Search NASA⌕ Search

SEARCH · Search NASA

Results for “Stormwater”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

77 records · Page 5

Uranium Mill Tailings Radiation Control Act Title II DOE Due Diligence and Lessons Learned from a Previous Site Transfer - 20352

Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) established that a government agency will provide perpetual care for closed uranium and thorium ore-processing sites that were operating under an NRC source material license in 1978 or were licensed thereafter. Commercial owners (licensees) operating under an NRC or agreement state specific license when UMTRCA was passed are responsible for conducting reclamation of any byproduct material remaining from uranium-ore processing operations in accordance with an NRC or agreement state approved reclamation plan. Reclamation includes both surface and groundwater remedies. Upon completion of reclamation and approval by NRC, the site is required to be transferred to either the host state or the DOE for long-term surveillance and maintenance. Since UMTRCA's enactment, six Title II sites have been transferred to DOE; an additional 24 Title II sites are anticipated to be transferred before 2050. DoE's role mandated under UMTRCA Title II as the long-term care custodian is to perform 'monitoring, maintenance, and emergency measures necessary to protect the public health and safety.' UMTRCA requires that the licensee pay a long-term surveillance charge 'sufficient to cover the annual costs of site surveillance.' However, at some sites such as the Bluewater, New Mexico, Disposal Site, this mandate has required additional effort and expense by DOE, beyond the originally anticipated and intended scope within UMTRCA, but within the authority of DOE under UMTRCA. In 1997, the Bluewater site became the second UMTRCA Title II site to be transferred to DOE. The site was the location of a uranium mill operated from 1953 until 1982. The specific licensee began site reclamation in 1991, and by 1995 all tailings and contaminated materials were encapsulated in two tailings disposal cells and other disposal areas. In addition to surface contamination, milling activities impacted groundwater in the two upper aquifers. In 1989, the specific licensee attempted active groundwater remediation; however, no significant reduction in contaminant concentrations was observed. As a result, the specific licensee applied to NRC for alternate concentration limits (ACLs) in 1990, which were approved in 1996 as being protective, after additional corrective actions were performed. Since transfer of the Bluewater site to DOE, unforeseen challenges have occurred, requiring additional actions. The first challenge is the occurrence of surface depressions located on the northern section of the main tailings disposal cell. The depressions were first observed during DoE's initial inspection in 1998; however, evidence of these can be observed on satellite images taken prior to transfer. Since being first observed, the depressions have continued to grow both in depth and areal extent. Due to the design of the main tailings disposal cell, the depressions impede storm water from being effectively shed off the 101- hectare (250-acre) top slope of the main tailings disposal cell. Instead, storm water accumulates in the depressions, forming a large ephemeral pond that has stored up to 16.3 x 10{sup 6} liters (4.3 million gallons) of stormwater. The ponding poses a potential risk to the integrity of the main tailings disposal cell in the case of a large storm event, with the potential to cause the pond to overtop and erode the cover material and underlying waste. DOE has taken a number of short-term actions to monitor, measure, and reduce the ponding and is currently working with the US Army Corps of Engineers to design and construct a repair. Additional challenges are associated with groundwater at the Bluewater site. Nine wells were present on the 1335-hectare (3300-acre) site upon transfer. Groundwater compliance was called into question after the State of New Mexico reduced its uranium groundwater standard from 5.0 to 0.03 milligrams per liter in 2004, and when an ACL for uranium was exceeded in a site monitoring well in 2010. Acquiring historical groundwater data and subsequent evaluations as well as additional DOE groundwater monitoring led to installing 10 new monitoring wells and performing additional site hydrogeology recharacterization. DOE continues to evaluate groundwater conditions at the site and works with the NRC to determine regulatory requirements and a path forward. As a result of lessons learned at the Bluewater site and other Title II sites, improved processes have been implemented at a programmatic level to increase due diligence before site transfer and prevent similar issues from occurring at other UMTRCA Title II sites under long-term management. DoE's due diligence process is documented in the Process for Transition of UMTRCA Title II Disposal Sites to DOE for Long-Term Surveillance and Maintenance and is designed to ensure that DOE has no technical or compliance concerns with regulatory decisions that might compromise protectiveness following site transfer to DOE. Implementation of the due diligence process has increased DoE's role prior to site transfer and has been effective in identifying potential issues. Actions by NRC and specific licensees, in response to enhanced due diligence efforts by DOE, are expected to minimize, if not totally prevent, the need for unanticipated actions by DOE pertaining to the surface and groundwater remedies after site transfer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Opportunities to Implement Solutions to Achieve Remedial Action Objectives in Consideration of Stakeholder Interests - 20365

A case study in the implementation of a soils excavation and removal project conducted at a Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) vicinity property; an active commercial business, in a densely populated area, with significant operational, technical and, logistical constraints that were expected to limit areas that could be remediated. The United States Army Corps of Engineers-led (USACE) team successfully navigated complex overlapping stakeholder interests to achieve a more efficient and complete removal of contaminated soils and debris while minimizing unnecessary excess costs to the Government. This paper centers on FUSRAP activities at the FMSS vicinity property located at 149-151 Maywood Avenue, Maywood, Bergen County, New Jersey. For most of its FUSRAP history, this ∼109,000 square meter (27-acre) property housed a now-demolished ∼26,000 square meter (6.5-acre) warehouse operated by Sears Logistics Services, a unit of the Sears Roebuck Company (Figure 2). Sears ended its property lease and vacated the warehouse in December 2016. Given that long history and for the purposes of this paper, the property will be referred to as the 'Sears property' or simply 'the property.' The Sears property is approximately 109,000 square meters (27-acres) and is currently zoned for commercial use. The property is bound to the north and northwest by 100 West Hunter Avenue (the Stepan Company), to the northeast by 205 Maywood Avenue, to the east by Maywood Avenue, to the south by 23 West Howcroft Road, and to the west by businesses on NJ Route 17 and the NJ Route 17 roadway. Until December 2016, the property housed a warehouse and distribution center operated by Sears Logistical Services. On-site structures were demolished by the property owner in 2017. The warehouse covered the north section of the property along the Stepan Company property line. A railroad spur from the adjacent property now known as the Maywood Interim Storage Site (MISS) ended at the northeast corner of the warehouse. Wetlands were located east of the warehouse; the rest of the property was covered with paved parking lots and grassed areas. During remediation at the property, opportunities frequently arose where the project team was able to coordinate effectively with stakeholders to sequence remediation activities to facilitate removal of otherwise inaccessible soils and identify opportunities for materials reuse when supported by residual radiological and chemical levels. Some specific opportunities include: - remediating individual truck loading dock bays to maintain tenant operations; - working along a busy highway and in a utility corridor containing a 30-inch high pressure gas main; - remediating Lodi Brook and associated wetlands requiring bypass pumping and other diversionary structures to maintain local community stormwater drainage; - protecting during remediation and supporting access to facilitate tenant/owner maintenance of critical fire protection and water supply system service lines buried in contaminated soils and necessary for safe warehouse operations; and - coordinating with stakeholders to ensure non-radiological contaminants of concern for the site (unaffiliated with FUSRAP) were addressed by the responsible party in a manner that maximized benefit to all parties while supporting an efficient overall site remediation program. Once the property was vacant and the warehouse structure and radiologically non-impacted above-grade structures were demolished, the project identified an opportunity to significantly reduce the volume of waste associated with the foundation of the former warehouse, a foundation suspected of being partially constructed in radiologically contaminated soils. The project developed and implemented supplemental radiological verification survey and sampling strategies based on radiological cross-contamination risk potential with process flow-charts and screening-level based decision points; a program that classified saw-cut sections of concrete based on observed residual surface radioactivity conditions using a combination of gamma sensitive sodium-iodide scans and beta sensitive Geiger-Muller direct measurements. The proposed approach was reviewed with stakeholders with feedback, including consideration of applicable State of New Jersey Site Remediation Program criteria and guidance before implementation. Once classified, additional sampling was performed at frequencies driven by screening. The sampling methods, stockpile sampling frequencies, criteria and, approach to data evaluation were developed in consideration of existing site cleanup standards, regional background ranges, State of New Jersey radiological remediation program guidance, and specific stakeholder input With the property remediation and survey efforts nearly completed, it is relevant to examine retrospectively the objectives, assumptions and limitations in the remedial design (i.e., what was planned) versus what was able to be accomplished through effective teaming. Benefits to other environmental remediation site programs include better understanding of how to work effectively with stakeholders to achieve win-win outcomes, and approaches to site remediation, waste minimization and materials reuse that were successful in their overall outcomes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Utilization of Unmanned Aircraft Systems for Environmental Purposes at the Savannah River Site – 26578

Born in the 1950s, the Savannah River Plant was constructed as a plutonium and tritium production plant. As the Cold War era came and went, a change of direction was signaled when the name of the facility changed from Savannah River Plant to Savannah River Site (1989) – the main mission at Savannah River shifted from “production” to “cleanup.” The Department of Energy is responsible for managing the 310 square miles of land that is the Savannah River Site and the cleanup/remediation activities that occur. The Savannah River National Laboratory utilizes unmanned aircraft systems to assist with some of those environmental monitoring and remediation activities. One function of unmanned aircraft systems at the Savannah River National Laboratory is conducting aerial photography and videography. Various infrastructure evaluations have been performed with unmanned aircraft – facility rooftop inspections, water tower lock verifications, earthen dam surveys, etc. An unmanned aircraft system has been used for progress footage of remediation projects – Dunbarton Bay remediation, Saltstone Disposal Unit construction, etc. Thermal cameras on an unmanned aircraft system are used to help identify cracks/leaks in structures from vantage points not readily accessible by personnel. Virtual tours of different waste units are conducted with unmanned aircraft systems for Site groups and federal/state regulators to save costs and travel time. Additionally, advanced remote sensing technologies are used on unmanned aircraft systems at the Savannah River Site. Light Detection and Ranging uses laser pulses to measure distances to the Earth's surface or other targets to create highly detailed topographic maps that accurately portray terrain (e.g., elevation changes, slopes, and contours). Data collection with a Light Detection and Ranging unit mounted on an unmanned aircraft system is quick and efficient – large-area surveys are conducted in shorter time frames. Because Light Detection and Ranging can penetrate through foliage and vegetation to ground level, it is being used in conjunction with a watershed model to study the General Separations Area of the Site to determine stormwater flow volume and direction, monitor stream stability, and forecast river flow behavior. A hyperspectral camera captures a wide spectrum of electromagnetic wavelengths across numerous narrow bands, beyond what the human eye can see. It provides detailed spectral information about the objects or surfaces in an image, which can be used to identify and analyze materials based on their spectral signatures. A hyperspectral camera mounted on an unmanned aircraft system has been used at the Savannah River Site for non-destructive evaluation of concrete and concrete structures. Unmanned aircraft systems at the Savannah River Site are also used for the application of herbicide on identified rooftops. P-Reactor and R-Reactor are entombed nuclear reactors at the Savannah River Site. Unwanted vegetation is often present on these rooftops – over time roots can penetrate seams, cracks, and joints of the general roof and concrete caps, leading to water ingress and deterioration of the structural components. For time and cost efficiencies as well as in the interest of personnel safety, an unmanned aircraft is used to dispense herbicide on rooftop areas where vegetation is noticed to help alleviate the issues/hazards.

Lorier, Troy [Savannah River National Laboratory (↗

Integrating Contaminant Source Indicators, Water Quality Measures, and Ecotoxicity to Characterize Contaminant Mixtures and Per- and Polyfluoroalkyl Substance (PFAS) Variability in an Urban Watershed

Thousands of chemical contaminants threaten watersheds but are time and cost prohibitive to monitor. Identifying their sources, transport, and ecological risk is limited in heterogeneous urban watersheds. We present an integrative watershed approach using source-specific indicator compounds, common water quality measures, and ecotoxicity assays to examine the distribution of contaminant mixtures in an urbanized watershed. Indicator compound concentrations were temporally and spatially distributed for treated/untreated sewage (sucralose, artificial sweetener), road runoff (diphenyl-guanidine [DPG] and 6PPD-quinone [6PPD-Q], automobile tire additives), and lawncare runoff (aminomethanephosphonic acid (AMPA), major degradant of the herbicide glyphosate). Sucralose was predominately sourced from treated wastewater; measurable concentrations in tributaries indicated raw sewage inputs. DPG and 6PPD-Q concentrations correlated to road density during base flow and were elevated during stormflow. AMPA was measurable spring through fall, especially where lawns were dense. When specific sources dominated flow, water quality measures correlated with wastewater (sulfate, potassium, chloride, and sodium) and road runoff (chromium and lead) indicators. The limited behavioral toxicity observed in exposed zebrafish (Danio rerio) (18%) was not well explained by source-indicators. PFAS concentrations were highly variable spatially but not well explained by our source-specific indicator compounds. Here, more costly compound-specific monitoring may be necessary when multiple sources exist or when unexpected toxicity trends occur.

computer simulations↗

Vegetation Management Lessons Learned and Helpful Tools

The InSPIRE Project is investigating questions around vegetation management and agrivoltaics at solar sites across the US. Results from research at three Enel Green Power pollinator-friendly solar sites in Minnesota have shown that the success of different pollinator-friendly seed mixes depend on the ecoregion and can vary from site to site. Results from the Enel Green Power sites also showed that weed coverage decreases dramatically by three years post seeding. The InSPIRE project has also created resources like The 5 C's of Agrivoltaics and an online agrivoltaics financial calculator to help farmers, land owners, developers, and facility operators with vegetation management at solar facilities. The PV-SMaRT calculator was created by the University of Minnesota in partnership with NREL to help with questions surrounding storm-water runoff at PV sites.

agrivoltaic↗