PV) and PV paired with battery systems to reduce energy costs, avoid emissions, and improve resilience.

BESS↗

Powering Data Centers with Clean Energy: A Techno-Economic Case Study of Nuclear and Renewable Energy Dependability

Rising data demands from artificial intelligence (AI) and large language models (LLMs) generating images, videos, and text have prompted increased need for larger and more robust data centers in the United States. Major companies interested in these larger data centers face the choice of linking them to existing regional grids, building stand-alone power supplies onsite, or a combination of both. The request, review, and approval process for new transmission lines to grids in the United States, however, has grown in recent years to times spans rivaling those of new construction for nuclear power plants. Building an islanded power supply for each data center is therefore becoming a prominent option. In this case study, several technologies are modeled in techno-economic simulations for long-term system costs subject to fixed electricity demand from a singular data center. A 250 MWe data center is assumed with additional 50 MWe for resiliency. Techno-economic simulations are conducted using the Holistic Energy Resource Optimization Network (HERON) software, which is a part of the Framework for Optimization of Resources and Economics (FORCE) tool suite. Technologies considered include solar, wind, lithium-ion batteries, and several types of nuclear reactors: large-scale reactors, small modular reactors, and microreactors. A low- and high-cost estimate for each technology is assumed to develop a range of expected economic performance. Low-cost estimates included several clean energy production tax credits. Different combinations of renewable energy generators with nuclear reactors are considered, ranging from a fully renewable-powered data center to a fully nuclear-powered data center. Historic time series of wind and solar availability from the Texas grid are used to train a reduced order model; this model then generates unique time series with similar characteristics of the training dataset. Multiple scenarios of weather and subsequent operations are simulated for each renewable-nuclear combination to determine total costs throughout the project lifetime. Fully renewable-powered configurations required large amounts of installed capacity (GW scale) in the simulations to meet the fixed demand of the data center. This is due to some scenarios in the historical dataset which captured low-wind and low-solar days, requiring over-building of these technologies as well as batteries to compensate for the low amounts of electricity generation. Fully nuclear-powered configurations outperformed the fully renewable and mixed renewable-nuclear configurations in terms of cost, with ranges between $1B and $10B in 2023 USDs compared to $40B+ for fully renewable configurations. Of the nuclear technologies, small modular reactors performed better economically than large-scale nuclear models due to lower projected capital costs, and both performed better than the microreactor models. These results demonstrate the applicability of firm, dispatchable electricity resources from baseload generators like nuclear power plants for operating facilities that run at constant power without daily variability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗